Ventura County Community College District ADDENDUM NO. 4
Moorpark College Parking Structure – VCCCD Project #19125
IPD ARCHITECTURE / ENGINEERING / CONSULTING
00904-1
STANDARD SPECIFICATIONS
1 of 16
ADDENDUM NO. 4
To The
DRAWINGS AND PROJECT MANUAL
For The
Moorpark College Parking Structure & Police Station
7075 Campus Rd.
Moorpark, California 93021
Project No. 10-555
Prepared By:
INTERNATIONAL PARKING DESIGN, INC.
Architects/Engineers/Parking Consultants
14144 Ventura Boulevard, Suite 100
Sherman Oaks, CA 91423
(818) 986-1494
IPD Job No:
Date: 08.31.2012
NOTE: The following clarifications, deletions, additions and supplements have been incorporated into
the original Contract Drawings and Project Manual dated 07/18/2012, and shall be included as a part of
the Bid / Contract Documents.
In case of conflict between Drawings, Specifications and this Addendum, this Addendum shall supersede
all previous Drawings, Specifications, Addenda and instructions pertaining to these items and the work
of this Contract.
Addenda shall become a part of Contract awarded. Owner and Architect will not be responsible for any
oral or other explanations or interpretations. Receipt of Addenda by the Bidder must be acknowledged
on the Proposal (Bid Form) in the space provided. Should this signed and dated addendum not be
attached to the proposal, the proposal could be considered non-responsive.
SIGN AND ATTACH A COPY OF THIS ADDENDUM COVER TO YOUR BID
I hereby acknowledge that I have received, read and understand this Addendum and certify that the total
price/time bid includes any and all additions/deletions associated with this Addendum.
Company Name
Bidder's Signature
Ventura County Community College Distric ADDENDUM No.4
Moorpark College Parking Structure – VCCCD Project #19125
IPD ARCHITECTURE / ENGINEERING / CONSULTING
00904-2
STANDARD SPECIFICATIONS
2 of 16
SUPPLEMENTAL INFORMATION INDEX:
A. RFIs & RESPONSES:
Responded to “Request for Information” from Contractors Bidding for project.
B. SUPPLEMENTAL INFORMATION FOR DETECTING LOOPS:
Provided sketches for clarification: Sk-A-001 & Sk-A-002
C. SUPPLEMENTAL INFORMATION FOR WATERPROOFING :
Revised Manufacturer’s list on Section “07113 - 1.09”
Revised Warranty information on “07113 – 2.01”
D. SUPPLEMENTAL INFORMATION ADDED FOR BLUE PHONE:
Provided sketch for clarification:
END OF SECTION
Ventura County Community College Distric ADDENDUM No.4
Moorpark College Parking Structure – VCCCD Project #19125
IPD ARCHITECTURE / ENGINEERING / CONSULTING
00904-2
STANDARD SPECIFICATIONS
3 of 16
A. RFIs & RESPONSES:
Q16- Who is relocating the existing 4” Transite irrigation main line pipe shown on sheet L2.02?
A16- Cutting and rerouting the existing 4” transite irrigation mainline should be included in the scope
of work for the contractor.
Q17- Sheet L3.01 shows where two pines trees that are to be boxed and relocated are to be planted.
Where are they on the campus? Can they be directly relocated? If not, where are they to be
stored and for how long?
A17- Revise this to read: The trees to be removed and disposed.
Q18- Vapor Barrier Section 02225 is not totally clear on structural section. It calls for 6” gravel over
2” sand at Mechanical Room, Electric Cart Storage, Electric Room, Communication Room,
Storage Rooms and Elevator Mechanical Room.
A18- Vapor barrier is required under enclosed rooms, add to the list also the Future PV Panels
Electrical Room. It is not required for the rest of the parking area on B1 level.
Q19- What type of gravel is required?
A19- Refer to Section 02225-2.01 D – 1&2
Q20- Will the main B-1 level slab be 5” thick on select fill?
A20- Yes.
Q21- Are the doors to be motorized??? per 2.05 unless indicated the doors are to be chain. The
details indicate motors, however, the electrical power plans do not indicate motors. Which is
correct?
A21- Yes doors number 1,2,3, 9 & 17 are motorized and 1,2, 3 &17 are auto Activated rated Doors.
