1 Length of Road = 330.00 Mt
2 Land Development= 5000.00 Sqm3 Length of CC Drain along road = 100.00 mt
4 Dhapa drain Nos 2.00 No
5 Length of wall compound = 400.00 mt
TOTAL Amount =179.00
Add 20 %Naxal Area 20%
S.N. MATERIAL LEADS QUARRY
1 CEMENT -- 15.50 Gadchiroli Market2 STEEL -- 15.50 Gadchiroli Market
3 SAND -- 13.50 Kathani River in Km 195/200 on SH 275 & 0.50 Km Ghat A 195.2
4 CR. METAL -- 139.00 Nandori Quarry in Km 49/400 on JWCRA Road 87.3
5 80MM METAL -- 9.00 Kitali Quarry in Km 213/800 on SH 275 213.8
6 MURUM -- 9.00 Kitali Quarry in Km 213/800 on SH 275
7 RUBBLE -- 9.00 Kitali Quarry in Km 213/800 on SH 275 213.8
8 BRICKS -- 21.50 Madia Tu.
9 Flooring stone -- 15.50 Gadchiroli Market
10 TILES CEMENT -- 15.50 Gadchiroli Market
11 TILES GLAZED -- 15.50 Gadchiroli Market
12 RCC pipe -- 25.50 Shivani factory 192.3
13 Bitumen W Sie -- 1010.50
14 Bitumen Mix -- 10.50
SUB DIVISION -- 87.3
DIVISION --
MATERIAL OLD RATE NEW RATE Diffn
CEMENT -- 130.00 180.00 50.00STEEL -- 26000.00 26000.00 0.00
Bitumen 5239.1 15-Aug
DATA SHEET
Sub Divisional Engineer
NAME OF WORK :- CONSTRUCTION OF ADMINISTRATIVE COMPLEX
DIST -GADCHIROLI
AT PORLA REVENUE CIRCLE IN TALUKA GADCHIROLI AND
17758240.00
Public Works Dn. No.1,
Gadchiroli
Executive Engineer
Public Works Sub Division No 1
Gadchiroli
-
7/31/2019 Administrative Building Porla
2/244
90.5 -82.6 3 1 11.9
-192.3 1.00 90.5 -82.6 3 1 15.8
-49.5 2.2 90.5 3 1 134.5
-192.3 1 90.5 -82.6 3 1 34.4
1 90.5 -87.2 3 1 8.3
-192.3 82.6 -79.4 0.5 1 26.2
87.2 -79.4 0.5 1 9.3
-182.7 90.5 -82.6 3 1 21.5
-49.5 2.2 82.6 197.6 -192.3 127.9
-
7/31/2019 Administrative Building Porla
3/244
DHANORA
90/500
MADY TUKUM MURUM
QUARRY & 87/200
BRICKS
BHATTI
218/700
213/800
197/600
195/200
192/300
188/950
ARMORI
82/600
1.00 KM OFF HOT MIX207/00 PL NT
PORLA VILLAGE GOGAON
(REVENUE)
79/400
POLICE MEDICAL
COMPLEX COMPLEX
72/00
0/00
JWCRA ROAD
CHANDRAPUR
JAM 2.00 KM
GHUGUS
0/00
49/400
NANDORI
C.B.METAL
QUARRY
WAINGANGA RIVER
87/30
QUARR
186/700
KATHANIRIVER
S.H.269
KITADIMETALQUARRY
DONGARGAON
C.B.METALQUARRY
INDIRAGANDHISQ
NANDORIC.B.METAL
QUARRY
`
-
7/31/2019 Administrative Building Porla
4/244
Bamani Village DHANORA
3/00 0/00
1.00 km off to road 100/500
Murum
MADY TUKUM MURUM Bricks 87/200
218/700
213/800
207/00
197/600
195/200
192/300
188/950
ARMORI
82/600
1.00 KM OFF . m o HOT MIXPLANT
GOGAON
(REVENUE)
79/400
POLICE MEDICAL
COMPLEX COMPLEX
72/00
0/00
JWCRA ROADCHANDRAPUR
JAM 2.00 KM
GHUGUS
QUARRY - C
49/400
0/00
S.H.269
186/700
NANDORI
C.B.METAL
QUARRY
KATHANIRIV
ER
WAINGANGA RIVER
88/00
KITADIMETALQUARRY
DONGARGAONC.B.METAL
QUARRY
INDIRAGANDHISQ
NANDORIC.B.METALQUARRY
`
Propos
e sitePORLA
-
7/31/2019 Administrative Building Porla
5/244
-
7/31/2019 Administrative Building Porla
6/244
ESTIMATED COST -Rs. 17758240.00
PUBLIC WORKS DIVISION NO.1, GADCHIROLI
PUBLIC WORKS SUB DIVISION NO 1, GADCHIROLI
lR;eso t;rs
GOVERNMENT OF MAHARASHTRA
PUBLIC WORKS DEPARTMENT
DETAILED ESTIMATE FOR
CONSTRUCTION OF ADMINISTRATIVE COMPLEX
AT PORLA REVENUE CIRCLE IN TALUKA-
GADCHIROLI AND DIST -GADCHIROLI
113820780.xls.ms_office
-
7/31/2019 Administrative Building Porla
7/244
SR
NO FROM TO
1 FACE SHEET 1 1
2 GENERAL REPORT 2 4
3 GENERAL ABSTRACT 5 5
4 ABSTRACT Main Building 6 24
5 MEASUREMENTS Main Building 25 54
6 RATE ANALYSIS Main Building 55 78
7 ABSTRACT Internal Road 79 81
8 MEASUREMENTS Internal Road 82 85
9 RATE ANALYSIS Internal Road 86 91
10 ABSTRACT Sump well and Pump House 92 97
11 MEASUREMENTS Sump well and Pump House 98 102
12 RATE ANALYSIS Sump well and Pump House 103 109
13 ABSTRACT Compound Wall 110 114
14 MEASUREMENTS Compound Wall 115 118
15 RATE ANALYSIS Compound Wall 119 123
16 ABSTRACT Cycle Stand 124 128
17 MEASUREMENTS Cycle Stand 129 131
18 RATE ANALYSIS Cycle Stand 132 135
19 ABSTRACT Bore Well 136 136
20 MEASUREMENTS Bore Well 137 137
21 RATE ANALYSIS Bore Well 138 138
22 LEAD STATEMENTS 139 140
23 QUARRY CHART 141 141
24 SCHEDULE OF COLUMNS AND BEAMS 142 142
25 DRAWINGS 142 148
26 TALUKA MAP 143 149
INDEX
PARTICULARS PAGES
NAME OF WORK :- CONSTRUCTION OF ADMINISTRATIVE COMPLEX
DIST -GADCHIROLI
AT PORLA REVENUE CIRCLE IN TALUKA GADCHIROLI AND
-
7/31/2019 Administrative Building Porla
8/244
Circle - Public Works Circle, Gadchiroli
Division. - Public Works Dn. No. 1, Gadchiroli
Sanctioned Estimate No. -
Fund Head. -
Major Head. -
Minor Head. -
Service Head. -
Department. -
Estimate Framed in the office of the Executive Engineer,
Public Works Dn. No1, Gadchiroli of the probable expences that will be
incurred on construction of
NAME OF WORK :- CONSTRUCTION OF ADMINISTRATIVE COMPLEX
AT PORLA REVENUE CIRCLE IN TALUKA GADCHIROLI AND
DIST -GADCHIROLI
Estimated Cost Rs. 177.58 Lakh
Administratively approved under -
No. Date
Technically sanctioned under -
No. Date
Estimate prepared by - Shri. , A.E.-2
Estimate checked by -
Sub Divisional Engineer Executive Engineer
Public Works Sub Division No 1 Public Works Dn. No.1,
Gadchiroli Gadchiroli
Seperately attached.
E S T I M A T E
GENERAL DESCRIPTION
-
7/31/2019 Administrative Building Porla
9/244
1 Name of Work :- CONSTRUCTION OF ADMINISTRATIVE COMPLEX
AT PORLA REVENUE CIRCLE IN TALUKA GADCHIROLI
DIST -GADCHIROLI
2 Estimated Cost :- ` 177.58 Lakhs
3 Authority :-
4 Necessity :-
5 Scope of Work :- 1)Construction of Administrative Building
2) Construction of Internal Road - 330.00
3) Construction of wall Compound - 400.00
4) Construction of septik tank and Sump well 200
6 Provisions :- Following provisions are made in this Estimate.(As per Type Drawing No. - GCR - 170
i) Structure :-
ii) Foundation :-
iii) Plinth :-
iv) Brick Masonary :-
v) Flooring :-
All outer wall shall be 23 cm thick second class Bbma
2nd class brunt Bricks in cm 1:6 in Foundation and
superstructure and Half Brick wall in 1:4 for partitio
proposed.Mirror Polished kota stone flooring for rooms an
Ceramic tiles flooring are proposed for WC and Tiolet bl
The depth of Foundation is is consider 2.10 m bel
Ground level .Plinth level is proposed to be 0.75 M ab
ground level for the buildings.
Plinth level is proposed to be 0.75 M above general grou
the buildings.
GENERAL REPORT
Work is approved as per Govt. Resolution P.W.D. No.C.R-152, Bdg-3 dated 08/03/2010 Page no. 75
1,79,00,000/- and B.P. Rs. 65,21,750/-
For effective administration at revenue circle level, th
of administrative complex along with residential q
the employee of various offices ,so that the villeg
there certificate & Documents at village level &
/Guidance /Aid from offices of Govt. /Semi Government
Revenue, Forest, Health, Water Supply, Agriculture, Zil
electricity, Police also get Central Govt. facility like
Banking, Post office, Railway reservation etc.Hence Govt of Maharashtra has decided to
Adminitrative Complex and 16 Type II residential qua
Revenue Circle Head Quarter. And same is adm
approved as mentioned in Authority.
Administrative Building structure shall be of RCC fram
in cement concrete grade M-20 including footings, colu
and lintels, slab and landings, chajja, canopy etc. Pli
proposed to be 0.75m above general ground lev
buildings.
113820780.xls.ms_office
-
7/31/2019 Administrative Building Porla
10/244
vi) Plaster :-
vii) Painting :-
viii) Doors & Window :-
ix) Water proofing :-
x) Water supply :-
xi) Sanitory :-
xii) Plinth Protection :-
xiii) Antitermite treat. :-
xiv) Internal Road :-
1
2
3
xv) External water
supply Arrangement-
1
2
xvi) Land :-
17) Quarries :- CEMENT -- Gadchiroli MarketSTEEL -- Gadchiroli Market
SAND --
CR. METAL -- Nandori Quarry in Km 49/400 on J
80MM METAL -- Kitali Quarry in Km 213/800 on S
MURUM --
RUBBLE -- Kitali Quarry in Km 213/800 on S
Consrtuction of sumpwell of sufficient capacity along
house.
Land is in possesion of Revenue dept which is hand o
Department for Construction purpose only.
Kitali Quarry in Km 213/800 on SH
Kathani River in Km 195/200 on S0.50 Km Ghat App. Rd
Antitermite treatment- For sides of foundations, plinth filli
outer peripheri of building.
Internal Road shall be 3.00 m wide with following provisi
Earthwork about 20 cm depth including 15 cm thi
blanketting.
80 mm metal Layer 15 cm & 40 mm Layer 10 cm compa
Black topping with one coat of 75 mm thick BBM, Opremix carpet and Liquid seal coat for entire road and c
is 3.00 m width.
Construction of 300 mm dia bore well
Doors - Doors are with solid core flush door shutters &
frame & for toilet sintex doors are proposed.
Windows and Ventilators-M.S.steel windows and ventil
type drawing.
Polymer based water proofing to terrace to terrace slab
Syntex Tanksfor each Building and GI. Water supply p
necessary Taps and wheel valves etc are proposed.
Orisa type W.C.pan, stoneware gulley trap, CI / PVC N
Inspection chamber, Septic tank of required size as pare proposed. (Size - 6.00 x 2.00m x 2.00m), soak pit,
waste/Vent Pipe and UPVC rain water pipe etc. are prop
Plinth protection and catch water drain in cc M-15 for sa
disposal are proposed.
Dado and skirting - with Ceramic tiles are proposed.
Outer-Sand faced plaster, Inner-12mm and 20 mm th
plaster with niroo finish.
Ceilings -6 mm thick cement plaster with niroo finish.
