Metro East Joint Development Assessment Panel Agenda
Meeting Date and Time: Friday, 29 January 2016; 10:00am Meeting Number: MEJDAP/73 Meeting Venue: City of Swan
2 Midland Square Midland
Attendance
DAP Members
Mr Eugene Koltasz (Presiding Member) Ms Sheryl Chaffer (Deputy Presiding Member) Mr Patrick Dick (Alternate Specialist Member) Cr Sandra Hawkins (Local Government Member, Shire of Serpentine Jarrahdale) Cr Michelle Rich (Local Government Member, Shire of Serpentine Jarrahdale) Cr Daniel Parasiliti (Local Government Member, City of Swan) Cr Darryl Trease (Local Government Member, City of Swan)
Officers in attendance
Ms Lisa Powell (Department of Planning) Mr Regan Travers (Shire of Serpentine Jarrahdale) Ms Aviva Mahfouda (City of Swan) Mr Phil Russell (City of Swan) Mr Robert Hodges (Department of Planning)
Local Government Minute Secretary
Ms Meghan Dwyer (City of Swan)
Applicants and Submitters
Mr Michael Spight (TAG Architects) Mr Peter Lippman (EIW Architects) Mr Greg Rowe (Rowe Group)
Members of the Public
Nil
1. Declaration of Opening
The Presiding Member declares the meeting open and acknowledges the pastand present traditional owners and custodians of the land on which the meetingis being held.
2. Apologies
Mr Peter Addison (Specialist Member)
Version: 1 Page 1
3. Members on Leave of Absence
Nil
4. Noting of Minutes
Note the Minutes of the Metro East JDAP meeting No.72 held on the 13 January 2016.
5. Declarations of Due Consideration
Any member who is not familiar with the substance of any report or other information provided for consideration at the DAP meeting must declare that fact before the meeting considers the matter.
6. Disclosure of Interests
Nil
7. Deputations and Presentations
Nil
8. Form 1 - Responsible Authority Reports – DAP Application
8.1 Property Location: Lot 282 Mead Street, Byford Application Details: Byford Secondary College - Stage 3 -
Construction of Senior Learning Community Building and Associated Parking and Landscaping
Applicant: TAG Architects Owner: Department of Education Responsible authority: Western Australian Planning Commission DoP File No: DoP Ref 29-50074-5, DAP Ref 16/00970
9. Form 2 – Responsible Authority Reports - Amending or cancelling DAP
development approval
9.1 Property Location: Lot 7231 (No.18) Strathmore Parkway, Ellenbrook
Application Details: Holy Cross College - Expansion and Additions to Secondary School
Applicant: EIW Architects Owner: The Roman Catholic Archbishop of Perth Responsible authority: City of Swan DoP File No: DAP/15/00738
9.2a Property Location: Lot 121 (No.3241) Great Northern Highway,
Bullsbrook Application Details: Additional Sheds to a Transport Depot Applicant: Rowe Group Owner: LPG Bullsbrook Pty Ltd Responsible authority: City of Swan DoP File No: DP/12/01317
Version: 1 Page 2
9.2b Property Location: Lot 121 Great Northern Highway, Bullsbrook Application Details: Additional Sheds to Transport Depot Applicant: Rowe Group Owner: LPG Bullsbrook Pty Ltd Responsible authority: WAPC DoP File No: DP/12/01317
10. Appeals to the State Administrative Tribunal
Nil
11. General Business / Meeting Closure
Version: 1 Page 3
Meeting No.72 13 January 2016
Minutes of the Metro East Joint Development Assessment
Panel Meeting Date and Time: Wednesday, 13 January 2016; 4:00pm Meeting Number: MEJDAP/72 Meeting Venue: Department of Planning 140 William Street Perth Attendance
DAP Members Mr Eugene Koltasz (Presiding Member) Ms Sheryl Chaffer (Deputy Presiding Member) Mr Peter Addison (Specialist Member) Cr Ron Mitchell (Local Government Member, City of Gosnells) Cr Julie Brown (Local Government Member, City of Gosnells) Officers in attendance Mr Tim Price (City of Gosnells) Department of Planning Minute Secretary Ms Natalie Garland Applicant and Submitters Mr Chris O’Neill (Chris O’Neill & Associates) Members of the Public There were 2 members of the public present. 1. Declaration of Opening
The Presiding Member, Mr Eugene Koltasz, declared the meeting open at 4:00pm on Wednesday, 13 January 2016 and acknowledged the past and present traditional owners and custodians of the land on which the meeting was being held. The Presiding Member announced the meeting would be run in accordance with the Development Assessment Panel Standing Orders 2012 under the Planning and Development (Development Assessment Panels) Regulations 2011. The Presiding Member advised that the meeting is being audio recorded in accordance with Section 5.16 of the Standing Orders 2012; No Recording of Meeting, which states: 'A person must not use any electronic, visual or audio recording device or instrument to record the proceedings of the DAP meeting unless the Presiding Member has given permission to do so.'
Mr Eugene Koltasz Presiding Member, Metro East JDAP Page 1
Meeting No.72 13 January 2016
The Presiding Member granted permission for the minute taker to record proceedings for the purpose of the minutes only.
2. Apologies
Nil
3. Members on Leave of absence
Nil
4. Noting of minutes
Minutes of the Metro East JDAP meeting No.71 held on 15 December 2015 were noted by DAP members.
5. Declaration of Due Consideration
All members declared that they had duly considered the documents.
6. Disclosure of interests
Nil
7. Deputations and presentations
7.1 Mr Chris O’Neill (Chris O’Neill & Associates) addressed the DAP for the
application at Item 8.1. Mr O’Neill and Mr Tim Price (City of Gosnells) answered questions from the Panel.
8. Form 1 - Responsible Authority Reports – DAP Application
8.1 Property Location: 280 (Lot 123) Shreeve Road, Canning Vale Application Details: Additional Facilities to Existing Place of
Worship Applicant: Chris O'Neill & Associates Owner: Sikh Association of WA Responsible authority: City of Gosnells DoP File No: DAP/15/00911
REPORT RECOMMENDATION / PRIMARY MOTION Moved by: Cr Ron Mitchell Seconded by: Cr Julie Brown That the Metro East Joint Development Assessment Panel (JDAP) resolves to: Approve DAP Application reference DAP/15/00911 and accompanying plans dated 31 July 2015 in accordance with Clause 11.3 of the City of Gosnells Town Planning Scheme No. 6 and Clause 68(2) of the Planning and Development (Local Planning Schemes) Regulations 2015 - Schedule 2 - Deemed Provisions, subject to the following conditions as follows:
Mr Eugene Koltasz Presiding Member, Metro East JDAP Page 2
Meeting No.72 13 January 2016
Conditions:
1. This decision constitutes planning approval only and is valid for a period of 2 years from the date of approval. If the subject development is not substantially commenced within the 2 year period, the approval shall lapse and be of no further effect.
2. The landowner/applicant shall contribute towards development infrastructure
and public open space, pursuant to Town Planning Scheme No. 6 and the adopted Canning Vale Development Contribution Plan.
3. The applicant shall submit a drainage design, prescribing a functional
drainage system, including detailed engineering drawings, and necessary technical information to demonstrate functionality of the design. The design is to be endorsed prior to the lodgement of a Building Permit application and thereafter implemented to the satisfaction of the City of Gosnells.
4. The site is to be connected to the reticulated sewerage system.
5. A landscape plan for the development site and the adjoining road verge(s) is
to be submitted in accordance with the City's Landscape Plan Information Sheet, and approved by the City's Parks and Environmental Operations branch, prior to the lodgement of a Building Permit application.
6. Landscaping and irrigation of the development site and adjoining road verges
is to be installed prior to occupying the proposed development, and thereafter maintained, in accordance with the approved landscaping plan to the satisfaction of the Manager Parks and Environmental Operations.
7. External finishes and colour schemes are to be submitted prior to the
lodgement of a Building Permit application to the satisfaction of the City.
8. No floodlights shall be illuminated after 10.00pm with any illumination being confined to the limits of the development and be in accordance with the City's Animals, Environment and Nuisance Local Law 2009. Floodlights erected on columns or posts require the lodgement of a Building Permit application.
9. A maximum of 677 people are permitted on the site at any one time.
10. A Parking Management Strategy is to be prepared prior to the lodgement of a
Building Permit application, and thereafter implemented, to the satisfaction of the City.
Advice Notes:
1. With respect to the requirement to make contributions pursuant to Town Planning Scheme No. 6, it is acknowledged that an amendment to the Canning Vale Outline Development Plan is currently awaiting determination of the Western Australian Planning Commission. This amendment, if approved, will exempt a portion of the subject site from being required to make a contribution in accordance with the Canning Vale Development Contribution Plan, through the designation of a 'Place of Worship Precinct'. All
Mr Eugene Koltasz Presiding Member, Metro East JDAP Page 3
Meeting No.72 13 January 2016
development situated outside of the 'Place of Worship Precinct' will attract cost contributions.
2. With respect of the drainage design requirement, it should be noted that a
maximum 10% stormwater runoff coefficient applies to calculate the critical permissible site discharge (PSD) from the development. This PSD shall not be exceeded in all storm events up to the 1 in 100 year Average Recurrence Interval. All excess stormwater shall be detained and/or infiltrated on site through suitable structural means.
3. You are advised of the need to apply for a Building Permit from the City's
Building Services Branch prior to the commencement of work. In this regard, your attention is drawn to the requirements of the Building Code of Australia and the Building Act 2011.
4. In terms of the landscaping plan, the applicant is advised as follows:
i. Any landscaping or earthmoving in the street verge is to be set at
levels as directed by the City's Infrastructure Directorate to ensure minimum disruption to future footpath levels. In this regard you are required to submit levels to the Infrastructure Directorate.
ii. The developer is advised that the City has a Shade Policy which must
be considered as part of the development process.
5. Your attention is drawn to the requirements for access to buildings for people with disabilities in accordance with the Building Code of Australia and AS1428.1. Detailed drawings are to be submitted with the Building Permit application identifying means of access from carparking areas to the entrance of the building and throughout the building, as required by AS1428.1.
6. An Occupancy Permit is to be applied for and issued by the Local Authority
(Permit Authority) prior to occupation of the building or part thereof. For a new building, a Certificate of Construction Compliance (BA17) is to be provided with the application for it to be valid. For an existing building, a Certificate of Building Compliance (BA18) is to be provided with the application for it to be valid.
7. Where an "Alternative Design Solution" is proposed in place of "Deemed to
Satisfy" provisions of the Building Code of Australia, a Design Brief submitted by a suitably qualified Engineer is to be agreed upon in principle by Council and FESA, prior to the lodgement of the final report. The final report will be required to address all the relevant performance requirements, indicating the satisfactory qualification of all safety provisions of the Building Code of Australia.
8. Department of Fire and Emergency Services assessment is required prior to
approval of a Building Permit application.
9. Due to the nature of foundation materials, footing and slab details and a site report from a structural engineer are required to be submitted with the Building Permit application.
Mr Eugene Koltasz Presiding Member, Metro East JDAP Page 4
Meeting No.72 13 January 2016
10. Your attention is drawn to the following to minimise the impact of development works:
i. All development works must be carried out in accordance with Control
of Noise Practices set out in section 6 of AS2436 1981. For further details please contact the Department of Environment Regulation.
ii. Development work shall only be permitted between 0700 hours and
1900 hours on any day which is not a Sunday or public holiday, without the written approval of the City.
iii. Development work shall comply in all respects with the Environmental
Protection (Noise) Regulations 1997.
11. The use of the approved buildings should comply in all respects with the Health (Public Buildings) Regulations 1992.
AMENDING MOTION Moved by: Ms Sheryl Chaffer Seconded by: Nil To delete Condition 2. REASON: Due to the uncertainty as to its application The Amending Motion LAPSED for want of a seconder. The Report Recommendation/Primary Motion was put and CARRIED UNANIMOUSLY. 9. Form 2 – Responsible Authority Reports - Amending or cancelling DAP
development approval
Nil
10. Appeals to the State Administrative Tribunal
The following State Administrative Tribunal Application has been received:
• City of Swan – Proposed 145 Grouped Dwellings - Lot 241 (2) Wangella Place, Koongamia
As invited by the State Administrative Tribunal under Section 31 of the State Administrative Tribunal Act 2004, the Metro East JDAP reconsidered Lot 467 (110) Terrace Road, Guildford on the 15 December 2015.
Mr Eugene Koltasz Presiding Member, Metro East JDAP Page 5
Meeting No.72 13 January 2016
11. General Business / Meeting Close
There being no further business, the presiding member declared the meeting closed at 4:50pm.
Mr Eugene Koltasz Presiding Member, Metro East JDAP Page 6
Responsible Authority Report (Regulation 12)
Property Location: Lot 282 Mead Street, Byford Application Details: Byford Secondary College - Stage 3 -
Construction of Senior Learning Community Building and Associated Parking and Landscaping
DAP Name: Metro East Joint Development Assessment Panel
Applicant: TAG Architects Owner: Department of Education LG Reference: P09130/07 Responsible Authority: Western Australian Planning Commission Authorising Officer: Sue Burrows
Assistant Director General Perth and Peel Planning
Department of Planning File No: DoP Ref 29-50074-5, DAP Ref 16/00970 Report Date: 15 January 2016 Application Receipt Date: 6 January 2016 Application Process Days: 60 Days Attachment(s): 1: Location and Aerial Plans
2: Development Plans (Site Plan, Floor Plan and Elevations)
Officer Recommendation: That the Metro East Joint Development Assessment Panel resolves to: A. Approve DAP Application reference 16/00970 and accompanying plans date
stamped 6 January 2016 in accordance with the provisions of the Metropolitan Region Scheme, subject to the following conditions:
(1) All storm water shall be contained on-site, to the specification of the Shire of
Serpentine Jarrahdale and to the satisfaction of the Western Australian Planning Commission. Erosion shall be controlled so as not to result in sand runoff into the road reserves or any adjoining land.
(2) A Construction Management Plan is required to be submitted, approved and
thereafter implemented to the specification of the Shire of Serpentine Jarrahdale to the satisfaction of the Western Australian Planning Commission.
