Form.3i'6"0-5 -(August 2007) UNITED STATES
DEPARTMENT OF THE INTERIOR \ BUREAU OF LAND MANAGEMENT \
SUNDRY NOTICES AND REPORTS ON WELlib^ Do not use this form for proposals to drill or to re-entb,rjgi
abandoned well. Use form 3160-3 (APD) for such proposals.
Lease Serial No. NMLC064637
FORM APPROVED OMB NO. 1004-0135 Expires: July 31. 2010
If Indian, Allottee or Tribe Name
SUBMIT IN TRIPLICATE - Other instructions on reverse side. 7. If Unit or CA/Agreement. Name and/or No. 8910064530
1. Type of Well C ^ / { ~ 2 ^ 0 > 1 _ ^ _ Oil Well • Gas_W t̂T _ Other .
8. Well Name and No. HENSHAW DEEP UNIT 5
2. Name of Operator' CHESAPEAKE OPERATING INC
Contact: CINDY H MURILLO E-Mail: [email protected]
9. API Well No. 30-015-03913-00-S1
3a. Address
OKLAHOMA CITY, OK 73154-0496
3b. Phone No. (include area code) Ph: 575-263-0431 Fx: 575-391-6679
10. Field and Pool, or Exploratory HENSHAW
4. Location of Well (Footage, Sec, T., R., M., or Survey Description)
Sec 23 T16S R30E NENE 660FNL 660FEL
11. County or Parish, and State
EDDY COUNTY, NM
12. CHECK APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
• Notice of Intent • Acidize • Deepen • Production (Start/Resume) • Water Shut-Off
• Notice of Intent • Alter Casing • Fracture Treat • Reclamation • Well Integrity
_ Subsequent Report • Casing Repair • New Construction • Recomplete • Other
• Final Abandonment Notice • Change Plans _ Plug and Abandon • Temporarily Abandon
• Convert to Injection • Plug Back • Water Disposal
13. Describe Proposed or Completed Operation (clearly state all pertinent details, including estimated starting date of any proposed work and approximate duration thereof. If the proposal is to deepen directionally or recomplete horizontally, give subsurface locations and measured and true vertical depths of all pertinent markers and zones. Attach the Bond under which the work will be performed or provide the Bond No. on file with BLM/BIA. Required subsequent reports shall be filed within 30 days following completion of the involved operations. If the operation results in a multiple completion or recompletion in a new interval, a Form 3160-4 shall be filed once testing has been completed. Final Abandonment Notices shall be filed only after all requirements, including reclamation, have been completed, and the operator has determined that the site is ready for final inspection.)
Chevron USA Intends to Workover the Above well: 01/14/13 Chesapeake started job to repair a casing issue. It was discovered the casing had parted @ 6,080-83'. Two alignment tools were run and the casing cemented on 02/04/2013. Chesapeake rigged down 02/26/2013 after issues alignment tool. Chevron rigged up 08/23/2013 to complete fishing job and return well to production. After getting through the parted area it was discovered there was a casing collapse. Remedial work over the next few weeks determined there were several areas of collapsed pipe. After working through the upper one from 6,723-30' we had trouble remaining in the weilbore as the collapse at 6,731'forced us outside the weilbore. At that point the decision to abandon the Wolfcamp zone was made and Jim Amos was contacted. Based on the information we'j collected and discussed with Jim, it was agreed that when Chesapeake had pumped cement to fix tl parted area the casing below the RBP had collapsed. Due to the volume of cement pumped, it was
AccqMforweorcl
tp0
14. I hereby certify that the foregoing is true and correct. Electronic Submission #227881 verifiejd
For CHESAPEAKE OPERATI JG Committed to AFMSS for processing by WE$LEY
by the BLM Well Information System ~ INC, sent to the Carlsbad
INGRAM on 11/25/2013 (13KMS5V
' Name(PrmteaYTyped) CINDY H MURILLO Title PERMITTING SPECIALIST
Signature (Electronic Submission) Date 11/25/2013
THIS SPACE FOR FEDERAL OR STATE OFFICE USE
A p p p p j p n Approved By /*V_/WI_.I 1 L- U
EDWARD FERNANDEZ T i t l e PETROLEUM ENGINEER Date 12/02/2013
Conditions of approval, if any, are attached. Approval of this notice does not warrant or certify that the applicant holds legal or equitable title to those rights in the subject lease which would entitle the applicant to conduct operations thereon. office Carlsbad
Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the United States any false, fictitious or fraudulent statements or representations as to any matter within its jurisdiction.