Ventura County Community College Distric ADDENDUM No.4
Moorpark College Parking Structure – VCCCD Project #19125
IPD ARCHITECTURE / ENGINEERING / CONSULTING
00904-2
STANDARD SPECIFICATIONS
4 of 16
Q22- If motorized, the controls are specified as on/off lockout, keyswitch and pushbuttons, not to
mention fire department overrides. Clear as mud. Perhaps they could determine which is
correct?? Also, cylinder locks with interlocks are called for if motorized. Our experience is that
the redundant locks should be deleted as the doors are self-locking through the gearhead
motor operator. Please have owner review how these doors are to be used.
A22- All motorized doors will be controlled with manual switch by authorized personnel using
clickers like residential garage doors. If the door is fire rated, it should be able to shut down
automatically.
Q23- Please confirm whether door mark #9 needs to be fire-rated, as it's on an exterior wall. Perhaps
it is non-rated and would be covered under 2.04 service doors?
A23- Confirmed. It is not fire rated.
Q24- Please see attached regarding the logo swoosh. The design sheet calls out for ¼” thick sheet
metal but the specs says steel/stainless steel plate laser cut. Please clarify which is correct.
A24- Revise to read ¼” thick powder coated sheet metal
Q25- Please specify powder coat color for the logo swoosh.
A25- Logo Color to match the college standard color.
Q26- Section 4.4.2.4 – submittals will be electronic and will not have “wet stamp”. Please delete this
requirement.
A26- College suggested this specification section not to be changed.
Q27- As per attached spec section 16620 Generator can the MTU Onsite Energy/Detroit Diesel brand
also be accepted? This equipment is a lot more quieter and superior.
A27- Consider “MTU Onsite Energy/Detroit Diesel” part of the list.
Ventura County Community College Distric ADDENDUM No.4
Moorpark College Parking Structure – VCCCD Project #19125
IPD ARCHITECTURE / ENGINEERING / CONSULTING
00904-2
STANDARD SPECIFICATIONS
5 of 16
Q28- Can the electrical conduits for lighting, power, home runs any conduit smaller than 1” is
allowed to installed in the concrete ceilings and walls?
A28- Yes, refer to structural details and notes for conduits inside the Post Tensioned slab and beams
& also concrete columns.
Q29- Is the electrical contractor able to install conduit and boxes in the columns?
A29- Refer to RFI A28.
Q30- Can concrete structural beams be sleeved?
A30- Yes, refer to detail 8/S5.03.
Q31- What is the height that the electrical contractor has to maintain in the parking structure?
A31- Refer to notes 8 & 9 in “General Notes” on A0.01.
Q32- Per spec section 02225 page 12 section 3.11-D please confirm that the only areas to receive 6”
gravel over 2” sand are at the Mechanical Room, Electrical Cart Storage, Electric Room,
Communication Room, Storage Room and Elevator Mechanical Room.
A32- Refer to A18 in response to Q18
Q33- What grading plan are we to follow�Sheet 6 & 7 or C3.10 & C3.20. Plans show different AC
Paving and Curb requirements-see lower lot G.
A33- Follow the Civil drawings submitted to City of Moorpark
Q34- Section 09500 2.01 – Armstrong Tile #536 is discontinued for many years - please make
another selection
A34- Use Optima, Vector #3900 – Fine Texture by Armstrong World Industries or approved equals
Ventura County Community College Distric ADDENDUM No.4
Moorpark College Parking Structure – VCCCD Project #19125
IPD ARCHITECTURE / ENGINEERING / CONSULTING
00904-2
STANDARD SPECIFICATIONS
6 of 16
Q35- Section 09500 2.02 A CMC grid 850 is discontinued for many years - please make another
selection
A35- Suspension System recommended by manufacturer for the abovementioned model or equal is
acceptable upon review by Architect.
Q36- Section 09500 2.02 I please specify the type of ceiling system from APS that goes in room 202
A36- Ceiling panels are identical to wall panels in this room.
Q37- Sheet 1/A5.03 “Enlarged Plan – Public Toilet” indicates a note “FB5” in the right side hallway in
two locations . FB5 is vinyl. There is also a word “carpet” in the same hallway. Carpet is
indicated on the Finish Schedule A5.50 at both rooms 201 and 203 which this corridor/hallway
connects. Confirm the FB5 noted should be changed to FB4 in both locations so carpet is the
flooring material desired.
A37- Yes, refer to “Finish Schedule” on this.
