Macedonian Kicevo-Ohrid Motorway Project SECTION PODVIS-PRESEKA Calculation for quantities of excavation II.3 Additional for excavation in rock with mine Location: km 12+340 ~ km 12+600 Profile Chainage Distance ref no 1005-18/683 no no km m % 1 97 12+339.40 0.000 59.990 20.600 1,235.790 1,235.790 0.00 1,235.790 78% 963.920 2 98 12+360.00 119.980 300.000 20.000 6,000.000 7,235.790 168.30 5,831.700 78% 4,548.730 3 99 12+380.00 480.010 639.620 20.000 12,792.400 20,028.190 1,864.70 10,927.700 78% 8,523.610 4 100 12+400.00 799.230 812.200 20.000 16,244.000 36,272.190 3,613.60 12,630.400 78% 9,851.710 5 101 12+420.00 825.170 765.610 19.400 14,852.830 51,125.020 3,380.64 11,472.190 78% 8,948.310 6 102 12+439.40 706.050 633.530 20.600 13,050.720 64,175.740 2,538.64 10,512.080 78% 8,199.420 7 103 12+460.00 561.010 455.360 20.000 9,107.200 73,282.940 1,100.70 8,006.500 78% 6,245.070 8 104 12+480.00 349.710 316.530 20.000 6,330.600 79,613.540 402.60 5,928.000 78% 4,623.840 9 105 12+500.00 283.350 291.440 20.000 5,828.800 85,442.340 378.50 5,450.300 78% 4,251.230 10 106 12+520.00 299.520 302.550 19.400 5,869.470 91,311.810 174.41 5,695.060 78% 4,442.150 11 107 12+539.40 305.580 259.920 20.600 5,354.350 96,666.160 0.00 5,354.350 78% 4,176.390 12 108 12+560.00 214.250 127.640 20.000 2,552.800 99,218.960 0.00 2,552.800 78% 1,991.180 13 109 12+580.00 41.030 20.520 20.000 410.400 99,629.360 0.00 410.400 78% 320.110 14 110 12+600.00 0.000 Serial number Actual Section Area Average Section Area Quantity for this period Sumary Quantity Diference Quantity March Quantity (calculation 6) Add. for excavation in rock for this period m 2 m 2 m 3 m 3 m 3 m 3 m 3

Upload: goran-gogo-anastasieski

Post on 14-Jul-2016

1 views

Category:

Documents


0 download

DESCRIPTION

bdfbfgb

TRANSCRIPT

Macedonian Kicevo-Ohrid Motorway Project Date 05 02 2016

SECTION PODVIS-PRESEKAⅡ

Calculation for quantities of excavation

II.3 Additional for excavation in rock with mine

Location: km 12+340 ~ km 12+600 Calculation no. 6.7

Profile Chainage Distanceref no 1005-18/683

no no km m %

1 97 12+339.40 0.00059.990 20.600 1,235.790 1,235.790 0.00 1,235.790 78% 963.920

2 98 12+360.00 119.980300.000 20.000 6,000.000 7,235.790 168.30 5,831.700 78% 4,548.730

3 99 12+380.00 480.010639.620 20.000 12,792.400 20,028.190 1,864.70 10,927.700 78% 8,523.610

4 100 12+400.00 799.230812.200 20.000 16,244.000 36,272.190 3,613.60 12,630.400 78% 9,851.710

5 101 12+420.00 825.170765.610 19.400 14,852.830 51,125.020 3,380.64 11,472.190 78% 8,948.310

6 102 12+439.40 706.050633.530 20.600 13,050.720 64,175.740 2,538.64 10,512.080 78% 8,199.420

7 103 12+460.00 561.010455.360 20.000 9,107.200 73,282.940 1,100.70 8,006.500 78% 6,245.070

8 104 12+480.00 349.710316.530 20.000 6,330.600 79,613.540 402.60 5,928.000 78% 4,623.840

9 105 12+500.00 283.350291.440 20.000 5,828.800 85,442.340 378.50 5,450.300 78% 4,251.230

10 106 12+520.00 299.520302.550 19.400 5,869.470 91,311.810 174.41 5,695.060 78% 4,442.150

11 107 12+539.40 305.580259.920 20.600 5,354.350 96,666.160 0.00 5,354.350 78% 4,176.390

12 108 12+560.00 214.250127.640 20.000 2,552.800 99,218.960 0.00 2,552.800 78% 1,991.180