BLM REVISED ** BLM REVISED ** BLM REVISED ** BLM REVISED ** BLM REVISED
Additional data for EC transaction #227881 that would not fit on the form
32. Additional remarks, continued
concluded that we had cement inside the 4 1/2' from TD to 6,000-6,755' and tagged to confirm its depth at 5,995'. Additionally a CIBP was set at 5,925'. Chevron rigged down to evaluate uphole potential. Please see attached Current weilbore and Casing issue weilbore and Summary reports.
811111!!! Ural—-
MM-Carilinehl FicaWamo
Job.Dotalls: .̂ Jcb Category;
Gasir^Strings
sun Da:.'.' 8/23/2013"'
, CSB'OCS.
Surface.
Intermediate
Producijan'-
ODfiii);,
1313/8:
9 5/8
4 i / 2
Perforatipnsv
' "48100
36:00
•11.CO
.'.Grade:.' , . TopTVrcod 8;RD; 8-RD
8-RD
' :suotpai:' (MO) (t-.KBl.
3,052
9,250
OblO TOF(IIKS).. ;'B!m(ilKBlii
:shoi,"' ,-,DoHs.. :(sfi3ii?i)
Enlsred Shot; ; Telsl .,, ...HchBfiiConipJftiipn
3/B/20.13;. '400.0 • 400.0
3/8/2013. 1,475:0! ' M?5-0
8/3/.1965.'.': ' B;716.0 ;,8,'728:p 2,0 22' .^J^C^P,;^ijj^;WOIe'
8/24/1362'; 0.785:0 i 8.702.0 2:0 15 .wgl^^M^Ortglnfll'Hole
8/Z5/1|̂ 2; . 8;795:p. 8,801.0 ;; 2.0 :i5 y^0^pAtyip;'Ortg|narr|ole Other Strings
Run Os lo ' SolOeph (tlKB)'
Other InHola o n :
PLUG BACK (TQP'O'F, CEMENT)
GnstltohBridge Plug
Milled casing section
Packer
iTopglKB).
5;995:o
•6,128.0
6,718.0
9;100.0
Bim(lixo). 6,755.0
6;178:0
6.725.0
9.102.0
R U . I O J I O -
9/4/2013
2(25/2013
.8/3/1965
9/4/2013
Csm
Page 1/1 Report Prihlad: 11/11/2013
13-3/g
^'/•v U.fa a* iafrfT* 5RSL
W « 3
esq Cod^pse - 7
-= 8195*- 8.601'
MVz 11.6, Scxfi. q^go
Toe© 0,<*<3H-'
5if J a ( w T <a 5<?54'
Oieviph Major Rig Work Over (MRWO) Gasing: Repair
Job Start bate:|/23/20i3 Job Ena"Date:
Well Name'. Lease • • HENS^Vy.DFePUNIT
Field Namo ' ~ HBns%w/'VVolf(»mb; _
Business, Unit '•" MiSCebntiiient Mud Una Elevation (ft) Ground Elevation <,h)'
3.834:00 Original RKB:(fi)
.3.850,00 Cuiiera RKBEIevaiion 3.850.00, 9/20/2013
Water Dei* (It)
RepOrt^S^IDater. 8/23/2013;
JSA
RUP.U
FGRKLIFT/SET^ STRING';(KNIGHT m / T O . O t S ^ R ^ G ) ;
^.gE^IR^V^gljiQME'' R ^ b r t l S t ^ i P a t ^ 8 ^ 4 i 2 0 1 3
•SB^^^^\JQ^p^f)pti • ' . " • SAFETY MEETING
NDiPRODUCTIONTREE; &^WH 7-1/16 FLANGE:
NU:.BpP/ANNULAR'(HYD)*
TeST;BpP;WI.TH;4 :5J(fjEAK
p i G K ; U ^ XO
•RiWf.Vy 192'"j'fS}2:3,75'''W/O.RK: STRING; TAG 5:96V (OLD CSG REPAIR-SPOT- 5,956');, PICK-UP"AND ,RIH PAST'IT. TAG T6|V"@-'6,1 15' +/- (PREVIOUS JOB
ROTATE BOX/TAP ON TOR.
