agenda nfpa technical committee on building systems (bld

33
AGENDA NFPA Technical Committee on Building Systems (BLD-BSY) NFPA 5000 First Draft Meeting Monday-Tuesday, July 23-24, 2018 Minneapolis Marriott City Center Minneapolis, Minnesota 1. Call to order. Call meeting to order by Chair Joshua Greene at 8:00 a.m. on July 23, 2018 at the Minneapolis Marriott City Center, Minneapolis, Minnesota. 2. Introduction of committee members and guests. For a current committee roster, see page 2. 3. Approval of June 20, 2016 second draft meeting minutes. See page 4. 4. The process – staff PowerPoint presentation. See page 6. 5. Correlating committee minutes with direction for 2018 editions. See page 23. 6. NFPA 5000 First Draft preparation. For Public Input, see page 31. 7. BLD-BSY Security Task Group. 8. Other business. 9. Future meetings. 10. Adjournment. Page 1 of 33

Upload: others

Post on 19-Oct-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AGENDA NFPA Technical Committee on Building Systems (BLD

AGENDA NFPA Technical Committee on Building Systems (BLD-BSY)

NFPA 5000 First Draft Meeting Monday-Tuesday, July 23-24, 2018 Minneapolis Marriott City Center

Minneapolis, Minnesota

1. Call to order. Call meeting to order by Chair Joshua Greene at 8:00 a.m. on July23, 2018 at the Minneapolis Marriott City Center, Minneapolis, Minnesota.

2. Introduction of committee members and guests. For a current committeeroster, see page 2.

3. Approval of June 20, 2016 second draft meeting minutes. See page 4.

4. The process – staff PowerPoint presentation. See page 6.

5. Correlating committee minutes with direction for 2018 editions. See page 23.

6. NFPA 5000 First Draft preparation. For Public Input, see page 31.

7. BLD-BSY Security Task Group.

8. Other business.

9. Future meetings.

10. Adjournment.

Page 1 of 33

Page 2: AGENDA NFPA Technical Committee on Building Systems (BLD

Address List No PhoneBuilding Systems BLD-BSY

Building Code

Kevin Carr06/26/2018

BLD-BSY

Joshua D. Greene

ChairJENSEN HUGHES600 West Fulton Street, Suite 500Chicago, IL 60661-1241Alternate: Steven J. Whitman

SE 1/15/2004BLD-BSY

Kevin Carr

Secretary (Staff-Nonvoting)National Fire Protections AssociationOne Batterymarch ParkQuincy, MA 022169

4/19/2018

BLD-BSY

William Ambrefe

PrincipalCity of BeverlyMunicipal Inspection56 Water StreetBeverly, MA 01915-5027

E 7/20/2000BLD-BSY

Kevin L. Brinkman

PrincipalNational Elevator Industry, Inc.925 West Center StreetEureka, IL 61530-9505National Elevator Industry Inc.Alternate: Gary L. Nuschler

M 08/17/2015

BLD-BSY

Phil Forner

PrincipalAllendale Heating Company Inc.11672 60th AvenueAllendale, MI 49401Air Conditioning Contractors of AmericaAlternate: Luis Romeo Escobar

IM 10/6/2000BLD-BSY

Raymond N. Hansen

PrincipalUS Department of the Air ForceAFCEC/COSM139 Barnes Drive, Suite 1Tyndall AFB, FL 32403-5319

U 7/20/2000

BLD-BSY

Davor Novosel

PrincipalNational Energy Management Institute8403 Arlington Boulevard, Suite 100Fairfax, VA 22031

L 08/17/2017BLD-BSY

Michael J. Reeser

PrincipalSanta Rosa Fire Equipment Service Inc.595-A Portal StreetCotati, CA 94931California Automatic Fire Alarm Association Inc.Alternate: Shane M. Clary

IM 7/20/2000

BLD-BSY

John A. Rickard

PrincipalP3 Consulting5838 Balcones Drive, Suite BAustin, TX 78731-4206Alternate: James Rickard

SE 7/20/2000BLD-BSY

Frank Shingleton

PrincipalViega, LLC100 North Broadway, Suite 600Wichita, KS 67202-2209Alternate: Mark Fasel

