6
Requirements for System Installation C.,A,?0 -0/ ,9/ ;=0;,=0 >@-2=,/0 ;0= engineer’s plans. 7,.0 9:9ரB:A09 20:?0C?470 :A0= ;=0;,=0/ >:47> ,9/ @; 0C.,A,?4:9 B,77>ற 9>?,77 @9/0=/=,49> 41 =0<@4=0/ற 7,.0 .70,9ய .=@>30/ய ,92@7,= >?:90 1:@9/,?4:9 ஹ ழஸள 88 := ஷ ழளள 88 B4?3 , >49270 7,D0= :1 0:2=4/ 'ழவஷற "00 ;7,9> 1:= 1:@9/,?4:9 >?:90 /0>429ற:8;,.? ?: ,.340A0 , Ȓ,? >@=1,.0ற 1 ADS StormTech ® Installation Guide SC-160LP Required Materials and Equipment List Ǯ ..0;?,-70 ȑ77 8,?0=4,7> ;0= #,-70 ழ Ǯ " 7@> ,9/ 9:9ரB:A09 20:?0C?470 1,-=4.> Ǯ "?:=8#0.3 >:74/ 09/ .,;> ,9/ ;=0ர.:=0/ 09/ .,;> Important Notes: ற #34> 49>?,77,?4:9 2@4/0 ;=:A4/0> ?30 84948@8 =0<@4=0809?> 1:= ;=:;0= 49>?,77,?4:9 :1 .3,8-0=>ற :9ர,/30=09.0 ?: ?34> 2@4/0 8,D =0>@7? 49 /,8,20 ?: .3,8-0=> /@=492 49>?,77,?4:9ற !0;7,.0809? :1 /,8,20/ .3,8-0=> /@=492 := ,1?0= -,.6ȑ77492 4> .:>?7D ,9/ A0=D ?480 .:9>@8492ற ? 4> =0.:8809/0/ ?3,? ,77 49>?,770=> ,=0 1,8474,= B4?3 ?34> 2@4/0ய ,9/ ?3,? ?30 .:9?=,.?:= 49>;0.?> ?30 .3,8-0=> 1:= /4>?:=?4:9ய /,8,20 ,9/ 5:49? integrity as work progresses. ற ,=0 >3:@7/ -0 ?,609 49 ?30 3,9/7492 :1 .3,8-0=> ,9/ 09/ .,;>ற A:4/ /=:;;492ய ;=D492 := 0C.0>>4A0 1:=.0 :9 .3,8-0=> /@=492 =08:A,7 1=:8 pallet and initial placement. Ǯ "?:=8#0.3 .3,8-0=> Ǯ "?:=8#0.3 8,941:7/> ,9/ ȑ??492> "?:=8#0.3 Installation Video

Upload: others

Post on 07-Sep-2021

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ADS StormTech Installation Guide SC-160LP...Initial Anchoring of Chambers – Embedment Stone Backfill of Chambers – Embedment Stone Initial embedment shall be spotted along the

Initial Anchoring of Chambers – Embedment Stone

Backfill of Chambers – Embedment Stone

Initial embedment shall be spotted along the centerline of the chamber evenly anchoring the lower portion of the chamber. This is best accomplished with a stone conveyor or excavator reaching along the row.

more than 12” (300 mm) between adjacent chamber rows or between chamber rows and perimeter. wall.

12" (300 mm)MAX.

3

Uneven Backfill Even Backfill Perimeter Not Backfilled Perimeter Fully Backfilled

Manifold, Scour Fabric and Chamber Assembly

at inlet rows [min. 12.5 ft (3.8 m)] at each inlet

single layer) along entire length of Isolator®

row with inlet pipes. Contractor may choose to

and leave ends of rows open for easy inspection

chambers.

A�aching the End Caps Prefabricated End Caps Isolator Row Plus

ordered as an 8” (200mm) open hole or can be extends the entire width of the chamber feet.

Requirements for System Installation

engineer’s plans.

1

2

ADS StormTech® Installation Guide SC-160LP

Required Materials and Equipment List

Important Notes:

integrity as work progresses.

pallet and initial placement.