pgOJ3WvW0p_KS3pR.ING, "'"(BOX'TAP WAS CUT IN TWO'PLACES), SWH SDFWE ;
CREW TRAVEL HOME
Repdrt'SlartiDate:.:,8/26/2013
CREW TRAVEL T O . L 0 O A T I O N " - '
JSA
WAIJ ON WIRE'UINE:ENTRY'Gyil5E
WHpSrO'PSL"glH WWIj: ;ENTRY.:gyipE T.p TOF AT 6,1 ̂ ' . (DID'NpT TAG. ANYTHING'AT 5;961\
C ^ R C U J ^ E i W r ^
CREW TRAVEL HOME.
Report Start Date:- 8/27/2013
CREW TRAVEL"TO/WELL
JSA
WHpSH 0 P,S), CIRCULATE WELLBORE }^Y,qpWN;6 JTS;TBG: .EpT':5,638'
RU jBJwe jK ; ^
RIH'W;GAMERAAAJL-(IDN~IBEDCSG:ISSUES),.R0SSIBL&CSG ISSUE/CEMENT AT ;5;961". 6,028', CAT SLIVER'BELOW 6028'tAID UP AGAINST CSG VVAll. SCHAROES'OF CSG OR CAT ON BOTTOM.
Rp WL
POOH. STANDING BACK WORK- STRING
CREW TRAVEL'HOME
R9port':Start;Date:. 8/28/2013
_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ ^ CREW TRAVEL TO LOCATION ' ~ ~ ~ ~ ~ ~ JSA MAKE UP BHA .MULE SHOE, 3.75" STRING MILL, 6-3 1/8" DRILL COLLARS, JARS, 2.375" WORK STRING,
RIH TO 6,00.4'
PICKUP POWER SWIVEL
WORK SWIVEL FROM-5,943* TO 6,040' (ONLY TORQUED UP A LITTLE AT 5,963" (TOP BAD AREA-LINER TOP), THEN :DIDNT TORQUE UP ANYMORE)"
CIRCULATED WJ5LLBORE CLEAN (ONLY RECOVERED RUST AND VERY FEW SLIVERS OF METAL SHAVINGS)"
RD POWER'SWIVEL
POOH STANDING BACK TBG IN DERRICKrSWH SPHN
CREW TRAVEL HOE
Report Start Date: 8/29/2013
CREW TRAVEL TO LOCATION
JSA
WHPSI O.-PSI, MAKE UP FISH BHA = 3:75"-OD(2" CUT UP ON BOTTOM) BOX TAP, XO, 2.375" TBG WORKSTRING:
Pago 1/7 Report Printed: 11/21/2013
Chevron Major Rig Work Oyer (MRWO) Casing Repair
Job Start Date;: 8/23/2013 Job'End Date:
Wei! Namo J . C H K ^ N S H A W DEEP.UNI 1.005 ' ,
Lease • HENSHAW DEEP. UNIT
Field Narno'-
HenshawvWojfcbrhp ^siness.Unll f
Mid'Continent Ground Elevation (ft)
3.634.00 OrigjnatRKB (tt)-
3.850.00 CurrentRKB Elevation *
'3,850:00, 9/20/2013. Mud Line Bevolion (ft) Water Doplh (ft)-
S J O E f c
RU POWER'SWIVEL
ROTATED PIPE AND PICKED UP THREE TIMES TO GET THROUGH IT. PICKED/UP PvOWER SWIVEL AND WORKEDTT FROM 5;7?2' TO 6; 117!,
RD POWER'SWIVEL
ROOH:STANDING-,BACK.(V,ERY,SLOW DUE'T.O'KEXVIEW:COMP.UTER ISSUESV.'.NO NOTICABLE DAMAGE INSIDE'BOXTAP FROM FISH, ONLY i£XT ER N AL' DAMAG E FROM ROTAt IN G (N O' MAI OR. GOUGES)'. SWH SDFN
CREW'TRAVEtfHOME '
Report Start Date: . 8/30/2013 (<!V.'«
CREW TRAVEL Tp.LOCATIpN
JSA
MAKE UP DRILL BHA,.3.7.5" CONCAVE MILL, BIT SUB, 6- 3 1/8" COLLARS, JARS
RIH W 2.375'! WORKSTRING: TAG'5,962'. PICK UP AND, RUN THROUGH, TAG.CAT AT 0,115'
RIG UP POWER SWIVEL
DRILL- OUT CAT. 6,115"TO 6;139'. STOPPED MAKING-HOLE AS FAST, AND RETURNS OF CIBP. ' "DID NOT RECOVER-AS MUCH ALUMINUM AS EXPECTED.