(3) Traffic Management Devices as required within the Traffic Assessment Report,
are to be constructed to the specification of the Shire of Serpentine Jarrahdale and to the satisfaction of the Western Australian Planning Commission.
(4) A minimum of two car parking bays per classroom shall be provided and
maintained on-site to the specifications of the Shire of Serpentine Jarrahdale and to the satisfaction of the Western Australian Planning Commission.
(5) A minimum of two (2) disabled parking bays to be provided including the required
statutory signage and markings to the specifications of the Shire of Serpentine
Page 1
Jarrahdale and to the satisfaction of the Western Australian Planning Commission.
(6) The vehicle parking access(s), accessway(s) and crossover(s) shall be designed,
constructed, sealed, kerbed, drained and line marked in accordance with the approved plan prior to the occupation of the development and thereafter maintained to the specifications of the Shire of Serpentine Jarrahdale and to the satisfaction of the Western Australian Planning Commission.
(7) Pedestrian ramps shall be provided at all kerb crossings and contained within the
subject site. (8) A signage plan indicating the location and design of any proposed signage
(including traffic directional signage) is to be prepared to the specification of the Shire of Serpentine Jarrahdale and the satisfaction of the Western Australian Planning Commission.
(9) Bicycle parking facilities being provided in accordance with Local Planning Policy
No.58 Bicycle Facilities to the specifications of the Shire of Serpentine Jarrahdale and to the satisfaction of the Western Australian Planning Commission.
(10)A Dust Management Plan is to be prepared to the specification of the Shire of
Serpentine Jarrahdale and the satisfaction of the Western Australian Planning Commission prior to the commencement of site works. Once approved, the Dust Management plan is to be implemented in its entirety.
ADVICE (1) The proposed works fall within a site that has identified low to moderate acid
sulphate soil risk. In line with standard self-assessment tools developed by the Department of Planning all construction and development on site shall recognize the risk and monitor any potential exposure of soil.
(2) Adjacent roads and footpaths, including the entry to the property, shall be
maintained at the existing standards to the satisfaction of the Shire of Serpentine Jarrahdale. Any damage caused to the road by the proponent or its contractors shall be repaired immediately to the specifications of the Shire of Serpentine Jarrahdale.
(3) Once installed, the proposed landscaping and vegetation, including street verges,
shall be maintained to the specifications of the Shire of Serpentine Jarrahdale and to the satisfaction of the Western Australian Planning Commission.
B. Advise the applicant, the Department of Planning and the Shire of Serpentine
Jarrahdale of its decision accordingly.
Page 2
Background: Insert Property Address: Lot 282 Mead Street, Byford Insert Zoning MRS: Urban TPS: Urban Development Insert Use Class: In accordance with the Structure Plan Zoning
(High School) Insert Strategy Policy: Byford (District) Structure Plan - Identified for
High School Insert Development Scheme: Nil Insert Lot Size: 13.05 hectares Insert Existing Land Use: High School Value of Development: $10,500,000.00
The site is zoned 'Urban' under the MRS (Attachment 1A) and 'Urban Development' under the Shire of Serpentine Jarrahdale Town Planning Scheme No.2 (the Scheme). The site is subject to the Byford (District) Structure Plan which identifies the site for a public high school. The subject site comprises a regular shaped land parcel with three road frontages (Attachment 1B). The site is owned by the Department of Education (DoE) and the DoE is seeking approval to commence construction of Stage 3 of works pertaining to a public high school on the site which has been operating since 2014. The adjoining land parcel to the west, of similar shape and size, is intended to accommodate a private high school, however, no applications for this site have been submitted to date. The development of a public high school is a public work under the Public Works Act 1902. Under Section 6 of the Planning and Development Act 2005, public authorities are exempt from the requirement to obtain development approval for a public work under a local planning scheme. However, the landowner is still required to seek approval under the Metropolitan Region Scheme. The application is referred to the Joint Development Assessment Panel as the estimated cost of development exceeds 10 million dollars in value. The site has been subject of the following development approvals to date: Application Approval Date
Decision Making Body/s
Scope of Works
December 2011
WAPC Bulk earthworks (forward works); filling, utility provisions, sub-soil drainage.
February 2012
JDAP Stage 1 - Administration, library and five learning buildings, playing fields, courts and parking areas.
May 2012 WAPC Oval and Sporting Grounds October 2012
WAPC Additional learning building (Year 7)
May 2014 JDAP Stage 2 - Six learning blocks, playing courts, parking areas
September 2014
WAPC Additional learning building (Year 9)
Page 3
The conditions recommended to the Joint Development Assessment Panel are generally consistent with the conditions imposed on the previous approvals associated with this site and land use. Details: outline of development application The application proposes to construct Stage 3 of the Byford Secondary College, on the subject site. The scope of works proposed under this application includes: • A two storey Senior Learning Community Building; • Landscaping including shade-sails placed around the new building; • An additional fifty-one (51) onsite car bays in the north-west of the site; • An additional four off-site parking embayments in the Gordin Way road reserve;
and • Refurbishment of the southern portion of the existing Library Building
(Attachment 2).
To undertake the works detailed above, nine transportable buildings are proposed to be relocated from the north to the south-east of the site adjacent to the playing courts. Legislation & policy: Legislation Planning and Development Act 2005 Metropolitan Region Scheme Clause 30 (1) of the Metropolitan Region Scheme sets out three overarching factors to be considered when determining development applications, these being: 1. the purpose for which the land is zoned or reserved under the Scheme; 2. the orderly and proper planning of the locality; and 3. the preservation of the amenities of the locality. State Government Policies Development Control Policy No. 2.4 – School Sites Local Planning Framework Shire of Serpentine Jarrahdale Town Planning Scheme No. 2 (TPS No. 2) The objectives of the Urban Development zone under the Scheme include providing for the orderly planning of large areas of land in a locally integrated manner and within a regional context, whilst retaining flexibility to review planning with changing circumstances. The zone allows for the development of functional communities and provide for facilities to service the needs of residents. The Scheme identifies that the site is zoned ‘Urban Development’, which refers to Clause 5.18.6.3 for any proposed use, and which states:
Page 4
5.18.6.3 Without limiting the generality of clause 5.18.6.2, under a Structure Plan: (a) In the areas designated as zones, the permissibility of uses is to be the same
as set out in the Zoning Table as if those areas were zones under the Scheme having the same designation;
(b) The standards and requirements applicable to the zones and R Codings under the Scheme apply to the areas having corresponding designations under the Structure Plan;
(c) The planning approval procedures including the procedures for the approval of uses and developments under the Scheme are to apply as if the land were correspondingly zoned or reserved under the Scheme;
(d) Where land is classified as a local reservation, the rights, provisions and procedures, and the obligations of the local government in regard to compensation set out in clauses 2.3 and 2.4 inclusive apply as if the land was correspondingly reserved under the Scheme; and
(e) Any other provision, standard or requirement in the Structure Plan is to be given the same force and effect as if it were a provision, standard or requirement of the Scheme.
Structure Plans The Byford District Structure Plan (BDSP) identifies the site for ‘High School’. The Byford Town Centre Local Structure Plan (BTCLSP) identifies the site as a 'Public High School'. The proposed expansion of the high school site is consistent with the intent of the structure plans. Consultation: Public Consultation Public advertising was undertaken by the Shire of Serpentine Jarrahdale (the Shire) as part of the Stage 1 application. Subsequent proposals to date, including Stage 3, have been relatively consistent with the initial application and therefore further public consultation has not been considered necessary. Consultation with other Agencies or Consultants The Shire supports the proposal subject to conditions. The Shire has advised that the Water Management Plan approved for Stage 2, as per condition of the previous approval, remains applicable to the works proposed as part of Stage 3. Therefore, consultation with the Department of Water (DoW) was not necessary, nor any conditions regarding the submission of water management plans deemed necessary. Planning assessment: Metropolitan Region Scheme The proposed development is considered to meet the intent of the Urban zone in that it provides for an existing public facility to be extended to meet the ongoing needs of the surrounding community.
Page 5
The school site has three road frontages, providing good accessibility for vehicles and public transport. The new two-storey building is setback approximately 35 metres from the Abernethy road frontage. Its height and location is complimentary to the existing single and two story buildings on the site which, with exception of the Performing Arts block, are setback approximately 25 metres from the street. The building is well articulated, using projections, screens and differing coloured materials to break up any perceived building bulk. In is considered that the proposed built form of the new building will contribute positively to the amenity of the area. Development Control Policy No. 2.4 – School Sites The proposed high school is assessed against the provisions of Development Control Policy No. 2.4 – School Sites (DC Policy 2.4) as follows: • Site Requirements The site area of 13.0554 hectares is consistent with the 10 hectare area stipulated within DC Policy 2.4. Adequate provision is made for pick-up and drop-off areas both on and off-site. The recreational facilities have been co-located with the recreational facilities on the adjoining land parcel to the east, and there is in-principle support given by the Department of Education, the Catholic Education Office (proposed operators of the adjacent Private High School) and the Shire of Serpentine Jarrahdale in relation to the shared use facilities/public open space. A joint use agreement is currently applicable to this space. • Site Selection and Planning The school site slopes in excess of six metres from east to west. However, the majority of buildings are located on the eastern portion of the site which is relatively level. The site is also rectangular in shape and provided with all required services. • Access Issues The school site has three road frontages and each frontage is provided with footpaths. The applicant has submitted a Transport Assessment as part of the Stage 3 application and the Shire of Serpentine Jarrahdale has advised that the document is acceptable. • Relationship to Nearby Land Uses The school site will have a future shared school oval/public open space with the adjoining private high school to the west. No common boundaries with residential uses are proposed. Based on the above the proposed high school is considered to be in accordance with the provisions of DC Policy 2.4. Shire of Serpentine Jarrahdale Town Planning Scheme No. 2 Under the Scheme, car parking standards for Educational Establishment (Secondary Schools) are:
2.0 spaces per classroom
The development plans demonstrate that upon conclusion of the Stage 3 works, the site will provide 290 on-site parking bays, 41 on- street parking bays and four (4) on-street bus bays. The proposal is compliant with the parking requirements of TPS No. 2.
Page 6
Public Art Contribution The Shire of Serpentine Jarrahdale has requested a 1% monetary contribution which reflects the Stage 1 and 2 JDAP decisions. Whilst the development cost of the proposal is significant, the expansion and scope of works is not considered to be substantial within the context of the overall site to require a public art contribution. Further, given the Department of Education's practice of providing a 1% budget for public art on the school site, it is not considered necessary to impose a condition for a public art contribution as part of this approval. Conclusion: The proposed works are associated with an existing high school which is located on a site identified for ‘Public High School’ in a District Structure Plan and an approved Local Structure Plan. Car parking and access for the high school is adequate. The layout and scale of the school is appropriate for the area. There are no known environmental or heritage constraints that would restrict the development of Stage 3 of the high school site. It is recommended that the application be supported subject to conditions.
Page 7
ATTACHMENT 1A - MRS ZONING
18,386
Legend
1:
Kilometres
0 0.80.42
at A4
Notes:
15-Jan-2016
The data that appears on the map may beout of date, not intended to be used at thescale displayed, or subject to licenseagreements. This information is stored inthe relevant layers metadata. For thesereasons the map should not be distributedoutside of the Department.
INTERNAL USE ONLY
Projection:
WGS_1984_Web_Mercator_Auxiliary_Sphe
Date produced:
FUNCTIONALITY TO COME
Link to viewer
Produced by:
Internal Spatial Viewer
Local Government Area
Cadastre (View 1)
Region Scheme Boundary
Bush Forever Areas
Region Scheme Zones and Reserves
Other regional roads
Parks and recreation
Primary regional roads
Railways
Rural
Urban
Urban deferred
ATTACHMENT 1B - AERIAL PLAN
18,386
Legend
1:
Kilometres
0 0.80.42
at A4
Notes:
15-Jan-2016
The data that appears on the map may beout of date, not intended to be used at thescale displayed, or subject to licenseagreements. This information is stored inthe relevant layers metadata. For thesereasons the map should not be distributedoutside of the Department.
INTERNAL USE ONLY
Projection:
WGS_1984_Web_Mercator_Auxiliary_Sphe
Date produced:
FUNCTIONALITY TO COME
Link to viewer
Produced by:
Internal Spatial Viewer
Local Government Area
Cadastre (View 1)
Form 2 - Responsible Authority Report (Regulation 17)
Property Location: Lot 7231 (No.18) Strathmore Parkway, Ellenbrook
Application Details: Holy Cross College DAP Name: Expansion and Additions to Secondary
School Applicant: EIW Architects Owner: The Roman Catholic Archbishop of Perth LG Reference: DA-129/2015/B Responsible Authority: City of Swan Authorising Officer: Phil Russell
Manager – Statutory Planning Department of Planning File No: DAP/15/00738 Report Date: 4 February 2016 Application Receipt Date: 9 December 2015 Application Process Days: 60 days Attachment(s): Attachment 1 – Modified Plans (as identified
below) Officer Recommendation: That the Metro East Joint Development Assessment Panel resolves to: 1. Accept that the DAP Application reference DAP/15/00738 as detailed on the
DAP Form 2 dated 9 December 2015 is appropriate for consideration in accordance with regulation 17 of the Planning and Development (Development Assessment Panels) Regulations 2011;
2. Supersede the previously approved plans considered by the Metro East Joint Development Assessment Panel as its meeting held on 18 May 2015, to the extent that they are inconsistent with the approved plans herein.
3. Supersede the previously approved plans considered by the Metro East Joint Development Assessment Panel as its meeting held on 27 August 2015, to the extent that they are inconsistent with the approved plans herein.