13 109 12+580.00 41.03020.520 20.000 410.400 99,629.360 0.00 410.400 78% 320.110

14 110 12+600.00 0.000

Serial number

Actual Section Area

Average Section Area

Quantity for this period

Sumary Quantity

Diference Quantity March Quantity

(calculation 6) Add. for excavation in rock

for this periodm2 m2 m3 m3 m3 m3 m3

Total 99,629.36 Total 86,007.27 Total 67,085.67

8,854.364

-60,377.25

Total 15,562.78

Подизведувач: (име, презиме и потпис) Изведувач: (име, презиме и потпис) Надзорен инженер (име, презиме и потпис)

Subcontractor (name,surname and signature) Contractor (name,surname and signature) Project Engineer (name, surname and signature)

Date 05 02 2016

Calculation no. 6.7

Remarks

March Quantity

Надзорен инженер (име, презиме и потпис)

Project Engineer (name, surname and signature)

deduction from calculation 6.6

Macedonian Kicevo-Ohrid Motorway Project Date 20 02 2016

SECTION PODVIS-PRESEKAⅡ

Calculation for quantities of excavation

II.3 Additional for excavation in rock with mine

Location: km 17+040 ~ km 17+460 Calculation no. 8.10

Profile Chainage Distanceref no 1005-18/683

no no km m %

1 341 17+040.000 0.00040.310 20.000 806.200 806.200 463.50 342.700 45% 154.220

2 342 17+060.000 80.610242.140 20.000 4,842.800 5,649.000 1,896.90 2,945.900 45% 1,325.660

3 343 17+080.000 403.670925.910 20.000 18,518.200 24,167.200 8,604.00 9,914.200 45% 4,461.390

4 344 17+100.000 1,448.1402113.790 20.000 42,275.800 66,443.000 24,290.20 17,985.600 45% 8,093.520

5 345 17+120.000 2,779.4402991.690 20.000 59,833.800 126,276.800 39,674.30 20,159.500 45% 9,071.780

6 346 17+140.000 3,203.9303144.820 20.000 62,896.400 189,173.200 43,247.70 19,648.700 45% 8,841.920

7 347 17+160.000 3,085.7103008.280 20.000 60,165.600 249,338.800 39,998.60 20,167.000 45% 9,075.150

8 348 17+180.000 2,930.8402778.380 15.380 42,731.480 292,070.280 27,519.74 15,211.740 45% 6,845.280

9 349 17+195.380 2,625.9202164.450 24.620 53,288.760 345,359.040 31,687.54 21,601.220 45% 9,720.550

10 350 17+220.000 1,702.9701140.100 20.000 22,802.000 368,161.040 11,336.70 11,465.300 45% 5,159.390

11 351 17+240.000 577.230593.260 20.000 11,865.200 380,026.240 2,879.50 8,985.700 45% 4,043.570

12 352 17+260.000 609.280871.250 20.000 17,425.000 397,451.240 4,413.00 13,012.000 45% 5,855.400

13 353 17+280.000 1,133.2201256.300 20.000 25,126.000 422,577.240 9,619.70 15,506.300 45% 6,977.840

14 354 17+300.000 1,379.3701221.220 20.000 24,424.400 447,001.640 11,412.50 13,011.900 45% 5,855.360

15 355 17+320.000 1,063.060858.770 25.380 21,795.580 468,797.220 10,290.96 11,504.620 45% 5,177.080

16 356 17+345.380 654.470450.560 14.620 6,587.190 475,384.410 2,096.95 4,490.240 45% 2,020.610

17 357 17+360.000 246.640163.090 20.000 3,261.800 478,646.210 184.80 3,077.000 45% 1,384.650

18 358 17+380.000 79.54084.070 20.000 1,681.400 480,327.610 405.40 1,276.000 45% 574.200

19 359 17+400.000 88.60044.300 20.000 886.000 481,213.610 382.20 503.800 45% 226.710

20 360 17+420.000 0.000

Total 481,213.61 Total 210,809.42 Total 94,864.28

Serial number

Actual Section Area

Average Section Area

Quantity for this period

Sumary Quantity

Diference Quantity March Quantity

(calculation 8) Add. for excavation in rock

for this periodm2 m2 m3 m3 m3 m3 m3

Total 481,213.61 Total 210,809.42 Total 94,864.28

121,773.191

-213,841.41

Total 2,796.06

Подизведувач: (име, презиме и потпис) Изведувач: (име, презиме и потпис) Надзорен инженер (име, презиме и потпис)

Subcontractor (name,surname and signature) Contractor (name,surname and signature) Project Engineer (name, surname and signature)

Date 20 02 2016

Calculation no. 8.10

Remarks

March Quantity

Надзорен инженер (име, презиме и потпис)

Project Engineer (name, surname and signature)

deduction from calculation 8.9