CIRCULATED WELBORE CLEAN. SWH. S.D FOR HOLIDAY WEEK END.
TRAVEL.HOME
Report Start Date: 9/3/2013
CREW TRAVEL TO LOCATION
JSA
WHPSI 0-PSI, DISPLACE FRESH WATER IN WELBORE TO 2% KCI. (NO CHANGE |"N~FLUID LEVEL OVER HOLIDAY WEEKEND)
MILL TOP SLIPS pF CIBP. FREEING PLUG (OIL SHOW DURING DRILL OUT OF PLUG) ' ~
RD POWER SWIVEL
CHASING CIBp DOWN•(PICKING..UP TBG OFF OF TBG RACK) TO 6,718', CIBP STOPPEDGOINGDOWN
RU. POWER SWIVEL'"
MILL DOWN TO 6.721.', SWH, SDFN
CREW TRAVEL HOME
Report Start Date: 9/4/2013
TRAVEL TO LOCATION ~ '
JSA
WHPSI 0-PSI;.CONTINUE MILLING UP CIBP 6,721' TO 6,724', NOT MAKING.ANY MORE DEPTH (CAST IRON IN.RETURNS)
RD POWER SWIVEL
POOH, LAID DOWN MILL,
RIH W MULE- SHOE/RE-ENTRY GUIDE ANDTBG. SWH,.SDFN
CREW TRAVEL HOME
Report Start Date: 9/5/2013
CREW TRAVEL TO LOCATION
JSA
JSA, WHPSI 0-PSI, CIRCULATE WELLBORE WITH CLEAR CLEAN WATER
RU WUCAMERA (WARRIOR AND DOWN HOLE VIEW)
R.IH' W WUCAMERA TO 6723'. RECORD VIEW 15' ABOVE TO.CIBP'(NO VISIBLE CASING COLAPSE OR SPLIT).
RDWL/CAMERA
POOH W WORKSTRING STANDING BACK. LAID DOWN MULE SHOET
RIH W 3.75"X6' SHOE, XO, JARS, 6-3' 1/8 DCS AND 168 JTS 2.375" WORKSTRING (EOT-5514'). SWH SDFN
CREW TRAVEL HOME
Report Start Date: 9/6/2013
CREW TRAVEL TO LOCATION
JSA
CONTINUE RIH. TAG TOF @ 6,723'.
RIG UP POWER SWIVEL
START CUTTING AROUND FISH WITH SHOE, CUT DOWN TO 6,726' (STARTED GETTING CEMENT IN RETURNS). SWH, SDFN
Page 2/7 Report Printed: 11/21 /2013
Chevron MajorRig WprR;Overi(jvnj?WOy .Casing"Repair
Job iStart $ ^ : ^ i m m % Job End Date:
BusinesslSnit
rGr'lK'BF^SHAW DEER UNyi.005 Lease: ' -HENSttA'W'DEEP^ONIT-
Field Name; Henshaw Wollcarnp
Mud Line Elevation (ft)-Ground fclevation;(ftV' 3,834.00
Original RKB (ft) , ' . 3:850.00
Current;RKB:ElBvabon k ' 3-350100; 9 /2^013
Water Depth (ft)
i s ; ; * r £ ~ t t ; » & i g g s 5 3 r " ^ GREW: JR^VEL-'HOME"
RepgrMtarllPate::; 9/7/20,1
GREWiTRAVElJirP. LOCATION.
USA,
eUpQYER.;EjSH^
RD POWER SWIVEL l ^ l j T ^ U F / M N ^
SD3DUE'TP;POWER TONGSiEAILURE;ON PULLING,]UNITrDEGISION-M DOWN'HOLE
GREW/TRAVEL' HOME
RopprtlStart':Dafe;'j9^ ' K j l ^ - t * - T : CREWTRAyEL TO LOCATION:
,)SA' RjH :W;3J75;xg' 5HOE:;TppLTO
GIRCUI_M:E WEULBOREWITH CI!EAN FRESH WATER.
