Major Achievements
Zero Outage count (Karachi) S1Less repeated Outage (cable installation)Prolonged T-prime/DC issues rectified
Al-fareed Engineering & Consultants (Pvt) LTD
Organizational Policy
Being Quality Solution provider AFES strives for cost effective and consistent rectification, Keeping above policy Below mentioned Sites may be lead as a role model ,since some of them were running prime fro, 3 yrs.
Al-fareed Engineering & Consultants (Pvt) LTD
Al-fareed Engineering & Consultants (Pvt) LTD
Optimization Initiatives Timely Ho-ToSwift SLA obedience under given
conditions Additional recommendations/ProposalsCost effective ,Consistent rectification Certified electrical Staff for PMT
(Wapda)24/7 NOC availability Transparency in reporting & client
Comfort Level
Performance
Al-fareed Engineering & Consultants (Pvt) LTD
Swift Rectification within 3-5 hrsTracking for faulty transformers through
KESCLow cost Consistent Solution for repeated
outagesLess repeated outage ATS fault indication
Microsoft Office Excel Worksheet
Al-fareed Engineering & Consultants (Pvt) LTD
Karachi
Region wise team builup
Current Karachi trend
Zero Count Record In KHI for AFES End
Al-fareed Engineering & Consultants (Pvt) LTD
Summary KarachiTotal Under process = 05Cases Pending PMCL end = 02Pending at MES End including approvals = 01KESC issues = 02
T-Prime Count Karachi
Day 2-Jan-13 3-Jan-13 4-Jan-13 5-Jan-13 6-Jan-13 7-Jan-13 8-Jan-13 9-Jan-13 10-Jan-13 11-Jan-13 12-Jan-13 13-Jan-13 14-Jan-13 15-Jan-13 16-Jan-13 17-Jan-13
Count 2 4 4 4 4 7 6 6 6 6 4 4 4 4 4 5
2-Ja
n-13
3-Ja
n-13
4-Ja
n-13
5-Ja
n-13
6-Ja
n-13
7-Ja
n-13
8-Ja
n-13
9-Ja
n-13
10-Ja
n-13
11-Ja
n-13
12-Ja
n-13
13-Ja
n-13
14-Ja
n-13
15-Ja
n-13
16-Ja
n-13
17-Ja
n-13
012345678
2
4 4 4 4
76 6 6 6
4 4 4 4 45
T-Prime Trend Karachi (MES)
Team Build Up Karachi Region 1000 sites
Al-fareed Engineering & Consultants (Pvt) LTD
SummeryCable Installation Team-3 PersonsKorangi – 2 personShahfaisal /Landhi– 2 personOrangi– 2 personBaldia -1 personLyari – 2 personDefence – 1 personGarden – 2 personGulsha e hadeed – 2 personsBahadurabad ,Nazimabad - 2Total = 21Logistics DetailsNo Of Bikes – 20No Of Utility van – 03
Cable installation - 3person
Korangi / – 2 person
Orangi 2 ,Baldia1,Lyari2,Defence1,Garden2
Laandhi/Shah faisal ,Gulsha e hadeed – 2 persons
Bahadurabad-Nazimabad -2
Team Build Up Karachi Region 1000 sites
Al-fareed Engineering & Consultants (Pvt) LTD
SummeryCable Installation Team-3 PersonsGulistan e johar – 1 personSurjani– 1 personMalir– 1 person
Gulistan E Johar-1
Surjani – 1 person
Malir -1
Saddar/Garden -2
Saddar/Garden -2
FB area – 1 person
Gulshan E Iqbal-1
Al-fareed Engineering & Consultants (Pvt) LTD
Team Build Up Karachi Region
Cable In-stallation; 3
Korangi; 3
Laandhi; 1Orangi; 1
Baldia; 1
Gulshan-e-Hadeed; 1Bahadurabad; 1Nazimabad; 1
Lyari; 2Defence; 1
Saddar/Garden; 2
Malir; 1
Surjani; 1
Gulis-tan-e-jo-har; 1
FB area; 1
Gulshan-e-Iqbal; 1
Al-fareed Engineering & Consultants (Pvt) LTD
Team Build Up Out of KESC domain sites
Cable In-stallation; 1
Hub; 1
Bela; 1Uthal; 1
National Highway ; 1
Kathore; 1
Gharo; 1
Performance
Al-fareed Engineering & Consultants (Pvt) LTD
Koran
gi
Land
hiM
alir
Shah
faisa
l
Baldia
Nazim
bad
Defenc
e
Garde
nLy
ari
Bhadu
raba
d
Orang
i
Gulsha
n -e-H
adee
dM
isc
20
129
17
1114
1215
128
10 9
2
Area Wise Outage TrendOutage Trend
Monthly Escalation Trend Karachi
Al-fareed Engineering & Consultants (Pvt) LTD
May; 80
June; 210
July; 181
August; 177September; 334
October; 219
November; 183
De-cember; 204
