activity summary: water supply - kaipara district · water rates are set to reflect the cost of...
TRANSCRIPT
Page 1 of 13 2302.19.07
Activity Profile Water Supply approved
Activity Summary: Water Supply
Activity name Water Supply
Activity description The Kaipara District Council operates four community Water Supply schemes for Dargaville (including Baylys), Glinks Gully, Ruawai,
and Maungaturoto. These schemes are for the purpose of providing these communities with a constant, adequate and sustainable
potable water supply. There is also a small scheme in Mangawhai.
The Council owns and maintains the whole Water Supply network. The Water Supply activity covering:
Collection of raw water
Treatment of raw water to produce suitable quality and quantities of drinking water
Distribution of treated water to the point of supply to the customer, to consistently meet specific flow, pressure and quality
standards. This includes water required for emergency fire-fighting services for urban area in Dargaville.
Council’s Water Supply activity also includes other responsibilities and through their professional and physical works contracts, Council
undertakes the following:
Asset Management
Customer Services
Treatment Plant Operation and Maintenance
Network Operations and Maintenance
Capital and Refurbishment Programme
Water Billing
Consent Monitoring and Compliance.
Activity Profile: Water Supply
Page 2 of 13 2302.19.07
Activity Profile Water Supply approved
Activity name Water Supply
Level of Service The supply of water is discretionary and defined by historic circumstances specific to the communities that comprise the District. The
preferred policy is that except where current systems supply to urban communities, households should expect to provide their own
Water Supply through harvesting of water.
The level of service for Water Supply is:
Council will continue to provide water as is currently supplied within the District.
Council will provide water to Drinking Water Standards for New Zealand 2005 (NZDWS) over the authorised timeframe.
Fault response time to outages will make up less than 1% of supply time.
Council will not extend its reticulation areas within the District to include new residential areas.
Where there are proposals for new commercial and industrial areas, Council will consider supporting that economic
development through the Water Supply as part of a rezoning proposal, on a cost-recovery basis.
Council will comply with Resource Consents in respect of water takes.
Contribution to
Community Outcomes
Council wants to work with the people in Kaipara to make it a place where it’s easy to live. When it’s easy, it will be easy to do
business here, easy to join in and easy to enjoy nature.
Water Supply services provided by Council support industry. For example, Council services are central to Silverfern Farms in
Dargaville and Fonterra in Maungaturoto.
Working within our consents ensures that the service does not impact negatively on the environment.
The challenge is to maintain the services at an affordable cost. Affordability is the biggest barrier for people maintaining a sense of
belonging and being able to join in with communities.
Activity delivery model Council will retain accountability for managing the Water Supply function in-house, with use of external services through two key
contracts:
Operations and Maintenance; carried out through a single multi-year contract (Contract 527).
Activity Profile: Water Supply
Page 3 of 13 2302.19.07
Activity Profile Water Supply approved
Activity name Water Supply
Professional Services; delivered through a separate multi-year contract (Contract 666).
The Professional Engineering Services Contract is provided within a larger contract that also covers Wastewater and Stormwater.
Contracts are due to be renewed in 2015/2016.
Service level issues: The Water Supply assets are in generally good shape with the exception of the network of pipes for the older schemes, which are
nearing the end of their effective lives and need renewal. The cost of renewing these assets will be high and need to be done in a
planned and affordable manner. Some small communities, serviced by old schemes, and the small Mangawhai scheme may find the
renewals required unaffordable.
The service levels as described will be applied to Dargaville (including Baylys), Maungaturoto and Ruawai schemes. There is a
six-year programme to gain better knowledge of the pipe assets that will enable a long-term renewal programme to be confirmed.
Meanwhile, these schemes will be kept in good working order.
The small schemes of Glinks Gully and Mangawhai will be reviewed over the next three years, when a decision on the future of these
schemes will be made. Meanwhile, these schemes will receive operational and response maintenance only. They will not be upgraded
to drinking water standards within the review period.