RU WARRIOR WIRE LINE.
RIH W DOWH HPLE.VIEW:(CAMERA); RECORDED DAMAGED GSG' AT 6,726'."
PULL UP.HOLE TO 5.:95p:'(ENIXOF';SHOE);
Rll|,yy DOWN.HOLE VIEW (CAMERA); RECORDED DAMAGED CSG AT 5,952:.'SWH SDFN
CREW;TRAVEL HOME Report Start Dale: ,9/10/2013
GREWTRAVEL TO LOCATION
JSA
RIG UP POWER SWIVEL
PUTP0WjNJWITH 'SHpE;^ROM,.6^ TO'6,/30' WHIL E REV CIRC ,(RETURNS=CEMENT; LITTLE STEEL SHAVINGS, FORMATION)
CIRCULATE WELLBO.RE, SWH. SDFN ~ ' ~
CREW Tj'RAVEL HOME;
Report Start Date: 9/11/20"?3
GREW TRAVEL TO LPGATIPN ~
JSA WHPSI'0 PSI,J
,REV'GIRC*AT6;730"WITH FRESH WATER
RIG UP WIRE LINE AND DOWN HOLE VIEW CAMERA
RIH W CAMERA RECGRD BAD CASING AREA.
RIG DOWN WIRE LINE AND CAMERA
RIG UP POWER SWIVEL CUT'DOWN WITH'SHOE'FROM:6>730' TO 6-733' AND TBG PUJGGGDOFF.
RIG DOWN ROWER SWIVEL
RIGrUP'REBUlbT TONGS (DUE TO TONG FAILURE FROM BEFORE)., '"TONGS'DID NOT WORK; SWH SDFN
GREW TRAVEL HOME
Report Start Dale: 9/12/201,3
CREW TRAVEL TO LOCATION
JSA
WHPSI 0-PSI. RU POWER TONGS
PO.OH W WORKS TRING (SHOE WAS EMPTY, INTERNALLY SCARED FROM SHOE TO TOOL TOP),
PICK UP AND MAKE UP BHA, 3.5"X6'-SHOE (3.75" LIP), 30'X3.5" WASH PIPE, TOOL TOP, XO TO 2.375" EUE.
RIH W SHOE AND 2.375" WORKSTRING
RUPS
C.UT OOWN FROM 6,733' TO 6 ;737' (CEMENT AND METAL RETURNS), REVERSE UNIT STOPPED RUNNING. PULL UP, SWH, SDFN
CREW TRAVEL HOME
Report Start Data; 8/13/2013
TRAVEL TO LOCATION
Page 3/7 Report Printed: 11/21/2013
Chevron Casing Repair Job Start • r ^ % J / 2 | M ! l |
Job End Date: Businra^Unit;
MidVCoritineht Woli Name , •CHK'HcNSHAW'OEE-? UNI.TQ05
Loasflt
riENSHAW;;DEEP>.UNIT FrBW:Nama;-
Henshaw syyolfcamp GroundBovation (ft):
b;834.00 OriainnliRKB (fl)
'3,850:00 CurrentRKBEIevatlon' '
-3,:B5d:da;9"/2W2b;i3 Mud PneSevation.(«)' Wator Depth (ft)
JSA
gO^JI.NjLJE ;e :Up!NQ LOST CIRCULATION, CUT DOWN TO 6,746"
RDPS
RU W'RE'UNE
RIHTO'SHOOT DRAIN ;HpreS^DEr^lSj^T360';
RD;WIRE';LINEi
POQH-W'.WORKSTRING (EOUNDiTBG:RLU,GGED OFF 10 STANDS ABOVEv'SHOE) (EMPTY'SHOE/WASH PIPE. WASH PIPE.SCARED INTERNALLY FOR
CREW TRAVEL HOME
Report Start Date: ;9A6/20,1.3,
GREWTRAVEL TO.LOCATION
JSA:
WHPSI 0-PS! , ; :MAKE UP BHAj3.75';X6' SHQE(DIAMOND & WIRE), .i;J.T,S'WASH-piPE«3i:^X30,
! TOP SUB/XO)
RIH'W WPRKSTRINGr(2;375' !), XAG FISH^a'-HIG^'tgrBJ-IS;