4. Approve the DAP Application reference DAP/15/00738 as detailed on the
DAP Form 2 date 9 December 2015 and accompanying plans (as below):
a. SK1.01 – Site Plan – Lower Level – Revision E – Dated: December 2015
b. SK1.02 – Site Plan – Upper Level – Revision E – Dated: December 2015
c. SKI.03 – Site Elevations – Revision D – Dated: October 2015 d. SK2.01 – Stage 4 – Year 8 & 9 Building First Floor – Revision D –
Dated: October 2015 e. SK2.02 – Stage 4 – Year 8 & 9 Building Ground Floor – Revision D –
Dated: October 2015 f. SK2.03 – Stage 4 – Year 8 & 9 Building Elevations – Revision D –
Dated: October 2015
Page 1
g. SK2.04 – Stage 4 – Year 8 & 9 Building Elevations – Revision D – Dated: October 2015
h. SK3.01 – Stage 4 – Multipurpose / Changeroom Building Ground Floor – Revision D – Dated: October 2015
i. SK3.02 – Stage 4 – Multipurpose / Changeroom Building First Floor – Revision D – Dated: October 2015
j. SK3.03 – Stage 4 – M multipurpose / Changeroom Building Elevations – Revision D – Dated: October 2015
k. SK3.04 – Stage 4 – Multipurpose / Changeroom Building Elevations – Revision D – Dated: October 2015
l. SK5.01 – Stage 5 – Primary Teaching Block Floor Plan – Revision C – Dated: May 2015
m. SK2.02 – Stage 5 – Primary Teaching Block Floor Plan – Revision C – Dated: October 2015
n. SK6.01 – Arts Building Floor Plan – Revision E – Received 13 January 2016
o. SK6.02 – Arts Building Roof Plan – Revision E – Received 13 January 2016
p. SK6.03 – Arts Building Elevations – Revision E – Received 13 January 2016
q. SK7.01 – Stage 5 – Food Technology Room Floor Plan – Revision A – Dated October 2015
r. SK7.02 – Stage 5 – Arts Room Floor Plan – Rev A – Dated: August 2015
s. Drawing No.C01 – Car Park Plan – Revision A t. Drawing No.C02 – Civil Details – Revision A u. L02-B – Landscape Site Plan – Issue B – Dated: December 2015 v. Hydraulics Services Drawings:
i. H1 Rev C - Dated 27 November 2015 ii. H2 Rev D - Dated 27 November 2015 iii. H3 Rev C - Dated 27 November 2015 iv. H4 Rev B - Dated 27 November 2015 v. H5 Rev B - Dated 27 November 2015 vi. H6 Rev B - Dated 27 November 2015
in accordance with the provisions of the City of Swan Local Planning Scheme No.17, for the proposed minor amendment to the approved addition to the ‘Educational Establishment’ at Lot 7231 (No.18) Strathmore Parkway, Ellenbrook, subject to conditions of the original approval dated 18 May 2015.
Advice Notes All other conditions, footnotes, advice notes and requirements detailed on the previous approval dated 18 May 2015 shall remain. Background: Insert Property Address: Lot 7231 (No 18) Strathmore Parkway
Ellenbrook Insert Zoning MRS: Urban TPS: Special Use Zone 4 Insert Use Class: Lot is zoned Private Clubs and Institutions in
Page 2
accordance with the approved Structure Plan: Falls within the Use Class of ‘Educational Establishment’ which is an ‘A’ use in the City’s Local Planning Scheme No. 17.
Insert Strategy Policy: • Local Planning Policy – Building and Development Standards – other zones (POL-TP-127)
• Local Planning Policy - Vehicle Parking Standards (POL-TP-129)
• Local Planning Policy – Provision of Public Art (POL-LP-1.10)
Insert Development Scheme: Local Planning Scheme No. 17 Insert Lot Size: 13.848ha Insert Existing Land Use: Educational Establishment Value of Development: $9,000,000 Approval History • 5 December 2007 - Stage 1 of the ‘Educational Establishment’ was approved
under delegated authority for 14 Classrooms, a student café, art rooms, library and science laboratories, administration centre and recreation areas.
• 19 January 2009 - Amendment to the Stage 1 approval previously issued in
2007. The initial approval proposed that the administrative building would be two (2) separate buildings joined by a covered walkway. The amendment proposed to join the two (2) buildings. This did not result in an increase to floor areas and no additional parking bays were required.
• 9 March 2010 – A ‘Place of Worship’ at the subject site was approved under
Delegated Authority with a total of 40 parking bays required. • 7 April 2011- Amendment to the original approval for the ‘Place of Worship’. The
amendment proposed minor structural modifications as a result of the Building Act requirements.
• 18 March 2013 – The Metro East Joint Development Assessment Panel (JDAP)
resolved to approve an application for extensions to the Holy Cross College. This approval consisted of an early childhood centre, a secondary learning centre with a design and technology centre on the ground level and classrooms on the upper level, an extension to the existing admin building with a uniform shop and staff room, a maintenance shed, a new crossover along Westgrove Drive with access to a new car park with 16 bays and minor internal alterations to existing buildings.
• 11 December 2013 – The Metro East (JDAP) resolved to approve an
amendment to the application for extensions to the Holy Cross College approved at the Metro East JDAP on 18 March 2013. The amendments consisted of the approved temporary workshop and male change room being changed to a temporary male change room and an additional classroom, an increase in the floor area of the maintenance shed from 87sqm to 100sqm and the relocation of the bin store area.
Page 3
• 18 May 2015 – In accordance with regulation 8 of the Planning and Development (Development Assessment Panels) Regulations 2011, planning approval was granted by the Metro East Joint Development Assessment Panel for alterations and additions to the Holy Cross College. This included to construction of the Primary School, Middle School, Multi-purpose Building, Arts Building and minor refurbishments.
• 27 August 2015 - In accordance with regulation 8 of the Planning and
Development (Development Assessment Panels) Regulations 2011, planning approval was granted by the Metro East Joint Development Assessment Panel for minor modifications to the building design.
Details: outline of development application The proposed development forms part of an amendment to the Holy Cross College which was originally approved on the 18 May 2015 and modified 27 August 2015. The subject of this application is specifically for minor re-design modifications for Stage 4 works and primarily Stage 5 works including:
o The Primary Learning Centre: Proposes a more simplified building design. This includes the incorporation of peaked roof with a simplified gable entry, verandah and additional aluminium framed doors and windows to match the existing buildings;
o The Arts Building: - Proposes a more simplified building design. This includes the
incorporation of peaked roof with a simplified gable entry matching the existing buildings;
- Proposes between the Arts Building and the Primary Block a play space area in lieu of the previously approved tiered seating. The undercover area, which was previously over the tiered seating location of the Arts Building, has been relocated to the southern end of the Arts Building;
o Minor Refurbishments: ‘Building B’ proposes to be converted from a dance
room to art room and ‘Building D’ to be converted from a music room to food technology room.
o Minor Structural Modifications: Modified plans were also received by City offices on 13 January 2016. These modifications included structural mechanical changes to ensure the application mimics that of the proposed Building Permit application and for clarity purposes.
Legislation, Strategies & Policies: Legislation
1. Planning and Development Act 2005 2. Metropolitan Region Scheme (1963) 3. City of Swan Local Planning Scheme No.17
Page 4
Strategies
1. Economic and Employment Lands Strategy: Non-Heavy Industrial Perth Metropolitan and Peel Regions (April 2012)
2. Outer Metropolitan Perth and Peel Sub-Regional Strategy (August 2010) 3. Directions 2013 and Beyond Metropolitan Planning Beyond and Horizon
(August 2010) 4. North-East Corridor Extension Strategy (July 2003) 5. Draft Bullsbrook Townsite and Rural Strategy (2008) 6. Great Northern Highway Access Strategy West Swan to Muchea (2011)
Policies
1. Local Planning 2. Provisions of Public Art (POL-LP-1.10)
The above list is unchanged from the City’s original Responsible Authority Report, dated 18 March 2013. An assessment on the application against the abovementioned legislation, strategies and policies is contained in that report. Consultation: Public Consultation Given there is minimal and only aesthetic modifications to buildings incidental to this use, this proposal was not re-advertised to adjoining landowners or agencies. Planning assessment: The subject of this application is specifically for minor aesthetic and re-design modifications for ‘Stage 5’ and ‘Stage 4’ works. As the modification does not result in an increase to floor area or students, no additional parking bays were required. City staff consider the modifications not to unduly impact on the amenity of the subject site and surrounding properties and that the minor amendment should be supported, subject to conditions of the original approval dated 18 May 2015. Council Recommendation: Option 1: The Metro East Joint Development Assessment Panel resolves to
grant approval for the proposed alterations to the Educational Establishment at Lot 7231 (No.18) Strathmore Parkway, Ellenbrook, subject to conditions of the original approval dated 18 May 2015.
This is the recommended option. Implications: The owner/application would then be permitted to proceed with the
proposed development subject to the satisfaction of planning conditions, approval and issue of a building permit.
Page 5
Advice Notes All other conditions, footnotes, advice notes and requirements detailed on the previous approval dated 18 May 2015 shall remain. Conclusion: The proposed development forms part of an additional amendment to the Holy Cross College which was originally approved on the 18 May 2015 and modified 27 August 2015. The subject of this application is specifically for minor re-design modifications which resulted in structural mechanical changes for ‘Stage 5’ and ‘Stage 4’ works. City staff consider the modifications not to unduly impact on the amenity of the subject site and surrounding properties and that the minor amendments should be supported, subject to the same conditions and advice notes of the original approval dated 18 May 2015.
Page 6
t """"'"""""""""'""'""' L t """"'"""""'""" L L """"'""'"" L L """"'"""""""" L . 1 1 1 1 1 1 ?'ST1NGEAil.Yl.EAAHIHGcam!E l EXISTIHGo.etiSTR.lllONIIl.IUlttG l L NE"NPRIWirlf1l£li!HIHGCEKT'R£ - ST.f<JE5 L
f 1 1 1
STREET ELEVATION FROM STRATHMORE PARKWAY
L NEWCXHIECTJNGIIIIIOGE -STAGE4 L EXIS'!Nl~IO.ISENCIO>T L 1 1 nnaaa 1
L EXISTINGSECONlAR'fiGISE«<DoT L t£'HCCHECTWG8Ro!OOE - STAGE4 L NEWY£NilltCCUI..NT'1 -STAGE4 l
1 1 1 L 1 tEWSPC.lRTSSTORUCWoHGEAIX.lloCS- STAGE • L
~ -~~ L I
ELEVATION FROM SPORTS FIELDS
1 1
~ L ~~~ ------------------------~~~~~ .. ~·~~~~·~~~ ... ·~--------------------~~1 EXlSTWGLaWIV l L tEWSPORTSSTCJIElaw«)EROCJoi& . STAGE4 l 1 1
SITE ELEVATIONS HOLY CROSS COLLEGE - STAGE 5 18 STRATHMORE PARKWAY, ELLENBROOK
SCALE. : 1:250@A1 2.5 5 25m
JOB NO. :1504 DATE :OCTOBER 2015 DWG NO. :SK1.03 REV : 0
~HiyStl-.t~ --T +fi1 a 9381 4&44 ,--....,... w---... ...,. 111210 ,.. m
I.N .. 1/ -.(
© eiw architects
• architects
"d.ea-;,
Cb
~
I GLA .,,
(11111 1 1
GLA 252
.Q
VERANDAH MONO
f1om:o:r:oJ\
GLA 253
Q
.illl .......... ""'l>.
MEETING 254
\ VOID
ENTRY 04
""""
.Q
. I 1- I ! I~~= . ~ ~w~
~ s 255 PASS
1>1
267 --.,..,.,
SCIENCE LAB ~ ~ ~ m
f\ riJDlWHJg·~;r;;j~~
2040 3545 1545 / ~ - 1'- - ;1-
LOCKERS
'"
4200
-
-..;;;:;:;a
3000 / -
1-,-
-/-
.. 275 I
"""
VERANDAH """0
3000 ' ~
GLA
"'
4200
i---
4200
PASS 276
GLA
"'
0
•
""
·-• SGA I
m .,.
0
GLA
"'
3000 3000 4200 ~- -/ - -;
<Jil!lr
I ~~
•
/
Q
•
SGA
'"
· o
--~-~~1
GLA 285
7285
-- ...
VERANDAH
""""
VOID
STAFF 274 i ~
ENTRY 05
""""
-I!!!!
/
1 2 4 5 7 8 9 i' 10 11 12 14 15 18
WALKWAY MONO
4880
FIRST FLOOR HOLY CROSS COLLEGE STAGE 4-8 & 9 BUILDING 18 STRATHMORE PARKWAY, ELLENBROOK
SCALE.: 1:100@A1 &m
JOB NO. :1504 DATE :October 2015 DWG NO. :SK2.01 REV : D
L
/
20
~
"' M ...
g ~
"' ~
~
~
"' ~
0
&i
~
"' M ...
'A
' B
' c
' 0
' E
' F
' H
' J
' L
' M
' N
,....., __ _ ---T -t61 I llll 4144 ·- w---.... ..... taO OM m a itects
~~ © elw architects
Cb
.. lfll -. -. i
~ I I i • ... . is ·m l -'~M< \ Jo.L I I I ~ I UP ~
.... , .. COl
I
GLA
"" "'!'PET
f1IIIIiTI ca. ca. - CXl.
GLA 202
CAAP£T
f1DIDio:nr\ ca. CCI. - ca.
-Ill!
GLA 203
CAAP£T
·~··-;
LOCKERS (27)
lllllllll COl
COl
MEETING ,.. CARl'EI
GAlli! EN
HYO ACCESS PANEL R£FER TOHYO DETAILS
VERANDAH P.VE
GARDEN SOil
I I t :1 s: I· w .... LIFT LOBBY
"" I
CMPET/LINO
SGA
"" CAAP£T ~ 1J~"R ElEC
211 COMMS
"'' CllNC ~~
~~";..
WlBENO<
CIENCELAB 218
IDCIER'SI STWEHT'S lAB BENQ<
VM1.
Cl.ENERSSINK lAB BENO<
~
"""'
""" ISOlATOR.
lA8BENO<
RWP LOCKERS (27)
.. RWP
2040 3545 3370 / / / /
1 2 4 6
ENTRYD3 PAVE
aJ
7 ~
5375
GROUND FLOOR SCALE.: 1:100@A1
0 1 2 10m
·~
/
8
3000
I /
9
PASS
"" """"
• RWP
4200 {
II .~
• ·-a
"""
Ill"
l iFT-' ~
flES
-B
• " ...
4200 3000 3000 ~ / ,
rJME~ING I) CARffT
--
4200
STAFF 12'
CIRPET .....