Major Site Rectifications Plz double click
Cable Installation Jobs @-KHI5013__S_Near_Korangi_Crossing -
50 meters 16mm 4 core-KHI0665__P_KDA_Employees_Krngi -
190 meter 16mm 4 core-KHI0656__H_Korangi_5_Township -
115 meter 16mm4core-KHI0910__S_BhainsColonyMor - 120
meter 16 mm4core-KHI5437__S_KgiRes10Sector50B -35
meter 16 mm4core-KHI5328__s_future_colony_blocke -
15 meter LT-Meter
Al-fareed Engineering & Consultants (Pvt) LTD
Microsoft Office PowerPoint Presentation
Microsoft Office PowerPoint Presentation
Microsoft Office PowerPoint Presentation
Microsoft Office PowerPoint Presentation
Major Site Rectifications Plz double click
KarachiHGW0451__P_Malir_Canttr LT
Span theftHUB5675 cable installation.pptxHUB5675 Jamoot Goth Hub.pptxKHI0641__H_Buffalow_Colony.ppt
xKHI0658__P_H_Javdan_Cmnt_Ma
ng.pptxKHI0669 PMT leads faulty.pptxKHI6510__P_Khuda KiBasti lt
span.pptxKHI6513 N5 Bus Stop separate
PMT Proposal.pptxAl-fareed Engineering & Consultants (Pvt) LTD
Microsoft Office PowerPoint Presentation
Microsoft Office PowerPoint Presentation
Microsoft Office PowerPoint PresentationMicrosoft Office
PowerPoint Presentation
Microsoft Office PowerPoint Presentation
Microsoft Office PowerPoint Presentation
Microsoft Office PowerPoint Presentation
Microsoft Office PowerPoint Presentation
Current Hyderabad trend
Zero Count Record In HYD for AFES End
Al-fareed Engineering & Consultants (Pvt) LTD
Summary HyderabadTotal Under process = 16CP DC cases Pending at PMCL end = 06Pending at myson End including approvals = 07Contactor Faulty Sites = 02
T-Prime Count HYDDay 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug-12 11-Aug-12 12-Aug-12 13-Aug-12
Count 14 15 16 16 15 14 14 14 16
5-Au
g-12
6-Au
g-12
7-Au
g-12
8-Au
g-12
9-Au
g-12
10-A
ug-1
2
11-A
ug-1
2
12-A
ug-1
2
13-A
ug-1
21313.5
1414.5
1515.5
1616.5
14
15
16 16
15
14 14 14
16T-Prime Trend HYD (MES)
Plz double click
Hyderabad BHT6169__MullMakhan PMT Broken
Insulator.pptx HGW6018 PMT bush replacement and
tapping done.pptx HYD5335__S_Hyderabad2.pptx HYD5336__H_Hyderabad3.pptx HYD5666__Bilal_Complex cable
requirment.pptx HYD5851__Badin_Stop.pptx HYD5856__S_Suzuki Cable
requirment.pptx HYD6312__S_KaimKhaniHostel PMT
Energization issue wapda payment.pptx MRI7070_SarhandiMohallah pole tilt
issue.pptx
Al-fareed Engineering & Consultants (Pvt) LTD
Microsoft Office PowerPoint Presentation
Microsoft Office PowerPoint Presentation
Microsoft Office PowerPoint Presentation
Microsoft Office PowerPoint Presentation
Microsoft Office PowerPoint Presentation
Microsoft Office PowerPoint Presentation
Microsoft Office PowerPoint Presentation
Microsoft Office PowerPoint Presentation Microsoft Office
PowerPoint Presentation
Major Site Rectifications Plz double click
Mirpur Khas
DDH6669__S_Malkani cable installation.pptx
HGW6115 Pole installation.pptxJUD6682 PMT tapping.pptxKGM6451__S_DTESamara_Naka_
KGM pole requirment.pptxMPK5705__S_ChandniChowk
PMT installation.pptxMTP5356 PMT Overhauling
(1).pptxMTP5356 PMT Overhauling.pptx
Al-fareed Engineering & Consultants (Pvt) LTD
Microsoft Office PowerPoint Presentation Microsoft Office
PowerPoint PresentationMicrosoft Office
PowerPoint Presentation
Microsoft Office PowerPoint Presentation
Microsoft Office PowerPoint Presentation
Microsoft Office PowerPoint Presentation
Microsoft Office PowerPoint Presentation
Al-fareed Engineering & Consultants (Pvt) LTD
Hyderabad
Region wise team builup
Al-fareed Engineering & Consultants (Pvt) LTD