M 10/29/2012

BLD-BSY

Shelley Siegel

PrincipalUniversal Design & Education Network, LLC9268 Palomino DriveLake Worth, FL 33467-1024American Society of Interior Designers

SE 7/20/2000BLD-BSY

James B. Smith

PrincipalAmerican Wood Council6457 Woodland TrailDane, WI 53529-9603

M 08/17/2015

BLD-BSY

Peter J. Willse

PrincipalGlobal Asset Protection Services, LLC100 Constitution Plaza, 12th FloorHartford, CT 06103

I 8/9/2011BLD-BSY

Felix I. Zemel

PrincipalTown Of Dover5 Springdale RoadDover, MA 02030

SE 08/17/2017

1Page 2 of 33

Page 3: AGENDA NFPA Technical Committee on Building Systems (BLD

Address List No PhoneBuilding Systems BLD-BSY

Building Code

Kevin Carr06/26/2018

BLD-BSY

Shane M. Clary

AlternateBay Alarm Company5120 Commercial CircleConcord, CA 94520-8522California Automatic Fire Alarm Association Inc.Principal: Michael J. Reeser

IM 7/20/2000BLD-BSY

Luis Romeo Escobar

AlternateAir Conditioning Contractors of America2800 South Shirlington Road, Suite 300Arlington, VA 22206Air Conditioning Contractors of AmericaPrincipal: Phil Forner

IM 10/29/2012

BLD-BSY

Mark Fasel

AlternateViega LLC7338 Jackie CourtIndianapolis, IN 46221Principal: Frank Shingleton

M 12/08/2015BLD-BSY

Gary L. Nuschler

AlternateUTC/Otis Elevator Company5 Farm Springs RoadFarmington, CT 06032-2575National Elevator Industry Inc.Principal: Kevin L. Brinkman

M 4/15/2004

BLD-BSY

James Rickard

AlternateP3 Consulting5838 Balcones Drive, Suite BAustin, TX 78731-4206Principal: John A. Rickard

SE 04/08/2015BLD-BSY

Steven J. Whitman

AlternateJENSEN HUGHES3610 Commerce DriveSuite 817Baltimore, MD 21227Principal: Joshua D. Greene

SE 10/27/2009

BLD-BSY

Kevin Carr

Staff LiaisonNational Fire Protections AssociationOne Batterymarch ParkQuincy, MA 022169

4/19/2018

2Page 3 of 33

Page 4: AGENDA NFPA Technical Committee on Building Systems (BLD

NFPA Technical Committee on Building Systems NFPA 5000 SECOND DRAFT MEETING MINUTES

Monday, June 20, 2016 Hilton Fort Lauderdale Marina

Fort Lauderdale, FL

Call to Order. The meeting was called to order by Chair Joshua Green at 8:10 a.m. on June 20, 2016 at the Hilton Fort Lauderdale Marina, Fort Lauderdale, FL

1. Self -introductions were made by Committee Members and Guests.

TECHNICAL COMMITTEE MEMBERS PRESENT

NAME COMPANY Joshua D. Greene, Chair Jensen Hughes Inc. Allan Fraser, (Staff-Nonvoting) National Fire Protection Association Kevin Brinkman Principal National Elevator Industry Raymond N. Hansen, Principal US Dept. of the Air Force John Ricard, Principal (by web) P3 Consulting Shelley Siegel, Principal Universal Design and Education Network

Rep: American Society of Interior Designers

James B. Smith, Principal American Wood Council

GUESTS: None

TECHNICAL COMMITTEE MEMBERS NOT PRESENT

NAME COMPANY William Ambrefe, Principal City of Beverly Municipal Inspection Michael J. Reeser Bay Alarm Company

Rep: California Automatic Fire Alarm Association Inc.

Phil Forner, Principal Allendale Heating Company Inc. Rep: Air Conditioning Contractors of America

Charles Riforgiate, Principal Lombard Fire Department Frank Singleton, Principal Viega, LLC Peter Willse, Principal XL Global Asset Protection Services

Page 4 of 33

Page 5: AGENDA NFPA Technical Committee on Building Systems (BLD

2. Approval of Prior Meeting Minutes. The July 27, 2015 meeting minutes were approved as written and distributed.

3. The Chair welcomed everyone.

4. The New Process Review. Staff gave a Powerpoint presentation on the process for the

2nd draft public comment stage through the end of the cycle.