SGA 228
CARPETITI.ES
• 0
RWP
,, I~
t l
•
4200 3085 / / /
10 11 12 14 15 17 18
HOLY CROSS COLLEGE STAGE 4-8 & 9 BUILIDNG 18 STRATHMORE PARKWAY, ELLENBROOK JOB NO. :1504 DATE:OCTOBER 2015 DWG NO. :SK2.02 REV : D
WALKWAY PAVE
REFER TO MULTIPURPOSE CHANGEROOM DRAWINGS
4880
~
•
20
' A
~
_,_ B
"' ;;;i
~
"' :;: ...
~
0
~ <D
"' M ...
' c
' D
' E
' F
' N
I ,....., __ _ -- .... T +61 I tlll 4&44 ·- w--- • tao ... '" architects
~~ © elw architects
UPPER LEVEL R.L. 58.540 (45c)
LOWER LEVEL R.L. 54.683 (DOc)
CQ..ORBONO CUSTOM OR8 ROOF SHEETING OS" PITCH TOUFT 1.
20 ;
4400
UHK BR:I)GE FROM EXISTIHG SE<XlNOARY SCHOCl. 8ULOIHG.
19 ;
N M L 4315 3760
; ; ;
COlOftBOND CUSTOM ORB ROOF SHEET1NGQWPfTOi. -----------,
NORTH EAST ELEVATION 1:100
16 13 5265 6990
; ;
COLORBONO CUSTOM ORB ROOF r- SHEETNi OW PITCH.
I I Il l i I 1 II ! ~ 111 ! 1 ! 1111 T II' I" II' 'Ill !P II . 1 II :,1 iII .! 11
-Ct.£AR • Ulm2
NORTH WEST ELEVATION 1:100
cD ELEVATIONS SCALE. : 1:100@A1
_,
5210
ExoeacF~WALL ClAOOONGPANSS
5710
ill
J ;
11 ;
H 2615
;
10 4200
;
I
I
II 1111 ; II 11 1! !i~ '111 :II !. : I II II
6m
4200
II ii1
F E 6710 3420
; ;
9 8 7 3000 3000
; ; ;
ro==
I I
D c 4415 3760
; ;
5 4200 4200
;
B 4315
;
ca..oRBONOOJSTOM am ROOF St£ETJNGQ5" PITCH TO LIFT 1
3 2930
;
4200
11''111! i.l' 11 1 :li li!! I· ::!1 II· IJ· I II! II r ] li Ill ·II IIi I II I ~t! ll ! I • I' Jl ,, i
( TYPE 2)
(TYPE 1)
HOLY CROSS COLLEGE STAGE 4- 8 & 9 BUILDING 18 STRATHMORE PARKWAY, ELLENBROOK JOB NO. :150 4 DATE: OCTOBER 2015 DWG NO. :SK2.03 REV : 0
A ;
t.HCBRI:IGEFROMEXISTffG SECOP«Wn' SOiOOL8IJI.OING.
WN.l<NAY FROM EXJSTV«lSECOHOARY 5CHOOI.8UI.ll4HG.
PLANT LEVEL R.L. 62.397 (90c)
UPPER LEVEL R.L. 58.540 (45c)
LOWER LEVEL R.L. 54.683 (DOc)
340Hirtsw.t~ --T .. , I 1311 4144 ·w... _ .. m
r.-f ·,~
@ elw architects
II architects
·~~~
A B c D E G H K L M N 4200 4315 3760 1 4415 5245 l 4885 1 3485 I 4340 I 3760 4315 1
-~ 1 I I f I f _..., I I f-
EXISTING SECONOAAY HOUSE UPPER FlOOR LEVEL R.L 59.740
EXISTIHG SECOHOARY HOUSE
~~F-LOOR_L_EVEL_ RL_"'-""-~-..1....---------------i
:::.:: Ill' ALUMIHUM MECHANICAL LOWRE PANELS
__ PL!-NT LEV~L R.L 62.397 (9~c) , 1
__ UPPER LEV~L R.L ~8 540 (~5c_) _ _
LOWER LEVEL R.L 54.683 (QOL~ ----- --
2
Cb ELEVATIONS SCALE.: l :l OO@Al
I I SOUTH WEST ELEVATION 1:100
4 5 7 8 9 10 11 12 14 3000 4200 4200 3000
15 4200
ca.....l..o CUSTOM ORll ROOf r----t----- SHEET'f'OWPfTCH.
COlOR8pHD CUSTOM ~8 ROOf SHEETING gg• PITCH.
_ _j __________ __________ P~NT LEV~L ~ 63.397 (9~c)_ :=:::::::::::::
17 18 4880
I I
20
CURVED WALl BRICKWORK { TYPE I)
__ UP~ER LEV~L R.L. 5_8 540 (4~c_) _
SR<:I<WORJ((TVP€ I)COOTRASTBANo LOWER LEVEL R.L. 54.683 (~c_) --- -- --------------
~~--~----~---------~-------~-------li-#----l~~~~~~c~ COI.CRBOND CUSTOM ORB l SHEelnt+GQWPITCH.
BRICI\I (TYPEt) ! 1 ~-~~~ l SOUTH E ST ELEVATION 1:100
6m
I
I ca.ORBOOO CUSTOM""" ROOf
1 SHEETIHG os• PrTCH TO LIFT I
I COLORSONO CUSTOM ORB ROOF --- r SHEETING(WPITCHTOUFTJ
- c ___ =_=If=-=--==-'- _:J_ - -- - - -I I I
:I : I ,,...-T--,, II f- UFTJTOFOREGROUND I , : l 1 SHOWN IN DASHED LINE I 11 I I FOR cu.RITY
I ~I ii i :: : II • ' I
Lf-"~~·-- : - --- -------o I I
4f,-_.;.--i---+---- 8RJCI<WORI( (TYPE 1) PIERC<X.ONHAOE
~w 1 1
~ i BRICKWORK (lYPE 1) CONTRAST SAND
J. ' '{ 1~-'-'...__1 ____ ----
I Lr-------J
HOLY CROSS COLLEGE STAGE 4-8 & 9 BUILDING 18 STRATHMORE PARKWAY, ELLENBROOK JOB NO. :1504 DATE :OCTOBER 2015 OWG NO. :SK2.04 REV : 0 I
...,,.., ..... ,._ . ---T "61 I 9381 4844 ·- w---.......
.... 'IZliO (154 m architects
k~~
~M'; /" -.... ,
p' ~~ /R ' N Q '
~/ ~/ -~- '--,~ "--../
,-i T
LIFT3
----j- -~
Cb GROUND FLOOR - - 10m 1:100@A1 SCALE.:
--, -~/
~
VERANDAH BfiiCKPAVlNG
LOCKABLE STORAGE
CGNC{SEALEO)
r,-' T J '-,-
/u '\j' -, "--.-·/
~
-,
VERANDAH BRICK PAVING
(w ~,--/
r-
/
"v
ENTRY BRICKPAVlt«:>
SPORTS STORE
"'
/
t I
I -,
I
r I I II I I
(23 --....__.~
{E)
'21'
r,::;:;, -~\~Q;
f18 ~-j
HOLY CROSS COLLEGE STAGE 4- MULTIPURPOSE/CHANGE ROOM BUILDING 18 STRATHMORE PARKWAY, ELLENBROOK JOB NO.: 1504 DATE :OCTOBER 2015 DWG NO. :SK3.01 REV : D
340 ~ Street Wilko ---T ~1 8 1381 4844 ·w--........
f:. .,_ r:-
© eiw architects
• architects
d>a<,
cD FIRST FLOOR SCALE.: 1:100@A1
M
' ~
LIFT3
w u ~ u a: ~ ~
N
J
TERRACE CONe
p
MUL nPURPOSE ROOM 341
TERRACE cooc
z - 10m
l ~
Q
r \ I
R
MULTI-PURPOSE ROOM 342
-L ___ _ TERRACE
COl(;
s
MULTI-PURPOSE ROOM 342
T
"'ll.., c
~-
u v w
l :l=;rr *~ p n ~ 1-1. ,...::....
X
"-
r ~,
I
g~
STORE
"' ~'w~- ~--~ • ~ (1
I SERVERY L- -...._, 345
• .-.. . 0
(IIIIIIIIIL=;--1-·
L./\ r \_! TERRACE
CONe
'
y
-l TERRACE
COHC
HOLY CROSS COLELGE STAGE 4- MULTIPURPOSE/CHANGE ROOM BUILDING 18 STRATHMORE PARKWAY, ELLENBROOK JOB NO. :1504 DATE :OCTOBER 2015 OWG NO. : SK3.~ REV : D
@
23
22
21
20
18
:MO...,.Sti'MtSut*:o --6000 T +11 I 13111 4644 ·w-~ MIN MillO I»' lin
© elw architects
• archttects
·ef'4.t,
'COLORBOND' METAL FASCIA CAPPING SELECT COlOUR
M N p Q R s T u v w EXPRESSJOINT'EXOTEK' - ·- ~~-- - COl.ORBONOCUSTOMORBROOF -~ "'ANPALON'WEATHER BRICKWORK - ..--- 'CCl.OR80NO'METAL FASCIA
CAPPING SHECT COLOUR :~~e;;:~INlSH SHEETING@S" PITCH. ~lE~=S~=~IFIEO ( TYPE2 ) j I
X y
:~1;:'" ~~ f= -· ~r-~.-du::t::rcm I_ ,_QCDDIJIJ 1 !:JJ[] w -11 ' ' J 111 : ..... :~"·"«: .. t , 1 • E£~;;:.:~-- TOP OF STRUCT FFW.E RL 61.883 (84c)
CONCRETEUFTSHAFTWAI.l.S. -------1 SELECT FINISH AS SPEC.
i~:i-~~REF~I H m II SELECT PAINT FINISH
=~==~=~ - ! ~;~;;~~;;~;~b~~b~~~··- ~ STAIRlBEYOND--1
~~~ I t EDGE OF STAIR FUGHT
ELEVATION 1:100
M
'COt.ORBONO'METALFASCIA - --~
CAPPING SElECT COLOOR
BRICKWORK ( TYPE 2 }. -----E::I-21:: HIGH HEADERS OVER OPENINGS (TYPICAL)
EXPRESS JOINT 'EXOTEI<" COMPRESSED SHEET WAll
N
BRICKWORI(( TYPE 1} TO COlUMNS
S.S UNIVERSAL DRINKING TROlJGH AS SPECIFIED
[ ' "'"""""" ( TYPE2 )
L 2t ( TYPE 2 ) HEADER COURSE. TYPICAl TOCOlUWIS
p Q R s 'EXOTEK'CLADOING --, TO NIB WALLS. I
~ COlORBOND CUSTOM ORB ROOF SHEET!t+G@ S" PITCH.
~'EXOTEK' Cl.AOOING TONIBWAJ.lS
T u ..---- 'EXOTEK' ClAOOING
v w r 'Ca.ORSONO' METAL
FASCIA CAPPING EXPRfSS JOINT 'EXOTEK' COMPRESSED SHEET WAll. CI.ADOING TO WALlS SELECT PAINT FIHISH
I TO NIB WALLS. ~. ::.eu:;~.o • r-A!III ! rn>m:ot1 :.t:Lti.. I I"AINII'"INI~ i :.t:U:I.. I I"AIN II'"IP'II:>I"' 1 t~o~:t.tL.II"AIN i t~l~ .......... "' '
X y
TED j 6mmEXPRESSJOINTEO
1c(TYPE2 ) HEADER CAPPING
CURVED WALL BRICKWORK ( TYPE 1 )
BRICKWORK ( TY!'£2 ) OFFSET 2S1M1 FROM EDGE OF STAIR FLIGHT
FIRST FlOOR LEVEL Rl58.540m(45t)
GROUND FL(')(fl LEVEL Rl.54.683m (OOc)
6mmEXPRESS COMPRESSED SHEETING. SflE
T SOFFIT - ~ ) -f"- ) < · r----- COMPRESSED SHEET SOFFIT
p .... ,~,'" ---- --- ____ ,_ J[] u I n 11 I c-o ' JL J u I ~-~ -- -- -- I s.EETmc>saECTP.WFINISH TOP OF STRUCT. FRAME R.L 61 .883 (84<:)
CONCRETE LIFT SELECT FINISH ~tAUS ~~-- __ · D __ -._ -~. ~ -- -- "r= l - -- • - ~ ~ r- - ~ ~ :=~~=~ ~·=:1 _. . ~•• ~g[bg; g;j~ gg:; ~B~~g:; g;j~ ~.g;. ' • <- IEr"-""-"'TRA!l€ ToDEr"'-REFER TO BUILDING CONTINUATION FIRSTFLOIJf!LEVEL
RL58.540m (-45c)
----- - - ---- .-- BRKXWt'RI:(lVPE2). ;~ ----, IIRlQ\WORK{T't?£2).2cHIGi .. l-:J. SUSP. CONC. FLOORSL-.s.
----- HEAllatSCMRDOOR -(TYf'ICAl) . HEADERSOVEROOCIRFRAIIE(TYPICAl.) REFERTOSTRUCT.OWGS
~ BruCl<WOR!< ( TYI'E 2; .lii<IZ - ~ ~.lUll:.. ~ IF'FFI ~ IFFF'\ ~ .lUll:.. ~ __, ~ ~~";"' 2t91LIIRIO<!(T'IPil~ -f-]-p ~.lUlL ~ I bb; b!dd -A!! bbbf STAIR3B£YONO
! 2tSill8RaS(TY9E2) . ...j r- RAG
- E"""' __.._ c. CJ CJ m fl~ ......__ - -!! • u - !! to.-av v k -11. Q<,_mz v "-'-"- 'l
ELEVATION 1:100
S.S UNIVERSAl DRINKING TROUGH AS SPEClFffO
BRICI<WORK ( TYPE2 )
CONC. FOOTINGS. REFER TO STRUCT.OWGS
S.SIJNIVERSAlORINIOOG TROUGI-I AS SPECIFIED
23 22 21 20 18 23 22 21 20 18
J • GAS INSTAHT AHEOUS RECESSED HWS.
