africa oil & gas assembly presentation

10
INVESTING IN AFRICA Infrastructur & Gas in re Side of Oil n Africa

Upload: others

Post on 28-Oct-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

INVESTING IN AFRICAInfrastructure Side of

& Gas in Africa

Infrastructure Side of Oil

& Gas in Africa

TransCentury at a Glance

TransCenturyTransCentury

PowerTransport

TransformersFuel Tankers

Electrical CablesLocomotives

TransCentury at a Glance

TransCenturyTransCentury

Power Engineering

1

Transformers

Mechanical/Civil Eng.

Tank Farms

Electrical Cables

Ethiopia

South

SudanJuba

Addis

Ababa

Melut

Unity State

Oil & gas opportunity in E Africa…

Total Population – 249.2 million

Uganda

Tanzania

Nairobi

Dar es

Salaam

Mombasa

Rwanda

BurundiMwanza

Arusha

Nakuru

L Turkana

Kampal

a

Songo Songo

Pakwach

L AlbertKenya

Tororo

Oil & gas opportunity in E Africa…

Population Breakdown

Country Millions

Ethiopia 93.8

Tanzania 43.6

Kenya 43.0

Uganda 35.9

Rwanda 11.7

South Sudan 10.6

Burundi 10.6

Mombasa

Lamu

Mtwara

Songo Songo

2

1,163 km -

Mombasa to

Pakwach

Key

Selected Oil

Fields/Finds

Selected Gas

Fields/Finds

Installed

Capacity

...will require an improved transport corridor...

Tororo

Kenya

Uganda

South

Sudan

DRCPakwach

Rail Network Oil Fields

Nairobi

Kasese

Kenya

Tanzania

Rwanda

Burundi

...will require an improved transport corridor...

Kenya

Ethiopia

Nairobi

Mombasa

Partners

Kenya

Lamu

3

...to overcome existing logistical

challenges to NW UgandaThe Transport Infrastructure Scenario at Present

Mombasa Port, Kenya

...to overcome existing logistical

challenges to NW UgandaThe Transport Infrastructure Scenario at Present

4Trucks Queuing at Gilgil

POWER IS ALSO A MAJOR BOTTLENECK ACROSS AFRICA… 5POWER IS ALSO A MAJOR BOTTLENECK ACROSS AFRICA…

...which requires significant capacity increases

Kenya

Connections

Power generation

�1.46 million in 2010 with a 5 year plan to increase by

1,576 MW

3,325 MW

0

500

1,000

1,500

2,000

2,500

3,000

3,500

2012 2018F

Inst

all

ed

Ca

pa

city

in M

W

Uganda Power generation

�1.46 million in 2010 with a 5 year plan to increase by

200,000 annually

Connections

� Creation of Umeme Ltd, a regulated distribution company

with a 20yr concession charged with growing connections

currently at 300,000 connections

Source: KPLC, Tanesco, Uganda Electricity Generation Co, Ministry of Infrastructure (Rwanda)

530 MW

869 MW

0

100

200

300

400

500

600

700

800

900

1000

2011 2013F

Inst

all

ed

Ca

pa

cit

yin

MW

...which requires significant capacity increases

Tanzania

Connections

Power generation

� Increase to planned 1.2 million by 2012 and to 1.6

636 MW

1,600 MW

0

200

400

600

800

1000

1200

1400

1600

1800

2011 2015F

Inst

alle

d C

ap

aci

ty

in M

W

Rwanda

Connections

Power generation

� Increase to planned 1.2 million by 2012 and to 1.6

million thereafter

� Planned increase from 0.11 million in 2008 and to

0.35 million by 2012

Source: KPLC, Tanesco, Uganda Electricity Generation Co, Ministry of Infrastructure (Rwanda) 6

60 MW

130 MW

0

20

40

60

80

100

120

140

2011 2013F

Inst

alle

d

Cap

aci

tyin

MW

Engineering Capacity for

Infrastructure/Oil & Gas Projects

Mechanical Engineering

Civil Engineering

Engineering Capacity for

Infrastructure/Oil & Gas Projects

Logistics

7

Cranage & Erection

In Conclusion

Transport Opportunity Power Opportunity

Rail cargo for the � Power generation� Rail cargo for the

development phase

� Rail transport for

intermediate oil cargo

� Port terminals

� Toll roads

� Power generation

� Power transmission &

distribution

In Conclusion

Power Opportunity

Power generation

Engineering Opportunity

� Turnkey projects for:

8

Power generation

Power transmission &

distribution

� Turnkey projects for:

– Infrastructure

– Oil & Gas

– Mining

Contact Us

www.transcentury.co.kewww.transcentury.co.ke

Contact Us

www.transcentury.co.kewww.transcentury.co.ke

9