Exterior emulsion water based water proof cemen
external surface and washable Acrylic emulsion paint
113820780.xls.ms_office
-
7/31/2019 Administrative Building Porla
11/244
BRICKS --
Flooring stone -- Gadchiroli Market
TILES CEMENT -- Gadchiroli Market
TILES GLAZED -- Gadchiroli Market
7 Rates and :-
Specification
:-
Sub Divisional Engineer Executive Eng
Public Works Sub Division No 1 Public Works D
Gadchiroli Gadchiroli
The estimate has been prepared on the basis ofCurre
the Year 2010-2011 w.e.f. Dated 01- 07-2010
Under "Special plan for Naxal prone Gadchiroli distt" 20
in rates w.e.f. Dated 1/2/2010 vide S.E. P.W.Circle, N
no. 629/Tech/DSR 2009-10/2010 Dated 28/1/2010
The work will be executed as per the standard specificat
Public Works Department as well as the M
Specifications for Roads and Bridges, in force. The
executed as per the instructions of Engineer-in-charge.
Madia Tu.
113820780.xls.ms_office
-
7/31/2019 Administrative Building Porla
12/244
ND
M.
M.
Persons
onary with
plinth and
walls are
passage
ck
ow the av
ve general
nd level for
Bdg 2910For Rs.
re is need
arters for
rs will get
information
Deptt. like
laparishad,
elephone,
Construct
rters at 40
inistratively
d structure
ns, beams
th level is
l for the
113820780.xls.ms_office
-
7/31/2019 Administrative Building Porla
13/244
CRA Road
H 275
H 275
with pump
er to P.W.
275
275 &
ing, and for
ons
ck murum
cted thick.
en gradedrriage-way
.C.C. door
tors as per
ipeline with
hani Trap,
er I.S.codeUPVC soil
osed.
itory water
ick cement
paint for
for inside
113820780.xls.ms_office
-
7/31/2019 Administrative Building Porla
14/244
ineer
. No.1,
t CSR. for
% increase
gpur, letter
ions, of the
.O.R.T.&H.
ork will be
113820780.xls.ms_office
-
7/31/2019 Administrative Building Porla
15/244
1 Cost as per Building Proper Rs. 11529835.00
2 Cost of Internal Road Rs. 1944200.00
3 Cost of Sump Well , Septik Tank and Pump House Rs. 426196.00
4 Cost of Compound Wall Rs. 2078726.00
5 Cost of Bore Well Rs. 58585.00
6 Add 9 % Electrificaion on Building Proper Rs. 1037685.00
TOTAL COST Rs. 17075227.00
7 Add 4 % Contengencies Rs. 683009.00
TOTALAMOUNT Rs. 17758236.00
Say Rs. 17758240.00
GENERAL ABSTRACT
AT PORLA REVENUE CIRCLE IN TALUKA GADCHIROLI AND
DIST -GADCHIROLI
NAME OF WORK :- CONSTRUCTION OF ADMINISTRATIVE COMPLEX
GadchiroliGadchiroli
Sub Divisional Engineer
Public Works Sub Division No 1
Executive Engineer
Public Works Dn. No.1,
113820780.xls.ms_office
-
7/31/2019 Administrative Building Porla
16/244
S.N. ITEM OF WORK QUANTITY RATE UNIT
1 Excavation for foundation in earth, soils of all types,
sand, gravel and soft murum, including removing
the excavated material upto a distance of 50 m.
beyond the building area and stacking or spreadingas directed, preparing the bed for the foundation and
necessary back filling, ramming, watering, including
shoring and strutting as necessary complete.
Up to1.5M. Depth 879.79 100.65 Cum
1.5M. to 2.50 Depth 232.61 109.00 Cum
2 Providing and laying in situ, cement concrete in
1:4:8 of trap/ granite/quartzite/gneiss metal for
foundation and bedding including bailing out water,
plywood/steel formwork, compacting, finishing
uneven and honeycombed surface curing etc.
complete. The Cement Mortar 1:3 plaster is
considered for rendering uneven and honeycombed
surface only. Newly laid concrete shall be covered
by gunny bag, plastic, tarpaulin etc. (Wooden
centering will not be allowed.)
175.78 2842.75 Cum
3 Providing and laying in situ cement concrete of M-
15/1:2:4 with trap / granite / quartzite / gneiss metal inface wall including plywood/ steel formwork and steel
centering, compaction by vibrator, finishing uneven
and honeycombed surface with C.M.1:3 of sufficient
minimum thickness to give smooth and even surface,
filling joints with bitumen, curing etc. complete.
(Excluding cost of reinforcement.) The C.M. 1:3
plaster is considered for rendering uneven and
honeycombed surface only. Newly laid concrete shall
be covered by gunny bag, plastic, tarpaulin etc.
(Wooden centering/formwork will not be allowed).
48.94 4903.60 Cum
NAME OF WORK :- CONSTRUCTION OF ADMINISTRATIVE COMP
AT PORLA REVENUE CIRCLE IN TALUKA GADCHIROLI AND
DIST -GADCHIROLI
ABSTRACT- MAIN BUILDING
Page 16 of 244
-
7/31/2019 Administrative Building Porla
17/244
S.N. ITEM OF WORK QUANTITY RATE UNIT
ABSTRACT- MAIN BUILDING
4 Providing and laying in situ cement concrete of M20
grade of trap / granite/ quartzite / gneiss metal for
R.C.C. work in foundations like raft, grillages,
strip foundations and footings of R.C.C.columns
and steel stanchions including bailing out water,
plywood/steel formwork, compaction, curing and
roughening the surface if special finish is to be
provided, finishing uneven and honeycombed surfacewith C.M. 1:3 of sufficient minimum thickness to give
smooth and even surface etc. complete. (Excluding
reinforcement and structural steel, including
cover block) The Cement Mortar 1:3 plaster is
considered for rendering uneven and honeycombed
surface only. Newly laid concrete shall be covered
by gunny bag, plastic, tarpaulin etc. (Wooden
centering will not be allowed)
107.56 5524.60 Cum
5 Providing and casting in situ cement concrete of
M20 grade of trap / granite /quartzite/ gneiss metal
for R.C.C. columns as per detailed design and
drawings or as directed, including steel centering,
plywood/steel formwork, compaction, finishing
uneven and honeycombed surface with C.M. 1:3 of
sufficient minimum thickness to give a smooth and
even surface or roughening the surface if special
finish is to be provided and curing etc. complete.
Including use of plastisizer wherever necessary as
directed by Engineer (Excluding reinforcement,
including cover block). The Cement Mortar 1:3plaster is considered for rendering uneven and
honeycombed surface only. Newly laid concrete
shall be covered by gunny bag, plastic, tarpaulin
etc. (Wooden centering will not be allowed)
77.20 6836.40 Cum
6 Providing and laying 50 mm thick layers in C.M. 1:8
belowe plinth beam including floating, watering,
curing and levelling and ramming the bed if
necessary before laying the layer etc, complete.
43.76 130.95 Sqm
7 Providing 2nd class Burnt Brick masonry with
conventional/I.S. type bricks in cement mortar 1:6 in
foundations and plinth of inner walls/in plinth of
external walls including bailing out water, striking
joints on unexposed faces, racking out joints on
exposed faces and watering complete.
51.43 3436.25 Cum
Page 17 of 244
-
7/31/2019 Administrative Building Porla
18/244
S.N. ITEM OF WORK QUANTITY RATE UNIT
ABSTRACT- MAIN BUILDING
8 Providing and casting in situ cement concrete of
M20 grade of trap / granite /quartzite /gneiss metal
forR.C.C. beams and lintels as per detailed design
and drawings or as directed,including steel centering,
plywood/steel formwork steel props, compaction,
finishing uneven and honeycombed surface with
C.M.1:3 of sufficient minimum thickness to give asmooth and even surface or roughening if special
finish is to be provided and curing etc. complete.
Including use of plastisizer wherever necessary as
directed by Engineer-In-charge (Excluding
reinforcement, including cover block). The Cement
Mortar 1:3 plaster is considered for rendering uneven
and honeycombed surface only. Newly laid concrete
shall be covered by gunny bag, plastic, tarpaulin
etc. (Wooden centering will not be allowed)
102.51 6909.50 Cum
9 Filling in plinth and floors with approved excavated
materials in 15 cm. to 20 cm. layers including
watering and compaction complete.109.60 50.30 Cum
10 Filling in plinth and floors with contractors approved
material / murum / stone dust in 15cm. to 20cm.
layers including watering and compaction complete.141.53 330.50 Cum
11 Providing soling using 80 mm size granite / quartzite
/ gneiss / trap metal in 15 cm. layer including hand
packing filling voids with sand / grit, ramming,
watering etc complete.
235.81 538.95 Cum
12 Providing and laying in situ, cement concrete M-15 of
trap/ granite/quartzite/gneiss metal for foundation and
bedding including bailing out water, plywood/steel
formwork, compacting, finishing uneven and
honeycombed surface, curing etc. complete. The
Cement Mortar 1:3 plaster is considered for rendering
uneven and honeycombed surface only. Newly laidconcrete shall be covered by gunny bag, plastic,
tarpaulin etc. (Wooden centering will not be allowed.)
63.90 4622.10 Cum
Page 18 of 244
-
7/31/2019 Administrative Building Porla
19/244
S.N. ITEM OF WORK QUANTITY RATE UNIT
ABSTRACT- MAIN BUILDING
13 Providing second class Burnt Brick masonry with
conventional/ I.S. type bricks in cement mortar 1:6
in super structure including striking joints, racking
out joints wateringand scaffolding complete.200.86 3487.80 Cum
14 Providing second class Burnt Brick masonry with
conventional / I.S. type bricks in cement mortar 1:4in half brick thick wall including mild steel
longitudinal reinforcement of 2 bars of 6 mm.
diameter/2 hoop iron strips 25 mm x 1.6 mm placed
at every third course, properly bent and bounded at
ends scaffolding, racking out joints and watering
complete.
150.84 555.80 Sqm
15 Providing and casting in situ cement concrete M-15
of trap/ granite/quartzite/gneiss metal for coping to
plinth or parapet, moulded or chamfered as per
drawing or as directed including steel centering,plywood/steel formwork compacting, roughening
them if special finish is to be provided, finishing
uneven and honeycombed surface and curing etc.
complete. The Cement Mortar 1:3 plaster is
considered for rendering uneven and honeycombed
surface only. Newly laid concrete shall be covered
by gunny bag, plastic, tarpaulin etc. (Wooden
centering will not be allowed.)
4.78 4693.95 Cum
16 Providing and casting in situ cement concrete ofM20 grade of trap / quartzite / granite/ gneiss metal
forR.C.C. chajja as per detailed design and drawings
including steel centering, plywood/steel formwork,
steel props, compaction finishing uneven and
honeycombed surface with C.M. 1:3 of sufficient
minimum thickness to give a smooth and even
surface or roughening the surface if special finish is
to be provided and curing etc.complete.(Excluding
reinforcement, including cover block) The Cement
Mortar 1:3 plaster is considered for rendering uneven
and honeycombed surface only.Newly laid concrete
shall be covered by gunny bag, plastic, tarpaulinetc. (Wooden centering will not be allowed)
10.32 7168.25 Cum
Page 19 of 244
-
7/31/2019 Administrative Building Porla
20/244
S.N. ITEM OF WORK QUANTITY RATE UNIT
ABSTRACT- MAIN BUILDING
17
Providing and casting in situ cement concrete of
M20 grade of trap / granite /quartzite /gneiss metal
for R.C.C slabs and landings as per detailed design
and drawings including steel centering, plywood
/steel formwork, steel props, compaction, finishing
uneven and honeycombed surface with C.M. 1:3 of
sufficient minimum thickness to give a smooth andeven surface or roughening the surface if special
finish is to be provided with fan hook box of 2 mm
thick M.S.Sheet rectangular size 180 mm x 100 mm
with required depth, with holes or notches, as
required, bottom and top lids of 1.6 mm thick
M.S.Sheet
92.39 7446.20 Cum
fixed with 3.5 mm dia. round headed screws together
with 12 mm dia. M.S.bar bent to shape with hooked
ends for fan hook and painting to exposed surface
and curing etc. complete. (Excluding reinforcement,
including cover block) The Cement Mortar 1:3plaster is considered for rendering uneven and honey
combed surface only. Newly laid concrete shall be
covered by gunny bag, plastic, tarpaulin etc.
