africa oil & gas assembly presentation
TRANSCRIPT
INVESTING IN AFRICAInfrastructure Side of
& Gas in Africa
Infrastructure Side of Oil
& Gas in Africa
TransCentury at a Glance
TransCenturyTransCentury
PowerTransport
TransformersFuel Tankers
Electrical CablesLocomotives
TransCentury at a Glance
TransCenturyTransCentury
Power Engineering
1
Transformers
Mechanical/Civil Eng.
Tank Farms
Electrical Cables
Ethiopia
South
SudanJuba
Addis
Ababa
Melut
Unity State
Oil & gas opportunity in E Africa…
Total Population – 249.2 million
Uganda
Tanzania
Nairobi
Dar es
Salaam
Mombasa
Rwanda
BurundiMwanza
Arusha
Nakuru
L Turkana
Kampal
a
Songo Songo
Pakwach
L AlbertKenya
Tororo
Oil & gas opportunity in E Africa…
Population Breakdown
Country Millions
Ethiopia 93.8
Tanzania 43.6
Kenya 43.0
Uganda 35.9
Rwanda 11.7
South Sudan 10.6
Burundi 10.6
Mombasa
Lamu
Mtwara
Songo Songo
2
1,163 km -
Mombasa to
Pakwach
Key
Selected Oil
Fields/Finds
Selected Gas
Fields/Finds
Installed
Capacity
...will require an improved transport corridor...
Tororo
Kenya
Uganda
South
Sudan
DRCPakwach
Rail Network Oil Fields
Nairobi
Kasese
Kenya
Tanzania
Rwanda
Burundi
...will require an improved transport corridor...
Kenya
Ethiopia
Nairobi
Mombasa
Partners
Kenya
Lamu
3
...to overcome existing logistical
challenges to NW UgandaThe Transport Infrastructure Scenario at Present
Mombasa Port, Kenya
...to overcome existing logistical
challenges to NW UgandaThe Transport Infrastructure Scenario at Present
4Trucks Queuing at Gilgil
...which requires significant capacity increases
Kenya
Connections
Power generation
�1.46 million in 2010 with a 5 year plan to increase by
1,576 MW
3,325 MW
0
500
1,000
1,500
2,000
2,500
3,000
3,500
2012 2018F
Inst
all
ed
Ca
pa
city
in M
W
Uganda Power generation
�1.46 million in 2010 with a 5 year plan to increase by
200,000 annually
Connections
� Creation of Umeme Ltd, a regulated distribution company
with a 20yr concession charged with growing connections
currently at 300,000 connections
Source: KPLC, Tanesco, Uganda Electricity Generation Co, Ministry of Infrastructure (Rwanda)
530 MW
869 MW
0
100
200
300
400
500
600
700
800
900
1000
2011 2013F
Inst
all
ed
Ca
pa
cit
yin
MW
...which requires significant capacity increases
Tanzania
Connections
Power generation
� Increase to planned 1.2 million by 2012 and to 1.6
636 MW
1,600 MW
0
200
400
600
800
1000
1200
1400
1600
1800
2011 2015F
Inst
alle
d C
ap
aci
ty
in M
W
Rwanda
Connections
Power generation
� Increase to planned 1.2 million by 2012 and to 1.6
million thereafter
� Planned increase from 0.11 million in 2008 and to
0.35 million by 2012
Source: KPLC, Tanesco, Uganda Electricity Generation Co, Ministry of Infrastructure (Rwanda) 6
60 MW
130 MW
0
20
40
60
80
100
120
140
2011 2013F
Inst
alle
d
Cap
aci
tyin
MW
Engineering Capacity for
Infrastructure/Oil & Gas Projects
Mechanical Engineering
Civil Engineering
Engineering Capacity for
Infrastructure/Oil & Gas Projects
Logistics
7
Cranage & Erection
In Conclusion
Transport Opportunity Power Opportunity
Rail cargo for the � Power generation� Rail cargo for the
development phase
� Rail transport for
intermediate oil cargo
� Port terminals
� Toll roads
� Power generation
� Power transmission &
distribution
In Conclusion
Power Opportunity
Power generation
Engineering Opportunity
� Turnkey projects for:
8
Power generation
Power transmission &
distribution
� Turnkey projects for:
– Infrastructure
– Oil & Gas
– Mining