5. NFPA 5000 Second Draft Preparation. The committee reviewed and resolved 1 public comment. The committee did not create any second revisions.

6. New Business. Staff relayed information related to ASHRAE 90.2 and A117.1 that may committee apprised as

new information develops.

7. Date and Location of Next Meetings. To be determined

8. Adjournment. The meeting was adjourned at 9:45 am on Monday, June 20, 2016

Respectfully Submitted:

Allan B. Fraser, Staff Liaison

Page 5 of 33

Page 6: AGENDA NFPA Technical Committee on Building Systems (BLD

5000 First Draft Meetings July 23‐27 & August 20‐23, 2018

1

NFPA.ORG | © National Fire Protection Association. All rights reserved.

IT’S A BIG WORLD. LET’S PROTECT IT TOGETHER.TM

NFPA 5000 First Draft Meetings

Minneapolis Marriott City Center

Minneapolis, Minnesota

July 23-27, 2018 & August 20-23, 2018

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

2

At this and all NFPA committee meetings, we are concerned with your safety.

If the fire alarm sounds, please egress the building.

Page 6 of 33

Page 7: AGENDA NFPA Technical Committee on Building Systems (BLD

NFPA 5000 First Draft Meetings July 23‐27 & August 20‐23, 2018

2

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

• Please verify/update your contact information onroster attached to sign-in list.

• Members categorized in any interest category whohave been retained to represent the interests ofANOTHER interest category (with respect to issuesaddressed by the TC) shall declare those intereststo the committee and refrain from voting on thoseissues throughout the process.

3

Members:

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

• All guests are required to sign in and identify theiraffiliations.

• Participation is limited to TC members or thoseindividuals who have previously requested time toaddress the committee.

• Participation by other guests is permitted at theChair’s discretion.

4

Guests:

Page 7 of 33

Page 8: AGENDA NFPA Technical Committee on Building Systems (BLD

NFPA 5000 First Draft Meetings July 23‐27 & August 20‐23, 2018

3

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

• Use of audio recorders or other meanscapable of reproducing verbatimtranscriptions of this meeting is notpermitted.

5

Members and Guests:

NFPA.ORG | © National Fire Protection Association. All rights reserved.

Annual 2020 Revision Cycle – Key Dates• Public Input Stage (First Draft):

First Draft Meeting: July 23-27 and August 20-23, 2018 Posting of First Draft for Balloting Date: before October 17, 2018 Posting of First Draft for Public Comment: February 27, 2019

• Comment Stage (Second Draft): Public Comment Closing Date: May 8, 2019 Second Draft Meeting Period: TBD - June 1 to July 31, 2019 Posting of Second Draft for Balloting Date: September 11, 2019 Posting of Second Draft for NITMAM: January 22, 2020

• Tech Session Preparation: NITMAM Closing Date: February 19, 2020 NITMAM / CAM Posting Date: April 1, 2020 NFPA Technical Meeting: June 17, 2020 (Orlando)

• Standards Council Issuance: Issuance of Documents with CAM: August 14, 2020

6

Page 8 of 33

Page 9: AGENDA NFPA Technical Committee on Building Systems (BLD

NFPA 5000 First Draft Meetings July 23‐27 & August 20‐23, 2018

4

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

• Either Principal or Alternate can vote, not both.

• All Principals are encouraged to have an Alternate.

• Voting (simple majority) during meeting is used toestablish a base position on First Revisions.

• Voting (simple majority) during meeting is also usedto establish Public Input resolution responses andto create Committee Inputs.

7

Voting During the First Draft Meeting:

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

• Follow Robert’s Rules of Order

• Discussion requires a motion

8

General Procedures:

Page 9 of 33

Page 10: AGENDA NFPA Technical Committee on Building Systems (BLD

NFPA 5000 First Draft Meetings July 23‐27 & August 20‐23, 2018

5

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

• Member addresses the chair.

• Receives recognition from the chair.

• Member introduces the motion.

• Another member seconds the motion.