Installation Video

11065 SC160 LP Installation Guide 7-21.indd 1 7/22/2021 2:28:54 PM

Page 2: ADS StormTech Installation Guide SC-160LP...Initial Anchoring of Chambers – Embedment Stone Backfill of Chambers – Embedment Stone Initial embedment shall be spotted along the

Initial Anchoring of Chambers – Embedment Stone

Backfill of Chambers – Embedment Stone

Initial embedment shall be spotted along the centerline of the chamber evenly anchoring the lower portion of the chamber. This is best accomplished with a stone conveyor or excavator reaching along the row.

more than 12” (300 mm) between adjacent chamber rows or between chamber rows and perimeter. wall.

12" (300 mm)MAX.

3

Uneven Backfill Even Backfill Perimeter Not Backfilled Perimeter Fully Backfilled

Manifold, Scour Fabric and Chamber Assembly

at inlet rows [min. 12.5 ft (3.8 m)] at each inlet

single layer) along entire length of Isolator®

row with inlet pipes. Contractor may choose to

and leave ends of rows open for easy inspection

chambers.

A�aching the End Caps Prefabricated End Caps Isolator Row Plus

ordered as an 8” (200mm) open hole or can be extends the entire width of the chamber feet.

Requirements for System Installation

engineer’s plans.

1

2

ADS StormTech® Installation Guide SC-160LP

Required Materials and Equipment List

Important Notes:

integrity as work progresses.

pallet and initial placement.

Installation Video

11065 SC160 LP Installation Guide 7-21.indd 1 7/22/2021 2:28:54 PM

Page 3: ADS StormTech Installation Guide SC-160LP...Initial Anchoring of Chambers – Embedment Stone Backfill of Chambers – Embedment Stone Initial embedment shall be spotted along the

Initial Anchoring of Chambers – Embedment Stone

Backfill of Chambers – Embedment Stone

Initial embedment shall be spotted along the centerline of the chamber evenly anchoring the lower portion of the chamber. This is best accomplished with a stone conveyor or excavator reaching along the row.

more than 12” (300 mm) between adjacent chamber rows or between chamber rows and perimeter. wall.

12" (300 mm)MAX.

3

Uneven Backfill Even Backfill Perimeter Not Backfilled Perimeter Fully Backfilled

Manifold, Scour Fabric and Chamber Assembly

at inlet rows [min. 12.5 ft (3.8 m)] at each inlet

single layer) along entire length of Isolator®

row with inlet pipes. Contractor may choose to

and leave ends of rows open for easy inspection

chambers.

A�aching the End Caps Prefabricated End Caps Isolator Row Plus

ordered as an 8” (200mm) open hole or can be extends the entire width of the chamber feet.

Requirements for System Installation

engineer’s plans.

1

2

ADS StormTech® Installation Guide SC-160LP

Required Materials and Equipment List

Important Notes:

integrity as work progresses.

pallet and initial placement.

Installation Video

11065 SC160 LP Installation Guide 7-21.indd 1 7/22/2021 2:28:54 PM

Page 4: ADS StormTech Installation Guide SC-160LP...Initial Anchoring of Chambers – Embedment Stone Backfill of Chambers – Embedment Stone Initial embedment shall be spotted along the

® and the Isolator®

Notes:1.

bed.2.

paving.3.

extension.

with at least 12” (300 mm) of stone over the chambers

extension.5.

entire bed.

Material Location

Fill Depth over

Chambers in. (mm)

Maximum Allowable Wheel Loads

Maximum Allowable Track Loads6

Maximum Allowable Roller Loads

Max Axle Load for Trucks

lbs (kN)

Max Wheel Load for Loaders

lbs (kN)

Track Width

in. (mm)

Max Ground Pressurepsf (kPa)

Max Drum Weight or Dynamic Force

lbs (kN)

Material Compacted12” (305)

Material Compacted12” (305)

1150 (55)12” (305)

1080 (51)

(53 kN)

12” (305) 2110 (101)

1100 (52) (53 kN)

12” (300) 12” (305)

(53 kN)

12” (305)

800 (38)

Material Location

Placement Methods/ Restrictions

Wheel Load Restrictions

Track Load Restrictions

Roller Load Restrictions

See Table 2 for Maximum Construction Loads

Material

over chambers.cover is reached. cover is

reached.

Material ommended.when compacted

mm) above top ofchambers.

skid loaders allowed to grade cover stone with at

parallel to rows at all times.

of roller only after

reaches 12” (300 mm)

travel parallel to chamber rows only.

conveyor positioned off bed or

the top of chambers.

