Adeyinka Olurin SAP Digital Business Services.

August 15, 2016.

Change Request Management with SAP Solution

Manager 7.2 (SP02)

Internal

Page 2: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 2Internal

Disclaimer

The information in this presentation is confidential and proprietary to SAP and may not be disclosed without the permission of

SAP. Except for your obligation to protect confidential information, this presentation is not subject to your license agreement or

any other service or subscription agreement with SAP. SAP has no obligation to pursue any course of business outlined in this

presentation or any related document, or to develop or release any functionality mentioned therein.

This presentation, or any related document and SAP's strategy and possible future developments, products and or platforms

directions and functionality are all subject to change and may be changed by SAP at any time for any reason without notice.

The information in this presentation is not a commitment, promise or legal obligation to deliver any material, code or

functionality. This presentation is provided without a warranty of any kind, either express or implied, including but not limited to,

the implied warranties of merchantability, fitness for a particular purpose, or non-infringement. This presentation is for

informational purposes and may not be incorporated into a contract. SAP assumes no responsibility for errors or omissions in

this presentation, except if such damages were caused by SAP’s intentional or gross negligence.

All forward-looking statements are subject to various risks and uncertainties that could cause actual results to differ materially

from expectations. Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only

as of their dates, and they should not be relied upon in making purchasing decisions.

Page 3: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 3Internal

Agenda

Change Request Management

Business Requirement

Change Cycle Types

Change Documents

Transport Management

Release Management

Content activation steps in ChaRM context.

Live DEMO

• Creating:

• Solution, Branches, Change Cycles (Phase Cycle, Continual Cycle)

• Request for Change

• Change Documents (Normal Change, Urgent Change)

• Transport Management (Transport Request, Transport Organizer, Task List)

• Release Planning

• Reporting

Page 4: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 4Internal

SAP’s Change Control Management Portfolio

Change Request

Management

Quality Gate

Management

Change and Transport

system (SAP / Non SAP)

Central Transport

Management

Retrofit Transport

Analytics /

Change

Diagnostics

Release

Management

Page 5: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 5Internal

Lifecycle based on Branches

Basics

DevelopmentMaintenance

Production

A Branch represents a version of the

solution documentation containing processes,

libraries, and systems.

The Maintenance Branch represents

the editable version of the productive

solution documentation. It provides an

safe environment for performing

changes.

The Production Branch represents the

productive version of the entire solution

documentation.

Further Branches e.g. to

deliver the future solution

documentation.

Page 6: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 6Internal

Lifecycle based on Branches – 2

Multiple Branches

DevelopmentMaintenance

Production

There is always a Production and a

Maintenance Branch but customers can

define as many additional Branches as

required.

The Branch setup should be driven by the

customers System (Transport) Tracks and

the planned customer Releases.

Branch

Branch Branch Branch

Planned

Innovations

Page 7: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 7Internal

Understand the transformation from 7.1 to 7.2

Logical

Component Group

Project

Solution

Existing Infrastructure 7.1 New Infrastructure 7.2

Logical Component

Logical Component

Logical

Component

Logical

Component

Logical

Component

Logical

Component

Che

ck In

/ O

ut

Branches

Example “ERP”:

Page 8: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 8Internal

BranchesSystem Landscape

Introducing the Solution Landscape and its Components

Logical Component Development

Development

Development

DG3-100 QG3-100

Production

Log Comp Group ERP

Logical Component ProductionMaintenance Production

DG1-100 QG1-100 PG1-100

Planned

Innovations

Page 9: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 9Internal

Solution Landscape: Single Production System

Logical Component Development

Logical Component Production

Maintenance

Production

Development

Production system track

DG1-100 QG1-100 PG1-100

Development system track

DG3-100 QG3-100

Branches

(Solution documentation versions)Logical Component (Group)

Architecture

System Landscape

(Customer system tracks)

Logical Component

Group ERP

Planned

Innovations

Page 10: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 10Internal

Landscape Views

3 System Landscape 4 System Landscape

Multiple Landscape

Maintenance Landscape

Implementation Landscape

Page 11: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 11Internal

Enhanced Cycle Switch with Task List Re-Use

Logical

Component Group

Logical Component

Logical Component

Branches

Task List

“Phase Cycle”Phase Cycle #1

Phase Cycle #2

Cycle

Switch

Task Lists will be re-used if Cycles are closed

to minimize the time for re-assignment activities

Page 12: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 12Internal

Task List Re-Use for Release Management

Logical

Component Group

Logical Component

Logical Component

Branches

Task List

“Minor Release”

Task List

“Major Release”

Minor Release

Cycles

Major Release

Cycles

Task Lists will be re-used for the same Release Track to

allow central transport tracking and administration

Page 13: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 13Internal

Example: Change Cycle for ERP System only

Branches

Logical

Component

Groups

Logical

Component

Change Control

Landscape

Get Logical Components Get Logical Component Groups

Change Cycle

for ERPBranch: Maintenance

Contains logical Components of

Maintenance Landcape

Change Control Landscape: ERP

Contains logical Component Group

for ERP

Already defined

Already defined Already defined

Already defined

Planned

Innovations

Page 14: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 14Internal

New Fiori User Interface

Page 15: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 15Internal

Administration Cockpit

Central UI for Administrators

Replaces several outdated SAP GUI

transactions

Some Highlights

One-Stop Shop for Admins

Transport Analysis Features

New Tasklist UI (Web Based!)