Q38- Sheet 1/A5.02 “Enlarged Staff Shower Plan” indicates a note “FB2” in the alcove outside the two
tile floor rooms. FB2 is tile. The Hallway 200-B (Sheet 1/A501) is called out to be carpet.
Confirm that the FB2 noted should be changed to FB4 (carpet) at this alcove and thus carpet will
continue in the Hallway 200-B and into this alcove just outside Rooms 233 and 232.
A38- No, FB2 is correct. Alcove area finish is tile and it is separated by a vinyl threshold from carpet in
hallway aligned with the wall of corridor.
Q39- Sheet 1/A5.01 “Ground Floor Plan” has a note indicated FB5 in the middle of the Training Room
#203. FB5 is vinyl. Confirm this FB5 should be FB4 (carpet) which then will coordinate the
Finish Schedule (A5.50) as to carpet as the desired floor in the Training Room #203.
A39- Yes, refer to “Finish Schedule”.
Ventura County Community College Distric ADDENDUM No.4
Moorpark College Parking Structure – VCCCD Project #19125
IPD ARCHITECTURE / ENGINEERING / CONSULTING
00904-2
STANDARD SPECIFICATIONS
7 of 16
Q40- Sheet A501 – Custodial Closet 200-D is properly labeled as FB2 ceramic Tile and is correct as
Ceramic Tile on the Finish Schedule, the room is just not poche textured with “square tile floor
pattern” on the plan view like the other ceramic tile rooms are indicated.
A40- Refer to “Finish Schedule”.
Q41- Stone Flooring: Section 9310 – calls for Stone work; however, that spec only indicates “stone
countertop”
A41- As shown on A5.01 and Finish Schedule floor finish of the lobby in Police Station will be 24”x24”
polished travertine stone.
Q42- Stone Flooring: Sheet 1/A5.01 – Calls for FB3 at the Lobby #200 and the Hallway 200A. Sheet
A5.08 indicates FB3 as “stone flooring”
A42- As mentioned in RFI A41, FB3 is 24”x24” polished travertine stone.
Q43- Stone Flooring: Sheet A5.50 – Finish schedule indicates Stone as 24” x 24” travertine floor and
wall base
A43- Yes, police station lobby is furnished by 24” x 24” travertine tiles.
Q44- Stone Flooring: Is there a specification for Stone floors?
A44- Stone flooring shall be installed in conformance with Section 09310 – 3.03C
Q45- Is there a specific “travertine” name, model, color, manufacture desired?
A45- Desired material is as supplied by Stone Contact @ www.stonecontact.com; Stone Type:
Travertine – Stone Name: Travertine – Color: Beige – Place of Origin: Turkey – Supplier Mekmar
Dis Ticaret or approved equal.
Ventura County Community College Distric ADDENDUM No.4
Moorpark College Parking Structure – VCCCD Project #19125
IPD ARCHITECTURE / ENGINEERING / CONSULTING
00904-2
STANDARD SPECIFICATIONS
8 of 16
Q44- Is the wall base also to be 24” x 24” high except at the cabinets where is reduces to 4” under the
cabinet at base board. (See 9/A5.03)
A44- It’s only 4” high.
Q45- Section 11/A5.04 shows the travertine to the underside of the counter on the south wall of the
Lobby 200. Does that travertine of that height start and stop only under the counter from end
to end of the counter and at no other location of that height?
A45- Only under the counter.
Q46- Section 09500/2.01 calls out Armstrong tile #536. It is no longer available. Armstrong suggests
#756. Please advise.
A46- See RFI A34.
Q47- Section 09500/2.02-A calls out Chicago Metallic Grid #850. It is no longer available. Please
recommend another grid style # &/or manufacturer.
A47- See RFI A35.
Q48- Several doors have and “X” indicated in the Hardware set column of the door schedule on Sheet
A5.50 … Can you please lable the appropriate hardware set for these doors.
Door #4, 5, 6, 7, 24, 25, 32, Storefront Door #18
A48- See below:
DOOR NUMBER: 04 = HW SET: 12
DOOR NUMBER: 05 = HW SET: 09
DOOR NUMBER: 06 = HW SET: 09
DOOR NUMBER: 07 = HW SET: TBD
DOOR NUMBER: 24 = HW SET: 20
DOOR NUMBER: 25 = HW SET: 13A
DOOR NUMBER: 32 = HW SET: 21
DOOR NUMBER: 18 = HW SET: 01
Ventura County Community College Distric ADDENDUM No.4
Moorpark College Parking Structure – VCCCD Project #19125
IPD ARCHITECTURE / ENGINEERING / CONSULTING
00904-2
STANDARD SPECIFICATIONS
9 of 16
Q49- What is “optional” pad lock mean on gate #32? Does the owner want a pad lock or no pad lock?
or other ???