(Wooden centering will not be allowed)
18 Providing and casting in situ cement concrete of
M20 grade of trap / granite / gneiss / quartzite metal
for R.C.C. pardi 75 mm thick including steel
centering, plywood /steel formwork, compaction,
finishing uneven and honeycombed surface with C.M.
1:3 of sufficient minimum thickness to give a smoothand even surface or roughening them if special finish
is to be provided and curing etc.complete.(Excluding
reinforcement, including cover block) The Cement
Mortar 1:3 plaster is considered for rendering uneven
and honeycombed surface only.( Newly laid
concrete shall be covered by gunny bag, plastic,
tarpaulin etc.) (Wooden centering will not be
allowed)
3.63 9457.65 Cum
Page 20 of 244
-
7/31/2019 Administrative Building Porla
21/244
S.N. ITEM OF WORK QUANTITY RATE UNIT
ABSTRACT- MAIN BUILDING
19 Providing and casting in situ cement concrete of M-
15 grade of trap/ granite/quartzite/gneiss metal for
plain or molded sills, cornice, jambs, block in
course, or architraves of required size and shapes
including steel centering, plywood/steel formwork,
compacting, roughening them if special finish is to be
provided,finishing uneven and honeycombed surface
and curing etc. complete. The Cement Mortar 1:3plaster is considered for rendering uneven and
honeycombed surface only. Newly laid concrete
shall be covered by gunny bag, plastic, tarpaulin
etc. (Wooden centering will not be allowed.)
3.05 4902.40 Cum
20 Providing and fixing in position TMT bar of various
diameters for R.C.C. pile caps, footings, foundations,
slabs, beams and columns, canopies, staircases,
newels, chajjas, lintels, pardies, coping, fins, arches
etc. as per detailed design and drawings and
schedules including cutting, bending, hooking the
bars, binding with wires or tack welding and
supporting as required completed.
48.960 55838.70 M.T.
21 Providing internal cement plaster 20mm thick in a
single coat in cement mortar 1:5 with neeru finish
to concrete, brick surfaces in all positions including
scaffolding and curing. Providing groove at joint of
B.B.Masonry and concrete members complete
940.49 208.75 Sqm
22 Providing internal cement plaster 12 mm thick in asingle coat in cement mortar 1:5 with neeru finish
to concrete or brick surface in all positions including
scaffolding and curing complete. Providing groove at
joint of B.B. Masonry and concrete members
complete
794.44 132.25 Sqm
23 Providing internal cement plaster 12 mm thick in a
single coat in cement mortar 1:5 without neeru
finish to concrete or brick surface in all positions
including scaffolding and curing complete. Providing
groove at joint of B.B. Masonry and concrete
members complete
339.91 115.45 Sqm
24 Providing internal cement plaster 6 mm thick to
ceiling in a single coat in cement mortar 1:3 with
neeru finish to concrete surface in all positions
including scaffolding and curing. Providing groove at
joint of B.B.Masonry and concrete members complete
561.30 130.20 Sqm
Page 21 of 244
-
7/31/2019 Administrative Building Porla
22/244
S.N. ITEM OF WORK QUANTITY RATE UNIT
ABSTRACT- MAIN BUILDING
25 Providing internal cement plaster6 mm thick in a
single coat in cement mortar 1:3 without neeru
finish to concrete surface in all positions including
scaffolding and curing. Providing groove at joint of
B.B.Masonry and concrete members complete
95.75 95.45 Sqm
26 Providing sand faced plaster for external portion in
cement mortar using Kharsalia / Kasaba or similar
type of sand, in all positions including base coat of 15
mm. Thick in C.M. 1:4 using water proofing
compound at 1 kg per cement bag, curing the
same for not less than 3 days and keeping the
surface of the base coat rough to receive the sand
faced treatment 6 to 8 mm thick in C.M. 1:4 finishing
the surface by taking out grains, making grooves and
curing for fourteen days scaffolding etc. complete.
884.91 286.40 Sqm
Ground Floor
27 Providing patta on concrete/ plastered surface
100mm wide in C.M.1:3 in line, level, including drip
mould if necessary, scaffolding, finishing, curing etc.
complete.
35.80 31.15 Rmt
28 Providing and applying washable Acrylic emulsion
paint of approved colour and shade to existing
surface in two coats including scaffolding, preparing
the surface to receive paint and applying putty etc.
complete.
2296.23 88.65 Sqm
29 Providing and applying exterior emulsion water
based water proof cement paint of approved colour
and shade to exterior new surface in two coats
including scaffolding preparing the surface to receive
paint etc. complete
1320.57 93.45 Sqm
30 Providing and fixing mild steel grill railing 20
kg/Sqm. with teak wood hand rail of size 75 mm x60 mm and sill of 75 mm x 25 mm and newel posts
for staircases, including fabricating, fixtures, erecting,
the grill work with one coat of anticorrosive paint and
two coats of oil painting with approved colours and
polishing the sill, hand rail and the newel post with
french polish.
9.00 1989.90 Sqm
Page 22 of 244
-
7/31/2019 Administrative Building Porla
23/244
S.N. ITEM OF WORK QUANTITY RATE UNIT
ABSTRACT- MAIN BUILDING
31 Providing and fixing factory made precast
door/window frames of C.C. M-40 grade of section
100 mm x 60 mm including reinforcement as per
I.S.6523 with polymeric blocks having screw holding
capacity of 250 kg/screw fixed in position in
R.C.C.frame as per requirement and as per
specifications without fan light including holdfasts,
carting and erecting in position and two coats of oilpaint etc. complete.
49.50 288.70 Rmt
32 Providing and fixing cold rolled steel frame for door
100 mm x 60 mm of 16 guage as per drawing
with/without ventilator including holdfasts, hinges
welded to the frame, including filling cement mortar
1:6 in hollow core and finishing with oil painting etc.
complete.
32.88 912.90 Sqm
33 a) Providing and fixing factory made solid coreflush door in single leaf 32 mm thick, decorative
types, of exterior grade, as per detailed drawings,
conforming to I.S.:2202 - 1962 (Revised) including
Burmah/ superior Indian teak wood frame, approved
face veneers on both faces with/without glazing and
venetians in the positions shown on the drawings or
as directed, all necessary beads, moulding and
lipping, wrought iron holdfasts, chromium plated
fixtures and fastenings without/with brass mortise
lock, chromium plated handles on both sides,
stoppers and finishing with french-polish/ waxing
complete. (without door frame).(Sample to be gotapproved from Ex.Engineer before use)
6.48 2132.45 Sqm
34 Providing & fixing of approved make solid Panel of
29mm thick PVC single leaf door shutter of approved
colour and design made out of rigid PVC hollow
section shutter frame in configuration of A section of
size 50mm x 29mm as vertical styles, top & bottom
rails Machine cut and panel in fill of single panel
multi chambers hollow plastic section of size 25mm x750mm. with solid polymetric 'L' corner reinforcement
holding brackets and solid polymetric reinforcement
fil lers for holding hinges, aldrops, latch, tower bolts,
etc. remaking damaged surface etc. compete.
15.75 2285.80 Sqm
Ground Floor
Page 23 of 244
-
7/31/2019 Administrative Building Porla
24/244
S.N. ITEM OF WORK QUANTITY RATE UNIT
ABSTRACT- MAIN BUILDING
35 a) Providing and fixing factory made solid core
flush door shutters in double leaves 32mm
thick,decorative type of exterior grade, as per detailed
drawings, conforming to I.S.: 2202 1966 (Revised)
including approved face veneers on both sides,
without glazing and venetians including chromium
oxidised fixtures and fastening, stoppers and finishing
with french polishing etc. (Excluding doorframe)(Sample to be got approved from Ex.
Engineer before use)
26.40 2348.10 Sqm
36 a)Providing and fixing steel windows of various
sizes as per detailed drawings with welded square
bars 12 mm at 10 cm centre to centre without hot
dip Zinc coating without / with ventilator including
fabrication glazing with non- acetinic/plain/obscured
glass panels of approved type and quality, all fixtures
and fastenings without teak wood boxing, and
architraves and finishing with one coat of primer complete. (with flash butt welding) (Sample to be
got approved from Ex. Engineer before use)
116.91 3306.50 Sqm
37 Providing and fixing steel staggered ventilator with
12 mm dia square bar including fibre glass panels
fixed as per detailed drawing without hot dip zinc
coating including fabricating glazing with plain
obscured glass panes of approved type and quality
and fastening without teak wood boxing and
architecture and oil painting two coats etc. complete.(Sample to be got approved from Ex.Engineer before
use)
8.10 2228.30 Sqm
38 Providing and fixing M.S. grill doors weighing 22 to
24 kg per sq. meter of required size as per detailed
drawing without hot dip coating with iron oxidised
fixture and fastening and painting with 3 coats oil
paints etc. complete. (Sample to be got approved
from Ex. Engineer before use)
26.40 1473.55 Sqm
39 Providing and applying two coats of synthetic
enamel paint of approved colourto new structural
steel work and wood work in buildings, including
scaffolding if necessary, cleaning and preparing the
surface including primer coat complete. (Sample and
brand is to be got approved from Ex. Engineer
before use)
219.27 56.30 Sqm
Page 24 of 244
-
7/31/2019 Administrative Building Porla
25/244
S.N. ITEM OF WORK QUANTITY RATE UNIT
ABSTRACT- MAIN BUILDING
40 Providing and laying hand cut polished kota stone
Flooring 20 mm to 25 mm thick plain pattern on a
bed of C.M. 1:6 including cement float, filling joints
with neat cement slurry, curing rubbing, mirror
polishing and cleaning complete
564.45 965.20 Sqm
41 Providing and fixing 20 mm to 25 mm thick polished
Jaisalmair stone on parapet wall of terrace,
staircase, etc. on plane, leveled, top surface,
including cleaning top surface, fixing with ready made
adhesive, screws for fixing stones, rounding corners,
finishing etc. complete.
164.14 250.50 Sqm
42 Providing sills / jambs / revels of Green marble slabs
or equivalent 18mm to20 mm thick of approved
quality vein and colour with machine polished surface
on a bed of Cement Mortar 1:4 including neat cement
float fil ling joints with neat cement slurry to match thecolour of the slabs curing, polishing and rounding
edges, cleaning etc. complete.
30.48 2142.65 Sqm
43 Providing and Laying antiskid ceramic tiles of
approved quality , required size and 5.5.mm
thickness for flooring in required position laid on
bed of C.M.1:4 including cement float, filling joint with
white / colour cement slurry, cleaning, curing,
complete.
62.68 981.55 Sqm
44 Providing and fixing ceramic tiles of approved quality, required size and 5.5.mm thickness for dado and
skirting in required position with ready made
adhesive mortar of approved quality in required
position after making the wall portion in level in
plaster of C.M. 1:4 including joint filling with
white/colour cement slurry cleaning curing complete.
276.06 1027.95 Sqm
45 Providing and laying polished Kota Stone slabs
20mm to 25 mm thick for treads and risers of
steps and staircases, with rounded nosing andgroove at edge for the treads, on a bed of C.M. 1:4
including cement float fil ling joints with neat cement
slurry, curing, polishing and cleaning complete.
23.40 955.45 Sqm
Page 25 of 244
-
7/31/2019 Administrative Building Porla
26/244
S.N. ITEM OF WORK QUANTITY RATE UNIT
ABSTRACT- MAIN BUILDING
46 Providing and fixing white glazed earthenware
Wash Hand Basin of 55 cm x 40 cm size including
cold water piller tap, brackets, rubber plugs and brass
chain, stop tap, chromium plated bottle trap and
necessary pipe connections including UPVC waste
pipe and trap upto the out side face of the wall,
making good the damaged surface, testing etc.
complete. (Prior approval of sample and brand byEx. Engineer is necessary before use.)
6.00 2247.45 Nos
47 Providing and fixing 1st class white glazed
earthenware "Orissa type" W.C.Pan 600 x 400 mm
size including 'P'or 'S'trap UPVC soil and vent pipe
upto the outside face of the wall, 1:5:10 cement
concrete bedding, 10 litre fibre high level flushing
cistern with fittings, inlet pipe with stop tap, bracket
for fixing the cistern, 32 mm dia. UPVC flush pipe
with fitting and clamps, 20 mm dia. UPVC over flowpipe with mosquito proof coupling, chain and pulley,
painting of the exposed pipe and cutting and making
good walls and floor, testing etc. complete.(Prior
approval of sample and brand by Ex.Engineer is
necessary before use.)