COI..ORBONO CUSTOM ORB ROOF 1 - COOCRETE UFT SHAFT WALLS. SHEETING 0 5• PrTQ-l SELECT PAINT FINISH
~OLOROONO METAl GUTT1iR " RECESSED FliR CAli '1 I r::J AND FASC~ SELECTCOLOUR SELECT PAJNTF~ISH I - - I -~ II ' ="'.!~~,",';'~"' s r I I F I J ~-~~ SHEET1NG. SELECT PAINT - h '
METAL SALUS TRACE SELECT PAINT FlNI$-i
RWPREFERTO HYDRAULICS OWGS
CURVED WAll BRICKWORK { TYPE 1 )
BRICKWORK ( TYPf 1 l TO COlUMNS
21: I TYPE 2 ) HEADER COURSE. TYPICAL
ELEVATION 1:100
erua<WORK (TYPE 2 ) L S,SIJNIVERSALORINKJNG TRCIUGH AS SPECIFlEO
STEEL COLUMNS. REFER TO STRUCT OWGS. SELECT PAINT FINISH
TOP OF STRUCT FfW,E
EXPRESSJOINT'EXOTEK' R.L 61.88J (&le) '
COtM"RESSEO SHEET WALL CLADDING. SELECT PAINT FI~SH
CURVED WAll BRICKWORK ( TYPE I )
BRICKWORK ( TYPE 1 ) TO COlUMNS
a FIRST FLOOR LEVEL RL58.540m ('!ie) - v--
~
GROUNO FLOOR LEVEl Rl54.683m (00c) '
J • GAS INST ANl AHEOUS RECESSED HWS.
'COlORBONO' METAl GUTTER RECESSED FHR CAB. < I AHO FASCIA SElECT COLOUR SELECT PAINT FINISH
6mm EXPRESS JOINTED . . I .I 'I CCMPRESSEO SHEET SOFFIT r-": I j j ~ 1 j- .. SHEETING. SELECT PAINT
EXPRESS JOINT 'EXOTEK' COMPRfSSEO SHEET WALL CLADOING. SELECT PAINT FINISH
METAl BALUSTRADE SELECT PAINT FINISH
RWPREFER TO HYORAUUCS OWGS
BRICKWORK ( TYPE 1 ) TOCOl.UMNS
2c { TYPE 2 ) HEADER COURSE. TYPICAL
ELEVATION 1:100
BRICI<WOOK I
-- CO..ORBONO CUSTOM ORB ROOF SHEETING@ 5" PITCH.
L S.S~SAL DRINKING TROUGH AS SPECIFIED
GROliMJ FLOOR LEVEL RLS4.683m (00c)
STEEL COLUMNS. REFER TO STRUCT OWGS SELECT PAINT FINISH
TOP OF STRUCT FRAME R.L 61 .883 (8-'c) '
EXPRESS JOINT 'EXOTE!(' COfAlRESSED SHEET WALL Cl.ADOING. SELECT PAINT FINISH ~
METAl BALUSTRADE. SELECT PAINT FINISH FIRST FlOOR LEVEl
RL 58.540m (-45t) _., .
~
GROUNO FLOOR~ RLS468Jm (OO:) '
EXPRESS JOINT 'EXOTEK' CQI-.f)RESSEO SHEET WALL ctAOOING. SELECT PAINT FINISH
Cb ELEVATIONS HOLY CROSS COLLEGE- STAGE 5 MULTIPURPOSE/CHANGE ROOM BUILDING 18 STRATHMORE PARKWAY, ELLENBROOK
6m SCALE. : 1:100@A1 JOB NO, :1504 DATE :AUGUST 2015 DWG NO, :SK3.03 REV: D
SCALE 1:100
~ 1m 2m 4m 6m 6m
~
~ ~ if! i
i j.-
~
~
l401--11ystr.t.Sublco --T +iil I 9381 4844 ·w-& .;:.a ~/"A
© eiw architects
.aea,.
SIJSP CONC STAIRS. REFER TO STRUCT OWGS.
y ~ ~ ~ PONOERDCOo\T ALUMIN. LOlNREO r-r------, WALl PAHEI..S TO MEOi. ENCI..OSI.Jft£S. REFER TO SPEC ,, I I I I I I II I ! J 1 I 1 I ! II I I l =::.~;..=-
ELEVATION 1:100
y POM>EROCOAT AI.UMIN. LCl.NREO -r-' -------, WAU.PAHEI..S TOMEOt. ENCI.OSUf!ES
I ''· <OLORfiOifJ' METAl. GUffiR ~ l ffi ..... -----~!ASCIA~LECTC~~~.'i'i,-~' CONOlETE UFT SIW'T W.t.l.LS. SElECT PAM FINISH
PAINTED PVC RWP REFER TO tfYORAUUCS OM. WING FOR OET AILS
r!""-""""""""STOM""" ~ ----- ~- ·- - -- --·
SUSP CONC ST~.
REFER TO STRUCT OWGS.
,-------- 'COLORBOI'WMETALFASCIA CNWIG SELECT COlOUR
REFER TO SPEC. I ' . ~ =--I l !; 4 i ·~ iJ I I _________________ l_ IJ - ! - I I i i i i i II u I ~ =~;,_~ 1 \11m ' 1 0, ii iii 1 r ~ iii ~ : 1 1 ; a Pi : iii ; 1 ~ a ii -ft H
~
~
GROUNO FLOOR lEVEl --..:<om;;;{illkl
BRICKWORK ( TYPE 2 I OFFSET 25nvnFROt.l EOGE OF STAIR FUGHT
ELEVATION 1:100
EXPMSS JOINT 'EXOTEK'eot.FRESSEO SHEET WAll CLAOOING. SElfCT PAINT FINISH
6mm EXPRESS JOINTED COMPFIESSEO SHEET SOFfiT SHEETING SELECT PAINT FINISH
BRICKWORK (TYPE 1 ) TOCOI.liiO<S
'L_ 21: ( TYPE 2 J HEADER COllflSI:. TYPICAl.
ELEVATION 1:100
ELEVATIONS
~
CURVED WALL BFIICI<WI:::RK {TYPE 1)
I ~ ~
I
HOLY CROSS COLLEGE STAGE 4 18 STRATHMORE PARKWAY, ELLENBROOK
SIJSP CONC ST~.
REFER TO STRVCT. OWGS
MULTIPUPOSE/CHANGE ROOM BUILIDNG Cb I 6m l :lOO@Al SCALE.: JOB NO. :1504 DATE :OCTOBER 2015 DWG NO. :SK3.04 REV : 0
SCALE 1:100
~ 1m 2m 4m 6m 8m
l40Hioy Stl-.t~ ---T +61 I 1311 4144 ·w--·QIIO .. In
© eiw architects
• architects
~a~
STORE-1 178CM
TIERED SEATINGS
GlA-6 70SOM
GlA-7 70SOM
VERANDAH 1
GlA-8 70SOM
MULTIPURPOSE SPACE 29SQM
GlA-5 66SQM
PRIMARY TEACHING BLOCK FLOOR PLAN SCALE 1:100
~
TEACHERS PREP 31SOM
[;1l
~
~
lilll
COVERED DROP-OFF AREA
MULTIPURPOSE SPACE 60SQM
~
~
~
MULTIPURPOSE SPACE
64SQM
GlA-4 66SQM
HOLY CROSS COLLEGE STAGE 5 18 STRATHMORE PARKWAY, ELLENBROOK JOB No 15.04 OATE MAY 2015
VERANDAH 1
GlA-3 64SOM
LOCATION Of TV
VERANDAH 2
DWGNo SK5.01 REV: C
STORE-2 17-
:MO...,..._s............._ ............. T4li13114M4l~
w~ -•-- ~n
® eiw architects • architects
l
i ~
i ~
(E ' ~_)
Y-, C~NDENSER DECK~ RLJ.OOO
~ I I
y -'.-_GROUND FLOOR
RLO.OOO
..... CONDENSER D __ ,_- ECK
RL3.000
~ . I
R . y_.;,__GF~OUND FLOOI
RLO.OOO
·!9' y
I I
I I
1--
i -] ~
EAST ELEVATION SCALE 1: 100
"" ~~
I I
I I
-+ \ (
----, ~
~ ~ u I'· I Tl1
NORTH ELEVATION
,......-......,. I 1 \ \._,j
SCALE 1 :100
( 2 )
y
C?
(~
0
I I
I I
f-I I
~I
Cp
cp (s' y
CfJ i
I I
0
(~
~
-· /~ -roo~ I~ - -
1nLll I II/ 0
~-t
u
/'. 4 \ \.:j
\ ( --I \
- -
·ri- iF= I
IJ-
: . l !-.D • .Jt
',..-5\ 1/
cp l I
I I
·+ ~
- -
,--... \~
: ~ I I I J1. 1
, J1. ~ i T~_CONDENSER ~c~ b CL ----T - - - ; ~t:::J . ~---RL 3.000 1 r3S ............,.........., -- 4l . II ~-rW a r---wi
~
Y ....{_GROUND FLOOR .....II _ .l. ,,._... 'tir< : 'L 1, J _- I -~ RLO.OOO
SOUTH ELEVATION SCALE 1: 100
I I
'==! \
-
I ..,j
cp cp I I I I
I l I I
·I-
'
I - -
Ci) CD I I
1l ~ ~ i[j
{:;:; y ~-""
~
WEST ELEVATION SCALE 1: 100
9 l I
I I
t- ---- -
0 ~
\ -
y
ELEVATIONS HOLY CROSS COLLEGE STAGE 5 PRIMARY BUILDING 0 1000 5000 mm 18 STRATHMORE PARKWAY, ELLENBROOK
SCALf: 1 : 100 1.........1 ='-- JOB No: 1504 DATE: OCTOBER 2015 DWG No: SK5.02 REV:D SCALE 1: 100 @> A 1
,--. ' ~) "' · o
~/ (,E::\, \::__;
J«< ..... sa.& w.c....,...,., .......... 1001
E ~·--d~-w~-•-*m
® eiw architects
!I arch1tects
METAL ROOF ‘SURFMIST’
METAL ROOF ‘SURFMIST’
FACE BRICK AUSTRAL‘SYMMENTRAL SILVER’ PHASING TO ‘CHILLING HAM WHITE’
FACE BRICK AUSTRAL ‘SYMMENTRAL SILVER’ PHASING TO ‘CHILLING HAM WHITE’
FACE BRICK AUSTRAL- ‘SYMMENTRAL SILVER’ PHASING TO ‘CHILLING HAM WHITE’
FACE BRICK
METAL ROOF
METAL ROOF ‘SURFMIST’
FACE BRICKAUSTRAL
FACE BRICKAUSTRAL
FACE BRICK AUSTRAL
FACE BRICKAUSTRAL
CONCRETE
CONCRETE
METAL ALUCOBOND CLADDING-‘NATURAL ZINK’
METAL ALUCOBOND CLADDING- ‘NATURAL ZINK’
‘ACRATEX’ TEXTURE RENDER
‘ACRATEX’ TEXTURE RENDER
‘ACRATEX’ TEXTURE RENDER
CFC- ‘SURFMIST’
CFC- ‘SURFMIST’
CFC- ‘SURFMIST’
FACE BRICK AUSTRAL ‘SYMMENTRAL SILVER’ PHASING TO ‘CHILLING HAM WHITE’
CONCRETE
‘ACRATEX’ TEXTURE RENDER
NOTE REMOVE EXISTING CEILING AND LIGHT FITIINGS
COOL ROOM f------+------t----~EXISTINGCARPETSTOBE - EXISJING MU_SIC_ REMOVED FLOOR TO BE MADE
PRACTICE ROOMS m BE [)EM5ciSHE[)- _-_ oooororAKE NEWVINYL
1=-=~~~~~~~---.--~~~~~~i~~~~K COOL ROOM
---- _ _ _ _ _::': _ WALLS TO BE REMOVED REMOVE EXISTING VINYL FLOOR
- - - - -AND-liMBER SI<IRflNG:-MAKE Fl-ooR ) - GOOOl'ORliEWSHEETVlNIT - - - - - -
~~TS~E~~~EN~vt;~~-;;c-~~-~~-~ LINEN .EXISDNG_BEAMS_QVER. """'=l _ _
~~g;~~~~~;-~~i~~Jioo;------~---L"DRY COMPlETION-OF WORI( IN-NEW- - - - --
STAFF
VERANDAH
we - - uJC,MIOO - - - - - - -
t----- CLIENT TO REMOVE EX VY'HlTEBOARD - - - - -BEFORE-RENOVATION.- ~
CliENT TO REMOVE E.'(, ACOUSTIC- ~ ~
PANELS BEFORE RENOVATION
EXISTING BEAMS OVER.---1
;;:LTST~:~~~~~S,T-_:~:..._ ___ ___.
FOOD TECHNOLOGY
1~~0MO PLAN C)
COOL ROOM
COOL ROOM
LINEN
L'DRY we
STAFF
VERANDAH FOOD TECHNOLOGY
~1~00P FLOOR PLAN (])
FOOD TECHNOLOGY 2
PREPARATION ROOM
DEMOLISH EXTG ()()()fl:
AND FRAME AND MAKE GOOD TO OPENING
FOOD TECHNOLOGY 2
PREPARATION ROOM
STORE
STORE
Cb FLOOR PLAN -FOOD TECHNOLOGY SCALE.: l :lDD®Al
10m
-------------------------
:IN
I r-l"J It ~ 1"- ..::::,j Ji: L2J
~ ~ I"- I"- ~
COOL ROOM
COOL ROOM ~ 1'-- I'- D c-"- r-
p O , O~ED ID
CL 27
LINEN 1'-- I" D ~
-~ I"- l"- Dt-we L"DRY
"" I" I"- _.::::, STAFF =
27 0 Pfi:OPOSEO 1": 1"- l"i 1'-:"- :~
i ~ 1 _!@_ -I
~ VERANDAH FOOD TECHNOLOGY
~~~LING PLAN C)
FOOD TECHNOLOGY 2
PREPARATION ROOM
STORE
STORE
---, _~-;xo.;;c,
STUDIO
COOL ROOM LOCATION PLAN
COOL ROOM
LINEN
L"DRY we
STAFF
VERANDAH FOOD TECHNOLOGY
FLOOR FINISH PLAN
1:100
FOOD TECHNOLOGY 2
PREPARATION ROOM
1:500
HOLY CROSS COLLEGE STAGE 5- FOOD TECHNOLOGY ROOM 118 STRATHMORE PARKWAY, ELLENBROOK JOB NO. :1504 DATE :AUGUST 2015 DWG NO. :SK7.Dl REV : A
:-:2::- . -1: : ~ . r
* 0 \__Y
L~ -~· .... ~
EX.LIBRAAY
0~
STUDIO
~..., Strwt su..:. ---T...,ll3814844 ·-w---...