A49- Consider with “Pad Lock”.
Q50- Substitution request: We have a expansion joint bidder who want to bid “Construction
Specialties” in lieu of the companies listed. Can a substitution be submitted on this now.
A50- Yes, you can submit your Substitution Request .
Q51- What type of roofing are we providing for the stair and elevator roof? Roof plan calls for
elastomeric deck coating, while cut sections show different type.
A51- Consider roofing membrane.
Q52- Flooring issue in the 200-B Hallway: A5.01 also has a FB5 at grid line B/X.2 which would have to
change to FB4 if carpet is desired
A52- Refer to “Finish Schedule” on A5.50
Q53- Flooring issue in the 200-B Hallway: 2/A5.05 also has the FB5 and some words that say “Vinyl
flooring on smooth finish Concrete slab” – which would ned to change to FB4 and “carpet” if
carpet is desired.
A53- Refer to “Finish Schedule” on A5.50
Q54- STEEL TUBES AT Windows of Police Station: Elevation 7/A5.05 indicated 3” x 4” tubes BOTH
vertically and horizontally; however, Section 5/A5.05 indicates 3” x 3” on the vertical tube and
Plan View 1/A5.05 indicates 3” x 3” Horizontal attached to 3” x 3” vertical. Confirm these are all
to be 3” x 4” for BOTH vertical and horizontal.
A54- Consider HSS 3’x4”x1/4” for horizontal member and HSS 3’x3”x1/4” for vertical members.
Ventura County Community College Distric ADDENDUM No.4
Moorpark College Parking Structure – VCCCD Project #19125
IPD ARCHITECTURE / ENGINEERING / CONSULTING
00904-2
STANDARD SPECIFICATIONS
10 of 16
Q55- STEEL TUBES AT Windows of Police Station: a. Does the tube steel continue under the narrow
1’-6” wide side windows ? b. When looking at Plan view 2/A5.05 at grid line X.1/B.7 , there is a
section 6/A5.05. 6/A5.05 shows the section of the sloped window sill and calls out detail
7/A5.09. Section 7/A5.09 does not show the horizontal member under the low windows;
however 17/A5.09 does. Ids 17/A5.09 only at the high transom window. c. 7/A5.05 elevation
does not show dotted lines of a tube steel under the 1’-6” wide windows on either side.
Should there be three (3) steel frames ? One large one and two (2) small ones…or should
there be a horizontal tube under the low window welded to the two (2) vertical tubes of the
steel tube frame that supports up the higher transom window ?. Will this horizontal tube
under the lower window conflict with the Wide flange steel column?
A55- a. No.
b. Confirmed. These are two different sections one from low window sill and 17/A5.09 is thru
the high window sill in the south elevation of the police Station. Horizontal tube is always
located at elevation +9’ above the F.F.
c. No, as mentioned above horizontal tube never extends beyond the vertical posts.
Q56- MOCK-UP – detail 17/A5.09, Can you draw and elevation of each of the three (3) mock-up so
we understand the size of the mock-up required.
A56- Size of required mock-ups are approximately 4’x4’
Q57- Is there any COLORED concrete in the site work/ sidewalks/ ?
A57- No.
Q58- Substitution request: We have a expansion joint bidder who want to bid “Construction
Specialties” in lieu of the companies listed. Can a substitution be submitted on this now.
A58- Refer to RFI A50.
Q59- SLAB CRACKING – Detail 5/A2.04 shows the sidewalks being cut in a square pattern with no saw
cut thru the bands. This will cause a cracks at each of the four corners of the square pattern in
the sidewalk. Is it possible to accept the saw cuts continuous thru the bands in one direction ?
Ventura County Community College Distric ADDENDUM No.4
Moorpark College Parking Structure – VCCCD Project #19125
IPD ARCHITECTURE / ENGINEERING / CONSULTING
00904-2
STANDARD SPECIFICATIONS
11 of 16
A59- No, on the long bands in each direction consider one Caulked control joint @ every 15’
Q60- 1/A5.03 – there is a wall call out on the exterior of the weapons room as WC5. This WC5 wall
call-out would put exterior plaster inside of the building. Please correct the wall call-out. WC11?
maybe
A60- Refer to “Finish Schedule” – The call out on the east wall of the weapons room should read
“WC1”.
