SH 288 Toll Lanes Project Disadvantaged Business Enterprise Opportunities 4212 Almeda, Houston July 27, 2016 www.Drive288.com

Upload: ngophuc

Post on 08-Feb-2017

221 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: AGC 288 DBE Outreach Presentation 07.27.16

SH 288 Toll Lanes Project

Disadvantaged Business Enterprise Opportunities

4212 Almeda, HoustonJuly 27, 2016

www.Drive288.com

Page 2: AGC 288 DBE Outreach Presentation 07.27.16

üDBEReadyüEmploymentOpportunitiesüSH288ProjectOpportunities

v3MonthsLookAhead

üCorpusChristiProjectOpportunities

Agenda

www.Drive288.com

Page 3: AGC 288 DBE Outreach Presentation 07.27.16

v COMMERCIALLYUSEFULFUNCTION– CUFØADBEisresponsiblefortheexecutionofadistinctelementofworkandcarriesoutitsresponsibilitiesbyactuallyperforming,managingandsupervisingtheworkusingitsownlaborandequipment.

ØADBEdoesnotperformaCUFifitsroleislimitedtothatofanextraparticipantinatransaction,contract,orprojectthroughwhichfundsarepassedinordertoobtaintheappearanceofDBEparticipation.

DBECUF

www.Drive288.com

Page 4: AGC 288 DBE Outreach Presentation 07.27.16

49 CFR 26.55 – Regular Dealers

v Mustbeanestablished,regularbusinessthatengages,asitsprincipalbusinessandunderitsownname,inthepurchase,saleorleaseoftheproductsingeneral

v Isafirmthatowns,operatesormaintainsastore,warehouseorotherestablishmentinwhichthematerials,supplies,articlesorequipmentarebought,keptinstock,&regularlysoldorleasedtothepublic

v Aregulardealerhasaregulartradewithavarietyofcustomers

v Thereshouldbeapresenceofinventoryofmaterialsandorsupplies

v Aregulardealerassumestheactualandcontractualresponsibilityfortheprovisionsofthematerialandorsupplies

www.Drive288.com

Page 5: AGC 288 DBE Outreach Presentation 07.27.16

49CFR26.55- Manufacturer

v ManufacturersIsafirmthatoperatesormaintainsafactoryorestablishmentthatproduces,onpremises,thematerials,supplies,articlesorequipment

o Concretereadymixplanto Crushingoperationo Steelorconcretefabricatingplant

www.Drive288.com

Page 6: AGC 288 DBE Outreach Presentation 07.27.16

ØNorthAmericanIndustryClassificationSystem– ReviewandupdateyourNAICSCodes

ØDoingBusinessAs– DBA–MustbeonyourDBECertification

ØUpdatePhone#andEmailAddress

DBENotes– F.Y.I

www.Drive288.com

Page 7: AGC 288 DBE Outreach Presentation 07.27.16

EmploymentOpportunities

www.Drive288.com

• Receptionist• AdministrativeAssistant– Procurement• EnvironmentalInspector• FieldEngineer(Drainage&Utilities)• FieldEngineers(Roadway&Structural)• SegmentEngineer(North)• SegmentManager(South)• Superintendents(General)4• Superintendents(Bridges)10• SurveyFieldCrewLeaders&Rodman

Page 8: AGC 288 DBE Outreach Presentation 07.27.16

BlueridgeTransportationGroup

Almeda-GenoaConstructorsJointVenture(A-GCJV)

Developer

DB-JV

Owner

www.Drive288.com

Page 9: AGC 288 DBE Outreach Presentation 07.27.16

DesignBuildTeam

www.Drive288.com

Page 10: AGC 288 DBE Outreach Presentation 07.27.16

IH610

BW8

Texas Medical Center

HoustonPROJECTLOCATION

US 59 North Terminus Point of the Project

IH 610 Multi Level Interchange

Sam Houston Toll Road South Crossing over SH

288

Clear Creek/Brazoria County Line South

Terminus Point of the Project www.Drive288.com

Page 11: AGC 288 DBE Outreach Presentation 07.27.16

ProjectProfile

www.Drive288.com

Page 12: AGC 288 DBE Outreach Presentation 07.27.16

ü 10.3-mile section of SH288 from US 59 to Harris Co. line at Clear Creek

ü Design & Construction Cost $815 million

ü New Pavement is continually reinforced concrete pavement

ü Asphalt overlay all pavements not reconstructed

SH288TOLLLANESPROJECT

inHarrisCounty

Project Overview

www.Drive288.com

Page 13: AGC 288 DBE Outreach Presentation 07.27.16

ü Adding two direct connect ramps for The Medical Center at HolcombeBlvd. intersection

ü IH610/SH288 interchange will be demolished and reconstructed

ü The Beltway 8/SH288 interchange will get new direct connect ramps in alldirections – over 5.5 miles of direct connect ramps

ü Approximately 34 other bridges – crossing roadway and bayous

SH288TOLLLANESPROJECT

inHarrisCounty

Project Overview

www.Drive288.com

Page 14: AGC 288 DBE Outreach Presentation 07.27.16

3 Months Look Ahead

www.Drive288.com

v YardSite&OfficesØ ClearingØ Grading&baseparkingareaØ Utilities(electric,water&sewer)Ø FencingØ SecurityØ JanitorialØ DumpstersØ PortableToiletsØ IceØ SafetySupplies

Page 15: AGC 288 DBE Outreach Presentation 07.27.16

3 Months Look Ahead

www.Drive288.com

v RoadwayØ Barricadessupplies&service

Ø Clearingandgrubbing

Ø Stormdrains– subcontract&materials

Ø Soundwalls

Page 16: AGC 288 DBE Outreach Presentation 07.27.16

3 Months Look Ahead

www.Drive288.com

v BridgesØ RoadwaybridgepackagesØ LumberØ CranematsØ PermanentmetaldeckingØ SealedexpansionjointsØ DeckgroovingØ OverhangjacksØ Miscellaneousconcretesupplies

Page 17: AGC 288 DBE Outreach Presentation 07.27.16

Thankyouforattending!

[email protected]://www.Drive288.com

www.Drive288.com