J I I
) j
__ I-~
II architects
~~ (c) Piw ;~rrhitPrh
STORE
3TORE
FF
.ERY
~DAH
STORE
TORE
'F
:RY
DAH
Cb
STORE STORE
L:~TOREMa:~ MiRROR; ~;ORE RENOVATION
•(--------'-"-CLIENT TO REMOVE EX ACOUSTIC PANELS BEFORE RENOVATION.
-EXISTING sEAMS OVER.~-
-
'-4-----Cl1ENT TO REMOVE-EX TV BEFORE RENOVATION REINSTAll AFTER COMPlETION OF WORK IN NEW LOCATION -- r--= R1MOVE EX 9!NYrn.OORIRG AND Tlt.M!ER SKIRTING MAKE GOOO CONC FL~ ANO
- PR£PARE FOR N£~ SHEET VINYl FLOOR FINISH
-t-------=--- CllENTlO REMOVHX ACOUSTIC PANELS-B£FORE RENOVATION
EXtS!I_NG~SOVER_j CLIENT TO REMOVE EX MIRRORS BEFOR~
- RENOVATION
aJENTlO REMCNHX OVERHEAD
ACOUSTC PANElSBEFORE Tl RENOVATION
J I - ---- ~
ARTS DEMOLITION PLAN 1:100
NOTE All ELECTRICAL WORK TO BE VERIFIED ON SITE PRIOR TO INSTALLATION Of CABINETRY, ETC
CD
•J
STORE ·I f', -"
STORE ROOM STORE
cD [p
co [p cD DUCT (l>
cD ll>
cD MALE
FEMALE
VERANDAH
RE-INSTATE NEW FREESTANDING TROUGH WITH OVERHEAD STORAGE SHELVING SHOWN DASHED REFER TO HYDRAULIC DRAWINGS FOR WASTE AND I SHELVING _ FEEDWATER CONNECTlONS
EX. OC>OI=IS
l - r HJ !(l Q ' OVERL ER
STATION
PROPOSED ARTS ROOM
CL @l200 NEW VINYl SHEET FLOOR
Pf:I:OPOSEO __] WHITEBOARO TRIPlE SLIDING PANEL
ARTS
~
~
~1~00P . FLOOR PLAN CD
,____J
STORE ROOM
cD [p
cD [p cD D\JCT (l>
cD ~
1 cD EMALE
VERANDAH
FLOOR PLAN -ARTS SCALE. : 1:100@A1
STORE
MALE
ST
ST
DIS. TOILET
CLEANER
LIFT
DIS. TOILET
CLEANER
LIFT
10m
STORE
>TORE
FF
ERY
IDAH
STORE
rORE
RY
>AH
STORE STORE
ARTS CEILING PLAN 1:100
: ,-=] I I L_j_ - 1
. , ---- l L _ _ __ j
CD
I .
, ---- l I L _ _ __ j
L ARTS
CD FLOOR FINISHES 1:100
STORE ROOM STORE DIS. TOILET
cD [p CLEANER
cD [p cD DUCT (l>
LIFT
cD :l> ST
cD MALE
FEMALE
VERANDAH
I STORE ROOM STORE DIS. TOILET
. co [p CLEANER
co [p
I cD D\JCT :l>
LIFT
=o :l> ST
cD MALE
FEMALE
VERANDAH
HOLY CROSS COLLEGE STAGE 5 - ARTS ROOM 118 STRATHMORE PARKWAY, ELLENBROOK JOB NO.: 1504 DATE :AUGUST 2015 DWG NO. :SK7.02 REV : A
I I I '---"L-
STUDIO
LOCATION PLAN 1:500
EX LIBRARY
* " \_J
'~
EX MUSIC STUOIO
MO..., sa-t W.... --T~Ii3114144 ·w-J::.t-..(
(C) Piw :urhitPrh
:ea~
~
~-~ ~ ~ ~ ~ ~
Existing Car Park
T T T T T
CAPITAL HOUSE AUSTRALASIA ENGINEERS AND PROJECT MANAGERS Level 1, 172 St Georges Tee. Perth W.A. 6000 Phone: +61 (08) 9324 3211 Fax: +6 1 (08) 9324 3255 ACN 009 436 140
sumps
~ ~ ~ ~ ~ ~
Match existing levels -
T T T T T
57.00 .4,,56.90 I
57.30~ '~
57.80
Existing footpath make good and match levels shown
/
I Fire' truck ~
...... ~ \
I access I I d 1 Existing footpath
I ;- make good and Existing foot path match levels shown
I +=i ~ ~ Vs ~'1
RanlP ~ 1- I
\ ) , __________ / RAMP PLAN
In 4\ u!il ~ -Z :::::1 0 --·L- :::± a :s :c::::r :::;::;:::;1 _ -fi~jj:: =:~ Ej:iia= c:::: c:::: j:O t::: c::att->-______ >- ___ ->-I
t~ ~ -t ~ r-
+1 -t .J>} \ ;t \
~
T
\
~ t\ ... ··~ ~
\
'57.90 "-...
"-... ~ ~ ~ ~ 1\'--...//J. ~ ~ ~ ~ ~ ~ ~ ~ ~- -±--
"-... ~
Bollards -' \ ........
........ \ ........
------
""' ------
------ ---T T T T T T T-._ ...:r:_ T T T T T
---- ---- ---- ---- ----58.20
COOLEMON BOULEVARD
HOLY CROSS COLLEGE- STAGE 5 WORKS CAR PARK PLAN 18 Strathmore Parkway, Ellenbrook
EIW ARCHITECTS
---, 57.90
57.20
\
l I I I I
---7-
DRAINAGE
$ KERB SIDE GULLY 1 050 Dia x 1200 Deep (Refer Drg C02)
e SOAKWELL 1800 Dia x 1800 Deep (Refer Drg C02)
$ SOAKWELL (Vented) 1800 Dia x 1800 Deep (Refer DrgC02)
-->--- 250 dia. PVC stormwater drainage pipe.
G Denotes Bollards
KERBING
SEMI MOUNTABLE (Refer Drg C02)
SIGNS I ROADMARKING
m· ~
Denotes '8 kmlh' speed limit sign (450 x 600)
Denotes 'PEDESTRIAN CROSSING' sign (600 dia)
m @
Denotes 'STOP LINE' road marking (300mm Wide)
Refer to the City of Swan for crossover requirements (similar to crossover at entrance from Westgrove Drive)
0
i R
I f I 0
1 .8 2 g " ~ "' "iii
"' e ;; :I < " " :I 0
::t:
~ Q.
"' u '!;
t ~
I ~ 1 -6
~
2 I
0 0 N
Cast insitu kerb.
R50
R25
125 125 -/----.( - / -
R10
1.{) r-.
~~------~ ...... ~~ .. ~~~~~""~~~r----' E
~ a..
~ 1/~~~L-~:_~~~~~~~~~---&.J._ _____ L
~ -/ -----/ ·
SEMI MOUNTABLE KERB
- Concrete Cover.
150 (typ.)
Expansion joint.
Bituminous Surfacing to extend over concrete
---- surround and finish flush with grate.
Expansion joint.
Cast insitu kerb flush to back of gully frame.
)-50mm mortar to suit 1al level and grade.
Concrete liner to AS 4058
... ...
f---- - ·---Sand trap to be fixed with M 10 galv. adhesive anchors.
Compacted -- ... backfill. .1
I
....
I PLAN
I
I I
~==f=5 I
1050mm Dia.
.f T
I i
,:.··. I f--- --'!.- I 8
0 . ' <D
g ~ I . '
'~1
- . ___ Well liner.
900 x 450 Galv. Mild steel and frame set flush with finished level in 1200 x 1200 precast concrete cover.
-·
."1
/ ( / //// //' Roac
1- ---1 Finis of lin or ar
-- 80m1
I both
ement
·e flush with inside d seal with mortar d epoxy.
l '""' ::O""m I " Concrete base slab '
outsi
. grout and
iner.
230 Dia. Drain hole filled with 40mm nominal crushed rock
KERB SIDE GULLY
All to AS 3996, Class rating C (Heavy Duty - Trafficable)
CAPITAL HOUSE AUSTRALASIA ENGINEERS AND PROJECT MANAGERS level 1, 172 St Georges Tee. l'l:rth W.A. 6000 Phone: +61 (08) 9324 3211 Fax: +61 (08) 9324 3255 ACN 009 436 140
Backfill to be consolidated to 90% modified max. dry density
25 Asphaltic Concrete
//'///'/ ////////// // / // / / / // / / / / / /
>~ /_,>///////// >://///////:/
Compacted Sub-Grade
TYPICAL ROAD PAVEMENT SECTION
n I 1---- Approved vent
I I
---- ' 1.{)
r-., 0 1.{)
'
I I 8 -~ 1000 Min. I I "'~ ,_
r --- --- H--- \--- --- ..,... --- --- ---~ --- --- --- --- 1
I, --- LJ--- --- ~ --- --- --- --- ..L --- --- --- --- .... ~ ' I I I I
I) €-3 ~~ w F-"'1 ll I I I I K------------------------------------------~ I I I I [::::1 €-3 8 ~ I I 1800 Dia. I I 11' - fl II B ~~ II __ ___
75 Crushed Rock
150 Limestone base course
\ I
BJ-Louvered-~ type slots
v B ~ 1800 Dia.
---- -
F a ~ I I 1-.~.---- . - -- I· 1-1 I --+- --- __ ~ €-3 ~~ 1--.----
J-!; a ~
1 I Additional pit as required I I r lxlt--- --- T --- --- --- --- --- --- --- --- --- T --- --- r><h L~------L--- ------------------------L------~J
o' 1.{) ~ ..,_--
-~ J ~ ~~~:~:-1.-~~~-~~~:::~~~~~
I 1200 Dia l ( '1
Drain hole filled with 40mm nominal crushed rock
Mass concrete base placed insitu.
1.8m TWIN SOAKWELL
l 1200 Dia l ' Drain hole filled with ' 40mm nominal crushed rock
All to AS 3996, Class rat ing A (Non-Trafficable)
HOLY CROSS COLLEGE - STAGE 5 WORKS CIVIL DETAILS 18 Strathmore Parkway, Ellenbrook
EIW ARCHITECTS
-
- Approved precast concrete lid
Approved precast 1800 Dia. soakwe
- Approved geotext e
r--::: wrapping.
t+ ------~
IE;;l
Finish pipe flush "' inside of liner and with mortar or app epoxy.
th seal oved
Temporary support liner at th1rd point with masonry bricks when concreting base of well.
0
t t i l 0
1 .8 B g .!!!
~ "' -.;
"' "E 1ii ~ " "' ::l 0 :t:
!! Q.
"' u 'li
t il
I ~ l -e ~
Form 2 - Responsible Authority Report (Regulation 17)
Property Location: Lot 121 (No.3241) Great Northern Highway, Bullsbrook
Application Details: Additional Sheds to a Transport Depot DAP Name: Metro East JDAP Applicant: Rowe Group Owner: LPG Bullsbrook Pty Ltd LG Reference: DA-813/2012/C Responsible Authority: City of Swan Authorising Officer: Philip Russell
Manager – Statutory Planner Department of Planning File No: DP/12/01317 Report Date: 25 January 2015 Application Receipt Date: 7 December 2015 Application Process Days: 60 days Attachment(s): Attachment 1 – Modified Plans (as listed
below) Officer Recommendation: That the Metro East Joint Development Assessment Panel resolves to: 1. Accept that the DAP Application reference DA/12/01317 as detailed on the
DAP Form 2 dated 7 December 2015 is appropriate for consideration in accordance with regulation 17 of the Planning and Development (Development Assessment Panels) Regulations 2011;
2. Supersede the following approved plans considered by the Metro East Joint
Development Assessment Panel as its meeting held on 18 March 2013, which was subsequently reconsidered pursuant to section 31 of the State Administrative Tribunal Act 2004, at its meeting on the 11 December 2013:
a. Attachment 5 – Perspective – Revision P4 - October 2012 b. TP.10 – Site Plan – Design Response – Revision P4 – September
2009 c. TP.15 –Site Development Plan – Revision P4 – September 2009 d. TP.20 –Administration Office – Revision P4 – October 2012 e. TP.21 –Off Site Receipting – Revision P4 – October 2012 f. TP.22 – Internal Storage Warehouse – Revision P4 – October 2012 g. TP.30 – Materials and Finishes – Revision P4 – October 2012
3. Approve the DAP Application reference DA/12/01317 as detailed on the DAP
Form 2 date 7 December 2015 and accompanying plans received on 26 October 2015 and 7 December 2015 (as below):
a. Perspective – Revision P8 – 1 December 2015 b. TP.10 – Site Plan – Design Response – Revision P8 – 1 December
2015 c. TP.15 – Site Development Plan – Revision P8 – 1 December 2015
Page 1
d. TP.16 – Site Setout Plan & Site Section – Revision P8 – 1 December 2015
e. TP.20 – Administration Office – Revision P8 – 1 December 2015 f. TP.21 – Off Site Receipting – Revision P8 – 1 December 2015 g. TP.22 – Internal Storage Warehouse – Revision P8 – 1 December
2015 h. TP.30 – Materials and Finishes – Revision P8 – 1 December 2015 i. Dwg No. 358014 – GA – Sundown Deluxe Shed Plan – 5970 Span x
3000 Eave x 8060 Long j. Dwg No.358013 – GA – Sundown Deluxe Shed Plan – 2930 Span x
2400 Eave x 4450 Long
in accordance with the provisions of the City of Swan Local Planning Scheme No.17, for the proposed minor amendment to the approved addition to Transport Depot at Lot 121 (No.3241) Great Northern Highway, Bullsbrook.