Q61- LOOP SENSOR – our parking consultant/Sub believes that if there is not a curb added to
separate the “IN” from the “OUT” at the B1 level drive lane (See sheet A/2.01), that when the
student drives into the parking structure too quickly on the “curve” in the road, the drives car
tires may hit both the “IN” loop and the “OUT” loop… which will total mess up the entire
counting system. Please add some sort of concrete curb along some portion of the
entrance/exit drive way on Sheet A2.01
A61- Provide three 4” dia. plastic delineators and 4 detection loops at each entry/exit. (See attached
Sk-A-001 & Sk-A-002)
Q62- SOLAR PANEL EMBED AT ROOF COLUMNS: Section 2/A6.03 indicates a call-out for “FUTURE”
solar panels. Can you provide the detail of the embedded bolts and/or the base plate with or
without grout for this future solar panel attachment. The bolts will have to be set now or
drilled and epoxied later. If you decide on bolts now, can you provide the count of how many
columns and which columns will get these bolt embeds. S2.04 also does not show the locations or the detail for “future” sola panel attachments.
A62- Eliminate base plate for future solar panels. Provide conduit only at columns on lines B and C
between 4 and 14 lines.
Q63- BUS STOP TRELLIS – CANTILEVER: There appears to be no concrete or steel column at grid line
D.9 / 2 (refer to sheet 1/A7.01 and 1/S6.08). That would make the cantilever along D.9 about
32’-6” from grid line 3/D.9 or more and the cantilever along 1 line about 15’-9” or so from D/1
…. That appears to be far too much for a HSS 12x3x1/4”. Can you check on that ? and with the
added weight of the bud shelter roof, it makes it worse.
A63- There is no column at D.9/2. The beam is not cantilevered along Line D.9. The beam is
supported at the end D.9/1 by the cantilevered beam on Line 1.
Ventura County Community College Distric ADDENDUM No.4
Moorpark College Parking Structure – VCCCD Project #19125
IPD ARCHITECTURE / ENGINEERING / CONSULTING
00904-2
STANDARD SPECIFICATIONS
12 of 16
Q64- BUS SHELTER DRAINAGE ??? - Refer to 1/A7.01 - There appears to be no drain, no scupper, no
sheet metal stop along the south edge of the bus shelter roof. Will the water just drip down the
“C” channel to the ground or do you wish to change the design or add a gutter/downspout ?
A64- Yes, it will drip over the landscaped planter.
Q65- POUR STRIP: Refer to 3/A8.01 – There is an * asterisk symbol indicating 3’-0” or 3’-9” wide pour
strips. Can you please tell us which pour strip is 3’-0” and which is 3’-9”
A65- Consider 3’-9” as shown on structural detail 2/S5.04.
Q66- FINISH HARDWARE Installer – Spec 08710 3.01: Do you find this sentence antagonistic and a bit
nasty ? Shame on your spec writer. These are the requirements for the Finish Hardware
installer per the specs. “Can READ and UNDERSTAND manufacturer’s templates, suppliers
hardware schedules and printed installation instructions. Can readily distinguish drywall screws
from manufacturers furnished fasteners.”
A66- This spec section is provided by the Hardware Consultant / Manufacturer. Perhaps was included
based on a specific jobsite experience. We do not think that they intentionally tried to be
“antagonistic and a bit nasty”, but will request to be rewritten.
Q67- ELASTOMERIC COATING ON STEPS – detail 13/A5.09: There are steps #3, #4, #5, #6 which all
have detail 13/A5.09 referenced and this detail 13/A5.09 calls for Elastomeric coating on the
stairs. Detail 13/A5.09 should state “Elastomeric coating only at stair #4 from grade rto Ground
level per 2/A4.05B”. Please confirm that only the Stair #4 (2/A4.05B) as indicated by the dotted
line from the sidewalk to the Ground Level is the only area to receive the elastomeric on the steps.