9

Committee Member Actions:

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

• Restates the motion

• Calls for discussion

• Ensures all issues have been heard

• Calls for a vote

• Announces the vote result

10

Committee Chair Actions:

Page 10 of 33

Page 11: AGENDA NFPA Technical Committee on Building Systems (BLD

NFPA 5000 First Draft Meetings July 23‐27 & August 20‐23, 2018

6

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

• Not in order when another member has the floor

• Requires a second

• Not debatable and DOES NOT automatically stopdebate

• 2/3 affirmative vote immediately closes debate,returns to the original motion

• Less than 2/3 allows debate to continue

11

Motion to End Debate, Previous Question, or to “Call the Question”

12nfpa.org

Page 11 of 33

Page 12: AGENDA NFPA Technical Committee on Building Systems (BLD

NFPA 5000 First Draft Meetings July 23‐27 & August 20‐23, 2018

7

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

• Resolve Public Input (PI)

• Create a First Revision (FR)

• Create a Committee Input (CI) – a placeholder used tosolicit Public Comments and permit further work atSecond Draft stage

13

Committee Actions and Motions:

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

• Committee develops a committee statement to respond to(i.e., resolve) a Public Input.

• Committee indicates in statement its reasons for notaccepting the recommendation and/or points to a relevantFirst Revision.

• PI response does not get balloted.

14

Resolve a Public Input (PI):

Page 12 of 33

Page 13: AGENDA NFPA Technical Committee on Building Systems (BLD

NFPA 5000 First Draft Meetings July 23‐27 & August 20‐23, 2018

8

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

• FR is created to change current text or add new text.

• Committee statement is developed to substantiate thechange.

• Associated PIs get a committee response, often simplyreferring to the relevant FR.

• Each FR gets balloted.

15

Create a First Revision (FR):

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

• Committee is not ready to incorporate a change into theFirst Draft but wants to receive Public Comment on a topicthat can be revisited at Second Draft stage.

• Committee statement is developed to explain committee’sintent.

• CI is not balloted.

16

Create a Committee Input (CI):

Page 13 of 33

Page 14: AGENDA NFPA Technical Committee on Building Systems (BLD

NFPA 5000 First Draft Meetings July 23‐27 & August 20‐23, 2018

9

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

• All Public Input must receive a Committee Statement.

• A valid technical reason must be provided.

• Vague references to “intent” should not be used.

• Reasons for why the submitter’s substantiation is inadequate shouldbe provided.

• A First Revision should be referenced if it addresses the intent of thesubmitter’s Public Input

17

Committee Statements:

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

• In-meeting votes establish a base committee position onthe development of First Revisions (FRs).

• FRs are secured by electronic balloting (≥2/3 of completedballots affirmative, and affirmative by ≥1/2 votingmembers).

• Only the results of the electronic ballot determine theofficial position of the committee on the First Draft.

18

Formal Voting on First Revisions

Page 14 of 33

Page 15: AGENDA NFPA Technical Committee on Building Systems (BLD

NFPA 5000 First Draft Meetings July 23‐27 & August 20‐23, 2018

10

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

• Only First Revisions (FR) are balloted

Public Inputs and Committee Statements not balloted

Reference materials are available

• First Draft, PI, CI, and CS

• Voting options:

Affirmative on all FRs

Affirmative on all FRs with exceptions specifically noted

• Ballot provides option to vote affirmative with comment

• Vote to reject or abstain requires a reason

19

Ballots:

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

• Ballot system is web-based.

• Alternates are encouraged to complete ballots.

• Ballot session will time out after 90 minutes.

• Use “submit” to save your work – ballots can be reviseduntil the balloting period is closed.

20

Electronic Balloting:

Page 15 of 33

Page 16: AGENDA NFPA Technical Committee on Building Systems (BLD

NFPA 5000 First Draft Meetings July 23‐27 & August 20‐23, 2018

11

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

21

• Click link provided in ballot email.

• Sign in with NFPA.org username and password.

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

22

• Select either ‘Affirmative All’ or ‘Affirmative withException(s)’.

Page 16 of 33

Page 17: AGENDA NFPA Technical Committee on Building Systems (BLD

NFPA 5000 First Draft Meetings July 23‐27 & August 20‐23, 2018

12

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

23

• Use “See FR- #” link toreview all First Revisions.