8.00 3414.30 Nos
(a).. Do without flushing cistern with flush
cock and necessary fittings
48 Providing and fixing 450 mm x 550 mm sizesuperior type mirror with 16 mm dia. Nickel plated
towel rod etc. complete. (Prior approval of sample
and brand by Ex.Engineer is necessary before
use.)
6.00 479.20 Nos
49 Providing and fixing 10cm C.I.Nahani Trap (long
arm) including symet grating, bend, connecting piece
of C.I.pipe upto the outside face of the wall, making
good the damaged surface, testing etc. complete.
(Prior approval of sample and brand by
Ex.Engineer is necessary before use.)
10.00 788.30 Nos
Page 26 of 244
-
7/31/2019 Administrative Building Porla
27/244
S.N. ITEM OF WORK QUANTITY RATE UNIT
ABSTRACT- MAIN BUILDING
50 Providing Water proofing treatment to newly laid
fully cured concrete slab of terraces by applying
first coat of polymer modified semi-viscous paste
prepared by mixing polymer of approved make (such
as Master Seal 550/ brush bond / RoffSupercrete /
Webercrete / Monobond /Perma shield / Hypercrate /
Master Crete M 81) and Cement in 1 : 2 proportion ( 1
litre polymer : 2 Kg. Cement) or Rohnex water proofing system in two coats(1kg powder,700 ml
water and polymer jelly for first coat & 1 kg
powder,500 ml water & polymer jelly for second coat
)to a neatly cleaned and dust free concrete surface
and upto 300 mm. over parapet wall prepared by
removing loose and deposited material with brush
and water, laying glass fibre mesh of 10 x 10
specification of approved make over tacky surface of
first coat of polymer followed by second coat in
transverse direction, sprinkling coarse sand over it,
followed by protective mechanical cover of 40 mm to
75 mm. thick cement concrete of 1:2:3
194.44 1044.25 Sqm
proportion using coarse aggregate of 10 MSA and
water proofing compound of approved make and
polypropylene fibres @ 125 gm per bag of cement
within it confirming to IS, in pannels of 3m/4m oras
per site condition & filling the joints with polt sulphide
sealant(0.08 kg per sq.mt.) after curing including
providing holler with drip moulds at the junction and
finishing the concrete surface with neat cement
slurry,polypropylene fibres @ 125 gm per bag of
cement within it confirming to IS, in pannels of 3m/4m
oras per site condition & filling the joints with poltsulphide sealant(0.08 kg per sq.mt.) after curing
including providing holler with drip moulds at the
junction and finishing the concrete surface with neat
cement slurry,incuding curing as directed and
ponding the surface as directed etc.complete ;
covering 10 years guarantee against leakproofness
on court Fee stamp paper of Rs 100/-
Ground Floor
51Providing Preconstruction Antitermite treatmentby treating the back fill in immediate contact with
foundation at the rate of 5 litres of an emulsion
concentrate of one percent concentration of
CHLORPYRIFOC 20% EC ISI approved conforming
to I.S.8944 per square metre of vertical surface area
by high volume sprayer with ten years guarantee
bond as per I.S. 6313 (Part II) of 1971.
335.30 68.30 Sqm
Page 27 of 244
-
7/31/2019 Administrative Building Porla
28/244
S.N. ITEM OF WORK QUANTITY RATE UNIT
ABSTRACT- MAIN BUILDING
52 Providing Preconstructional Antitermite treatment by
treating the bottom surface and the sides of
excavation at the rate of 3 litres of emulsion
concentrate of one percent concentration of
CHLORPYRIFOC 20% EC, ISI approved conforming
(I.S.8944), (i.e by diluting 5 ltr. of chlorpyrifoc 20%
EC, with 95 ltr. of water) and spraying by high volumesprayer on one square metre surface area with ten
years guarantee bond as per I.S.6313 (Part II 1971)
564.22 123.40 Sqm
53 Providing Postconstructional Anti- termite
treatment to the soil along the external wall by
punching holes of 1.2 to 1.5 cm diametre about 30 to
60 cm deep at 15 cm centre to centre as close to the
wall as possible and inject one percent concentration
of CHLORPYRIFOC 20% EC ISI approved
conforming (I.S.8944)at the rate of 7.5 litre emulsion
concrete per square metre and sealing the same with
proper filling with two years guarantee bonds as per
I.S.6313 (Part III) of 1971.
86.37 165.30 Sqm
54 Providing and fixing UPVC SOIL / VENT / WASTE
SWR pipe of required diameter conforming to I.S.-
13592, and I.S.-4985 to withstand continous internal
hydroulic pressure of 4 kg/cm2 including necessary
fixtures and fittings, such as bends, tees, singlejunctions, double junctions and joining with rubber
rings and lubricants, on wall by means of clips or in
ground including necessary excavation, laying
refilling, trench testing etc. complete. (Prior approval
of sample and brand by Ex.Engineer is necessary
before use.)
Ground Floor
75 mm dia 60.00 263.55 Rmt
110 mm dia 150.00 397.75 Rmt
160 mm dia 100.00 603.80 Rmt
Page 28 of 244
-
7/31/2019 Administrative Building Porla
29/244
S.N. ITEM OF WORK QUANTITY RATE UNIT
ABSTRACT- MAIN BUILDING
55 Providing and fixing on walls/ ceiling/floors,
medium grade G.I. pipe (type) having embossed ISI
Mark on it, of required diameter with screwed
sockets, joints, necessary galvanised iron fittings
such as sockets,back nuts,elbows, bends, tees,
reducers, enlargers, plugs, clamps etc.including
necessary drilling holes in walls, slabs etc. and
remaking good the demolished portion to restore thesame in original condition neatly and providing and
applying anticorrosive primer and two coats of oil
painting, testing, etc.complete.(Prior approval of
sample by Ex.Engineer is necessary before use.)
Ground Floor
15mm dia 160.00 218.05 Rmt
25mm dia 80.00 307.90 Rmt
40mm dia 20.00 410.90 Rmt
56Providing and laying in trenches medium grade(type) galvanised iron pipe having embossed ISI
Mark on it, of required diameter with screwed,
sockets, joints, necessary galvanised iron fittings
such as sockets, back nuts, elbows, bends, tees,
reducers, enlargers, plugs, clamps etc. including
necessary excavation, back filling, fixing with clamps,
testing etc. complete. (Prior approval of sample and
brand by Ex. Engineer is necessary before use.)
15 mm dia 30.00 243.20 Rmt
25 mm dia 25.00 333.05 Rmt40 mm dia 100.00 436.05 Rmt
50 mm dia 0.00 0.00 Rmt
57 Providing and fixing in position unplasticized poly
venyl-chloride (UPVC) ultra voilet rays stabilised
110 mm outer diameter rain water SWR pipe
conforming to I.S. 4985 and I.S.13592,including
necessary fittings, such as PVC grating, bends, with
door, PVC clamps, horse shoes at bottom, rubber
ring and making connections water tight with solvent,
cement including making holes in masonary concrete
redoing the same in C.M. 1:3, curing, testing etc.complete. (Prior approval of sample and brand by
Ex.Engineer is necessary before use.)
202.20 251.60 Rmt
Page 29 of 244
-
7/31/2019 Administrative Building Porla
30/244
S.N. ITEM OF WORK QUANTITY RATE UNIT
ABSTRACT- MAIN BUILDING
58 Providing and fixing 15 mm dia. Screw down
bib cock of symet type including necessary
sockets, union nut, testing etc. complete. (Prior
approval of sample by Ex.Engineer is
necessary before use.)
2.00 188.10 Nos
59 Providing and fixing screw down 25 mm dia.wheeled stop tap of brass including necessary
sockets, union nut, testing etc. complete. (Prior
approval of sample and brand by Ex.Engineer
is necessary before use.)
25 mm dia 2.00 463.65 Nos
40 mm dia 2.00 900.90 Nos
50 mm dia 0.00 0.00 Nos
60 Providing and fixing 15 cm x 10 cm salt glazed
stoneware gully trap in cement concrete 1:4:8outside the building including symet grating in the
sink, connecting glazed stoneware pipe, brick
masonry chamber with R.C.C. lid and Symet grating
for the gully trap, testing etc. complete. (Prior
approval of sample and brand by Ex.Engineer is
necessary before use.)
4.00 778.70 Nos
61 Providing and constructing Brick Masonry
Inspection Chamber 60 cm x 45 cm including 1:4:8
cement concrete foundation, 1:2:4 cement concretechannels, Brick Masonry, plastering from inside and
air- tight R.C.C. lid with frame fixed in cement
concrete, curing, testing etc. complete(a) WIth
Reinforced cement concrete raft in B.C. soil area
including cost of reinforcement
10.00 3863.55 Nos
62 Providing and constructing Brick Masonry
Inspection Chamber 90 cm x 45 cm including 1:4:8
cement concrete foundation, 1:2:4 cement concrete
channels, Brick Masonry, plastering from inside and
airtight R.C.C.lid with frame fixed in cement concrete,
curing, testing etc. complete. (a) WIth Reinforced
cement concrete raft in B.C. soil area including
10.00 5771.95 Nos
Page 30 of 244
-
7/31/2019 Administrative Building Porla
31/244
S.N. ITEM OF WORK QUANTITY RATE UNIT
ABSTRACT- MAIN BUILDING
63 Providing and fixing in postion unplasticized
polyvinyl chloride (UPVC) ultra violet stabilized
110 mm outer diameter cowl dome conforming to
I.S.4985 including making joints with solvent cement
etc. complete.
10.00 41.95 Nos
64 Providing soak pit of size 120 cm x 120 cm x 120 cm
including excavating and filling with brick bats as per
drawing etc. complete.
1.00 893.70 Nos
65 Providing and laying rough Shahabad Stone
Flooring 20mm to 25 mm thick and of required width
in plain/diamond pattern on a bed of C.M. 1:6
including cement float, striking, joints, pointing in
cement mortar 1:3 curing and cleaning etc. complete.
0.00 306.40 Sqm
65 Providing, hoisting and fixing in position of approvedmake high density polyethylene UV stabilized
conforming to I.S.12701, water storage tank with
necessary connections, testing etc. complete. (Prior
approval of sample by Ex. Engineer is necessary
before use.)
4000.00 7.20 Litre
66 Providing and fixing in position Partition of polished
Kaddappa / Marble / Granite stone of required
thickness ,including making groove in wall / concrete
surface filling joints with slurry, curing, polishing,
rounding edges, as required cleaning etc. complete.
a) Kadappa Partition 25 mm to 30 mm thick
5.40 658.90 Sqm
67 Providing and fixing a set of 5 fire buckets of
special quality 0.3 m. diameter including painting,
lettering and providing M.S.angle iron stand, iron
hooks and locking arrangements and three coats of
white enamel paint for stand etc. complete as per
drawing.
4.00 1009.90 Set
68 Providing and fixing fittings and accessories such as
ball cock, over flow pipe with mosquito proof coupling.. 2.00 1764.65 Set
Page 31 of 244
-
7/31/2019 Administrative Building Porla
32/244
S.N. ITEM OF WORK QUANTITY RATE UNIT
ABSTRACT- MAIN BUILDING
69 Providing and fabricating structural steel work in
rolled sections like joists, channels, angles, tees etc.
as per detailed design and drawings or as directed
including cutting, fabricating, hoisting, erecting, fixing
in position making riveted / bolted / welded
connections without connecting plates, braces etc.
and including one coat of anticorrosive paint and over
it two coats of oil painting of approved quality and
shade complete.
0.09 71068.95 MT
Ground Floor
70 Providing PRECAST M-20 R.C.C. slabs over the
spans of Cross Drainage work as per drawings
including reinforcement, conveyance, fixing in C.M.
1:3 and curing, finishing complete.
1.50 7869.10 Cum
71 Providing and fixing chicken mesh of 22 gauge, with
about 30 cm. width at the junction of R.C.C members
and brick work, of approved quality including fixingmesh in position by necessary drilling in concrete
or/B.B.masonry and or tying by binding wire etc.
complete.
1340.62 51.50 Rmt
72 Providing groove to required size at specified
location as directed by Engineer, at junction of brick
masonry wall and R.C.C beams or Column, at
junction of composite masonry, including scaffolding,
finishing, curing etc. complete.
