Week 18 Jim Buck Activities Completed Peggy Chalker * Structural Steel: Sequence 1 Floor & Roof Decking Southern State * Structural Steel: Sequence 2 Roof Joists * Structural Steel: Sequence 2 Floor & Roof Decking * Structural Steel: Sequence 3 Columns and Beams * Drilling and Pouring of Parking Lot Bases Jeff Kring OFCC Activities in Progress * Temporary Building Power Installation Paul Orban * Underground Plumbing and Electric Rough-In - WEST Derick Stadge * Structural Steel: Sequence 2 Screen Wall Framing Giancarlo Del Vita * Structural Steel: Sequence 3 Floor and Roof Joists BHDP * Village of Mt. Orab Water Line Connection * Site Electrical Rough-In and Light Pole Base Installation * Prep Slab on Grade (Stone) - WEST * Spreading Grass and No-Mow Seed to West side of Site * Grouting Light Pole Bases Dennis Phillips Justin Koenes Nathan Minnich-Weber Todd Clevinger Tyler Brumbaugh Upcoming Activities Quandel Construction * Installation of Nelson Studs for Floor Decking * Pour Slab-on-Grade - EAST Weekly Update Contact: * Prep and Pour Slab-on-Deck Nathan Minnich-Weber * Structural Steel: Sequence 3 Decking [email protected] (513) 200-7953 Progress photos attached, courtesy of Quandel Distribution List: Nicole Roades Kevin Boys

Upload: trinhtuyen

Post on 27-Jul-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Week 18Jim Buck

Activities CompletedPeggy Chalker * Structural Steel: Sequence 1 Floor & Roof DeckingSouthern State * Structural Steel: Sequence 2 Roof Joists

* Structural Steel: Sequence 2 Floor & Roof Decking* Structural Steel: Sequence 3 Columns and Beams* Drilling and Pouring of Parking Lot Bases

Jeff KringOFCC

Activities in Progress* Temporary Building Power Installation

Paul Orban * Underground Plumbing and Electric Rough-In - WESTDerick Stadge * Structural Steel: Sequence 2 Screen Wall FramingGiancarlo Del Vita * Structural Steel: Sequence 3 Floor and Roof JoistsBHDP * Village of Mt. Orab Water Line Connection

* Site Electrical Rough-In and Light Pole Base Installation* Prep Slab on Grade (Stone) - WEST* Spreading Grass and No-Mow Seed to West side of Site* Grouting Light Pole Bases

Dennis PhillipsJustin KoenesNathan Minnich-WeberTodd ClevingerTyler Brumbaugh Upcoming ActivitiesQuandel Construction * Installation of Nelson Studs for Floor Decking

* Pour Slab-on-Grade - EASTWeekly Update Contact: * Prep and Pour Slab-on-DeckNathan Minnich-Weber * Structural Steel: Sequence 3 [email protected](513) 200-7953

Progress photos attached, courtesy of Quandel

Distribution List:

Nicole RoadesKevin Boys

Mt. Orab Contractor Fusing Water Line Sleeve for Water Service

Mt. Orab Trenching for the Water Line Connection

Mt. Orab water Line Contractor Boring Under Brooks-Malott for Water Service

Detailing Steel in Sequence 3

Setting Galvanized Screen Wall Framing in Sequence 2

Second Floor Steel Decking Complete

Installing Perimeter Deck Angle

Welding Brace Angles

Ongoing Nelson Stud Installation

Laying Out Bar Joist Bridging in Sequence 3

Grouting Column Base Plates

Installing Underground Water Lines to Lab Desks

Water Lines with Flange Connections Completed

Branch Panel Feeders Installed in Mechanical Room

Installing Communication Conduit to Building

Installing Duke Transformer Pad

Installing Under Slab Branch Conduit

Starting the Backfill for the Underground Duct Bank Inside the Building

Starting Slab-on-Grade Stone at West Half of Building

Seeding the Site West of the Building

Prepping Soil for No Mow Seed Around Pond