Central Place for Import

Scheduling

Enterprise Search enabled

Planned

Innovations

Page 16: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 16Internal

Administrator‘s Cockpit unites all key information in a central place

Transport

Overview

Landscape

Overview

Fulltext

Search

Task ListTrackingCSOL Data

Page 17: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 17Internal

Simplified Cycle Types in SAP Solution Manager 7.2

Maintenance Cycle (SMMN)

Maintenance Cycle (SMMM)

Project Cycle (SMMM)

Page 18: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 18Internal

Simplified Cycle Types in SAP Solution Manager 7.2

Continual Deployment Phase Driven Deployment Release Management

• Development and Imports may

happen either individually or

bundled (on demand / daily /

weekly)

• Deploy changes into

production at anytime

However:

- No phases, no gates!

• All changes and transports of

a cycle will be imported

together (Import All)

• Mostly relevant for Project or

Wave based transport and

change management

• Based on Release Planning

according to ITIL definition

• Defined Relationships and

dependencies between each

Release

• Import job for the entire

Release content

• Additionally, no risk changes

can be imported bundled

Page 19: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 19Internal

Normal Change Urgent Change Admin Change General Change Defect Correction

Change Documents

Daily maintenance

Implementation

Projects

Depending on project

release-cycle

Integrated with SAP

Transport

Management

Emergency Changes

Optimized for fast

processing

Independent from

project release cycle

Integrated with SAP

Transport

Management

Documentation only

Administrative

activities

Related to system

landscape of change

project

Not integrated in

SAP Transport

Management

Changes on IT

Assets

– Mobile Devices

– Printer

– …

Not mandatory

related to any

change project

Used during test-

phase of

implementation or

maintenance projects

Document test

defects and their

correction

Integrated in SAP

Transport

Management

Page 20: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 20Internal

Change Request Management – User Roles

… categorizes, approves and monitors change requests.

… is the steering committee in the change management process.

… implements a change and hands over to the tester.

… tests a change, sets status in the change document.

… takes care of software logistics.

… creates a service message or a change request directly.

… handles the service message and creates a change request.

Requestor

Service Desk

Employee

Change

Manager

Developer

Tester

IT Operator

Change

Advisory

Board

Page 21: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 21Internal

Request for Change Workflow

Page 22: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 22Internal

Urgent Change Workflow

Page 23: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 23Internal

Normal Change Workflow

Page 24: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 24Internal

User Interface and Usability Improvement

“Status Overview” assignment block

Visualize the status scheme of your transactions.

New Search Criteria

Additional search criteria

New search criteria are mostly available for:

Change Documents

Change Cycles

Requests for Change

Urgent Changes

Normal Changes

Page 25: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 25Internal

Scope Assignment Block

Document description for each scope item

Change manager approves or denies request

Scope Definition

Request Approval

Page 26: Adeyinka Olurin - Goal 3 - Change Request Management

Transport Management

Page 27: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 27Internal

Transport Management in Change Request Management

Task List Cross-System Object Locks

Page 28: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 28Internal

New and Revised Import Scheduling

Scheduling has been improved to

cope with special customer situations

that require high import frequency

Import Scheduling is now possible

with any timeframe!

Users can re-use existing timeframes

or define periods from scratch

Planned

Innovations

Page 29: Adeyinka Olurin - Goal 3 - Change Request Management

Release Management

Page 30: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 30Internal

Release 1.1 Release 1.2 Release 2.0Release 1.0

Minor Release 1.2

Release Management – Major and Minor Releases

Major Release 2.0

Minor Release 1.1 Minor Rel. 2.1

Urgent Changes

for Release 1.1

Urgent Changes

for Release 1.2Urgent Changes

for Release 2.0

This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. This document is provided without a warranty of any kind,

either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

Urgent Changes

for Release 1.0

Go-Live

Go-Live

Go-Live

Page 31: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 31Internal

Release Planning

First level

Second level

Third level

Page 32: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 32Internal

The 3-Step Approach for Release Management in Solution Manager

Release Track

DefinitionManage Release CycleRelease Planning

Durations & Go-Live DateAssign Change Documents &

Manage Release DeploymentSystem Landscape

Page 33: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 33Internal

Better Support for „Warning Mode“ of Downgrade Protection

New usability features for „Warning

Mode“ introduced which allow easier

processing of conflicts

In case of conflicts in warning mode,

the user gets a popup which contain

information about the conflicts for

instant processing.