200.00 6.35 Rmt
73 Providing and fixing 60mm thick factory made
Hydraulically pressed Mechanically vibrated and
compacted precast inter locking cement concrete
paving blocks in M-40 grade of approved size and
shape as specified 50 mm in gray cement and top
surface 10 mm in white cement with coloured
pigment including cost of all materials, manufacturing,
curing, transportation of blocks to work site including
loading, unloading and stacking as directed, laying
paving blocks in position over prepared bed of sand
of 50 mm thickness including necessary excavation in
all stratas, spreading blindge of fine sand over theprepared bed, compacting blocks by plate vibrator
etc. complete.
112.60 675.65 Sqm
Page 32 of 244
-
7/31/2019 Administrative Building Porla
33/244
S.N. ITEM OF WORK QUANTITY RATE UNIT
ABSTRACT- MAIN BUILDING
74 Providing and laying 25 mm. thick precast polished
chequered cement tiles for Plinth Protection of size
20 cm. x 32 cm. and 20 mm. Thick plain cement tiles
for risers of steps and staircase with nosing of treads
moulded as per drawing or as directed on a bed of
1:4 cement mortar in required positions including
cement float filling joints with neat cement slurry,
curing, polishing and cleaning complete.
268.06 347.20 Sqm
75 Providing and fixing mild steel grill gate with angle
iron frame 65 mm x 65 mm x 10 mm with iron bars at
150 mm C/C and diagonal flats as per the detailed
drawing including hinges, pivot blocks locking
arrangement welding, revetting with oil painting in
three coats of approved colour shade. (Weight of
gate 35 kg/Sq.m.)
9.00 1852.10 Sqm
76 Supplying crushed metal 40 mm of trap /
granite / quartzite / gneiss stone metal for rain
water harvesting including conveying and
stacking for use in bituminous road work.
18.00 1737.80 Cum
77 Providing and Laying concrete pipes of I.S.NP.2
class of 300 mm diameter in proper line, level and
slope including necessary collars, laying, fixing with
collars in cement mortar 1:1 and refilling the trench
etc. complete. ( Excluding Excavation )
12.00 624.10 Rmt
78 Cleaning the road site i.e. cutting bushessite
clearence etc complete. (item of EGS CSR ) 5000.00 2.90 Sqm
79 a)Providing and fixing European type white glazed
earthernware water closet with syphonic trap with
syphonic low level 10 litres UPVC cistern with
UPVC seat and lid with chromium plated brass
hinges including UPVC soil and vent pipe upto the
outside face of the wall including 100 mm dia. UPVC
plug bend, inlet pipe, stop tap etc. all fittings, cuttingand making good to the walls and floor, testing etc.
complete. (Prior approval of sample and brand by
Ex.Engineer is necessary before use.)
2.00 4170.25 No
(b) ------ do ------- with water jet and fittings
Page 33 of 244
-
7/31/2019 Administrative Building Porla
34/244
S.N. ITEM OF WORK QUANTITY RATE UNIT
ABSTRACT- MAIN BUILDING
80 Providing and fixing white glazed earthenware semi
stall type urinals without cistern, with inlet pipes stop
tap, UPVC flush pipe with fittings and flushing
arrangement including UPVC soil pipe, UPVC trap
and soil pipe connection upto outside face of wall,
making good the damaged surface, testing etc.
complete. (Prior approval of sample and brand by
Ex.Engineer is necessary before use.)
10.00 2406.80 No
81 Providing and fixing white glazed earthenware
urinal squatting type without cistern with fitting, inlet
pipes, stop tap, 32 mm dia. UPVC flush pipe with
fittings and spreader arrangement including UPVC
soil pipe, UPVC trap, soil pipe connection upto the
outside face of the wall, making good the damaged
surface, testing etc. complete. (Prior approval of
sample and brand by Ex.Engineer is necessary
before use.)
2.00 2245.05 No
Sub Divisional Engineer Executive En
Public Works Sub Division No 1 Public Works D
Gadchiroli Gadchiro
Total Rs.
Page 34 of 244
-
7/31/2019 Administrative Building Porla
35/244
AMOUNT
88551.00
25354.00
499699.00
239982.00
EX
Page 35 of 244
-
7/31/2019 Administrative Building Porla
36/244
AMOUNT
594226.00
527770.00
5730.00
176726.00
Page 36 of 244
-
7/31/2019 Administrative Building Porla
37/244
AMOUNT
708293.00
5513.00
46776.00
127090.00
295352.00
Page 37 of 244
-
7/31/2019 Administrative Building Porla
38/244
AMOUNT
700560.00
83837.00
22437.00
73976.00
Page 38 of 244
-
7/31/2019 Administrative Building Porla
39/244
AMOUNT
687954.00
34331.00
Page 39 of 244
-
7/31/2019 Administrative Building Porla
40/244
AMOUNT
14952.00
2733863.00
196327.00
105065.00
39243.00
73081.00
Page 40 of 244
-
7/31/2019 Administrative Building Porla
41/244
AMOUNT
9139.00
253438.00
1115.00
203561.00
123407.00
17909.00
Page 41 of 244
-
7/31/2019 Administrative Building Porla
42/244
AMOUNT
14291.00
30016.00
13818.00
36001.00
Page 42 of 244
-
7/31/2019 Administrative Building Porla
43/244
AMOUNT
61990.00
386563.00
18049.00
38902.00
12345.00
Page 43 of 244
-
7/31/2019 Administrative Building Porla
44/244
AMOUNT
544807.00
41117.00
65308.00
61524.00
283776.00
22358.00
Page 44 of 244
-
7/31/2019 Administrative Building Porla
45/244
AMOUNT
13485.00
27314.00
2875.00
7883.00
Page 45 of 244
-
7/31/2019 Administrative Building Porla
46/244
AMOUNT
203044.00
22901.00
Page 46 of 244
-
7/31/2019 Administrative Building Porla
47/244
AMOUNT
69625.00
14277.00
15813.00
59663.00
60380.00
Page 47 of 244
-
7/31/2019 Administrative Building Porla
48/244
AMOUNT
34888.00
24632.00
8218.00
7296.00
8326.0043605.00
0.00
50874.00
Page 48 of 244
-
7/31/2019 Administrative Building Porla
49/244
AMOUNT
376.00
927.00
1802.00
0.00
3115.00
38636.00
57720.00
Page 49 of 244
-
7/31/2019 Administrative Building Porla
50/244
AMOUNT
420.00
894.00
0.00
28800.00
3558.00
4040.00
3529.00
Page 50 of 244
-
7/31/2019 Administrative Building Porla
51/244
AMOUNT
6696.00
11804.00
69042.00
1270.00
76078.00
Page 51 of 244
-
7/31/2019 Administrative Building Porla
52/244
AMOUNT
93070.00
16669.00
31280.00
7489.00
14500.00
8341.00
Page 52 of 244
-
7/31/2019 Administrative Building Porla
53/244
AMOUNT
24068.00
4490.00
11529835.00
ineer
n. No.1,
li
Page 53 of 244
-
7/31/2019 Administrative Building Porla
54/244
S.N. ITEM OF WORK LENGTH BREDTH DEPTH QUANTITY
1
A1) Up to 1.50m. Depth
Column Group A ( 230 mm x 300 mm) 10 x 1 1.60 1.70 1.50 40.80
Column Group B ( 230 mm x450 mm) 45 x 1 1.80 2.10 1.50 255.15
Column Group C ( 350 mm Dia Circular ) 4 x 1 1.80 2.10 1.50 22.68
Column Group D ( 230mm x 830 mm ) 27 x 1 1.80 2.40 1.50 174.96
Column Group E ( 230 mm x 230 mm ) 19 x 1 1.60 1.60 1.50 72.96
C) For Plinth Protection :- Outer Side
Front portion 2 x 1 16.71 1.00 0.30 10.03
(7.46+5.02+2.23+1+1)
Rear portion 1 x 1 48.95 1.00 0.30 14.69(7.16+4.39+1.58+20.69+1.58+4.39+7.16+1+1
RHS & LHS portion 2 x 1 32.45 1.00 0.30 19.47
(25.88+0.6+1.58+4.39)
Inner Side -
Complete length 1 x 1 85.79 1.00 0.30 25.74
D) For Steps
L/W 4 x 1 3.20 1.50 0.40 7.68
A) Excavation of Beam at Ground Level-
PB 2.1,6.1,1.1,7.1 4 x 1 1.88 0.33 0.50 1.24
PB 1.2,8.2 2 x 1 0.78 0.33 0.43 0.22PB 9.1,11.1 2 x 1 3.28 0.33 0.70 1.52
PB 9.2,12.2 2 x 1 2.33 0.33 0.65 1.00
PB 21.1, 31.1 2 x 1 1.00 0.33 0.43 0.28
PB
21.2,35.2,41.2,47.2,53.2,59.2,32.2,40.2,46.2
,52.2,58.2,64.2
12 x 1 1.38 0.33 0.50 2.73
PB 67.2,77.293.1,94.1 4 x 1 0.50 0.33 0.43 0.28
PB 78.2,79.2,93.2,94.2, 4 x 1 1.69 0.33 0.65 1.45
PB 80.1,90.1 2 X 1 0.55 0.33 0.43 0.16
PB 91.1,92.1 2 X 1 2.92 0.33 0.65 1.25
PB 96.1,97.1,98.1, 3 x 1 1.68 0.33 0.50 0.83
PB 99.1,,101.1 2 x 1 1.72 0.33 0.50 0.57PB100.1 1 x 1 1.60 0.33 0.50 0.26
PB 3.1 1 x 1 4.20 0.33 0.70 0.97
PB 4.2 ,5.2 2 x 1 3.13 0.33 0.70 1.45
PB 16.2,17.2 2 x 1 0.50 0.33 0.43 0.14
PB 25.1,27.1 2 x 1 1.78 0.33 0.50 0.59
PB 24.1,28.1 2 x 1 0.60 0.33 0.65 0.26
PB24.2,29.2,65.2,75.2 4 x 1 1.38 0.33 0.50 0.91
PB 33.2,34.2 2 x 1 0.50 0.33 0.43 0.14
NAME OF WORK :- CONSTRUCTION OF ADMINISTRATIVE COMPLEX
AT PORLA REVENUE CIRCLE IN TALUKA GADCHIROLI AND
M E A S U R E M E N T S - M AIN BUILDINGNO
DIST -GADCHIROLI
Excavation for foundation in earth, soils of all types, sand, gravel and soft murum, including removing th
excavated material upto a distance of 50 m. beyond the building area and stacking or spreading as dire
preparing the bed for the foundation and necessary back filling, ramming, watering, including shoring an
strutting as necessary complete.
Page 54 of 244
-
7/31/2019 Administrative Building Porla
55/244
S.N. ITEM OF WORK LENGTH BREDTH DEPTH QUANTITY
M E A S U R E M E N T S - M AIN BUILDINGNO
PB 37.2,43.2,49.2,55.2,38.2,44.2,50.2,56.2 8 x
1
1.38 0.33 0.50
1.82
PB 69.1,74.1 2 x 1 0.25 0.33 0.43 0.07
PB 70.1,71.1 2 X 1 1.68 0.33 0.50 0.55
PB 72.1,73.1 1 X 1 1.72 0.33 0.50 0.28
PB 73.1 1 X 1 1.60 0.33 0.50 0.26
PB 61.2,77.2 2 X 1 0.30 0.33 0.43 0.09
For Porch 2 x 1 2.90 0.33 0.70 1.342 x 1 2.20 0.33 0.70 1.02
Drain around Plinth Protection
Outer side 1 x 1 147.27 0.90 0.80 106.03
Inner side 1 x 1 85.79 0.90 0.80 61.77
For Rain water harvesting 1 x 2 3.00 2.00 1.50 18.00
for Court yard 1 x 1 12.03 9.36 0.25 28.15
879.79
For 1 Unit 879.79
2) Up to 1.50m. To 3.00m. Depth
A) Excavation for Footing
Column Group A 10 x 1 1.60 1.70 0.60 16.32
Column Group B 45 x 1 1.80 2.10 0.60 102.06
Column Group C 4 x 1 1.80 2.10 0.60 9.07
Column Group D 27 x 1 1.80 2.40 0.60 69.98
Column Group E 19 x 1 1.60 1.60 0.60 29.18
For Rain water harvesting 1 x 2 3.00 2.00 0.50 6.00
232.61
For 1 Unit 232.61
2
Column Group A 1 x 10 1.60 1.70 0.15 4.08
Column Group B 1 x 45 1.80 2.10 0.15 25.52
Column Group C 1 x 4 1.80 2.10 0.15 2.27
Column Group D 1 x 27 1.80 2.40 0.15 17.50
Column Group E 1 x 19 1.80 2.40 0.15 12.31
C) For Plinth Protection :
Front portion 1 x 2 16.71 1.00 0.15 5.01
Rear portion 1 x 1 48.95 1.00 0.15 7.34
RHS & LHS portion 1 x 2 32.45 1.00 0.15 9.74
Inner Side - 1 x 1 85.79 1.00 0.15 12.87
D) For Steps
1 x 4 3.20 1.50 0.15 2.88
Providing and laying in situ, cement concrete in 1:4:8 of trap/ granite/quartzite/gneiss metal for foundati
bedding including bailing out water, plywood/steel formwork, compacting, finishing uneven and honeyco
surface curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and
honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc.