RUPS
CUT.POWN'AROUND FISH (REV CIRC). TO;6,726'/'CipC'eLEAN;-.SWH, 'SDFN,'
CREW TRAVELMOME
Report Start Date:' 9/1,7/20,13
GREWTRAVEL TO LOCATION . •
JSA
WHPSI'0-PSI, RDPS
POOH
CHANGE SHOE'W 3.75" SHOE; 1 JT 3:5 " WASH PIPE, TOP'SOB,VXO.(BOTH LARGIf.BORE ID)
RIH. TAG F'SH 6.728'
RUPS
Y V O R K ^ C ^ AND CEMENT IN RETURNS), .SWHJ'SDFN
CREW TRAVEL HOME
Report Start pate: 9/18/2013
CREWiTRAVEL XO LOCATION
JS"A"
WI;IPSI OiPSI, CONTINUE CUTTING; CUT FROM 6,'744.Tpi6;749'.(RETURNS WERE'MOSTLY CEMENTAND LITTLE STEEL SHAVINGS, THEN GOING TO ^R jCOi^W £LLfiEMlN^-'BlTUR'NSj.'TBG' STARTED'plt/GOlNG OT DOVVN 2' tp.6.75i : .
CIRCULATE CLEAN (REV)
RDPS
POOH. CHECK SHOE 4'X2" WADED UP (FRESH CUT)(2' ABOVE'END OF SHOE);-5-6" OF WADED CUT CSG 23' INTO WASH'PIPE, CSG, SWH, SDFN -
CREW TRAVEL HOME
Report Start Date:. 9/19/20.13
CREW TRAVEL TO LOCATION " ~ ! : :
JSA
P I C K U P - A ^ 1 j j 3.5" WASH RIPEf TOP SUB,"XO (BOTH FULL ID)
RIH;WITHi2.375" WORK,STRING,'TAGGED 7' HIGH AT 6,74>
CIRCULATE WELL BORE WITH'CLEAN FRESH WATER. (CONVENTIONAL).
RUWL7CAMERA"
RIH'W WU/CAMERA, RECORDED AFFECTED CSG AREA.
RpWL/S.WH; SDF.W (LIGHTENING STROM)
CREW TRAVEL.HOME
Report Start Date: 9/20/2013,
CREW TRAVEL TO LOCATION ~ " ' r~~~ !
JSA
FINISH RIH
RUPS
Page 4/7 Report Printed: 11/21/2013
Major Big WorR fiver"(MRWO) Casing Repair
Job Start D^^SlWMii JofrlnB^Date:
Wall Namo • G H ' K V H E N S H A W D E E P U N I T 005
i » » i ' * HENSHAW DEER. UNIT
PJeW Name; • • -Henstiaw.Wolfeanip
Duanosa Cln'i " Mid{Gon'tinent
Ground Elevalion (fl).:
" "*$jS&'.do Original RKB (fl) ''
3,850.00 Currant;RKB;Elevation
3','850:'60, 9/20/20'l3 Mud Line Elavalion;{ft) Water Depth (ft)
TAGGED:(6;743:), G.UT:pOyyN:TO^?755:.; SgOE'STPPTjEOJC^ T f NG/
RDPS:
P^PJH|;SCJAPES;t3FW
MAKE UP BHA
R!H:W ;?75' ,X6'5SHOE/T;iT WASH PIPE, TOP SUB, XO, TBG.. SDFN .©^SOp^SWH^
CREW TRAVEL-THOME
ReportStart Palo: : 9/20/2013••
GREW TRAVEL'TO LOCATION
JSA'
FINISH'RIH
RUPS TAGGED 2' HIGH (6;753'.)', ROTATEDrpOWN;?' CUTTO A6,755'|, GUT DOWN TO ;6;764'
RDPS'
POOH, r .0F CEMENT CORE IN SHOE WITH. PIECES OF'CSG,
MAKE UP BHA
RIH W 3.75"X6'.'SHOE WITH WIRE INSERTS, 1 JT'WASH PIPE, TOP SUB, XO„TBG. .SDFWE.® 6,500', SWH
CREW TRAVEL HOME