A67- Confirmed. Detail 13/A5.09 should read “Elastomeric Coating where occurs”
Q68- EMBEDDED STAIR NOSINGS – detail 3/A4.07: Note 1/A4.06 states for the stair nosing to be at
every tread on exterior stairs and bottom tread and landing of all runs (each flight) at interior
stairs. In Parking Structures, there is always a confusion on what is “INTERIOR” and what is
“EXTERIOR” because of sideways blowing rain and wind. Details on A4.06 and A4.07 do not
clearly show the embedded extra stair nosing (detail 3/A4.07), the details only show the steel
Ventura County Community College Distric ADDENDUM No.4
Moorpark College Parking Structure – VCCCD Project #19125
IPD ARCHITECTURE / ENGINEERING / CONSULTING
00904-2
STANDARD SPECIFICATIONS
13 of 16
nosing of the stair pan even at the top and bottom tread/landing.
Please confirm that the stairs #1 and #2 are INTERIOR stairs and will not have embedded stair
nosing on every tread and landing
A68- Incorrect, “Nosing Embed” occurs on all stairs and on all treads and landings.
Q69- COUNTERTOP at X.1 line / B.3 to B.7.: Refer to Sheet A5.01. There is a lower and upper cabinet
in the Hallway 200A to 200B across from the Training Room 203 along X.1 line. It has a section
5/A5.5. 2/A5.05 also shows the countertop in plan view. 7/A5.05 is an elevation of the
cabinet. 5/A5.04 is a section. 5/A5.04 has another section 7 & 10/A5.04. Both of these
section stae “plastic laminate or Granite where occurs. Please tell us what tyop of countertop is
for this base cabinet ? Granite or plastic laminate.
A69- There is no Upper Cabinet along the hallway as mentioned above. Only upper cabinet occur in
kitchenette beside the training room. Consider Granite counter top.
Q70- REFELCTIVE CEILING PLAN of the BASEMENT level under the Police station: We cannot find a
lighting plan or a reflective ceiling plan for the B1 level. Sheet E3.01 calls out 1/E3.05; however
that ceiling is the Police Station at the Ground Level, not the B1 level. There are no lights in the
B1 level rooms? Power is shown on 1/E4.10.
A70- See 1 / E3.10 for Enlarged Lighting Plan.
Q71- Are you aware of a “use tax” in the area for new construction?
A71- This following response is by district’s Legal:
Sales and “use” taxes are generally owed on personal property. The issue is covered in Articles
4.5.1 and 4.6 of the contract General Conditions: “4.5.1 Payment for Labor, Materials and
Services. Unless otherwise provided in the Contract Documents, the Contractor shall provide
and pay for labor, materials, equipment, tools, applicable taxes, and other facilities and services
necessary for proper execution and completion of the Work, whether temporary or permanent
and whether or not incorporated in the Work.” “4.6 Taxes. The Contractor shall pay, without
adjustment of the Contract Price, all sales, consumer, use and other taxes for the Work or
portions thereof provided by the Contractor under the Contract Documents.”
The contractor needs to determine whether there would be a use tax owed to the City the
same as any other sales or use tax owed on goods or materials purchased for the project.
Ventura County Community College Distric ADDENDUM No.4
Moorpark College Parking Structure – VCCCD Project #19125
IPD ARCHITECTURE / ENGINEERING / CONSULTING
00904-2
STANDARD SPECIFICATIONS
14 of 16
Q72- Detail 20/A5.09- is labeled as stair #3. Please confirm the correct stair is stair #4 for this detail
as taken from section 4/A4.05B.
A72- Confirmed. Note should read Stair #4.
Q73- WALL INSULATION: A5.01 at Police Station and 3/A5.08 at Wall Schedule.
a. Please confirm that there are no INTERIOR walls that receive insulation or sound
insulation. It appears that only EXTERIOR wall of Police Station Have Insulation.
b. Please confirm that the South wall of the B1 Level shown in 2/A5.07 does not have
insulation in the wall. Section 4/A5.07 is not clear. 5/A5.12 does not show insulation.
However, 19/AQ5.09 does show insulation below the Ground level. Which is correct for
insulation ?
A73- a. Confirmed.
b. Provide insulation at Police station GROUND LEVEL EXTERIOR walls only. No insulation
required at B1 level.
Q74- “NO PARKING” Stencil – 2/A9.05:
a. Confirm that the College does not want a “No parking” stencil at the Detail 11/A9.05
cross striping at the Fire extinguisher
b. Confirm that the College does not want a “No Parking” stencil at the two (2) diagonally
striped pedestrian entrances to the Police Station on Sheet A2.02 along grid line 2/C.5
to C.3 and 2/B.
A74- a. Confirmed. Only required at accessible spaces loading.
b. Confirmed. Only required at accessible spaces loading.