Other service level issues include:
A number of properties access raw water from takes in Dargaville, Maungaturoto and Mangawhai before it is treated to potable
standard.
Council does not consistently comply with all Resource Consent conditions for water takes.
Water taken from one of the sources for the Dargaville supply has no consents.
Security of supply for Dargaville is challenging during dry years. A pipeline from the Waiatua Dam at a cost of $2.8 million
would solve this (pencilled in for years 2016 onwards), but the Dargaville community may find it unaffordable.
Activity Profile: Water Supply
Page 4 of 13 2302.19.07
Activity Profile Water Supply approved
Activity name Water Supply
Risks The taking of raw water and Council charging for it is a risk, as it does not comply with NZDWS and Council would be liable for
health issues should they arise.
Ministry of Health may take legal action against Council if compliance with NZDWS is delayed (as planned for Glinks Gully and
Mangawhai Schemes).
Dargaville Water Supply has drought risks.
The renewals programme is currently based on affordability, rather than condition.
Asset knowledge (mainly pipes) is mixed. This, and the above mean that Council runs some risks of asset failure.
The Maungaturoto Scheme is experienced as expensive by older residents of the community. The Scheme was mainly
supplied to service Fonterra.
Funding source and
rationale
Funding:
Water Supply to be funded by targeted rates on the communities who receive the service, and some volumetric charges.
Rationale:
Water rates are set to reflect the cost of services and residents are charged on the amount of water used and this is reflected in
targeted rates.
Key policy and statutory
related cost drivers
Local Government Act 2002
The Health (Drinking Water) Amendment Act 2007
Drinking-water Standards for New Zealand 2000 and 2005
Resource Management Act 1991
Cost drivers for this activity are meeting compliance with Resource Consents and drinking water standards.
Activity Profile: Water Supply
Page 5 of 13 2302.19.07
Activity Profile Water Supply approved
Water Supply Asset Overview Summary
Co
mm
un
ity
Wate
r S
ou
rce
Po
int
Wate
r T
reatm
en
t P
lan
t
Pu
mp
Sta
tio
ns
Sto
rag
e
Reti
cu
lati
on
(km
)
Co
nn
ecti
on
Po
ints
(F
ire
hyd
ran
ts,
Valu
es, M
ete
rs)
Dargaville/Baylys 5 1 4 3 136 2,782 3,115
Maungaturoto 4 1 3 4 13 447 496
Ruawai 2 1 0 1 6.5 251 129
Glinks Gully 3 1 0 4 1.4 85 9
Mangawhai 1 0 0 5 2.9 18 14
Summary of Water Supply Asset Valuations 2013
Component Replacement Cost $
Depreciated Replacement Cost $
Annual Depreciation $
Dargaville/Baylys 46,786,098 15,945,127 735,195
Maungaturoto 17,241,373 9,061,429 260,037
Ruawai 2,672,342 1,048,715 70,556
Glinks Gully 755,269 441,466 12,380
Mangawhai 853,733 552,914 14,938
Water Supply Total $68,308,815 $27,049,651 $1,093,106
Page 6 of 13 2302.19.07
Activity Profile Water Supply approved
Measuring performance: Water Supply - Source – Long Term Plan 2012/2022 (pages 139 and140)
Performance indicator/ service level LTP Year 1 Target
2015/2016
LTP Year 2 Target
2016/2017
LTP Year 3 Target
2017/2018
LTP Years 4-10 Target
2018/2025
1. Safety of drinking water in accordance with DWS
2005 (2008).
The extent to which KDC’s drinking water supply
complies with:
(a) part 4 of the drinking-water standards (bacteria
compliance criteria), and
(b) part 5 of the drinking-water standards (protozoa
compliance criteria).