(Wooden centering will not be allowed.)
Page 55 of 244
-
7/31/2019 Administrative Building Porla
56/244
S.N. ITEM OF WORK LENGTH BREDTH DEPTH QUANTITY
M E A S U R E M E N T S - M AIN BUILDINGNO
Drain around Plinth Protection
Outer side 1 x 1 147.27 0.90 0.10 13.25
Inner side 1 x 1 85.79 0.90 0.10 7.72
C ) Below Flooring :
Police Aid and Setu 1 x 4 3.38 5.00 0.075 5.07
Bank and Post office 1 x 2 4.78 2.77 0.075 1.99
1 x 2 2.27 1.73 0.075 0.59
Office Area 2 x 6 2.88 4.50 0.075 11.66
Xerox Room 1 x 1 3.18 5.00 0.075 1.19
Canteen 1 x 2 3.18 5.00 0.075 2.39
Meeting Hall 1 x 2 3.22 5.00 0.075 2.42
1 X 1 33.10 5.00 0.075 12.41
Corridor 1 x 2 18.92 1.50 0.075 4.26
1 x 2 9.52 1.50 0.075 2.14
Triangular portion 0.5 x 4 3.20 3.60 0.075 1.73
rear side 1 x 1 20.69 1.50 0.075 2.33
1 x 2 5.75 1.68 0.075 1.45
1 x 2 4.70 1.68 0.075 1.18Triangular portion 0.5 x 2 4.70 4.70 0.075 1.66
Deduct for plinth beams 1 x -21 1.50 0.23 0.075 -0.54
1 x -2 4.12 0.23 0.075 -0.14
Tiolet 1 x 2 4.42 3.60 0.075 2.39
1 x 2 2.05 3.60 0.075 1.11
175.78For 1 Unit 175.78
3
Drain Foundation
Outer side 1 x 1 147.27 0.75 0.10 11.05
Inner side 1 x 1 85.79 0.75 0.10 6.43
Drain
Outer side 1 x 2 147.27 0.150 0.45 19.88
Inner side 1 x 2 85.79 0.150 0.45 11.58
48.94
For 1 Unit 48.94
4
Group-A (300x230mm)
Area Bottom (A1) 1.40 x 1.30 1.82
Area Top (A2) 0.40 x 0.33 0.13
Area mean (Am) 0.90 x 0.82 0.73
Providing and laying in situ cement concrete of M-15/1:2:4 with trap / granite / quartzite / gneiss metal in
wall including plywood/ steel formwork and steel centering, compaction by vibrator, finishing uneven an
honeycombed surface with C.M.1:3 of sufficient minimum thickness to give smooth and even surface, fil
Providing and laying in situ cement concrete of M20 grade of trap / granite/ quartzite / gneiss metal for
work in foundations like raft, grillages, strip foundations and footings of R.C.C.columns and steel stanch
including bailing out water, plywood/steel formwork, compaction, curing and roughening the surface if s
finish is to be provided, finishing uneven and honeycombed surface with C.M. 1:3 of sufficient minimum
thickness to give smooth and even surface etc. complete. (Excluding reinforcement and structural steelincluding cover block) The Cement Mortar 1:3 plaster is considered for rendering uneven and honeyco
surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centeri
not be allowed
Page 56 of 244
-
7/31/2019 Administrative Building Porla
57/244
S.N. ITEM OF WORK LENGTH BREDTH DEPTH QUANTITY
M E A S U R E M E N T S - M AIN BUILDINGNO
Depth End d1 0.20
Depth Centre D 0.60
Rectangular Portion 1 x 10 1.40 x 1.30 0.20 3.64
Trapezoidal Portion 1 x 10 0.0667 x 4.87 3.25
(H/6 x (A1+A2)+4Am) H/6 At+Ab+4Am
GroupB (300x450mm)
Area Bottom (A1) 1.80 x 1.50 2.70
Area Top (A2) 0.55 x 0.33 0.18
Area mean (Am) 1.18 x 0.92 1.08
Depth End d1 0.20
Depth Centre D 0.70
Rectangular Portion 1 x 45 1.80 x 1.50 0.20 24.30
Trapezoidal Portion 1 x 45 0.0833 x 7.20 27.00
(H/6 x (A1+A2)+4Am) H/6 At+Ab+4Am
Group C (350 x350mm)
Area Bottom (A1) 1.80 x 1.50 2.70
Area Top (A2) 0.55 x 0.33 0.18
Area mean (Am) 1.18 x 0.92 1.08
Depth End d1 0.20
Depth Centre D 0.60
Rectangular Portion 1 x 4 1.80 x 1.50 0.20 2.16
Trapezoidal Portion 1 x 4 0.0667 x 7.20 1.92
(H/6 x (A1+A2)+4Am) H/6 At+Ab+4Am
Group D (350 x350mm)
Area Bottom (A1) 2.10 x 1.50 3.15
Area Top (A2) 0.93 x 0.33 0.31
Area mean (Am) 1.52 x 0.92 1.39
Depth End d1 0.20
Depth Centre D 0.60
Rectangular Portion 1 x 27 2.10 x 1.50 0.20 17.01
Trapezoidal Portion 1 x 27 0.0667 x 9.02 16.24
(H/6 x (A1+A2)+4Am) H/6 At+Ab+4Am
Page 57 of 244
-
7/31/2019 Administrative Building Porla
58/244
S.N. ITEM OF WORK LENGTH BREDTH DEPTH QUANTITY
M E A S U R E M E N T S - M AIN BUILDINGNO
Group E (230 x230 mm)
Area Bottom (A1) 1.30 x 1.30 1.69
Area Top (A2) 0.33 x 0.33 0.11
Area mean (Am) 0.82 x 0.82 0.66
Depth End d1 0.20
Depth Centre D 0.60
Rectangular Portion 1 x 19 1.30 x 1.30 0.20 6.42
Trapezoidal Portion 1 x 19 0.0667 x 4.44 5.62
(H/6 x (A1+A2)+4Am) H/6 At+Ab+4Am
107.56For 1 Unit 107.56
5
For G.F.
From footing top to plinth level
Group-A 300x230mm) 1 x 10 0.30 0.23 1.75 1.21
Group-B (450x230mm) 1 x 45 0.45 0.23 1.65 7.68
Group-C (350x350mm) 1 x 4 1.20 0.60 1.75 5.04
Group-D (830x230mm) 1 x 27 0.83 0.23 1.55 7.99
Group-E (230x230mm) 1 x 19 0.23 0.23 1.75 1.76
Plinth to slab
Group-A 300x230mm) 1 x 10 0.30 0.23 4.50 3.11
Group-B (450x230mm) 1 x 45 0.45 0.23 4.50 20.96
Group-C (350x350mm) 4 x 0.79 0.35 0.35 4.50 1.74
Group-D (830x230mm) 1 x 27 0.83 0.23 4.50 23.19
Group-E (230x230mm) 1 x 19 0.23 0.23 4.50 4.52
77.20
For 1 Unit 77.20
Providing and casting in situ cement concrete of M20 grade of trap / granite /quartzite/ gneiss metal for
R.C.C. columns as per detailed design and drawings or as directed, including steel centering, plywood/s
formwork, compaction, finishing uneven and honeycombed surface with C.M. 1:3 of sufficient minimum
thickness to give a smooth and even surface or roughening the surface if special finish is to be providedcuring etc. complete. Including use of plastisizer wherever necessary as directed by Engineer (Excludi
reinforcement, including cover block). The Cement Mortar 1:3 plaster is considered for rendering uneve
honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc.
(Wooden centering will not be allowed)
Page 58 of 244
-
7/31/2019 Administrative Building Porla
59/244
S.N. ITEM OF WORK LENGTH BREDTH DEPTH QUANTITY
M E A S U R E M E N T S - M AIN BUILDINGNO
6
Below the Groung Level Beams
PB 2.1,6.1,1.1,7.1 4 x 1 1.88 0.33 - 2.48
PB 1.2,8.2 2 x 1 0.78 0.33 - 0.51
PB 9.1,11.1 2 x 1 3.28 0.33 - 2.16
PB 9.2,12.2 2 x 1 2.33 0.33 - 1.54
PB 21.1, 31.1 2 x 1 1.00 0.33 - 0.66PB
21.2,35.2,41.2,47.2,53.2,59.2,32.2,40.2,46.2
,52.2,58.2,64.2
12 x 1 1.38 0.33 - 5.46
PB 67.2,77.293.1,94.1 4 x 1 0.50 0.33 - 0.66
PB 78.2,79.2,93.2,94.2, 4 x 1 1.69 0.33 - 2.23
PB 80.1,90.1 2 X 1 0.55 0.33 - 0.36
PB 91.1,92.1 2 X 1 2.92 0.33 - 1.93
PB 96.1,97.1,98.1, 3 x 1 1.68 0.33 - 1.66
PB 99.1,,101.1 2 x 1 1.72 0.33 - 1.14
PB100.1 1 x 1 1.60 0.33 - 0.53
PB 3.1 1 x 1 4.20 0.33 - 1.39
PB 4.2 ,5.2 2 x 1 3.13 0.33 - 2.07PB 16.2,17.2 2 x 1 0.50 0.33 - 0.33
PB 25.1,27.1 2 x 1 1.78 0.33 - 1.17
PB 24.1,28.1 2 x 1 0.60 0.33 - 0.40
PB24.2,29.2,65.2,75.2 4 x 1 1.38 0.33 - 1.82
PB 33.2,34.2 2 x 1 0.50 0.33 - 0.33
PB 37.2,43.2,49.2,55.2,38.2,44.2,50.2,56.28 x 1 1.38 0.33 - 3.64
PB 69.1,74.1 2 x 1 0.25 0.33 - 0.17
PB 70.1,71.1 2 X 1 1.68 0.33 - 1.11
PB 72.1,73.1 1 X 1 1.72 0.33 - 0.57
PB 73.1 1 X 1 1.60 0.33 - 0.53
PB 61.2,77.2 2 X 1 0.30 0.33 - 0.20Beam for Ramp 1 x 2 1.50 0.33 - 0.99
Beam for Duct 1 x 8 0.60 0.33 - 1.58
1 x 4 0.37 0.33 - 0.49
1 X 2 1.31 0.33 - 0.86
1 x 2 1.81 0.33 - 1.19
1 x 2 0.37 0.33 - 0.24
For Porch 1 x 2 2.90 0.33 - 1.91
1 x 2 2.20 0.33 - 1.45
43.76
For 1 Unit 43.76
7
Masonary at Foundation Plinth Height = 0.75 m
PB 2.1,6.1,1.1,7.1 4 x 1 3.38 0.23 0.90 2.80
PB 1.2,8.2 2 x 1 1.78 0.23 0.90 0.74
PB 9.1,11.1 2 x 1 4.78 0.23 0.90 1.98
PB 9.2,12.2 2 x 1 4.28 0.23 0.90 1.77
PB 21.1, 31.1 2 x 1 2.00 0.23 0.90 0.83
Providing and laying 50 mm thick layers in C.M. 1:8 belowe plinth beam including floating, watering, curi
and levelling and ramming the bed if necessary before laying the layer etc, complete.
Providing 2nd class Burnt Brick masonry with conventional/I.S. type bricks in cement mortar 1:6 infoundations and plinth of inner walls/in plinth of external walls including bailing out water, striking joints
unexposed faces, racking out joints on exposed faces and watering complete.
