    A. D. ENTERPRISEEngineers & Engineering Services

  • 8/7/2019 A.D.enterprise Brochure_ 01 to 11

    2/17

    In late70s and early80s Power generation and supply, particularly in West Bengal,

    was passing through a severe critical situation. Very frequently there was a powercuts & shortage of power supply. Industrial sectors were passing through an acute

    production loss. Unrest ness among the workmenstarted surfacing out. Pay cut is imposed.Domestic and office fronts suffered badly due tofrequent & prolonged power cuts. There was achaotic condition in all works of life. Businesssuffered. It is realized; frequent power cuts are theprime reason for all these.

    We anticipated proper & consistence Quality of Overhauling & Maintenance work of Boilers in the Thermal Power plants are not carried out. Quality repair,overhauling & maintenance were need of the hour.

    With our knowledge, experience and expertise which we acquired whileexecuting overhauling, maintenance etc. work on behalf of M/s R.D.SteamEngineering Co. (Pvt.) Ltd., we emerged out in 1982 as a direct executor to thedamage control in the Small, Medium & High generation capacity Power Plants.

    We are glad to mention here that Boiler Directorate of West Bengal, vide its

    office order no. L/1056 dated the 20th. March 1994, Registered our name for Repair,

    Overhauling & Maintenance of Power Plant Boilers of any capacity.

    We are covered under: -

    Employees Provident Fund Vide Account No.:- WB/34934 E.S.I. Vide Code No. :- N-41/ 14271102 Service Tax Registration No. :- 918/MRS/SB02/KOL/05-06 VAT Registration No. :- 19674806045

    Proprietor : Mr. Ajit Kumar Das [9143336131]

    Regd. Office : (Old) 215/2, (New) 259, Bipin Ganguly Road. Dum Dum. Kolkata.

    West Bengal, India. Pin Code:- 700 030.

    Office : (033) 2548 1698

    Fax : (033) 2548 1698

    BTPS : 9477240559 [ Mr. Amit Das]

    DSP : 9474511671 [Mr. Soumen Kundu]

    DPL : 9903491063 [Mr. Subash Manna]

    IOCL : 9163216184 [Mr. Alok Brahma]

    Contact Us

  • 8/7/2019 A.D.enterprise Brochure_ 01 to 11

    3/17

    Mr. Arijit Das: MBA (Marketing & Finance) and B.Tech (Mechanical Engineer). Mr. Alok Biswas: Diploma (Mechanical Engineering). Mr. Soumen Kundu: Senior Supervisor.

    10 years of experience in over-hauling & maintenance of largeand high-pressure boilers.

    Mr. Alok Brahma: Supervisor.10 years of experience in over-hauling & maintenance of largeand high-pressure boilers.

    Mr. Amit Das: Supervisor.

    4 years of experience in over-hauling & maintenance of largeand high-pressure boilers.

    Mr. Ajit Mahato: Supervisor.10 years of experience in overhauling & maintenance of largepressure Boilers.

    Mr. Subash Manna: Supervisor.10 years experience in overhauling & maintenance of largepressure Boiler.

    In addition to above, we have highly qualified Engineers and Experts having vast knowledge

    in the field of High Pressure & High capacity Thermal generation plants/ stations with

    latest developments.

    Quite a good number of highly experienced & certified Argon welders are in our possession.

    Quite a good number of highly experienced & certified Carbon & Alloy Steel welders are

    readily available with us.

    Both the categories of welders are engaged throughout the year and carry out high pressure

    welding jobs in tubes/vales/pipes in various power stations maintaining IB Regulations.

    Semi-skilled and unskilled workmen are generally engaged from local areas.

    ENGINEERS AND TECHNICAL EXPERTS

  • 8/7/2019 A.D.enterprise Brochure_ 01 to 11

    4/17

    Welding Generating Set : 15 Nos. Welding Transformer Set : 16 Nos. WinchElectric3 Ton : 02 Nos. Winch2 ton Complete with wire rope

    Pulley block, snatch block etc. : 05 Nos.

    Winch3ton : 03 Nos. Winch5 - ton : 03 Nos. Chain Pulley Block :

    a) 5 ton capacity : 10 Nos.

    b) 3 ton capacity : 16 Nos.

    c) 2 ton capacity : 20 Nos.

    Pull lift :a) 1 ton capacity : 16 Nos.

    b) 3 ton capacity : 10 Nos.

    Max Puller :a) 3 ton capacity : 06 Nos.

    b) 1 ton capacity : 10 Nos.

    Oxygen Gas Set : 30 Nos. Argon Welding Set with flow meter : 20 Nos. Wire Rope(3/8, , 5/8 & ) : 3000ft. of each

    size.