Report Start Date: 9/23/2013
TRAVEL'TO LOCATION
JSA' WHP.SI-0 PSI'FINISH RIH
RUPS CIRCULATE WELLBORE
TAGGED.20'. HIGH AT 5.744'. ROTATE TBG; RIH TO 6,764'. RUN THROUGH /AFFECTED AREA'S TIMES, TAGGING'BOTTOM'AT'6,764',
RDPS
POOH (EMPTY SHOE)
RIH W 3.75'!X6' SLICK SHOE, 1 JT3.'5" WASH PIPE; TOP'SUB, XO, 2; 375" WORKSTRING, EOT : 6,600', SWH, SDFN
CREW TRAVEL.HOME
Report Start Date: 9/24/20,13
CREW T RAVEL TO LOCATION
JSA
WHPSI .0-PSI,'FINISH RIH
RUPS
TAG TOF @ 6.764', CUT DOWN'TO'6.772' (47'. BELOW TOP COLLAR OF COLLAPSED CSG JT)(CEMENT RETURNS W POSSIBLE FORMATION) RDPS ~~~~ ~ "
POOH (3' CORE IN SHOE AND 1 SMALL. PIECE OF .STEEL)
RIH W 2375" MULE:SHpEi;;2:375V W0RKSTRINQ,;EOT @ 6;600YSWH,iSDFN
CREW TRAVEL HOME' '
Report Start Date: 9/25/201.3
CREW TRAVEL TO LOCATION
JSA
WHPSI 0-PSI, FINISH RIH
RU/WL7CAMERA
RIH W'WL/CAMERA, RECORD BAD CSG AREA'(6,725- TO'6,772') (SIDE TRACKED)
RD/WL/OAMERA.
START POOH W TBG.
CREW TRAVEL HOME
Report Start Dato; 9/26/2013
CREW TRAVEL TO LOCATION
JSA
WHPSI 0-PSI, FINISH POOH
Page 5/7 Report Printed: 11/21/2013
Chevron Malpr;Rlg'W6H(^ir1(MRVVC>):
Casing Repair Job-Start Date: 8/23/26l3
Job, End Date: Well.Name 1gSk1HENS,tjAW.'DEEP -ONIT-pOS;
Lease 1
HENSHAW DEEPjUNIT Field Name ' Hensh'aw Wblfcarrip
Buonets Unit- ~" Mid;G6n\iheri\'.
Ground Elevation (fl) " Original RKB (ft)"- ; 3.834:00 3,850.00
Currenl RKB Elevation. 3,85b:00; 9/20/2013.
Mud Llno Boyation (h) • Water Depth (fl)
RU.WL
RUN IN HOLE WITrH':GRAYiWL CBL'TOOL'ASS^';vRIH:W'TOOU*'•TO':6^30• (DESIRED-DEPTH WAS 6;565') UOS,T;STRING;VVEIGrHTAND. PUUI. 'UP' ip" 6;6'3B; AND; PUSUEl' INTO' f jG r i t . SPOT (OIlD-GIGRTDEPTH' V fXt f f i UNABLE' TO' FREE TOO'li, S U R G E ' W M L ' P R E S S U ' R E FREE TOOL). .P'ULlSOUt bR^RQPE^SdCkET'AT's^SOOL^. '
STACKED OUT. (UNABLE TO
Rp WL, (FJSH TOOLS GpMING.pUT.OF.Op
CREW TRAVEL HOM>
ReportStart Patpl '9/27/2013
CREW TR AVEL TO. LOC ATION
.ISA
MAKE UP FISH BHA, '3>5/8" p^YERSHOT'W-1' 7/16" GRAPPLE ANp;CONTRPL\ TOOL TOP, XO, 2.375" WORK STRING.
RIH W BHA 215 JTS;'Tp'6,7:7q'. TOF SHO.ULD BE;6 ;757 '+ / -
WPRK GRAPPLE, ;SETTING'3 ;5 POINTS DOWN.
POOH STANDING'BACK W ^
FilH W.SAME BHAj.SHUT DOWN/ABOVE' OPEN HOLE SWH, SDFWE
CREW TRAVEL HOME FOR WEEK END.