• Use “edit election” tochange individual votes orto modify vote aftersubmitting ballot.

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

24

• Make selection:Affirmative with Comment,Negative, or Abstain

• No selection defaults toaffirmative

• Must include comment(reason) on each voteother than Affirmative

Page 17 of 33

Page 18: AGENDA NFPA Technical Committee on Building Systems (BLD

NFPA 5000 First Draft Meetings July 23‐27 & August 20‐23, 2018

13

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

25

• To complete ballot, click ‘ParticipantConsent and Submit’.

• Return to edit any votes by ballot due date.

NFPA.ORG | © National Fire Protection Association. All rights reserved.

NFPA First Draft Meeting

• Initial ballot

• Circulation of negatives and comments – electronicballoting re-opened to permit members to change votes

• Any First Revision that fails ballot becomes a CommitteeInput (CI)

26

Balloting:

Page 18 of 33

Page 19: AGENDA NFPA Technical Committee on Building Systems (BLD

NFPA 5000 First Draft Meetings July 23‐27 & August 20‐23, 2018

14

NFPA.ORG | © National Fire Protection Association. All rights reserved.

Legal

• Must comply with state and federal antitrust laws

• Participants are to conduct themselves in strictaccordance with these laws

• Read and understand NFPA’s Antitrust Policywhich can be accessed at nfpa.org/regs

27

Antitrust Matters:

NFPA.ORG | © National Fire Protection Association. All rights reserved.

Legal

• Participants must avoid any conduct, conversation or agreement thatwould constitute an unreasonable restraint of trade

• Conversation topics that are off limits include:

Profit, margin, or cost data

Prices, rates, or fees

Selection, division or allocation of sales territories, markets orcustomers

Refusal to deal with a specific business entity

28

Antitrust Matters (cont’d):

Page 19 of 33

Page 20: AGENDA NFPA Technical Committee on Building Systems (BLD

NFPA 5000 First Draft Meetings July 23‐27 & August 20‐23, 2018

15

NFPA.ORG | © National Fire Protection Association. All rights reserved.

Legal

• NFPA’s standards development activities are based on openness,honesty, fairness and balance

• Participants must adhere to the Regulations Governing theDevelopment of NFPA Standards and the Guide for the Conductof Participants in the NFPA Standards Development Processwhich can accessed at nfpa.org/regs

• Follow guidance and direction from your employer or otherorganization you may represent

29

Antitrust Matters (cont’d):

NFPA.ORG | © National Fire Protection Association. All rights reserved.

Legal

• Manner is which standards development activity is conducted can beimportant

• The Guide of Conduct requires standards development activity to beconducted with openness, honesty and in good faith

• Participants are not entitled to speak on behalf of NFPA

• Participants must take appropriate steps to ensure their statementswhether written or oral and regardless of the setting, are portrayed aspersonal opinions, not the position of NFPA

• Be sure to ask questions if you have them

30

Antitrust Matters (cont’d):

Page 20 of 33

Page 21: AGENDA NFPA Technical Committee on Building Systems (BLD

NFPA 5000 First Draft Meetings July 23‐27 & August 20‐23, 2018

16

NFPA.ORG | © National Fire Protection Association. All rights reserved.

Legal

• Disclosures of essential patent claims should be made by the patentholder

• Patent disclosures should be made early in the process

• Others may also notify NFPA if they believe that a proposed or existingNFPA standard includes an essential patent claim

• NFPA has adopted and follows ANSI’s Patent Policy

• It is the obligation of each participant to read and understand NFPA’sPatent Policy which can accessed at nfpa.org/regs

31

Patents:

NFPA.ORG | © National Fire Protection Association. All rights reserved.

TC Struggles with an Issue

•TC needs dataon a newtechnology oremerging issue

•Two opposingviews on anissue with noreal data

•Data presentedis not trustedby committee

Code Fund Lends a Hand

•TC rep and/orstaff liaisonsubmits a CodeFund Request

•Requests arereviewed by aPanel andchosen basedon need /feasibility

Research Project Carried Out

•Funding forproject is provided by the Code Fund and/or industry sponsors

•Project iscompleted anddata isavailable to TC

www.nfpa.org/research

Page 21 of 33

Page 22: AGENDA NFPA Technical Committee on Building Systems (BLD

NFPA 5000 First Draft Meetings July 23‐27 & August 20‐23, 2018

17

NFPA.ORG | © National Fire Protection Association. All rights reserved.