No wheel loads allowed. Material

the chamber bed.

allowed on chambers

cover stone is in place.

No rollers allowed.

6

Table 2

Table 3

5

Figure 2

D

C

B

*TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVEDINSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR,

INCREASE COVER TO 20" (510 mm).

PAVEMENT LAYER (DESIGNED BYSITE DESIGN ENGINEER)

SC-160LPEND CAP

PERIMETER STONE 14"(350 mm)

MIN*

10'(3.0 m)MAX

6" (150 mm)MIN

EXCAVATION WALL(CAN BE SLOPED OR VERTICAL)

12" (300 mm) MIN

ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL AROUND CLEANCRUSHED, ANGULAR STONE IN A & B LAYERS

NO SPACING REQUIREDBETWEEN CHAMBERS

25"(635 mm)

12" (300 mm)MIN

SINGLE LAYER OF GEOGRID BX124GG TO BE INSTALLEDBETWEEN NON WOVEN GEOTEXTILE AND BASE STONEWHEN BASE STONE DEPTH < 6" (150 mm)

SUBGRADE SOILS

A

DEPTH OF STONE TO BE DETERMINEDBY SITE DESIGN ENGINEER4" (100 mm) MIN WITH GEOGRID BX124GG6" (150 mm) MIN WITHOUT GEOGRID

12"(300 mm)

Backfill - Embedment Stone & Cover Stone Final Backfill of Chambers – Fill Material

StormTech Isolator Row Plus Detail

removed and replaced.

4

Final Backfill of Chambers – Fill Material

Material Location Description AASHTO M43 Designation1

Compaction/Density Requirement

D Final Fill: native soils or per engineer’s plans. Check plans for

C Initial Fill: starts from the top of the embedment

the top of the chamber. Note that processed aggregate. Most pavement

layer.

or1

Begin compaction after min. 12” (300 mm) of material over the chambers is

relative density for processed aggregate

B Embedment Stone: 1

A Foundation Stone:

chamber.

1

compactor.

Table 1 Figure 1

Please Note:1.

2.

3.

NOTE:INSPECTION PORTS MAY BE CONNECTED THROUGH ANY CHAMBER CORRUGATION CREST.

STORMTECH CHAMBER

CONCRETE COLLAR

PAVEMENT

12" (300 mm) MIN WIDTH

CONCRETE SLAB

8" NYLOPLAST INSPECTION PORTBODY (PART# 2708AG4IPKIT) ORTRAFFIC RATED BOX W/SOLIDLOCKING COVER

CONCRETE COLLAR NOT REQUIREDFOR UNPAVED APPLICATIONS

4" (100 mm)SDR 35 PIPE

4" (100 mm) INSERTA TEETO BE CENTERED ONCORRUGATION CREST

SUMP DEPTH BY SITEDESIGN ENGINEER

8" (200 mm) HDPE ACCESS PIPEREQUIRED USE 8" OPEN END CAPPART #: SC160IEPP08

ONE LAYER OF ADS PLUS 125 WOVEN GEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS4' (1.2 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS

SC-160LP CHAMBER

CATCH BASINOR

MANHOLE

11065 SC160 LP Installation Guide 7-21.indd 2 7/22/2021 2:29:09 PM

Page 5: ADS StormTech Installation Guide SC-160LP...Initial Anchoring of Chambers – Embedment Stone Backfill of Chambers – Embedment Stone Initial embedment shall be spotted along the

® and the Isolator®

Notes:1.

bed.2.

paving.3.

extension.

with at least 12” (300 mm) of stone over the chambers

extension.5.

entire bed.

Material Location

Fill Depth over

Chambers in. (mm)

Maximum Allowable Wheel Loads

Maximum Allowable Track Loads6

Maximum Allowable Roller Loads

Max Axle Load for Trucks

lbs (kN)

Max Wheel Load for Loaders

lbs (kN)

Track Width

in. (mm)

Max Ground Pressurepsf (kPa)

Max Drum Weight or Dynamic Force

lbs (kN)

Material Compacted12” (305)

Material Compacted12” (305)

1150 (55)12” (305)

1080 (51)

(53 kN)

12” (305) 2110 (101)

1100 (52) (53 kN)

12” (300) 12” (305)

(53 kN)

12” (305)

800 (38)

Material Location

Placement Methods/ Restrictions

Wheel Load Restrictions

Track Load Restrictions

Roller Load Restrictions

See Table 2 for Maximum Construction Loads

Material

over chambers.cover is reached. cover is

reached.