Report Start pate: ' 9/30/20.13' Comv
CREW TRAVEL TO.LOCATION
JSA
WHPSI 0-RSI, FINISH RIH, TAG'TOF @.6,759'
POOH (NO FISH'IN GRAPPLE)
RIH W 3 S/8" OVERSHOTW 1,7/16" GRAPPLE AND CONTROL, W-21 EXTENSION, TO.OL TOP, XO, 2.375" WORK STRING. TAG TOF @ 6,759';
POOH (NO FJSH IN.GRAPPLE). SWH, SDFN
CREW TRAVEL HOME
Report Start Date: 1,0/1/2013.
CREW TRAVEL TO LOCATION
JSA WHPSI.0-PSI, RIH'W'3.75" TRI-CONE BIT. 3.875" STRING'.'MII.L, AND TBG.
RU STRIPPER HEAD 8 I.JOWER SWIVEL ' ~
DRESSED CSG FRPM 5,800' TP6,600' (TWO TIGHTSPOTS 6,125' AND 6,028')
CIRC CLEAN POOH STANDING BACK TBG; LAID DOWN COLLARS. SWH SDFN
CREW TRAVEL HOME
Roport SlartDato: 10/2/2013. .Can i
CREW TRAVEL TO LOCATION
JSA WHPSI 0-PSI, RU GRAY WL,
RIH W 3.75" GUAGE RING (TAGGED 3,850', 6,028': AND,.6,400'), PULL.INTP SAME DEP THS ON WAY OUT.
RD GRAY WL
WAITED ON BLM TO. APPROVE LOWER ABANDONMENT CHANGES.
RIH W MULE'SHOE TO 6,000', SWH, SDFN
CREW TRAVEL HOM
Rpport'StartDalb: 10/3/2013
CREW T RAVEL TO LOCATION
JSA
WHPSI 0.-.PSI; FINISH RIH TO 6,755',(TAGGED SOMETHING)
RU HES CEMENT TRUCK
PUMPED A BALANCED CEMENT PLUG FROM 6,755' TO 6,000'.
PULL UP HOLE TO'5,965'
REV CIRC CLEAN
RD HESCEMENTTRUCK
POOH, SWH, SDFN (CEMENT TO CURE)
GREW TRAVEL HOME
Page 6/7 Report Printed: 11/21/2013
Chevron Major Rig-Workover (MRW^ Casing* Repair
Job End D§te-We'l Homo-.fcl.ik:HENSHAW;PF^EP:.UNIT 005
Lease " • - - !
HENSHAW DEEP UNIT Field Name; Business, Unit', "
Mi|-Gpntihent Ground Elevation ,(ft)
- - 3 8 3 4 0 C
Original RKB (It]-
3 850 00 CurrentiRKB.EIevation
^850:00; f?20/2pl'3-Mud Lino.Elevation (ft) WaterDootfi (ft)
RepjjrLStertlpatepIO
GREWiJRAVEL T0.L0CATI0N
iiSA"
WHPSI'SLIGHT'VAC, RIH ;WITH 2.375^MUUE'SHOE'ENTRY'GUIDE, 2;375"'WpRK^STRING, TAG TOC'.@'5;995''(GOOD)(BLM'REGUIRED TOC'OF 6,030' &®;000'j',
TESTCSG TO 300 PSI (LOOSE 50 PSI IN 10 MIN)
POOH. W/^ppjqNiREAK^PACKER'HA^
GREW.TRAVELSHOME' Report Start Date:' 10/5/20,13
TRAVELTO LOCATION
JS* WHPSI 0-PSL RIH W HALLIB,URTpN'4-5'; CIBP, MEGHAN
SET CIBP @ 5,925',
TEST TO 300 PSI (GOOD TEST),
POOH LAYING.DOWN WORK STRING:
NDBOP LOAD WELLBORE W-FRESH WATER
NU.WH-FLANGE. SWH, SDFWE.
GREW TRAVEL HOME
Report-Slart.Dato: 10/7/2013
CREW TRAVEL TO LOCATION.
JSA
RIG DOWN PULLING UNIT
FIELD MOVE UNIT TP/ HENSHAW FEDERALA-I, (PERFORM MAINTENANC&ON.UNIT)-
CREW TRAVEL HOME
Page 7/7 Report Printed: 11/21/2013