Team buildup Hyderabad regionS# Region Applicable sites/Available Person1 Hyd City 145/2 person2 Badin 50/1 person3 Sehvan 14/1 person4 Hala 44/1 person5 Thatta 29/1 person6 Sanghar 19/1 person7 Umarkot 17/1 person8 Mirpurkhas 23/1 person9 Degree 31/1 person10 Tandoallayar 14/1 person11 Moro 20/1 person12 Nwabshah/
Daddu88/2 person
Current MPK trend
Zero Count Record In HYD for AFES End
Al-fareed Engineering & Consultants (Pvt) LTD
T-Prime Count MPKDay 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug-12 11-Aug-12 12-Aug-12 13-Aug-12
Count 2 1 2 1 1 2 3 3 3
5-Au
g-12
6-Au
g-12
7-Au
g-12
8-Au
g-12
9-Au
g-12
10-A
ug-1
2
11-A
ug-1
2
12-A
ug-1
2
13-A
ug-1
2
00.5
11.5
22.5
33.5
2
1
2
1 1
2
3 3 3T-Prime Trend MPK(MES)
Summary Mirpur khasTotal Under process = 03CP DC cases pending at PMCL end = 02Pending at myson End including approvals = 01
Snag Indication & Achievements HYD Plz double click
Al-fareed Engineering & Consultants (Pvt) LTD
S.No Site name Site Code
Status Generic Reason with Remarks (OSV) CP Restored - Restored / Pending
CP Meter Reading DG Reading
1 DAO7071__S_Dando 7071 T-Prime CP Restored Restored N/A N/A2 HYD5334__S_Hyderabad_1 5334 T Prime CP Restored Restored 19179 62783 HGW6108__H_TMK_HYD_Highway_PW6108 T-Prime CP Restored by replacing of PMT Bush & tapping Restored 311797 3396.254 NRP6362__H_nasarpur_Matiari_Rd6362 T-Prime Access Issue Pending N/A N/A5 MTL5888__H_Digri_Rd_Matli 5888 Stand By (One Phase) No CP issue found - All phases OK Restored 157075 13813.116 HGW6311__H_Khandu_Hala_MRI6311 T-Prime CP Restored Restored 8368 / 3032 1047.687 BUL6168__S_MirpurBathoro 6168 T-Prime CP restored by installing 16 mm 4 core 5 meters cable Restored N/A 2457.568 TBG6377__H_Talhar_Tando_Bagho6377 T Prime CP restored by sagging of HT jumpers Restored 2425 / 1085 2920.79 HYD5856__S_Suzuki 5856 T Prime CP restored by LT Service Restored N/A N/A10 BSC_Auto_Bhan_Repeater 6407 T Prime CP DC due to billing Pending N/A N/A11 HGW7090__S_Palijani_Station7090 T-Prime CP DC due to billing Pending N/A N/A12 RJK7062__S_Rajo_Khanani 7062 T-Prime CP DC due to billing Pending 2741 / 3287 1167.1613 HYD5335__S_Hyderabad2 5335 T-Prime CP restored by sagging of HT jumpers Restored N/A N/A14 BER6132__H_Bherani_DTE 6132 T-Prime CP Restored Restored N/A 490515 PHK0073__S_Falkara 73 T-Prime CP DC due to billing Pending 3200 / 383 N/A16 HYD5666__S_Bilal_Complex 5666 T-Prime Approval req - Neutral grounding 300 ft cable Pending 0 017 HYD6494__S_Ghumanabad 6494 T-Prime CP Restored Restored 1041 1100418 NRP6361__S_Akbari_Masjid 6361 T-Prime CP Restored Restored N/A 258.3219 MRI7070__S_SarhandiMohallah7070 T-Prime CP restored - Structural & Civil work required at site Restored N/A N/A20 HYD5853__S_Unit_5_Latifabad5853 T-Prime CP Restored Restored N/A N/A
Snag Indication Prior To Ho-To
Individual visit to all Sites within regionHighlighting and recommendation of
proposals such as Contactor replacements ,DG auto issue , Meter Burnt ,Cable Requirements
Initiation of approvals Rectification of snags in view of go ahead
Al-fareed Engineering & Consultants (Pvt) LTD
Microsoft Office Excel Worksheet
Al-fareed Engineering & Consultants (Pvt) LTD
Sukkur
Region wise team builup
Al-fareed Engineering & Consultants (Pvt) LTD
Team buildup Sukkur regionSummary
Rohri 30/1 person
Ghotki 57/1 person
Ranipur 38/1 person
Khairpur 28/1 person
Sukkur 24/1 person
Larkana 53/1 person
Jaccobabad 52/1 person
Shikarpur 26/1 person
Total Site Count 308
Al-fareed Engineering & Consultants (Pvt) LTD
Ghotki-57Ranipur-38Khairpur-28Sukkur-24Larkana-53Jaccobabad-52Shikarpur-26