Q75- Parking Lot “G” – Sheet A2.05:
a. Please provide a total count of stalls that the College desires to be re-striped or new
striping at Lot “G”. Is it only 9 total or are there additional that are desired. Sheet
A2.05 is unclear as to full scope of work.
b. Is any of this Parking lot G to be slurry sealed over the existing asphalt. Sheet C3.10 is
also not completely clear as to scope of work. C3.00 shows the grading cutting thru
several of the stall that are labeled as existing stalls.
c. Is any of this Parking lot G to be re- asphalted (reconstructed) with new asphalt ? Not
labeled as part of the work but appears to be required.
Ventura County Community College Distric ADDENDUM No.4
Moorpark College Parking Structure – VCCCD Project #19125
IPD ARCHITECTURE / ENGINEERING / CONSULTING
00904-2
STANDARD SPECIFICATIONS
15 of 16
A75- a. New striping in this area will include 9 parking spaces plus striping around relocated light pole
or any that is removed during construction
b. No need for any Slurry Sealed in this area, as college may have a future addition to garage.
c. Solid grey hatch on sheets 7 & 8 of Grading Plans for the City of Moorpark depicts area of the
revised paving.
Q76- SHORING and Temp support of existing Tennis courts, existing vaults and existing utility pipes.
Civil Drawings C.300. Please design the shoring or desired support for the tennis courts, existing
vaults and the pipe support at the north and west sides of the construction site.
A76- Protection of existing utilities and structures is the responsibility of the Contractor. Temporary
shoring and support is considered design/build to address the conditions out in the field.
Stamped plans and calculations from the shoring provider shall be submitted to the District for
review.
Q77- Fire Alarm System:
On plan sheet E7.00 there are 2 scopes of work. One which specifies a new fire alarm system for
the elevator area only and the second specifies another fire alarm system for the parking
structure. The device legend points out as well that there is indeed two separate FACP’s as well
as the riser diagrams on E7.01 and E7.07. Next is the police station which will also be yet
another new FACP as specified on the scope of work on sheet 7.50 and riser on E7.53.
Please confirm there will be 3 separate FACP’s (Elevator Area, Parking Structure and Police
Station)?
A77- There are three separate FA systems and each is tied together.
Q78- Details 2 & 4/A7.06 – Architectural Fin at Grid line 16/D on North Side of the Building:
The sections indicate the metal studs as “3 5/8” x 18 gauge” above the 3rd
floor and “4” GA 18
studs “ below the 3rd
floor. Confirm that all studs of this Fin construction are 3 5/8” x 18 gauge
studs at 16” oc.
A78- Confirmed.
Q79- CABLE RAILS – detail 5/A7.05
a. Where does this detail 5/A7.05 occur?
b. Confirm that this detail has been deleted and there are no cable rails on the project ?
Ventura County Community College Distric ADDENDUM No.4
Moorpark College Parking Structure – VCCCD Project #19125
IPD ARCHITECTURE / ENGINEERING / CONSULTING
00904-2
STANDARD SPECIFICATIONS
16 of 16
A79- a. See South Elevation 1/A3.01 (W29)
b. Incorrect.
Q80- GENERATOR ENCLOSURE – gate footings
Detail 11/A8.02 from 2/A2.01 and 3/A2.01 . Please provide the size and rebar for gate footings
of Door #12, the door to the Generator Enclosure. 5/S5.06 and S2.01 only show footing at wall.
Is this adequate for the gate post?
A80- For sleeve detail refer to item C @ 05500-13 of Specification Book.
Q81- ARROWS – sheet A2.05:
There are four (4) arrows that are in the road south of the surface parking Lot PS-x. Are those
four (4) arrows part of the scope of work ?
A81- No. they are not.
Q82- SOCCER FIELD – A2.05:
There is a note on A2.05 indicating “revised soccer field location). Please confirm that there is
no work at the soccer field, or restriping the grass etc. in this scope of work.
A82- Confirmed.
Q83- Per schedule, I found four (4) coiling doors. In the remark section, door # 1 & 3 are showing
"....auto activated door" and on doors # 9 & 17, this wording is not there. Does this mean that
they are "motorized"?
A83- Yes, they are motorized.
Q84- Also, all four doors show 1.5 hr fire rating on schedule, are they all, in fact, rated? The spec
sheets show both rated and non-rated door spec's. Please advise.