Page 59 of 244
-
7/31/2019 Administrative Building Porla
60/244
S.N. ITEM OF WORK LENGTH BREDTH DEPTH QUANTITY
M E A S U R E M E N T S - M AIN BUILDINGNO
PB
21.2,35.2,41.2,47.2,53.2,59.2,32.2,40.2,46.2
,52.2,58.2,64.2
12 x 1 2.88 0.23 0.90 7.15
PB 67.2,77.293.1,102.1 4 x 1 1.58 0.23 0.90 1.31
PB 78.2,79.2,93.2,94.2, 4 x 1 3.49 0.23 0.90 2.89
PB 80.1,90.1 2 X 1 2.05 0.23 0.90 0.85
PB 91.1,92.1 2 X 1 4.42 0.23 0.90 1.83
PB 96.1,97.1,98.1, 3 x 1 3.18 0.23 0.90 1.97PB 99.1,,101.1 2 x 1 3.22 0.23 0.90 1.33
PB100.1 1 x 1 3.10 0.23 0.90 0.64
PB 4.2 ,5.2 2 x 1 4.78 0.23 0.90 1.98
PB 16.2,17.2 2 x 1 1.50 0.23 0.90 0.62
PB 25.1,27.1 2 x 1 3.28 0.23 0.90 1.36
PB 24.1,28.1 2 x 1 1.60 0.23 0.90 0.66
PB24.2,29.2,65.2,75.2 4 x 1 2.88 0.23 0.90 2.38
PB 33.2,34.2 2 x 1 0.50 0.23 0.90 0.21
PB 37.2,43.2,49.2,55.2,38.2,44.2,50.2,56.28 x 1 2.88 0.23 0.90 4.77
PB 69.1,74.1 2 x 1 1.75 0.23 0.90 0.72PB 70.1,71.1 2 X 1 3.18 0.23 0.90 1.32
PB 72.1,73.1 1 X 1 3.22 0.23 0.90 0.67
PB 73.1 1 X 1 3.10 0.23 0.90 0.64
PB 61.2,62.2 2 X 1 1.30 0.23 0.90 0.54
Beam for Duct 1 x 8 0.60 0.115 0.90 0.50
1 x 4 0.37 0.115 0.90 0.15
1 X 2 1.31 0.115 0.90 0.27
1 x 2 1.81 0.115 0.90 0.37
1 x 2 0.37 0.115 0.90 0.08
Steps 1 x 4 3.00 1.50 0.15 2.70
1 x 4 3.00 1.20 0.15 2.16
1 x 4 3.00 0.900.15 1.621 x 4 3.00 0.60 0.15 1.08
1 x 4 3.00 0.30 0.15 0.54
51.43For 1 Unit 51.43
8
Beams at Plinth Level
PB 2.1,6.1,1.1,7.1 4 x 1 3.38 0.23 0.30 0.93
PB 1.2,8.2 2 x 1 1.78 0.23 0.23 0.19
PB 9.1,11.1 2 x 1 4.78 0.23 0.50 1.10
PB 9.2,12.2 2 x 1 4.28 0.23 0.45 0.89
PB 21.1, 31.1 2 x 1 2.00 0.23 0.23 0.21
PB
21.2,35.2,41.2,47.2,53.2,59.2,32.2,40.2,46.2
,52.2,58.2,64.2
12 x 1 2.88 0.23 0.30 2.38
Providing and casting in situ cement concrete of M20 grade of trap / granite /quartzite /gneiss metal for R.C.
beams and lintels as per detailed design and drawings or as directed,including steel centering, plywood/steel
formwork steel props, compaction, finishing uneven and honeycombed surface with C.M.1:3 of sufficient mini
thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc.
complete. Including use of plastisizer wherever necessary as directed by Engineer-In-charge (Excluding
reinforcement, including cover block). The Cement Mortar 1:3 plaster is considered for rendering uneven and
honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wood
centering will not be allowed)
Page 60 of 244
-
7/31/2019 Administrative Building Porla
61/244
S.N. ITEM OF WORK LENGTH BREDTH DEPTH QUANTITY
M E A S U R E M E N T S - M AIN BUILDINGNO
PB 67.2,77.2,93.1,102.1 4 x 1 1.58 0.23 0.23 0.33
PB 78.2,79.2,93.2,94.2, 4 x 1 3.49 0.23 0.45 1.44
PB 80.1,90.1 2 X 1 2.05 0.23 0.23 0.22
PB 91.1,92.1 2 X 1 4.42 0.23 0.45 0.91
PB 96.1,97.1,98.1, 3 x 1 3.18 0.23 0.30 0.66
PB 99.1,,101.1 2 x 1 3.22 0.23 0.30 0.44
PB100.1 1 x 1 3.10 0.23 0.30 0.21
PB 3.1 1 x 1 6.00 0.23 0.50 0.69PB 4.2 ,5.2 2 x 1 4.78 0.23 0.50 1.10
PB 16.2,17.2 2 x 1 1.50 0.23 0.23 0.16
PB 25.1,27.1 2 x 1 3.28 0.23 0.30 0.45
PB 24.1,28.1 2 x 1 1.60 0.23 0.23 0.17
PB24.2,29.2,65.2,75.2 4 x 1 2.88 0.23 0.30 0.79
PB 33.2,34.2 2 x 1 0.50 0.23 0.23 0.05
PB 37.2,43.2,49.2,55.2,38.2,44.2,50.2,56.2 8 x
1
2.88 0.23 0.30
1.59
PB 69.1,74.1 2 x 1 1.75 0.23 0.23 0.19
PB 70.1,71.1 2 X 1 3.18 0.23 0.30 0.44
PB 72.1 1 X 1 3.22 0.23 0.30 0.22
PB 73.1 1 X 1 3.10 0.23 0.30 0.21PB 61.2,62.2 2 X 1 1.30 0.23 0.23 0.14
For Porch 1 x 2 5.00 0.23 0.50 1.15
1 x 2 4.00 0.23 0.50 0.92
Internal beams at Plinth level
PB 2.2,7.2 1 x 2 5.00 0.23 0.50 1.15
PB 10.2,11.2 1 x 2 2.77 0.23 0.30 0.38
PB 13.1, 19.1 1 x 2 2.21 0.23 0.23 0.23
PB13.2 , 20.2 1 x 2 1.50 0.23 0.23 0.16
PB14.15.1,17.1,18.1 1 X 4 3.05 0.23 0.30 0.84
PB 22.1 , 30.1 1 x 2 2.27 0.23 0.23 0.24PB
35.1,41.1,47.1,53.1,59.1,67.1,76.1,63.1,57.1,51.
1,45.1,39.1
1 x 12 4.50 0.23 0.45 5.59
PB 78.1,78.3,78.5,89.1,89.3,89.5 1 x 6 2.05 0.23 0.23 0.65
PB 81.1,81.3,, 94.1,94.3 1 x 4 4.42 0.23 0.45 1.83
PB 81.2,89.2 1 x 2 3.49 0.23 0.45 0.72
PB 82.2,83.2,84.2,85.2,86.2,87.2,88.2 1 x 7 4.78 0.23 0.50 3.85
PB
15.2,36.1,42.1,48.1,54.1,60.1,65.1,69.2,70.2,71.
2,72.2,73.2,74.2,75.1,66.1,62.1,56.1,50.1,44.1,3
8.1,18.2,65.1
1 x 21 1.50 0.23 0.23 1.67
PB 23.1, 29.1 1 x 2 4.12 0.23 0.45 0.85
PB 82.1,83.1,84.1 1 X 3 3.18 0.23 0.30 0.66
PB 85.1,87.1 1 X 2 3.22 0.23 0.30 0.44
PB 86.1 1 X 1 3.10 0.23 0.30 0.21PB 23.2,30.2,42.2,45.2,54.2,57.2 1 X 6 2.56 0.23 0.30 1.06
PB 36.2,39.2,48.2,51.2,60.2,63.2 1 X 6 2.77 0.23 0.30 1.15
Tiolet 1 x 8 1.20 0.15 0.23 0.33
Beam for Ramp 1 x 2 1.50 0.23 0.23 0.16
Beam for Duct 1 x 8 0.60 0.23 0.23 0.25
1 x 4 0.37 0.23 0.23 0.08
1 X 2 1.31 0.23 0.23 0.14
1 x 2 1.81 0.23 0.23 0.19
1 x 2 0.37 0.23 0.23 0.04
Total Quantity for Plinth Beams = 41.05
Page 61 of 244
-
7/31/2019 Administrative Building Porla
62/244
S.N. ITEM OF WORK LENGTH BREDTH DEPTH QUANTITY
M E A S U R E M E N T S - M AIN BUILDINGNO
B) Beams at Lintel Level
LB 2.1,6.1,1.1,7.1 4 x 1 3.38 0.23 0.23 0.72
LB 1.2,8.2 2 x 1 1.78 0.23 0.23 0.19
LB 9.1,11.1 2 x 1 4.78 0.23 0.23 0.51
LB 9.2,12.2 2 x 1 4.28 0.23 0.23 0.45
LB 21.1, 31.1 2 x 1 2.00 0.23 0.23 0.21
LB
21.2,35.2,41.2,47.2,53.2,59.2,32.2,40.2,46.2
,52.2,58.2,64.2
12 x 1 2.88 0.23 0.23
1.83
LB 67.2,77.2,93.1,102.1 4 x 1 1.58 0.23 0.23 0.33
LB 78.2,79.2,93.2,94.2, 4 x 1 3.49 0.23 0.23 0.74
LB 80.1,90.1 2 X 1 2.05 0.23 0.23 0.22
LB 91.1,92.1 2 X 1 4.42 0.23 0.23 0.47
LB 96.1,97.1,98.1, 3 x 1 3.18 0.23 0.23 0.50
LB 99.1,,101.1 2 x 1 3.22 0.23 0.23 0.34
LB100.1 1 x 1 3.10 0.23 0.23 0.16
LB 4.2 ,5.2 2 x 1 4.78 0.23 0.23 0.51
LB 16.2,17.2 2 x 1 1.50 0.23 0.23 0.16
LB 25.1,27.1 2 x 1 3.28 0.23 0.23 0.35
LB 24.1,28.1 2 x 1 1.60 0.23 0.23 0.17
LB24.2,29.2,65.2,75.2 4 x 1 2.88 0.23 0.23 0.61
LB 33.2,34.2 2 x 1 0.50 0.23 0.23 0.05LB 37.2,43.2,49.2,55.2,38.2,44.2,50.2,56.2 8 x 1 2.88 0.23 0.23 1.22
LB 69.1,74.1 2 x 1 1.75 0.23 0.23 0.19
LB 70.1,71.1 2 X 1 3.18 0.23 0.23 0.34
LB 72.1 1 X 1 3.22 0.23 0.23 0.17
LB 73.1 1 X 1 3.10 0.23 0.23 0.16
LB 61.2,62.2 2 X 1 1.30 0.23 0.23 0.14
LB 16.2,17.2 2 X 1 1.50 0.23 0.23 0.16
LB 10.2,11.2 1 x 2 2.77 0.23 0.23 0.29
LB 13.1, 19.1 1 x 2 2.21 0.23 0.23 0.23
LB13.2 , 20.2 1 x 2 1.50 0.23 0.23 0.16
LB14.1,15.1,17.1,18.1 1 X 4 3.05 0.23 0.23 0.65
LB 22.1 , 30.1 1 x 2 2.27 0.23 0.23 0.24
LB 41.1,53.1,67.1,76.1,57.1,45.1 1 x 6 4.50 0.23 0.23 1.43
LB 78.1,78.5 ,89.1,89.5 1 x 4 2.05 0.23 0.23 0.43
LB 81.1,81.3,, 94.1,94.3 1 x 4 4.42 0.23 0.23 0.94
LB 81.2,89.2 1 x 2 3.49 0.23 0.23 0.37
LB 82.2,83.2,85.2,88.2 1 x 4 4.78 0.23 0.23 1.01
LB 82.1,83.1,84.1 1 X 3 3.18 0.23 0.23 0.50
LB 85.1,87.1 1 X 2 3.22 0.23 0.23 0.34
LB 86.1 1 X 1 3.10 0.23 0.23 0.16
LB 23.2,30.2,42.2,45.2,54.2,57.2 1 X 6 2.56 0.23 0.23 0.81LB 36.2,39.2,48.2,51.2,60.2,63.2 1 X 6 2.77 0.23 0.23 0.88
Toilet block 1 x 8 1.20 0.15 0.15 0.22
Beam for Duct 1 x 12 0.60 0.115 0.15 0.12
1 x 4 0.60 0.115 0.15 0.04
1 x 4 1.31 0.115 0.15 0.09
For Porch 1 x 2 5.00 0.23 0.23 0.53
1 x 2 4.00 0.23 0.23 0.42
Total Quantity for Lintel Beams = 20.76
C) beams at Slab Level
Page 62 of 244
-
7/31/2019 Administrative Building Porla
63/244
S.N. ITEM OF WORK LENGTH BREDTH DEPTH QUANTITY
M E A S U R E M E N T S - M AIN BUILDINGNO
SB 2.1,6.1,1.1,7.1 4 x 1 3.38 0.23 0.30 0.93
SB 1.2,8.2 2 x 1 1.78 0.23 0.23 0.19
SB 9.1,11.1 2 x 1 4.78 0.23 0.50 1.10
SB 9.2,12.2 2 x 1 4.28 0.23 0.45 0.89
SB 21.1, 31.1 2 x 1 2.00 0.23 0.23 0.21
SB
21.2,35.2,41.2,47.2,53.2,59.2,32.2,40.2,46.2
,52.2,58.2,64.2
12 x 1 2.88 0.23 0.30 2.38
SB 67.2,77.293.1,102.1 4 x 1 1.58 0.23 0.23 0.33
SB 78.2,79.2,93.2,94.2, 4 x 1 3.49 0.23 0.45 1.44
SB 80.1,90.1 2 X 1 2.05 0.23 0.23 0.22
SB 91.1,92.1 2 X 1 4.42 0.23 0.45 0.91
SB 96.1,97.1,98.1, 3 x 1 3.18 0.23 0.30 0.66
SB 99.1,,101.1 2 x 1 3.22 0.23 0.30 0.44
SB100.1 1 x 1 3.10 0.23 0.30 0.21
SB 3.1 1 x 1 6.00 0.230 0.50 0.69
SB 4.2 ,5.2 2 x 1 4.78 0.23 0.50 1.10
SB 16.2,17.2 2 x 1 1.50 0.23 0.23 0.16
SB 25.1,27.1 2 x 1 3.28 0.23 0.30 0.45
SB 24.1,28.1 2 x 1 1.60 0.23 0.23 0.17SB24.2,29.2,65.2,75.2 4 x 1 2.88 0.23 0.30 0.79
SB 33.2,34.2 2 x 1 0.50 0.23 0.23 0.05
SB 37.2,43.2,49.2,55.2,38.2,44.2,50.2,56.2 8 x
1
2.88 0.23 0.30
1.59
SB 69.1,74.1 2 x 1 1.75 0.23 0.23 0.19
SB 70.1,71.1 2 X 1 3.18 0.23 0.30 0.44
SB 72.1 1 X 1 3.22 0.23 0.30 0.22
SB 73.1 1 X 1 3.10 0.23 0.30 0.21
SB 61.2,77.2 2 X 1 1.30 0.23 0.23 0.14
SB 2.2,7.2 1 x 2 5.00 0.23 0.50 1.15
SB 10.2,11.2 1 x2 2.77 0.23 0.30
0.38SB 13.1, 19.1 1 x 2 2.21 0.23 0.23 0.23
SB13.2 , 20.2 1 x 2 1.50 0.23 0.23 0.16
SB14.15.1,17.1,18.1 1 X 4 3.05 0.23 0.23 0.65
SB 22.1 , 30.1 1 x 2 2.27 0.23 0.23 0.24SB
35.1,41.1,47.1,53.1,59.1,67.1,76.1,63.1,57.1,51.