Material ommended.when compacted

mm) above top ofchambers.

skid loaders allowed to grade cover stone with at

parallel to rows at all times.

of roller only after

reaches 12” (300 mm)

travel parallel to chamber rows only.

conveyor positioned off bed or

the top of chambers.

No wheel loads allowed. Material

the chamber bed.

allowed on chambers

cover stone is in place.

No rollers allowed.

6

Table 2

Table 3

5

Figure 2

D

C

B

*TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVEDINSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR,

INCREASE COVER TO 20" (510 mm).

PAVEMENT LAYER (DESIGNED BYSITE DESIGN ENGINEER)

SC-160LPEND CAP

PERIMETER STONE 14"(350 mm)

MIN*

10'(3.0 m)MAX

6" (150 mm)MIN

EXCAVATION WALL(CAN BE SLOPED OR VERTICAL)

12" (300 mm) MIN

ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL AROUND CLEANCRUSHED, ANGULAR STONE IN A & B LAYERS

NO SPACING REQUIREDBETWEEN CHAMBERS

25"(635 mm)

12" (300 mm)MIN

SINGLE LAYER OF GEOGRID BX124GG TO BE INSTALLEDBETWEEN NON WOVEN GEOTEXTILE AND BASE STONEWHEN BASE STONE DEPTH < 6" (150 mm)

SUBGRADE SOILS

A

DEPTH OF STONE TO BE DETERMINEDBY SITE DESIGN ENGINEER4" (100 mm) MIN WITH GEOGRID BX124GG6" (150 mm) MIN WITHOUT GEOGRID

12"(300 mm)

Backfill - Embedment Stone & Cover Stone Final Backfill of Chambers – Fill Material

StormTech Isolator Row Plus Detail

removed and replaced.

4

Final Backfill of Chambers – Fill Material

Material Location Description AASHTO M43 Designation1

Compaction/Density Requirement

D Final Fill: native soils or per engineer’s plans. Check plans for

C Initial Fill: starts from the top of the embedment

the top of the chamber. Note that processed aggregate. Most pavement

layer.

or1

Begin compaction after min. 12” (300 mm) of material over the chambers is

relative density for processed aggregate

B Embedment Stone: 1

A Foundation Stone:

chamber.

1

compactor.

Table 1 Figure 1

Please Note:1.

2.

3.

NOTE:INSPECTION PORTS MAY BE CONNECTED THROUGH ANY CHAMBER CORRUGATION CREST.

STORMTECH CHAMBER

CONCRETE COLLAR

PAVEMENT

12" (300 mm) MIN WIDTH

CONCRETE SLAB

8" NYLOPLAST INSPECTION PORTBODY (PART# 2708AG4IPKIT) ORTRAFFIC RATED BOX W/SOLIDLOCKING COVER

CONCRETE COLLAR NOT REQUIREDFOR UNPAVED APPLICATIONS

4" (100 mm)SDR 35 PIPE

4" (100 mm) INSERTA TEETO BE CENTERED ONCORRUGATION CREST

SUMP DEPTH BY SITEDESIGN ENGINEER

8" (200 mm) HDPE ACCESS PIPEREQUIRED USE 8" OPEN END CAPPART #: SC160IEPP08

ONE LAYER OF ADS PLUS 125 WOVEN GEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS4' (1.2 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS

SC-160LP CHAMBER

CATCH BASINOR

MANHOLE

11065 SC160 LP Installation Guide 7-21.indd 2 7/22/2021 2:29:09 PM

Page 6: ADS StormTech Installation Guide SC-160LP...Initial Anchoring of Chambers – Embedment Stone Backfill of Chambers – Embedment Stone Initial embedment shall be spotted along the

® and the Isolator®

Notes:1.

bed.2.

paving.3.

extension.

with at least 12” (300 mm) of stone over the chambers

extension.5.

entire bed.