Dargaville Maungaturoto
Ruawai
Dargaville Maungaturoto
Ruawai
Dargaville Maungaturoto
Ruawai
Dargaville Maungaturoto
Ruawai
Dargaville Maungaturoto
Ruawai
Dargaville Maungaturoto
Ruawai
Dargaville Maungaturoto
Ruawai
Dargaville Maungaturoto
Ruawai
2. Maintenance of the reticulation network.
The percentage of real water loss from KDC’s
networked reticulation system
Source: Water Balance and Review for Kaipara District
Council dated January 2013
Note: Nationally adopted practices for calculating a
water balance (this includes the Infrastructure Leakage
Index) have been used in this exercise.
Dargaville 28%
Maungaturoto 33%
Ruawai 33%
Mangawhai 65%
Dargaville 25%
Maungaturoto 30%
Ruawai 30%
Mangawhai 30%
Dargaville 20%
Maungaturoto 25%
Ruawai 25%
Mangawhai 25%
Dargaville 20%
Maungaturoto 25%
Ruawai 25%
Mangawhai 25%
Activity Profile: Water Supply
Page 7 of 13 2302.19.07
Activity Profile Water Supply approved
Performance indicator/ service level LTP Year 1 Target
2015/2016
LTP Year 2 Target
2016/2017
LTP Year 3 Target
2017/2018
LTP Years 4-10 Target
2018/2025
3. Fault response times
Where KDC attends a call-out in response to a fault
or unplanned interruption to its networked reticulation
system, the following median response times
measured:
(a) attendance for urgent call-outs: from the time that
the local authority receives notification to the time
that service personnel reach the site, and
(b) resolution of urgent call-outs: from the time that the
local authority receives notification to the time that
service personnel confirm resolution of the fault or
interruption.
(c) attendance for non-urgent call-outs: from the time
that the local authority receives notification to the
time that service personnel reach the site, and
(d) resolution of non-urgent call-outs: from the time
that the local authority receives notification to the
time that service personnel confirm resolution of
the fault or interruption.
1 hour
2 hours
2 hours
3 days
1 hour
2 hours
2 hours
3 days
1 hour
2 hours
2 hours
3 days
1 hour
2 hours
2 hours
3 days
Activity Profile: Water Supply
Page 8 of 13 2302.19.07
Activity Profile Water Supply approved
Performance indicator/ service level LTP Year 1 Target
2015/2016
LTP Year 2 Target
2016/2017
LTP Year 3 Target
2017/2018
LTP Years 4-10 Target
2018/2025
4. Customer satisfaction.
The total number of complaints for the District received
by KDC about any of the following:
(a) drinking water clarity
(a) drinking water taste
(b) drinking water odour
(c) drinking water pressure or flow
(d) continuity of supply, and
(e) the local authority’s response time to any of these
issues.