Advice Notes All other conditions, footnotes, advice notes and requirements detailed on the previous approval dated 18 March 2013 and modified conditions dated 11 December 2013 shall remain. Background: Insert Property Address: Lot 121 (No.3241) Great Northern Highway,
Bullsbrook Insert Zoning MRS: Rural TPS: General Rural Insert Use Class: ‘Transport Depot’ – ‘P’ (AU93) Insert Strategy Policy: Draft Bullsbrook Town Site and Rural Strategy Insert Development Scheme: Local Planning Scheme No.17 Insert Lot Size: 19.8009ha Insert Existing Land Use: Transport Depot Value of Development: $30,000
• 18 March 2009 – Transport Depot approved at the City of Swan Ordinary Council Meeting
• 18 March 2013 – Alteration and Extension to Non-Conforming Use (Transport Depot) approved by the Metro East Joint Development Assessment Panel (JDAP)
• 6 June 2013 - An application for reconsideration of Conditions 1, 3 and 4 was lodged at the State Administrative Tribunal in accordance with the provisions of the State Administrative Tribunal Act 2004.
• 25 July 2013 –The Metro East Joint Development Assessment Panel resolved to reconsider the application and resolved to amend Condition 1 and deleting Conditions 3 & 4.
• 3 September 2013 – An application for reconsideration of Condition 22 was
lodged at the State Administrative Tribunal in accordance with the provisions of the State Administrative Tribunal Act 2004.
Page 2
• 11 December 2013 – The Metro East Joint Development Assessment Panel resolved to reconsider the application and resolved to modify Condition 22.
• 2 April 2015 – Request for extension of time on planning approval dated 18
March 2013 and modified 25 July 2013 and 11 December 2013 was granted by Metro East Joint Development Assessment Panel on 18 March 2013 for two (2) years until 18 March 2017.
• 20 August 2014 - Pursuant to section 75 of the Planning and Development
Act 2005 Council resolved to adopt Town Planning Scheme Amendment No.106 (#TPS/1370) for the purposes of inserting an Additional Use (AU93) under Schedule 2 of Local Planning Scheme No.17 –
o ‘P’ – Transport Deport o ‘D’ – Storage
• 20 March 2015 – In accordance with section 87 of the Planning and
Development Act 2005 the Minister for Planning approved the above City of Swan local planning scheme amendment No.109 (#TPS/1370).
• 10 April 2015 – Amendment No.109 was published in the Government Gazette.
Details: outline of development application The proposed development forms part of the ‘Transport Depot’ development which was originally approved on the 18 March 2013, modified 25 July 2013 and 11 December and granted a two (2) year extension until March 2017. As a result of the Stormwater Plan requirements (Condition 13 & 17), there have been a number of modifications of the original approved plans dated 18 March 2013 and thus, forms the subject of this application:
• The ‘External Hardstand Storage Area’ has decreased from 30,000m² to 18,500m² to incorporate two (2) Bioretention Basin’s, a modification to the ‘Detention Basin’ and a site and landscape setback buffer located to the western boundary;
• Three (3) Water Storage tanks on the western boundary of the subject lot located within the ‘Tank Farm’ pad area.
• Two (2) additional Sheds on the western boundary of the subject lot, located within the approved ‘Tank Farm’ pad area.
o Proposed ‘Shed 1’ (8060mm x 5970mm x 3000mm) has an area of approximately 48.13m²; and
o Proposed Shed 2 (4450mm x 2930mm x 2400mm) has an area of approximately 13.04m²
Page 3
The purpose of both ‘Sheds’ are to store a fire pump, irrigation water and a site pressure water pump associated with the required fire services infrastructure; and
• 4.25mH ‘Acoustic Barrier’ (x 96m long) along the southern border of the
‘Hardstand Area’. Legislation, Strategies & Policies: Legislation
1. Planning and Development Act 2005 2. Metropolitan Region Scheme (1963) 3. City of Swan Local Planning Scheme No.17
Strategies
1. Economic and Employment Lands Strategy: Non-Heavy Industrial Perth Metropolitan and Peel Regions (April 2012)
2. Outer Metropolitan Perth and Peel Sub-Regional Strategy (August 2010) 3. Directions 2013 and Beyond Metropolitan Planning Beyond and Horizon
(August 2010) 4. North-East Corridor Extension Strategy (July 2003) 5. Draft Bullsbrook Townsite and Rural Strategy (2008) 6. Great Northern Highway Access Strategy West Swan to Muchea (2011)
Policies
1. Building and Development Standards – General (POL-TP-126) 2. Building and Development Standards – Rural Zones (POL-TP-126) 3. Vehicle Parking Standards (POL-TP-129) 4. Provisions of Public Art (POL-LP-1.10)
The above list is unchanged from the City’s original Responsible Authority Report, dated 18 March 2013. An assessment on the application against the abovementioned legislation, strategies and policies is contained in that report. Consultation: Public Consultation The original development application was advertised to surrounding landowners within 600m from the subject site for a period of 24 days. Given there is minimal modifications to the application and no statutory requirement to advertise under Part 9 of LPS17, it was not considered necessary. Consultation with other Agencies or Consultants The original application was advertised to five (5) government agencies; Swan River Trust, Department of Water, Department of Planning (Bush forever) and Main Roads. Given the development is as a result of Conditions 13 & 17 to the satisfaction of the City, no additional referrals were sent.
Page 4
Planning assessment: Zoning & Land Use Permissibility The subject lot is zoned ‘General Rural’ under the City of Swan Local Planning Scheme No.17 (LPS17). The proposed development is classified as incidental development to a ‘Transport Depot’ use. Previously this was an ‘X’ use, being not permitted in a ‘General Rural’ zone. In accordance with section 87 of the Planning and Development Act 2005, the Minister for Planning approved the City of Swan local planning scheme amendment no.109 for the purpose of inserting an Additional Use (AU93) under Schedule 2 of LPS17 –
• ‘P’ – Transport Deport • ‘D’ – Storage
This was published in the Government Gazette on the 10 April 2015, thus, making the subject of this development a ‘P’ (permitted) use. Setbacks Assessment was done in accordance with POL-TP-126 – Building and Development Standards, specifically against Table 1 – Site Requirements for ‘General Rural’ zones. In accordance with the minimum setback requirements for lots zoned ‘General Rural’, the setbacks to the ‘Sheds’, ‘Water Tanks’ and ‘Acoustic Barrier’ were compliant. Other Considerations/Notes In accordance with Condition 13 of the approval dated 18 March 2013, a detailed Stormwater Plan had to be prepared to the satisfaction of the City, based upon the advice from the Department of Water and Swan River Trust. It is noted that the crux of the modifications was as a result of the Stormwater Plan requirements. City staff note that there remains an outstanding requirement of Condition 13 (iii) for the incorporation of gross pollutant traps. As there is a condition that relates specifically to this requirement, no additional conditions are recommended to be imposed. However, it will be noted that this condition is still outstanding. Council Recommendation: That the Metro East Joint Development Assessment Panel resolves to:
1. Accept that the DAP Application reference DA/12/01317 as detailed on the DAP Form 2 dated 7 December 2015 is appropriate for consideration in accordance with regulation 17 of the Planning and Development (Development Assessment Panels) Regulations 2011;
2. Supersede the following approved plans considered by the Metro East Joint Development Assessment Panel as its meeting held on 18 March 2013,
Page 5
which was subsequently reconsidered pursuant to section 31 of the State Administrative Tribunal Act 2004, at its meeting on the 11 December 2013:
a. Attachment 5 – Perspective – Revision P4 - October 2012 b. TP.10 – Site Plan – Design Response – Revision P4 – September 2009 c. TP.15 –Site Development Plan – Revision P4 – September 2009 d. TP.20 –Administration Office – Revision P4 – October 2012 e. TP.21 –Off Site Receipting – Revision P4 – October 2012 f. TP.22 – Internal Storage Warehouse – Revision P4 – October 2012 g. TP.30 – Materials and Finishes – Revision P4 – October 2012
3. Approve the DAP Application reference DA/12/01317 as detailed on the DAP
Form 2 date 7 December 2015 and accompanying plans received on 26 October 2015 and 7 December 2015 (as below): a. Perspective – Revision P8 – 1 December 2015 b. TP.10 – Site Plan – Design Response – Revision P8 – 1 December 2015 c. TP.15 – Site Development Plan – Revision P8 – 1 December 2015 d. TP.16 – Site Setout Plan & Site Section – Revision P8 – 1 December
2015 e. TP.20 – Administration Office – Revision P8 – 1 December 2015 f. TP.21 – Off Site Receipting – Revision P8 – 1 December 2015 g. TP.22 – Internal Storage Warehouse – Revision P8 – 1 December 2015 h. TP.30 – Materials and Finishes – Revision P8 – 1 December 2015 i. Dwg No. 358014 – GA – Sundown Deluxe Shed Plan – 5970 Span x 3000
Eave x 8060 Long j. Dwg No.358013 – GA – Sundown Deluxe Shed Plan – 2930 Span x 2400
Eave x 4450 Long
in accordance with the provisions of the City of Swan Local Planning Scheme No.17, for the proposed minor amendment to the approved addition to Transport Depot at Lot 121 (No.3241) Great Northern Highway, Bullsbrook.
Advice Notes All other conditions, footnotes, advice notes and requirements detailed on the previous approval dated 18 March 2013 and modified conditions dated 11 December 2013 shall remain. Conclusion: The proposed development forms part of the ‘Transport Depot’ development which was originally approved on the 18 March 2013, modified 25 July 2013 and 11 December and granted a two (2) year extension until March 2017. As a result of the Stormwater Plan requirements (Condition 13 & 17), there have been a number of modifications of the original approved plans dated 18 March 2013 and thus, forms the subject of this application. It is recommended that the Metro East Joint Development Assessment Panel resolves to approve the minor modifications.
Page 6
Development Application Submission
F2 Architecture
T 613 9867 2233F 613 9867 2288
Level 1 Suite 3450 St Kilda RoadMelbourne 3004Victoria Australia© copyright3241 Great Northern Highway, Western Australia
LINFOX TRANSPORT FACILITY -BULLSBROOKProject No.
October 2012Date
12 09 06RevisionP8 01 Dec 2015
Drawn01 Dec 2015Date Page
FF/ GO12 09 06 LINFOX BULLSBROOK 3241 Great Northern Highway, Western Australia
Revision Scale:P8
T 613 9867 2233F 613 9867 2288
Level 1 Suite 3450 St Kilda RoadMelbourne 3004Victoria Australia© copyright
DESIGN RESPONSESite Plan - Design Response 1:2000 @ A3
0 20-20 40 60 80m
N
1
1
1
1
1
7
7
7
8
8
8
8
8
8
8
8
8
6
9
9
4
2
2
3
3
3
3
3
3
3
3
3
3
5
3
3
3
3
5
2
2
2
11
1010
1
2
3
4
5
6
7
8
9
10
11
10
10
10
10 10
10
10
TP.10
G R
E A
T N
O R
T H
E R
N H
W Y
Exi
stin
g N
atur
e S
trip
North Site BoundaryW
est S
ite B
ound
ary
Eas
t Site
Bou
ndar
y
South Site Boundary
TANK FARM
Adjoining Rural Land3297 Great Northern Highway
Adjoining Rural Land3191 Great Northern Highway
AdjoiningRural Land
Lot 120, 3241Great Northern
Highway
Ellen Brook Creek Tributary DRIVERS' ACCOMMODATION
4.25mH Acoustic Barrier along South Border of Hardstand Area
4.25mH Acoustic Barriers along North Sides of Car Parking
Provision of a 20m setback from front and side title boundaries, and 50m setback from rear title boundary, to reduce the amenity impact to the surrounding land.
Landscaping in the setback buffer to reduce the visual impact from the road and adjoining properties.
Provision of high quality landscape design within the development site.
Utilise the existing site access point to maintain the existing road traffic pattern.
Site signage to improve site identity and traffic/truck movement.
The proposed development does not affect the easement (right of carriageway) along the south boundary.
DESIGN RESPONSE
The proposal is for development of the land at Lot 121 of 3241 Great Northern Highway, Bullsbrook to provide transport logistics and storage facilities for the mining and resources industry in Western Australia.
The design has responded directly to the broader planning guidelines and site context issues, these include:
Provision of bioretention and detention basins at the lowest end of the site (west).
The proposed buildings are set well back from title boundaries and shielded by landscape buffers to minimise visual impact to the Great Northern Highway and adjoining properties.
Car parking requirements are accommodated within the site.
One-way on-site vehicle circulation to ensure site safety.
A 20m landscape buffer to the Ellen Brook creek tributary.