Material Location

Fill Depth over

Chambers in. (mm)

Maximum Allowable Wheel Loads

Maximum Allowable Track Loads6

Maximum Allowable Roller Loads

Max Axle Load for Trucks

lbs (kN)

Max Wheel Load for Loaders

lbs (kN)

Track Width

in. (mm)

Max Ground Pressurepsf (kPa)

Max Drum Weight or Dynamic Force

lbs (kN)

Material Compacted12” (305)

Material Compacted12” (305)

1150 (55)12” (305)

1080 (51)

(53 kN)

12” (305) 2110 (101)

1100 (52) (53 kN)

12” (300) 12” (305)

(53 kN)

12” (305)

800 (38)

Material Location

Placement Methods/ Restrictions

Wheel Load Restrictions

Track Load Restrictions

Roller Load Restrictions

See Table 2 for Maximum Construction Loads

Material

over chambers.cover is reached. cover is

reached.

Material ommended.when compacted

mm) above top ofchambers.

skid loaders allowed to grade cover stone with at

parallel to rows at all times.

of roller only after

reaches 12” (300 mm)

travel parallel to chamber rows only.

conveyor positioned off bed or

the top of chambers.

No wheel loads allowed. Material

the chamber bed.

allowed on chambers

cover stone is in place.

No rollers allowed.

6

Table 2

Table 3

5

Figure 2

D

C

B

*TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVEDINSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR,

INCREASE COVER TO 20" (510 mm).

PAVEMENT LAYER (DESIGNED BYSITE DESIGN ENGINEER)

SC-160LPEND CAP

PERIMETER STONE 14"(350 mm)

MIN*

10'(3.0 m)MAX

6" (150 mm)MIN

EXCAVATION WALL(CAN BE SLOPED OR VERTICAL)

12" (300 mm) MIN

ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL AROUND CLEANCRUSHED, ANGULAR STONE IN A & B LAYERS

NO SPACING REQUIREDBETWEEN CHAMBERS

25"(635 mm)

12" (300 mm)MIN

SINGLE LAYER OF GEOGRID BX124GG TO BE INSTALLEDBETWEEN NON WOVEN GEOTEXTILE AND BASE STONEWHEN BASE STONE DEPTH < 6" (150 mm)

SUBGRADE SOILS

A

DEPTH OF STONE TO BE DETERMINEDBY SITE DESIGN ENGINEER4" (100 mm) MIN WITH GEOGRID BX124GG6" (150 mm) MIN WITHOUT GEOGRID

12"(300 mm)

Backfill - Embedment Stone & Cover Stone Final Backfill of Chambers – Fill Material

StormTech Isolator Row Plus Detail

removed and replaced.

4

Final Backfill of Chambers – Fill Material

Material Location Description AASHTO M43 Designation1

Compaction/Density Requirement

D Final Fill: native soils or per engineer’s plans. Check plans for

C Initial Fill: starts from the top of the embedment

the top of the chamber. Note that processed aggregate. Most pavement

layer.

or1

Begin compaction after min. 12” (300 mm) of material over the chambers is

relative density for processed aggregate

B Embedment Stone: 1

A Foundation Stone:

chamber.

1

compactor.

Table 1 Figure 1

Please Note:1.

2.

3.

NOTE:INSPECTION PORTS MAY BE CONNECTED THROUGH ANY CHAMBER CORRUGATION CREST.

STORMTECH CHAMBER

CONCRETE COLLAR

PAVEMENT

12" (300 mm) MIN WIDTH

CONCRETE SLAB

8" NYLOPLAST INSPECTION PORTBODY (PART# 2708AG4IPKIT) ORTRAFFIC RATED BOX W/SOLIDLOCKING COVER

CONCRETE COLLAR NOT REQUIREDFOR UNPAVED APPLICATIONS

4" (100 mm)SDR 35 PIPE

4" (100 mm) INSERTA TEETO BE CENTERED ONCORRUGATION CREST

SUMP DEPTH BY SITEDESIGN ENGINEER

8" (200 mm) HDPE ACCESS PIPEREQUIRED USE 8" OPEN END CAPPART #: SC160IEPP08

ONE LAYER OF ADS PLUS 125 WOVEN GEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS4' (1.2 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS

SC-160LP CHAMBER

CATCH BASINOR

MANHOLE

11065 SC160 LP Installation Guide 7-21.indd 2 7/22/2021 2:29:09 PM