SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT
#0927-16 Evergreen Valley College October 7, 201625103 PE Building Boiler Replacement & AHU Modifications Addendum No. 1 Page 1 of 2
ADDENDUM NUMBER 01 TO THE BID DOCUMENTS
To all general contract bidders of record on the Bid Proposal:
BID NUMBER: 0927-16#25103 PE Building Boiler Replacement & AHU Modifications
Evergreen Valley College
Addendum Date: October 7, 2016
A. This addendum shall be considered part of the bid documents for the above mentioned project as though it had been issued at the same time and shall be incorporated integrally therewith. Where provisions of the following supplementary data differ from those of the original bid documents, this Addendum shall govern and take precedence.
B. Bidders are hereby notified that they shall make any necessary adjustments in their estimates as a result of this Addendum. It will be construed that each bidder’s proposal is submitted with full knowledge of all modifications and supplemental data specified herein.
Item #1: Architectural/Engineering Addendum 1:
Changes to Drawings
A. DRAWING G-0.0 - COVER SHEET: ADD following Note to the Mechanical Summary of Work: "3. DEMO <E> AIR COMPRESSOR, COPPER TUBING AND PANELS."
B. DRAWING ME-1.1 - MECHANICAL & ELECTRICAL EVC PE BUILDING ENLARGED PLAN1. REVISE Detail 2 to show the expanded scope of work with regards to demolishing the
abandoned air compressor, air dryer and control panels.2. ADD following Note to the Mechanical Reference Sheet Notes - Demo: "3. DEMO <E>
AIR COMPRESSOR, ASSOCIATED DRYER/FILTER, CONTROL PANELS AND TUBING BACK TO SOURCE. SEE DETAILS 9 & 10/ME-5.1."
3. ADD following Note to the Mechanical Reference Sheet Notes - Demo: "4. CONTRACTOR SHALL REMOVE PORTION OF <E> RAILING, AS REQUIRED, TO FACILITATE INSTALLATION OF BOILER. RAILING SHALL BE RESTORED TO ORIGINAL CONDITION UPON COMPLETION OF CONSTRUCTION."
4. ADD following Note to the Mechanical Reference Sheet Notes - Demo: "5. DEMO <E> VENT BACK TO ROOF PENETRATION.
5. ADD following Note to the Mechanical Reference Sheet Notes - New: "13. INSTALL NEW 6" DIA. VENT PER MANUFACTURER'S INSTRUCTIONS.
SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT
#0927-16 Evergreen Valley College October 7, 201625103 PE Building Boiler Replacement & AHU Modifications Addendum No. 1 Page 2 of 2
C. DRAWING ME-5.1 - MECHANICAL & ELECTRICAL DETAILS1. ADD Detail 9 - Front View of <E> Abandoned Compressor2. ADD Detail 10 - <E> Dryer/Filter
Sincerely,Carlos Marques
Purchasing AgentPhone: 408-270-6431E-mail: [email protected]
Encl. Documents:
DRAWING G-0.0 - COVER SHEETDRAWING ME-1.1 - MECHANICAL & ELECTRICAL EVC PE BUILDING ENLARGED PLANDRAWING ME-5.1 - MECHANICAL & ELECTRICAL DETAILS
305 South 11th Street
San Jose, California 95112-2218
408.282.1500 | 408.297.2995 (f)
salasobrien.com
Bozeman | Los Angeles | Monterey
Oakland | Orange County | Sacramento
San Diego | San Luis Obispo | Seattle
3095 YERBA BUENA RDSAN JOSE, CA 95135
BOILER REPLACEMENT& AHU MODIFICATIONS
305 South 11th Street
San Jose, California 95112-2218
408.282.1500 | 408.297.2995 (f)
salasobrien.com
Bozeman | Los Angeles | Monterey
Oakland | Orange County | Sacramento
San Diego | San Luis Obispo | Seattle
3095 YERBA BUENA RD
SAN JOSE, CA 95135
305 South 11th Street
San Jose, California 95112-2218
408.282.1500 | 408.297.2995 (f)
salasobrien.com
Bozeman | Los Angeles | Monterey
Oakland | Orange County | Sacramento
San Diego | San Luis Obispo | Seattle
3095 YERBA BUENA RDSAN JOSE, CA 95135