5
6
4
18
8
24 hours
5
6
4
18
8
24 hours
5
6
4
18
8
24 hours
5
6
4
18
8
24 hours
5. Demand management.
The average consumption of drinking water per day per
resident within Kaipara District
= Billed Metered Consumption (m3) x 1000
No of connections x 365 x 2.5 (Occupancy rate)
Dargaville 275
Maungaturoto 340
Ruawai 130
Glinks Gully 52
Mangawhai 230
Dargaville 275
Maungaturoto 340
Ruawai 130
Glinks Gully 52
Mangawhai 230
Dargaville 275
Maungaturoto 340
Ruawai 130
Glinks Gully 52
Mangawhai 230
Dargaville 275
Maungaturoto 340
Ruawai 130
Glinks Gully 52
Mangawhai 230
6. Water Take Consents 100% compliance with
Northland Regional
Council Water Take
Consents
100% compliance with
Northland Regional
Council Water Take
Consents
100% compliance with
Northland Regional
Council Water Take
Consents
100% compliance with
Northland Regional
Council Water Take
Consents
Human Resources
Activity Profile Sub Profile 30/06/14 FTE 2014/15 FTE 2015/16 FTE 2016/17 FTE 2017/18 FTE 2019 + FTE
Water Services Water Supply 2 2 2 2 2 2
Activity Profile: Water Supply
Page 9 of 13 2302.19.07
Activity Profile Water Supply approved
Improvement Programme 2015/2025 – Water Supply
Year 1
Planned improvement
2015/2016
Capex Improvement Cost Estimate $
Dargaville: Renewals + Manage existing water source
and consents + Take consent compliance and DWS
compliance + LOS Backlog
1,175,000
Maungaturoto: Renewals + NZDWS compliance and
watertake consent compliance projects
228,000
Ruawai: Renewal + NZDWS compliance 41,500
Mangawhai: Water take consent compliance 1,500
Glinks Gully: Water take consent compliance 1,500
Total $1,447,500
Opex improvements
Condition Assessment of Water Supply – continuation 70,000
Improvement of Asset Information System (AssetFinda) 50,000
Hydraulic Modelling Water Supply 35,000
Total $155,000
Year 2 Planned improvement
2016/2017
CAPEX Improvement Cost Estimate $
Dargaville: Renewals + Water take consent compliance
and DWS compliance
755,000
Maungaturoto: Renewals + NZDWS compliance and
Water take consent compliance
153,000
Ruawai: Renewal + NZDWS compliance 41,500
Mangawhai: Water take consent compliance 1,500
Glinks Gully: Water take consent compliance 1,500
Total $952,500
Page 10 of 13 2302.19.07
Activity Profile Water Supply approved
Year 3
Planned improvement
2017/2018
CAPEX Improvement Cost Estimate
$
Dargaville: Renewals + Take consent compliance and
DWS compliance
743,000
Maungaturoto: Renewal + NZDWS compliance and
water take consent compliance
153,000
Ruawai: Renewal + NZDWS compliance 41,500
Mangawhai: Water take consent compliance 1,500
Glinks Gully: Water take consent compliance 1,500
Total $940,500
Years 4-10
Planned improvement
2018/2025
Water Supply
Capital Expenditure 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25
Dargaville & Baylys Beach 1,007,500.00 1,157,500.00 1,407,500.00 1,707,500.00 1,807,500.00 1,807,500.00 1,907,500.00
Glinks Gully 31,500.00 11,500.00 11,500.00 11,500.00 16,500.00 21,500.00 26,500.00
Ruawai 51,500.00 51,500.00 51,500.00 61,500.00 61,500.00 101,500.00 126,500.00
Maungaturoto 154,500.00 154,500.00 204,500.00 304,500.00 354,500.00 504,500.00 604,500.00
Mangawhai 51,500.00 11,500.00 11,500.00 11,500.00 16,500.00 21,500.00 26,500.00
Activity Profile: Water Supply
Page 11 of 13 2302.19.07
Activity Profile Water Supply approved
Financial Information – Water Supply
Funding Impact Statement – Operating
For the period commencing:
Annual
Plan Forecast Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget
1 July 2014-2015 2014-2015 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025
$'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000
Operating fundingSources of operating funding
General rates, uniform annual general