1,45.1,39.1
1 x 12 4.50 0.23 0.45 5.59
SB 78.1,78.3,78.5,89.1,89.3,89.5 1 x 6 2.05 0.23 0.23 0.65
SB 81.1,81.3,, 94.1,94.3 1 x 4 4.42 0.23 0.45 1.83
SB 81.2,89.2 1 x 2 3.49 0.23 0.45 0.72
SB 82.2,83.2,84.2,85.2,86.2,87.2,88.2 1 x 7 4.78 0.23 0.50 3.85
SB
15.2,36.1,42.1,48.1,54.1,60.1,65.1,69.2,70.2,71.2,72.2,73.2,74.2,75.1,66.1,62.1,56.1,50.1,44.1,3
8.1,18.2
1 x 21 1.50 0.23 0.23 1.67
SB 23.1, 29.1 1 x 2 4.12 0.23 0.45 0.85
SB 82.1,83.1,84.1 1 X 3 3.18 0.23 0.30 0.66
SB 85.1,87.1 1 X 2 3.22 0.23 0.30 0.44
SB 86.1 1 X 1 3.10 0.23 0.30 0.21
SB 23.2,30.2,42.2,45.2,54.2,57.2 1 X 6 2.56 0.23 0.30 1.06
SB 36.2,39.2,48.2,51.2,60.2,63.2 1 X 6 2.77 0.23 0.30 1.15
Tiolet 1 x 8 1.20 0.15 0.23 0.33
Beam for Duct 1 x 8 0.60 0.23 0.23 0.25
1 x 4 0.37 0.23 0.23 0.08
Page 63 of 244
-
7/31/2019 Administrative Building Porla
64/244
S.N. ITEM OF WORK LENGTH BREDTH DEPTH QUANTITY
M E A S U R E M E N T S - M AIN BUILDINGNO
1 X 2 1.31 0.23 0.23 0.14
1 x 2 1.81 0.23 0.23 0.19
1 x 2 0.37 0.23 0.23 0.04
For Porch 1 x 2 5.00 0.23 0.50 1.15
1 x 2 4.00 0.23 0.50 0.92
Total Quantity for Floor Beams = 40.70
Total Quantity for Beams = 102.51
For 1 Unit 102.51
9
Quantity Available at Site as per It. No. 1 a 879.79
b 232.61
Total Quantity available at site 1112.40
------AQty of strutures -
Soling 11 49.37
PCC 2 49.37
Footing 4 107.56
Column upto GL vide It.No. 5Group-A 1 x 10 0.30 0.23 1.00 0.69
Group-B 1 x 45 0.45 0.23 0.90 4.19
Group-C 1 x 4 1.20 0.60 1.00 2.88Group-D 1 x 27 0.83 0.23 0.80 4.12
Group - E 1 x 19 0.23 0.23 1.00 1.01
Qyuantity avalable after back fill = 219.19
50% Servicable Qty available after back filling 109.60For 1 Unit 109.60
10
Police Aid and Setu 1 x 2 7.00 5.00 0.43 29.75
Bank and Post office 1 x 2 4.78 2.77 0.43 11.25
1 x 2 2.13 1.73 0.43 3.13
Office Area 1 x 6 4.50 6.00 0.43 68.85
Xerox Room 1 x 1 3.18 5.00 0.43 6.76
Canteen 1 x 1 6.59 5.00 0.43 14.00
Meeting Hall 1 x 1 10.00 5.00 0.43 21.25Corridor 1 x 2 18.92 1.50 0.43 24.12
1 x 2 9.52 1.50 0.43 12.14
Triangular portion 0.5 x 4 3.20 3.60 0.43 9.79
rear side 1 x 1 20.69 1.50 0.43 13.19
1 x 2 5.75 1.68 0.43 8.21
1 x 2 4.70 1.68 0.43 6.71
Triangular portion 0.5 x 2 4.70 4.70 0.43 9.39
Toilet 1 x 2 4.00 1.90 0.43 6.46
1 x 2 4.00 1.80 0.43 6.12
Total Qty reqd for filling plinth 251.12
Filling in plinth and floors with contractors approved material / murum / stone dust in 15cm. to 20cm. la
including watering and compaction complete.
Filling in plinth and floors with approved excavated materials in 15 cm. to 20 cm. layers including wateri
and compaction complete.
Page 64 of 244
-
7/31/2019 Administrative Building Porla
65/244
S.N. ITEM OF WORK LENGTH BREDTH DEPTH QUANTITY
M E A S U R E M E N T S - M AIN BUILDINGNO
Excavated Qty utilised for plinth filling 109.60
Total Qty for Plinth Filling 141.53
For Rain Water Harvesting 0 x 2 3.00 x 2.00 0.5 0.00
Net Qty 141.53
For 1 Unit 141.53
11
Column Group A 1 x 10 1.60 1.70 0.15 4.08
Column Group B 1 x 45 1.80 2.10 0.15 25.52
Column Group C 1 x 4 1.80 2.10 0.15 2.27
Column Group D 1 x 27 1.80 2.40 0.15 17.50
Column Group D 1 x 19 1.60 1.60 0.15 7.30
Plinth Protection-
Front portion 1 x 2 16.71 1.00 0.15 5.01Rear portion 1 x 1 48.95 1.00 0.15 7.34
RHS & LHS portion 1 x 2 32.45 1.00 0.15 9.74
Inner Side - 1 x 1 85.79 1.00 0.15 12.87
Below Flooring
Police Aid and Setu 1 x 4 3.38 5.00 0.15 10.14
Bank and Post office 1 x 2 4.78 2.77 0.15 3.97
1 x 2 2.13 1.73 0.15 1.11
Office Area 2 x 6 2.88 6.00 0.15 31.10
Xerox Room 1 x 1 3.18 5.00 0.15 2.39
Canteen 1 x 2 3.18 5.00 0.15 4.77
Meeting Hall 1 x 3 3.22 5.00 0.15 7.25Corridor 1 x 2 18.92 1.50 0.15 8.51
1 x 2 9.52 1.50 0.15 4.28
Triangular portion 0.5 x 4 3.20 3.60 0.15 3.46
rear side 1 x 1 20.69 1.50 0.15 4.66
1 x 2 5.75 1.68 0.15 2.90
1 x 2 4.70 1.68 0.15 2.37
Triangular portion 0.5 x 2 4.70 4.70 0.15 3.31
Deduct for plinth beams 1 x -21 1.50 0.23 0.15 -1.09
1 x -2 4.12 0.23 0.15 -0.28
Tiolet 1 x 2 4.42 3.60 0.15 4.77
1 x 2 2.05 3.60 0.15 2.21
for Court yard 1 x 1 12.03 9.36 0.15 16.89Drain around Plinth Protection
Outer side 1 x 1 147.27 0.90 0.15 19.88
Inner side 1 x 1 85.79 0.90 0.15 11.58
235.81
For 1 Unit 235.81
Providing soling using 80 mm size granite / quartzite / gneiss / trap metal in 15 cm. layer including handpacking filling voids with sand / grit, ramming, watering etc complete.
Page 65 of 244
-
7/31/2019 Administrative Building Porla
66/244
S.N. ITEM OF WORK LENGTH BREDTH DEPTH QUANTITY
M E A S U R E M E N T S - M AIN BUILDINGNO
12
Bedding for Flooing with Nomonal Reinforcement
Police Aid and Setu 1 x 4 3.38 5.00 0.10 6.76
Bank and Post office 1 x 2 4.78 2.77 0.10 2.65
1 x 2 2.13 1.73 0.10 0.74
Office Area 2 x 6 2.88 6.00 0.10 20.74
Xerox Room 1 x 1 3.18 5.00 0.10 1.59
Canteen 1 x 2 3.18 5.00 0.10 3.18
Meeting Hall 1 x 3 3.22 5.00 0.10 4.83
Corridor 1 x 2 18.92 1.50 0.10 5.68
1 x 2 9.52 1.50 0.10 2.86
Triangular portion 0.5 x 4 3.20 3.60 0.10 2.30
rear side 1 x 1 20.69 1.50 0.10 3.10
1 x 2 5.75 1.68 0.10 1.93
1 x 2 4.70 1.68 0.10 1.58
Triangular portion 0.5 x 2 4.70 4.70 0.10 2.21
Deduct for plinth beams 1 x -21 1.50 0.23 0.10 -0.72
1 x -2 4.12 0.23 0.10 -0.19
Tiolet 1 x 2 4.42 3.60 0.10 3.18
1 x 2 2.05 3.60 0.10 1.48
63.90For 1 Unit 63.90
13
For G.F.
PB 2.1,6.1,1.1,7.1 1 x 4 3.38 0.23 3.60 11.19
PB 1.2,8.2 1 x 2 1.78 0.23 3.60 2.95
PB 9.1,11.1 1 x 2 4.78 0.23 3.60 7.92
PB 9.2,12.2 1 x 2 4.28 0.23 3.60 7.09
PB 21.1, 31.1 1 x 2 2.00 0.23 3.60 3.31
PB
21.2,35.2,41.2,47.2,53.2,59.2,32.2,40.2,46.2
,52.2,58.2,64.2
1 x 12 2.88 0.23 3.60 28.62
PB 67.2,77.2,93.1,94.1 1 x 4 1.58 0.23 3.60 5.23
PB 78.2,79.