A84- Doors 1, 2, 3 & 17 are rated doors.
40.07
16
A2'
10'
2'-0"x10'-0" SAWCUT CONTROLLOOP CIRCUIT FOR SPACECOUNTING DISPLAY PANEL
SPACE COUNTINGDISPLAY PANEL
40.0740.07 2'
10'
2'
J―BOX
1514
1'-9" 1'-9"
PROVIDE ONE (1) 1" C.O. FOR EACH OF THEFOLLOWING TO THE ELECTRICAL ROOM:1- DATA & CONTROL2- SPARE
4'' DIA. PLASTIC DELINEATORSEPOXIED TO CONCRETESLAB 4' O.C.
MOORPARK COLLEGE PARKING STRUCTUREMoorpark, CA
SCALE: 3/16" = 1'-0"
COUNTING SYSTEM DETECTINGLOOPS - B1 LEVEL 1
Date: 08.31.12
Sk-A-001Addendum #4
Application #: 03-114024File #: 56-C1
IPD Project #: 10-555
Architecture / Engineering / Consulting
14 15 16
SPACE COUNTINGDISPLAY PANEL
2'
10'
51.40
2'
10'
2'
1'-9" 1'-9"
51.40 51.40
2'-0"x10'-0" SAWCUT CONTROLLOOP CIRCUIT FOR SPACECOUNTING DISPLAY PANEL
4'' DIA. PLASTICDELINEATORS EPOXIED TOCONCRETE SLAB 4' O.C.
J―BOX
PROVIDE ONE (1) 1" C.O. FOREACH OF THE FOLLOWING TOTHE ELECTRICAL ROOM:1- DATA & CONTROL2- SPARE
Date: 08.31.12
Sk-A-002Addendum #4
Application #: 03-114024File #: 56-C1
MOORPARK COLLEGE PARKING STRUCTUREMoorpark, CA
IPD Project #: 10-555
Architecture / Engineering / Consulting
SCALE: 3/16" = 1'-0"
COUNTING SYSTEM DETECTINGLOOPS - GROUND LEVEL 2
Ventura County Community College District Sheet Membrane Waterproofing/Underlayment Moorpark College Parking Structure VCCCD Project No. 19125 Section 07113-3 IPD Architecture/Engineering/Consulting Addendum #4
1.07 JOB CONDITIONS
A. Environmental Conditions: Apply in fair weather at temperatures of 40 degrees F and above. Provide adequate ventilation when using primers.
B. Covering: Sequence subsequent material / surfacing installation promptly at
temperatures of 40 degrees F and above. 1.08 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Deliver products to job site in unopened packages with labels and containers intact and store off the ground under waterproof cover. Do not stack palletized material.
B. Remove damaged material from job site and replace.
1.09 GUARANTEE
Furnish to District a written guarantee against all defects in materials, workmanship, resulting in water intrusion or similar defects. Provisions of the guarantee shall include responsibility for ruptures in the membrane caused by cracking in the substrate up to 1/8" in width, for ten (10) years from date of acceptance. The material installed and quality of work performed under this section of work shall be warranted by both the manufacturer and applicator, (joint and several), under a single document to the District
2.00 PRODUCTS 2.01 MANUFACTURER
Provide membrane underlayment as manufactured by one of the following: Tremco Roofing and Building Maintenance, 800.562.2728; Carlisle CCW WIP 200, 800-527-7092; Henry Company ‘Blueskin SA’ 800- 598-7663; Protecto Wrap Company ‘Rainproof 40’ 800-759-9727; W.R. Grace, 'Ice and Water Shield' (40) / 'Grace Ultra' (30mil) (high temperature applications) 866- 333-3726 Tamko TW Metal and Tile Underlayment (800) 539-8868 Miradri 'WIP 300HT', Or approved equal
2.02 MATERIALS
Provide a minimum 40 (30) mil flexible, self adhering rubberized asphalt (butyl rubber based adhesive backed by a layer of high density cross laminated polyethylene) sheet membrane with a polyethylene film on the surface and a removable silicone-treated release sheet on the adhesive underside.
3.00 EXECUTION
3.01 PROJECT CONDITIONS
A. Examine substrates and adjacent surfaces where work of this section will be performed. Report conditions detrimental to timely and proper completion to the
5EQUIPMENT DETAIL
D. SUPPLEMENTAL INFORMATION ADDED FOR BLUE PHONE:Addendum #4