charges, rate penalties 0 0 0 0 0 0 0 0 0 0 0 0
Targeted rates (other than a targeted
rate for water supply) 0 0 0 0 0 0 0 0 0 0 0 0
Subsidies and grants for operating purposes 0 0 0 0 0 0 0 0 0 0 0 0
Fees, charges and targeted rates
for water supply 2,851 2,851 3,175 2,965 2,919 3,014 3,084 3,204 3,495 3,668 3,758 3,931
Internal charges and overheads recovered 0 0 0 0 0 0 0 0 0 0 0 0
Local authorities fuel tax, fines, infringe-
ment fees and other receipts 12 12 0 0 0 0 0 0 0 0 0 0
Total operating funding 2,863 2,863 3,175 2,965 2,919 3,014 3,084 3,204 3,495 3,668 3,758 3,931
Application of operating funding
Payments to staff and suppliers 1,120 1,208 1,059 815 749 800 779 805 883 864 897 989
Finance Costs 332 332 344 355 334 314 315 323 351 402 377 352
Internal charges and overheads applied 369 369 515 464 455 474 477 491 517 521 539 569
Other operating funding applications 0 0 0 0 0 0 0 0 0 0 0 0
Total applications of operating funding 1,821 1,909 1,918 1,634 1,538 1,588 1,571 1,619 1,751 1,787 1,813 1,910
Surplus (deficit) of operating funding 1,042 954 1,257 1,331 1,381 1,426 1,513 1,585 1,744 1,881 1,945 2,021
Page 12 of 13 2302.19.07
Activity Profile Water Supply approved
Funding Impact Statement - Capital
For the period commencing:
Annual
Plan Forecast Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget
1 July 2014-2015 2014-2015 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025
$'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000
Capital fundingSources of capital funding
Subsidies and grants for capital expenditure 0 0 0 0 0 0 0 0 0 0 0 0
Development and financial contributions 37 37 0 0 0 0 0 0 0 0 0 0
Increase (decrease) in debt 296 184 191 -325 -344 29 121 468 876 -405 -414 -427
Gross proceeds from sale of assets 0 0 0 0 0 0 0 0 0 0 0 0
Lump Sum Contributions 0 0 0 0 0 0 0 0 0 0 0 0
Total sources of capital funding 333 221 191 -325 -344 29 121 468 876 -405 -414 -427
Applications of capital funding
Capital Expenditure - to meet additional demand 148 148 0 0 0 0 0 0 0 0 0 0
Capital Expenditure - to improve the level of service 0 0 495 13 11 82 15 15 16 16 17 17
Capital Expenditure - to replace existing assets 1,227 1,027 953 989 1,016 1,372 1,590 2,002 2,581 2,883 3,259 3,716
Increase (decrease) in reserves 0 0 0 5 10 0 28 36 24 -1,424 -1,744 -2,139
Increase (decrease) of investments 0 0 0 0 0 0 0 0 0 0 0 0
Total applications of capital funding 1,375 1,175 1,448 1,007 1,037 1,454 1,633 2,053 2,621 1,475 1,532 1,594
Surplus (deficit) of capital funding -1,042 -954 -1,257 -1,332 -1,381 -1,425 -1,512 -1,585 -1,745 -1,880 -1,946 -2,021
Funding Balance 0 0 0 -1 0 1 1 0 -1 1 -1 0
Page 13 of 13 2302.19.07
Activity Profile Water Supply approved
Capital Expenditure Programme – Water Supply
For the period commencing:
Annual
Plan Budget Budget Budget
1 July 2014-2015 2015-2016 2016-2017 2017-2018
$'000 $'000 $'000 $'000
Dargaville
Raw water pipe bridge - Parore Street 59
Protection of raw water main - Rotu Stream 49 50
Replace pipe bridges - Awakino Point and Baylys Coast Road 59
Pipe Renewals 315 753 794 811
Manage ex water source & Ahikiwi 212
Waiatua Dam Improvements 49 50
Mamaranui Pump 19 20
Automate shut-off valve Water Treatment Plant 29 30
Gated Weir across Kaihu River or Waiatua Stream 59 60
Water meter renewal 20
Glinks Gully
Minor replacement projects 1 1 2 2
Mangawhai
Water Treatment Plant Upgrade 31 2 2 2
Maungaturoto
Upgrade Telemetry 50
Watermain upgrades 265 160 161 167
Renewal of Railway Village pipeline and bulk meters 100
Water take improvements 68
State Highway 12 Relocation Maungaturoto Town Water Main 60
Ruawai
Replace 1.2km of piping to meet fireflow requirements 190 42 43 45
Upgrade Telemetry 20
Total 1,375 1,448 1,002 1,027