Document Information Pages

About

• Document scope• Table of contents• Articles• Research and statistical reports

• Latest codes and standards news on NFPA Today blog feed

• Free access

Current and Previous Editions

• Issued TIAs, FIs, Errata• Archived revision information such as meeting and ballot information, First Draft Reports (previously ROPs), Second Draft Reports (previously ROCs), and Standards Council and NITMAM information

Next Edition

• Revision cycle schedule• Posting & closing dates• Submit public input/comments via electronic submission system.

• Meeting and ballot information

• First Draft Report and Second Draft Report

• NITMAM information• Standard Council Decisions

• Private TC info (*red asterisk)• Ballot circulations, informational ballots and other committee info

Technical Committee

• Committee name and staff liaison

• Committee scope and responsibility

• Committee list with private information

• Committee documents (codes & standards) in PDF format

• Committees seeking members

• Online committee membership application

NFPA.ORG | © National Fire Protection Association. All rights reserved.

• www.nfpa.org/5000

34

Questions?

NFPA NFPA 5000 Document Information Pages

Page 22 of 33

Page 23: AGENDA NFPA Technical Committee on Building Systems (BLD

Page 23 of 33

Page 24: AGENDA NFPA Technical Committee on Building Systems (BLD

Page 24 of 33

Page 25: AGENDA NFPA Technical Committee on Building Systems (BLD

Page 25 of 33

Page 26: AGENDA NFPA Technical Committee on Building Systems (BLD

Page 26 of 33

Page 27: AGENDA NFPA Technical Committee on Building Systems (BLD

Page 27 of 33

Page 28: AGENDA NFPA Technical Committee on Building Systems (BLD

Page 28 of 33

Page 29: AGENDA NFPA Technical Committee on Building Systems (BLD

Page 29 of 33

Page 30: AGENDA NFPA Technical Committee on Building Systems (BLD

Standard on Community Risk

Assessment and Community Risk Reduction Plan Development

Page 30 of 33

Page 31: AGENDA NFPA Technical Committee on Building Systems (BLD

Public Input No. 118-NFPA 5000-2018 [ Section No. 52.1 ]

52.1* General.

All building premise electrical systems and equipment shall be designed and constructed in accordance withNFPA 70 . Electrical service equipment that is owned by the supply utility but is installed on the property shallbe designed and constructed in accordance with ANSI/IEEE C2 National Electrical Safety Code

Statement of Problem and Substantiation for Public Input

There are customer-utility arrangements which place service installations on customer property or in the building premise. These arrangements create "gray areas", "gaps" or "overlaps" that can be avoided with the recognition of the other dominant electrical safety standard developed by the Institute of Electrical and Electronic Engineers.

http://standards.ieee.org/about/nesc/index.html

This change will reflect the responsiveness of NFPA 5000 to building electrical system safety, and the expertise of the NFPA Electrical Division staff. Electrical provisions are weaker in the International Building Code (which only references NFPA 70 and has a difference stakeholder balance criteria). Adding this language may contribute to international adoption of NFPA 5000 because of different electrical system ownership regimes in other nations. The IEEE consensus documents are widely adopted internationally.

Submitter Information Verification

Submitter Full Name: Michael Anthony

Organization: Standards Michigan

Affiliation: Standards Michigan Group, LLC | www.standardsmichigan.com

Street Address:

City:

State:

Zip:

Submittal Date: Mon Jun 25 18:19:26 EDT 2018

Committee: BLD-BSY

Copyright Assignment

I, Michael Anthony, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in thisPublic Input (including both the Proposed Change and the Statement of Problem and Substantiation). I understand and intend that I acquire norights, including rights as a joint author, in any publication of the NFPA in which this Public Input in this or another similar or derivative form isused. I hereby warrant that I am the author of this Public Input and that I have full power and authority to enter into this copyright assignment.

By checking this box I affirm that I am Michael Anthony, and I agree to be legally bound by the above Copyright Assignment and the terms andconditions contained therein. I understand and intend that, by checking this box, I am creating an electronic signature that will, upon mysubmission of this form, have the same legal force and effect as a handwritten signature

National Fire Protection Association Report https://submittals.nfpa.org/TerraViewWeb/FormLaunch?id=/TerraView/...

1 of 1 7/6/2018, 1:52 PM

Page 31 of 33

Page 32: AGENDA NFPA Technical Committee on Building Systems (BLD

Public Input No. 64-NFPA 5000-2018 [ New Section after 3.3.696 ]

3.4 General Acronyms

ACM = Aluminum Composite Panel

AHJ = Authority Having Jurisdiction

ALS = Assistive Listening System

BFE = Base Flood Elevation

DFE = Design Flood Elevation

FBFM = Flood Boundary and Floodway Mapf

FHBM = Flood Hazard Boundary Map

FIRM = Flood Insurance Rate Map

HPM = Hazardous Production Material

HRR = Heat Release Rate

I = Importance Factor

LFL = Lower Flammable Limit

LP-Gas = Liquefied Petroleum Gas

MCM = Metal Composite Panel

OSB = Oriented Strand Board

p = Design Pressure

PEL = Permissible Exposure Limit

RDP = Registered Design Professional

SIED = Special Industrial Explosive Device

V = Wind Speed

Statement of Problem and Substantiation for Public Input

Statement of Problem and Substantiation for Public Input:New Section 3.4:We have become liberal over the years as TC members in the application of terms versus acronyms. When examining the publication the use of the full text of the term and its associated acronym are inconsistent throughout. In addition, while we have generated acronyms nowhere is there a listing where a user can easily refer to said acronym for reference.

We are proposing that a new Section 3.4 be added to Chapter 3. This will be a section dedicated for acronyms which are used in the document. While the current document illustrates the acronym following the term, most users of the document have trouble finding same since they view the acronym first and then must hint for the association with the actual term. By creating this list in a separate section will make the document more user friendly.

Assignment for Technical Committees:We are asking each of the technical committees to perform an assessment of their respective chapters and proposed modifications to follow the NFPA manual of style (Shown below) by replacing the text version of a definition which has been assigned an acronym with the appropriate acronym.

“3.2.5.1 Acronyms and Uncommon Abbreviations.3.2.5.1.1 All acronyms and any abbreviations that are not in common use shall be spelled out with the acronym or abbreviation following in parentheses for the first use of the term in the document.3.2.5.1.2 Each subsequent use shall be the acronym or abbreviation only.”

National Fire Protection Association Report https://submittals.nfpa.org/TerraViewWeb/FormLaunch?id=/TerraView/...

1 of 2 7/6/2018, 10:37 AM

Page 32 of 33

Page 33: AGENDA NFPA Technical Committee on Building Systems (BLD

(Source: “NFPA Manual of Style for NFPA Technical Committee Documents”, July 2004 Edition)

Submitter Information Verification

Submitter Full Name: Jonathan Humble

Organization: American Iron and Steel Institute

Affiliation: American Iron and Steel Instittute

Street Address:

City:

State:

Zip:

Submittal Date: Wed Jun 20 10:59:07 EDT 2018

Committee: BLD-FUN

Copyright Assignment

I, Jonathan Humble, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in thisPublic Input (including both the Proposed Change and the Statement of Problem and Substantiation). I understand and intend that I acquire norights, including rights as a joint author, in any publication of the NFPA in which this Public Input in this or another similar or derivative form isused. I hereby warrant that I am the author of this Public Input and that I have full power and authority to enter into this copyright assignment.

By checking this box I affirm that I am Jonathan Humble, and I agree to be legally bound by the above Copyright Assignment and the termsand conditions contained therein. I understand and intend that, by checking this box, I am creating an electronic signature that will, upon mysubmission of this form, have the same legal force and effect as a handwritten signature

National Fire Protection Association Report https://submittals.nfpa.org/TerraViewWeb/FormLaunch?id=/TerraView/...

2 of 2 7/6/2018, 10:37 AM

Page 33 of 33