    Wire Pulley Block : Different sizes. Rope Pulley Block : Different sizes. Manila Rope : Different sizes. Hydraulic Pipe Bending Machine up to 3 O.D. : 01 No. Pneumatic Expander : 06 Nos. Various sizes of expanders complete : 20 Nos. Electric Bench grinding machine : 01 No. Wire Rope Slings : Various sizes. Hydraulic Jack :

    25 ton capacity : 02 Nos.

    5o ton capacity : 04 Nos.

    Screw Jack :30 ton capacity : 08 Nos.

    50 ton capacity : 04 Nos.

    Angular Grinder (AG-7) : 04 Nos. Angle Grinder (Blacker & Decker) : 06 Nos. Portable Grinding Machine (GQ-4) : 15 Nos. Flexible Grinding Machine (FF2) : 04 Nos.

    TOOLS AND TACKLES

  • 8/7/2019 A.D.enterprise Brochure_ 01 to 11

    5/17

    Vertical Grinding Machine : 01 No. Pistol Grinding Machine : 15 Nos.

    Electric Hand Drill Machine : 04 Nos. Stand Drill (5/8 to 1) : 01 No. Ratchet Drill Machine : 02 Nos. Acetylene Regulator : 60 Nos. Oxygen Regulator : 60 Nos. Gas cutting Set : 30 Nos. Expander Machine -

    : 06 Nos.

    -2 : 06 Nos.

    -4 : 06 Nos.

    Boiler header milling cutter : 05 Nos. Pneumatic Grinder : 19 Nos. Pneumatic Rivet Gun complete : 03 Nos. Pistol drill : 04 Nos. Pneumatic Hand Drill : 06 Nos. Forge : 04 Nos. Vice : 09 Nos. Die : Various sizes. Tap : Various sizes. Magnetic base Dial Gauge : 05 Nos. Micrometer

    0 1 : 02 Nos.

    0 - 2 : 02 Nos.

    5 12 : 02 Nos.

    Vermeer Caliper -8 : 02 Nos.

    Precision Level -6 : 01 No.

    8 : 01 No.4 : 01 No.

    Spanner Ring, E.D., S.E. - Various sizes : 20 sets each. Dog Clip : Various sizes. Shackles : Various sizes. Reamer : Various sizes. Die nuts : Various sizes. Adjustable Reamer : 02 Nos. Pneumatic Operated Expander with Balance : 01 Set.