The customizing possibilities of DGP

have also been revised and enhanced

to provide better support for various

customer use-cases.

Page 34: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 34Internal

Important to Know & Your Next StepsUpgrade details

Relevant for all customers: No CRM issues this time: SAP Solution Manager 7.2 does not

contain a new SAP CRM release. We only move to a new

enhancement package, the impact of the 7.2 upgrade is

significantly lower than in the 7.1 upgrade

If you already adopted the Monitoring & Alerting infrastructure,

then you are fine. Note that business process monitoring

based on the Monitoring and Alerting Infrastructure (MAI)

is mandatory in 7.2

The split of ABAP and JAVA stacks, and the upgrade to SAP

NetWeaver 7.40 are performed automatically in a standard

upgrade procedure

Activation of Solution Documentation can be prepared well in

advance of the upgrade

Optional upgrade step:

• The migration to SAP HANA fully supports the one-step-

upgrade approach (i.e. the SAP standard for migrating to SAP

HANA)

The upgrade from SAP Solution Manager 7.1 to 7.2 is standard

Planned

Innovations

This is the current state of planning and may be changed by SAP at any time.

Page 35: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 35Internal

The Upgrade Road to Success – SAP Solution Manager general

For SAP Solution Manager customers we plan to offer

quick identification of those parts of your solution documentation which matter to you

decision support to plan and execute content activation

best practices, services, and tools for the upgrade to SAP Solution Manager 7.2

Start preparing Select what’s right Know the impact

Your journey starts today!

Planned

Innovations

This is the current state of planning and may be changed by SAP at any time.

Page 36: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 36Internal

Going to SAP Solution Manager 7.2 – Required Post-Upgrade Work

Automatic Steps

As part of the Content Activation data persistency is managed automatically

New Change Cycles will automatically be created and replace existing (unfinished) Change

Cycles

All references are automatically updated and refreshed

Manual Steps

Update and Check of existing Custom Implementations: Interfaces to Solar-Environment

Update of customer specific User Interface Configuration required; Replace former

Project/Solution fields with new delivered attributes, or copy the SAP standard User Interface

Configuration again to customer specific User Interface Configuration and adjust manually.

End-User Education – mostly for Change Managers, Administrators and Release Managers

Page 37: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 37Internal

Solution Manager 7.2 Content Activation

Content Activation is split in two

major steps:

Step 1: Define Scope (pre-upgrade)

Step 2: Content Activation (post-upgrade)

In Step 1 customers select which SOLAR-

Projects shall be considered for the

migration

Change Request Management

migration can consider ONLY projects

with active Cycles and Task Lists

Page 38: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 38Internal

The ChaRM specific Content Activation

Guided Procedure for Change Request

Management contains 4 Basic Steps:

Adapt Number Ranges

Adapt IT Calendar Configuration

Check Activation Readiness

Start Content Activation Job

All steps will be executed

automatically!

Page 39: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 39Internal

Detailed Content Activation Steps in the context of ChaRM

Match Landscape of Projects

Create Change Control Land-scape

Create Cycles

Re-Assign Task Lists

Cycle Mapping

Re-Assign Trans-actions

Update Referen-ces (opt.)

Done

Page 40: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 40Internal

What happens during the automatic content activation?

1. As part of the content activation, Change Request Management will look for Change

Control Landscapes with corresponding landscape definitions to the system landscape

which was defined in the Solar-Project before.

2. If there are Change Control Landscapes, those will be re-used – otherwise new Change

Control Landscapes will be created.

3. The job will then create new Change Cycle documents for each selected Solar-Project

which has active task lists / Change Cycles. Those will be assigned to the Change Control

Scenarios and respective Branches.

4. The existing task lists will be re-assigned to the newly created Change Cycles

automatically.

Page 41: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 41Internal

What happens during the automatic content activation?

5. All SMDV and SMMN will be mapped to a “Phase Cycle”. All SMMM will be mapped to a

“Continual Cycle”. Each Change Cycle will then get the same status as before.

6. After the Cycles have been updated, all open change transactions (Request for Change +

Change Documents) will be re-assigned from their former Solar-Project assignment to the

newly created Change-Cycles automatically.

7. Optional, only in case applicable: Existing references to Processes, Steps or Scenarios in

Solutions or Projects will also be automatically updated to the new entity in the related

Branch.

8. At this point, technically the content activation is already over. However, please be aware of

additional manual activities, which have to be checked.

Page 42: Adeyinka Olurin - Goal 3 - Change Request Management

Live DEMOInternal

Page 43: Adeyinka Olurin - Goal 3 - Change Request Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 43Internal

Live DEMO

• Creating:

• Solution, Branches, Change Cycles (Phase Cycle, Continual Cycle)

• Request for Change (Using Continual Cycle)

• Change Documents (Normal Change – with Major Release, Urgent Change)

• Transport Request and Task List

• Release Planning

• Reporting

Internal

Page 44: Adeyinka Olurin - Goal 3 - Change Request Management

Thank youContact information: