Upper Garnock Valley Flood Protection Scheme
Overview and Detailed Design
![Page 2: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/2.jpg)
• Background and why we are here today
• Review of the scale of the flooding problem
• The Upper Garnock Scheme
• Work Unit 1 – Storage Area
• Work Unit 2 – Kilbirnie
• Work Unit 3 – Glengarnock
• Work Unit 4 – Dalry
• DSM
• Beith Road
• Railway
Overview of Presentation
![Page 3: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/3.jpg)
A study looked at the urban areas of Kilbirnie, Glengarnock and Dalry with regards to flood risk from the River Garnock and its tributaries. The Upper Garnock scheme will provide improved flood protection to these communities.
Background and Flood Risk Overview
![Page 4: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/4.jpg)
• The area has a long history of flooding.
• Since 1990’s 6 times in 17 years with significant flood events in
• October 1998• October 2000• August 2004• August 2008• September 2010• November 2010
Historical Flooding
![Page 5: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/5.jpg)
• Scheme developed to address flood risk to residents and business in the communities in the Upper Garnock Valley.
• Activate consultation with community and stakeholders
• Detailed numerical and physical modelling undertaken to develop scheme
• Extensive surveys taken to inform design• Ground Investigation• Services• Ecological
Development of the Flood Protection Scheme
![Page 6: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/6.jpg)
• Upstream storage
• Minor works in Kilbirnie
• Powgree Burn defences
• Dalry defences
The Upper Garnock Valley Flood Protection Scheme
![Page 7: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/7.jpg)
An area of suitable ground upstream of Kilbirnie has the potential to attenuate greater volume of flood water.
This will reduce peak flood flows in the downstream reaches of the River Garnock and reduce flood risk
Work Unit 1 – Flood Storage Area
![Page 8: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/8.jpg)
Upstream Storage
![Page 9: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/9.jpg)
• 300m long and up to 12m high• Approx. 500,000m3 of flood storage provided• Approx. 75,000m3 of imported material to
construct embankment• Bentonite Slurry cut off trench • Geo-synthetic clay liner water proof element• Rock fill embankment with topsoil surface• RC concrete inlet structure and culvert• Coarse Screen debris capture ( hard wood post)• Fish Pass
© Crown Copyright. All rights reserved. 2015. Ordnance Survey Licence number 100023393
On-line Storage on the River Garnock
![Page 10: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/10.jpg)
Key features:• Over the crest spillway for exceedance events
– pre cast concrete blocks• Grassed finish • Passive System with no mechanical parts• Flow control based on double baffle
arrangement to optimise storage usage• All Reservoir Panel Engineer needs to be
satisfied with the execution of the works -approvals at key stages
What will upstream storage look like?
![Page 11: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/11.jpg)
What will upstream storage look like?
![Page 12: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/12.jpg)
Overview of Storage Area Embankment
![Page 13: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/13.jpg)
Key Embankment Design Considerations:• GI findings• Suitability and availability of material• Cut off arrangement • Filtration arrangement within the
embankment • Settlement of the structure• Working within river and floodplain• ARPE approvals at key stages• Rigorous in-situ testing• The need for river diversion channel and the
agreement from APRE to allow partial impoundment before flows diverted to culvert
General Arrangement
![Page 14: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/14.jpg)
Embankment and Spillway
![Page 15: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/15.jpg)
Key Considerations:• Divert river to allow the structure to be built in the dry• Need for diversion channel to have sufficient capacity
to protect the works• Fish Passage• Staged construction of the inlet arrangement• The need for river diversion channel and the agreement
from APRE to allow partial impoundment before flows diverted to culvert
Culvert and Flow Control Inlet
![Page 16: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/16.jpg)
Key Considerations:• Fish Pass arrangement
based on proprietary Larinier fish pass.