  • 8/7/2019 A.D.enterprise Brochure_ 01 to 11

    6/17

    Performance: April, 2001 - March, 2011

  • 8/7/2019 A.D.enterprise Brochure_ 01 to 11

    7/17

    7

    4

    8

    5

    13

    9

    5

    12

    9

    15

    April 2001 to

    March 2002

    April 2002 to

    March 2003

    April 2003 to

    March 2004

    April 2004 to

    March 2005

    April 2005 to

    March 2006

    April 2006 to

    March 2007

    April 2007 to

    March 2008

    April 2008 to

    March 2009

    April 2009 to

    March 2010

    April 2010 to

    March 2011

    TOTAL NO. OF WORK ORDER

  • 8/7/2019 A.D.enterprise Brochure_ 01 to 11

    8/17

    Rs.52,19,350.00

    Rs.15,30,250.00Rs.19,01,541.00

    Rs.48,77,495.00

    Rs.69,45,798.00 Rs.71,20,648.00

    Rs.48,19,267.00

    Rs.61,23,356.40

    Rs.1,03,85,798.75

    Rs.1,29,48,562.00

    April 2001 to

    March 2002

    April 2002 to

    March 2003

    April 2003 to

    March 2004

    April 2004 to

    March 2005

    April 2005 to

    March 2006

    April 2006 to

    March 2007

    April 2007 to

    March 2008

    April 2008 to

    March 2009

    April 2009 to

    March 2010

    April 2010 to

    March 2011

    TOTAL WORK ORDER AMOUNT

  • 8/7/2019 A.D.enterprise Brochure_ 01 to 11

    9/17

    Rs.7,45,621.43

    Rs.3,82,562.50

    Rs.2,37,692.63

    Rs.9,75,499.00

    Rs.5,34,292.15

    Rs.7,91,183.11

    Rs.9,63,853.40

    Rs.5,10,279.70

    Rs.11,53,977.64

    Rs.8,63,237.47

    April 2001 to

    March 2002

    April 2002 to

    March 2003

    April 2003 to

    March 2004

    April 2004 to

    March 2005

    April 2005 to

    March 2006

    April 2006 to

    March 2007

    April 2007 to

    March 2008

    April 2008 to

    March 2009

    April 2009 to

    March 2010

    April 2010 to

    March 2011

    AVERAGE AMOUNT

  • 8/7/2019 A.D.enterprise Brochure_ 01 to 11

    10/17

    Rs.24,59,556.00

    Rs.6,00,000.00Rs.6,75,000.00

    Rs.40,26,163.00

    Rs.18,23,500.00

    Rs.32,11,115.00

    Rs.13,79,150.00

    Rs.20,15,693.00

    Rs.27,17,057.75

    Rs.41,76,746.00

    April 2001 to

    March 2002

    April 2002 to

    March 2003

    April 2003 to

    March 2004

    April 2004 to

    March 2005

    April 2005 to

    March 2006

    April 2006 to

    March 2007

    April 2007 to

    March 2008

    April 2008 to

    March 2009

    April 2009 to

    March 2010

    April 2010 to

    March 2011

    MAXIMUM AMOUNT OF A WORK ORDER

  • 8/7/2019 A.D.enterprise Brochure_ 01 to 11

    11/17

    Rs.15,015.00

    Rs.3,37,000.00

    Rs.33,015.00

    Rs.1,05,000.00 Rs.1,09,500.00

    Rs.72,993.00

    Rs.3,14,280.00

    Rs.1,10,185.00

    Rs.2,10,000.00

    Rs.2,48,320.00

    April 2001 to

    March 2002

    April 2002 to

    March 2003

    April 2003 to

    March 2004

    April 2004 to

    March 2005

    April 2005 to

    March 2006

    April 2006 to

    March 2007

    April 2007 to

    March 2008

    April 2008 to

    March 2009

    April 2009 to

    March 2010

    April 2010 to

    March 2011

    MINIMUM AMOUNT OF A WORK ORDER

  • 8/7/2019 A.D.enterprise Brochure_ 01 to 11

    12/17

    24

    54

    6

    1

    0

    10

    20

    30

    40

    50

    60

    Overhauling Repairing/ Replacement Fabrication/ Erection / Commissioning Pipe Line

    WORK

  • 8/7/2019 A.D.enterprise Brochure_ 01 to 11

    13/17

    14

    9

    1

    0

    2

    4

    6

    8

    10

    12

    14

    16

    110 MW 210 MW 250 MW

    WORK ON BOILER CAPACITY

  • 8/7/2019 A.D.enterprise Brochure_ 01 to 11

    14/17

    0

    2000000

    4000000

    6000000

    8000000

    10000000

    12000000

    14000000

    April 2001 to

    March 2002

    April 2002 to

    March 2003

    April 2003 to

    March 2004

    April 2004 to

    March 2005

    April 2005 to

    March 2006

    April 2006 to

    March 2007

    April 2007 to

    March 2008

    April 2008 to

    March 2009

    April 2009 to

    March 2010

    April 2010 to

    March 2011

    OVERALL PERFORMANCE

    Total No Of Job Order Total Amount Average Amount Maximun Amount Minimum Amount

  • 8/7/2019 A.D.enterprise Brochure_ 01 to 11

    15/17

    CLIENTS OF A.D.ENTERPRISE

  • 8/7/2019 A.D.enterprise Brochure_ 01 to 11

    16/17

  • 8/7/2019 A.D.enterprise Brochure_ 01 to 11

    17/17

    BTPS STPS

    NO of Job First Job Last Job NO of Job First Job ast Job

    39 Jan, 2000 May,2010 15 Jan,2002 July, 2008

    DPL/ DPPS IOCL

    NO of Job First Job Last Job NO of Job First Job Last Job

    10 Feb,2005 Oct, 2010 6 July, 2008 Oct , 2010

    Kesoram Rayon Scale Away (@ BTPS)

    NO of Job First Job Last Job NO of Job First Job Last Job

    5 July, 2005 July, 2010 2 Sept,2003 Oct,2005

    DSP Shyam Sel Ltd

    NO of Job First Job Last Job NO of Job First Job Last Job

    2 July, 2008 July, 2008 1 May,2008 may, 2008

    Jai Balaji India Ltd.(JBIL) Chinakuri

    NO of Job First Job Last Job NO of Job First Job Last Job

    1 Aug,2009 Aug,2009 1 April,2008 April,2008

    Alstom (@ BTPS) Mc Nally (@ BTPS)

    NO of Job First Job Last Job NO of Job First Job Last Job

    1 Jan,2004 Jan, 2004 1 Nov,2002 Nov,2002

    Wright & Co (@ BTPS)

    NO of Job First Job Last Job

    1 June,2004 June, 2004