Culvert Inlet Arrangement
![Page 17: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/17.jpg)
Key Considerations:• Hardwood Timber posts• Works in river and to be
carried out in line with CAR Licence requirements
Debris Capture
![Page 18: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/18.jpg)
Key Considerations:• High Voltage overhead cables• Access to the site• Working within river and floodplain• ARPE approvals at key stages• Accommodation works for adjacent farming operations• Land drainage reinstatement
• Approved agricultural drainage contractor (by landowner)
• Main access to site for materials is via Dipple Road. Secondary access from the west through the town.• Road widening and passing places together with
Traffic Management required in advance of bulk import of material
Upper Garnock Flood Storage Area
![Page 19: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/19.jpg)
Key features:• Wall strengthening• Formalisation of existing
embankments• Footpath raised• Weir lowered to reduce water levels
and improve fish passage
Reproduced by permission of Ordnance Survey on behalf of HMSO.© Crown Copyright and database right. Licence number 100023393
Work Unit 2Paddockholm Industrial Estate
![Page 20: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/20.jpg)
Work Unit 2Paddockholm Industrial Estate
![Page 21: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/21.jpg)
Key Considerations:• Working in the river• Maintaining flood protection
to the works and the local properties
• Tree felling and required surveys
• Seasonal working – comply with CAR licence
Work Unit 2Paddockholm Industrial Estate
![Page 22: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/22.jpg)
Work Unit 2Paddockholm Industrial Estate
![Page 23: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/23.jpg)
Key features:• Replacement of existing wall with formal
flood defence wall
Work Unit 3Powgree Burn Defences
![Page 24: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/24.jpg)
Work Unit 3Powgree Burn Defences
![Page 25: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/25.jpg)
Key Considerations:• Working within the watercourse• Proximity of property• Maintaining flood defence standards during the
works• Access to the site• Sequence of working• Compliance with CAR licence requirements
Work Unit 3Powgree Burn Defences
![Page 26: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/26.jpg)
Work Unit 4 - Dalry Defences
![Page 27: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/27.jpg)
Key features:• Flood Wall with cut-off• Railway embankment cut off• Bund works along railway embankment• Earth Embankment and pipe
Work Unit 4 – Dalry Defences
![Page 28: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/28.jpg)
Key features:• Set-back flood wall along Beith Road maintains
as much normal flood plain flow as possible• Standard of protection provided is 1 in 50 year
due to constraints, the impact of the scheme and the residual risks.
• 10m deep cut-off through course grained alluvium through to underlying fine grained alluvium
• Close proximity to houses – press-in pilling to minimise noise and vibration
• Pipe crossings and proximity to services• Working from Beith Road (currently Trunk Road)
Flood wall
Flood wall
Beith Road Flood Wall
![Page 29: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/29.jpg)
Beith Road Flood Wall
![Page 30: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/30.jpg)
Key features:• 3 Pipe Crossings (SW)• Proximity to services (BT Fibre)• Proximity to houses• Traffic Management • Pre and Post CCTV surveys• Tie in to bridge parapet (Network Rail)
Beith Road Flood Wall
![Page 31: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/31.jpg)
Key features:• Works on Network Rail property• On-going consultation with Network Rail• Need Network Rail sign off prior to
commencement of works (contractors method statement – Fail Safe Working Methodologies appropriate to electrified line)
Dalry Railway Embankment
![Page 32: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/32.jpg)
Dalry Railway Embankment
![Page 33: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/33.jpg)
Key features:
• To mitigate the impacts of increased flood levels, the following works are needed:
• Low-level bunds at DSM factory
• Raising of Scottish Water manholes
• Low –level bund at Tofts
© Getmapping plc
Berms against railway embankment
Low-level bunds at DSM
Tofts Low flood embankment
Dalry Flood Defences – Other Items
![Page 34: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/34.jpg)
Key features:
• To mitigate the impacts of increased flood levels, the following works are needed:
• Low-level bunds at DSM factory
• Potential need to survey and determine requirement to extend electrical cables
• Agreed Induction process and site rules with DSM as its an operational site.
Works at DSM Plant
![Page 35: Add Title Here · A study looked at the urban areas of Kilbirnie, ... • Detailed numerical and physical modelling undertaken to develop scheme • Extensive surveys taken to inform](https://reader034.vdocuments.net/reader034/viewer/2022051510/5ffe248309749d22e3637b8d/html5/thumbnails/35.jpg)
Key features:
• Low level flood bund• Tie into railway embankment
• Short twin culvert and headwalls
• Flap valves
Low Level Embankment at Tofts