Drawn01 Dec 2015Date Page
FF/ GO12 09 06 LINFOX BULLSBROOK 3241 Great Northern Highway, Western Australia
Revision Scale:P8
T 613 9867 2233F 613 9867 2288
Level 1 Suite 3450 St Kilda RoadMelbourne 3004Victoria Australia© copyright
DEVELOPMENT PROPOSALSite Development Plan 1:2000 @ A3
0 20-20 40 60 80m
N
TP.15
G R
E A
T N
O R
T H
E R
N H
W Y
Exi
stin
g N
atur
e S
trip
North Site Boundary (Site Fence along)
Wes
t Site
Bou
ndar
y (S
ite F
ence
alo
ng)
Eas
t Site
Bou
ndar
y (S
ite F
ence
alo
ng)
South Site Boundary
Detention Basin
TANK FARM
Pump Shed 1
Pump Shed 2
Bioretention Basin
Bioretention Basin
Ped
estr
ian
Cro
ssin
g
Easement (Right of Carriageway) in Subject Site along South Boundary
4.25mH Acoustic Barrier along South Border of Hardstand Area
4.25mH Acoustic Barriers along North Sides of Car Parking
Adjoining Rural Land3297 Great Northern Highway
Adjoining Rural Land3191 Great Northern Highway
AdjoiningRural Land
Lot 120, 3241Great Northern
Highway
Site Access
Site Fence along Easement North Border
Ellen Brook Creek Tributary DRIVERS' ACCOMMODATION
Easement (Right of Carriageway)within setback zone
Chain link fence to boundary and easement
Fleet parking area
Fueling stationSite boundary
Proposed Free-standing Signage location
Existing creek
External hardstand storage area
20m / 50m setback landscape buffer to landscape details
Detention & Bioretention basinsrefer civil engineer's drawings
Site buffer & service area
Car parking
Office/service building
Internal roadwaydirection as shown
Storage building
Site services
LEGEND:
Administration OfficeHEIGHT - 9m (total 2 levels)FOOTPRINT - 33m x 24m (800m2)O/A AREA - 1500m2
SETBACK - min. 20m setback from site boundary
Security OfficeHEIGHT - 4mFOOTPRINT - 9m x 3.6m (32m2)
Visitor/Staff Car ParkingQUANTITY - 250 car spaces (incl. 8no. disabled)SETBACK - nom. 20m setback from site boundary
Small Truck Waiting QUANTITY - 24 lay-by spaces
Truck Lay-byAREA - varies
Truck Workshop/Auto Wash/Transport OfficeHEIGHT - 12m (total 3 levels)WORKSHO/AUTO WASH - 840m2
TRANSPORT OFFICE - 700m2 (over 2 levels)
Fueling StationFOOTPRINT - 13m X 13m (169m2)
Off Site Receipting HEIGHT - 15mFOOTPRINT - 168m x 119m (20000m2)
Fleet Parking Area AREA - o/a 198m x 93m (net 17000m2)
Pump Shed 1 AREA - 4.45m x 2.93m (13m2)
Pump Shed 2 AREA - 8.06m x 5.97m (48m2)
Internal Storage WarehouseHEIGHT - 16mFOOTPRINT - 191m x 141m (27000m2)
External Hardstand Storage AreaHEIGHT - n/a (open air)AREA - 18500m2
SETBACK - min. 20m setback from site boundary
WeighbridgeAREA - 30m x 3m (90m2)
Driver AccommodationAREA - 200m2
QUANTITY - 4no. 12mL x 4mW x 3mHSETBACK - min. 20m setback from site boundary
Drawn01 Dec 2015Date Page
FF/ GO12 09 06 LINFOX BULLSBROOK 3241 Great Northern Highway, Western Australia
Revision Scale:P8
T 613 9867 2233F 613 9867 2288
Level 1 Suite 3450 St Kilda RoadMelbourne 3004Victoria Australia© copyright
DEVELOPMENT PROPOSALSite Setout Plan | Site Section 1:2000 @ A3
0 20-20 40 60 80m
N
TP.16
G R
E A
T N
O R
T H
E R
N H
W Y
North Site BoundaryW
est S
ite B
ound
ary
Eas
t Site
Bou
ndar
y
South Site Boundary
Nominal 3m wide Easement (Right of Carriageway) alongSouth Site Boundary
Site Access
SITE SECTION A-A
SITE SETOUT PLAN
Detention / Bioretention Basins
Car Parking
Great Northern
Hwy
Workshop/Truckwash/Transport Officebehind
Administration Office behind
Eas
t S
ite B
oun
dar
y
Wes
t S
ite B
oun
dar
y
INTERNAL STORAGE WAREHOUSEEXTERNAL HARDSTAND STORAGE AREA
FLEET PARKING AREA OFF SITE RECEIPTING
DRIVERS' ACCOMMODATION
Detention Basin
Bioretention Basin
Bioretention Basin
Ped
estr
ian
Cro
ssin
g
TANK FARM
Pump Shed 1
Pump Shed 2
A A
Drawn01 Dec 2015Date Page
FF/ GO12 09 06 LINFOX BULLSBROOK 3241 Great Northern Highway, Western Australia
Revision Scale:P8
T 613 9867 2233F 613 9867 2288
Level 1 Suite 3450 St Kilda RoadMelbourne 3004Victoria Australia© copyright
DEVELOPMENT PROPOSALAdministration Office 1:500 @ A3
0 5-5 10 15 20m
N
TP.20
ADMINISTRATION OFFICEGROUND FLOOR PLAN
ADMINISTRATION OFFICEFIRST FLOOR PLAN
SOUTH ELEVATION
NORTH ELEVATION
EAST ELEVATION
WEST ELEVATION
BENCHMARK IMAGELINFOX HAZELMERE, W.A.
ADMIN OFFICE ADMIN OFFICE
ADMIN OFFICEADMIN OFFICE
Great Northern
HwyCar Parking
9m
9m 9m
9m
Minimum 20m Setback
Minimum 20m Setback Minimum 20m Setback
Minimum 20m Setback
FFL RL 53.5
FFL RL 53.5
RL 62.5
RL 62.5
FFL RL 57.3
FFL RL 57.3
Car Parking
Car ParkingGreat
Northern Hwy
No
rth
Site
Bo
und
ary
No
rth
Site
Bo
und
ary
Eas
t S
ite B
oun
dar
y
Eas
t S
ite B
oun
dar
y
1. Entry2. Waiting / Reception - 60m2
3. Office - 1250m2
4. Staff Break-out - 120m2
5. Amenities - 80m2
6. Landscape Buffer7. Car Park8. 4.25mH Acoustic Barrier
12
6
7
7
86
5 5
5 5
5 5
4
3 3
Acoustic barrier behind
Acoustic barrier at foreground
Drawn01 Dec 2015Date Page
FF/ GO12 09 06 LINFOX BULLSBROOK 3241 Great Northern Highway, Western Australia
Revision Scale:P8
T 613 9867 2233F 613 9867 2288
Level 1 Suite 3450 St Kilda RoadMelbourne 3004Victoria Australia© copyright
DEVELOPMENT PROPOSALOff Site Receipting 1:2000/1:1000 @ A3
1:2000
1:1000
0
0
20
10
-20
-10
40
20
60
30
80m
40m
N
TP.21
BENCHMARK IMAGELINFOX HAZELMERE, W.A.
OFF SITE RECEIPTINGFLOOR PLAN scale 1:2000 @ A3
WEST ELEVATIONscale 1:1000 @ A3
EAST ELEVATIONscale 1:1000 @ A3
NORTH ELEVATIONscale 1:1000 @ A3
1. Receipting Dispatch Facility - 5100m2
2. Receipting Storage - 14580m2
3. Staff Amenities & Training Area - 320m2
4. Small Truck Waiting Area
12 4
3
RL 64.5
RL 64.5
RL 64.5
RL 67.5
RL 67.5
RL 67.5
FFL RL 52.5
FFL RL 52.5
FFL RL 52.5
Great Northern
Hwy
Car Parking
Car Parking
Fleet Parking
Easement(Right of Carriageway)
Easement(Right of Carriageway)
No
rth
Site
Bo
und
ary
No
rth
Site
Bo
und
ary
So
uth
Site
Bo
und
ary
So
uth
Site
Bo
und
ary
Eas
t S
ite B
oun
dar
y
Minimum 20m Setback
Minimum 20m Setback
Minimum 20m Setback
Minimum 20m Setback
Minimum 20m Setback
15m
15m
15m
12m
12m
12m
Drawn01 Dec 2015Date Page
FF/ GO12 09 06 LINFOX BULLSBROOK 3241 Great Northern Highway, Western Australia
Revision Scale:P8
T 613 9867 2233F 613 9867 2288
Level 1 Suite 3450 St Kilda RoadMelbourne 3004Victoria Australia© copyright
DEVELOPMENT PROPOSALInternal Storage Warehouse 1:2000/1:1000 @ A3
1:2000
1:1000
0
0
20
10
-20
-10
40
20
60
30
80m
40m
N
TP.22
BENCHMARK IMAGELINFOX HAZELMERE, W.A.
INTERNAL STORAGE WAREHOUSEFLOOR PLAN scale 1:2000 @ A3
WEST ELEVATIONscale 1:1000 @ A3
EAST ELEVATIONscale 1:1000 @ A3
NORTH ELEVATIONscale 1:1000 @ A3
1. Internal Storage - 25600m2
2. Staff Area & Amenities - 1400m2
3. Services4. Truck Loading Area5. 4.25mH Acoustic Barrier
1
1
2
2
3
4
4
5
RL 62.0
RL 62.0
RL 62.0
RL 66.0
RL 66.0
RL 66.0
FFL RL 50.0
FFL RL 50.0
FFL RL 50.0Easement(Right of Carriageway)
Easement(Right of Carriageway)
Acoustic Barrier
Existing Creek
Bioretention / Detention Basin
Existing Creek
Fleet ParkingExternal Hardstand Storage
Wes
t S
ite B
oun
dar
y
No
rth
Site
Bo
und
ary
No
rth
Site
Bo
und
ary
So
uth
Site
Bo
und
ary
So
uth
Site
Bo
und
ary
Minimum 20m Setback
Minimum 50m Setback
Minimum 20m Setback
Minimum 20m Setback
Minimum 20m Setback
16m
16m
16m
12m
12m
12m
Acoustic barrier at background
Pump Sheds behind
Drawn01 Dec 2015Date Page
FF/ GO12 09 06 LINFOX BULLSBROOK 3241 Great Northern Highway, Western Australia
Revision Scale:P8
T 613 9867 2233F 613 9867 2288
Level 1 Suite 3450 St Kilda RoadMelbourne 3004Victoria Australia© copyright
DEVELOPMENT PROPOSALMaterials and Finishes N.T.S. @ A3 TP.30
OFF SITE RECEIPTINGELEVATION MODULE
ADMINISTRATION OFFICEELEVATION MODULE
INTERNAL STORAGE WAREHOUSEELEVATION MODULE
MATERIAL LEGEND
01 Profiled metal roof deck Zinclaume
02 Polycarbonate/Fibreglass roof light Translucent
03 Profiled metal canopy roofing Zincalume
04 Profiled metal wall cladding Colourbond light grey
05 Concrete wall/ Fibre cement cladding Paint dark grey
06 Concrete wall/ Fibre cement cladding Natural cement/ Paint light grey
07 Metal clad window shade/ Canopy frame Colourbond red
08 High performance window glass Light grey tinted
09 Steel roller shutter Colourbond dark grey
10 Aluminium window frame Natural anodised silver
01
01
0302
09
04
06
07
08
10
05
01
07
07
07
02
02
03
03
04
04
05
08
05
05
0608
10
09
09
CD 0 0 0 ff - -- -- -F - - - - - - t -
~LJ~ _____ F3 1~E _____ r-(J) l()
I I
!={ I ® ~I- RD1 - i:= - - - - -I I I
1-
N c<">
--I ,, II
\ l--J
\) c ) -i r -
' ' u;
4030 4030
8060 O/A
I I FRAME ROOF PLAN
---1----=::::::::= RD1 ====::: ~
~ --i= -
ELEVATION GRID B
0 0 I I
ELEVATION GRID A
~j I
I
'I
,1
CD I
® I ~ I
~
r SECTION GRID 2 I
ELEVATION GRID 3
0 I
ELEVATION GRID 1
KAD1
KAD1
0 I
0 0
o I co 0 (") 0 (")
® I
HIGHLINE OUAUTY·STR:ENGTli VALUE
Copyright 2015 Lysaght Building Solutions Pty Ltd
CLADDING ITEM PROFILE (min) FINISH COLOUR
ROOF TR I MD EK 0.42 BMT ZL ZL
WALLS TRI MD EK 0.35 BMT ZL ZL
CORNERS ZL ZL
BARGE ZL ZL
GUTTER SHE ERLI NE ZL ZL
DOWNPIPE 100x50 ZL ZL
0.35bml=0.40tct; 0.42bmt=0.47tct; 0.48bmt=0.53tct
ACCESSORYSCHEDULE&LEGEND QTY I MARK !DESCRIPTION
RD1 IB&D, Firmadoor, R.D, Residential "R1 F", 2600 high 2750 wide Clear Ooenina Z/L
2 I KAD1 Cllccess Door Kit. 38 Recess Z/L (D, .
ARCHITECTURAL DRAWING ONLY, NOT FOR CONSTRUCTION USE
WIND DESIGN IMPORTANCE LEVEL I REGION I TERRAIN I Ms
2 I A I 2.5 I 1.0
CLIENT
Alen Perkov SITE
3241 Great Northern Highway
BULLSBROOK WA 6084 BUILDING
SUNDOWN DELUXE 5970 SPAN x 3000 EAVE x 8060 LONG
TITLE
GENERALARRANGEMENT
SCALE DRAWING NUMBER PAGE A4 SHEET 1 :125 358014-GA 1/1
CD 00 ® 0 0 A i- - - - - =t - =\I - 1 ~ 1
<(
~Li i - __ RIDQE_j (") Q) N
® .. ,.1250~ 1 SECTION GRID
3200 2
4450 O/A
FRAME ROOF PLAN
I
ELEVATION GRID B ELEVATION GRID 3
00 CD 0 ® r-- 1 I
I I
~
C)
" ' ) -J ' I ~' ELEVATION GRID A ELEVATION C: w') ... ! GRID 1 ._,.,
HIGHUNE QUALITY· STl!ftlGTH · VALUE
Copyright 2015 Lysaght Building Solutions Ply Ltd
CLADDING
ITEM PROFILE (min) FINISH COLOUR
ROOF TRIMDEK 0.42 BMT CB BY
WALLS TRIMDEK 0.35 BMT CB BY
CORNERS CB BY
BARGE CB BY
GUTTER SHEERLINE CB BY
DOWNPIPE 100x50 CB BY
0.35bmt=0.40tct; 0.42bmt=0.47tct; 0.48bmt=0.53tct
ACCESSORY SCHEDULE & LEGEND QTY MARK DESCRIPTION
1 RD1 B&D, Firmadoor, R.D, Residential "R1 F", 2000 high P< 2750 wide Clear Opening C/B
ARCHITECTURAL DRAWING ONLY, NOT FOR CONSTRUCTION USE
WIND DESIGN IMPORTANCE LEVEL I REGION I TERRAIN I Ms
2 I A I 3 I 1.0
CLIENT
Alen Perkov SITE
3241 Great Northern Highway
BULLSBROOK WA 6084
BUILDING
SUNDOWN DELUXE 2930 SPAN x 2400 EAVE x 4450 LONG
TITLE
GENERALARRANGEMENT
SCALE DRAWING NUMBER PAGE A4 SHEET 1 :125 358013-GA 1 /1
Form 2 - Responsible Authority Report (Regulation 17)
Property Location: Lot 121 Great Northern Highway, Bullsbrook Application Details: Additional Sheds to Transport Depot DAP Name: Metro East JDAP Applicant: Rowe Group Owner: LPG Bullsbrook Pty Ltd LG Reference: DA-813/2012/C Responsible Authority: Department of Planning Authorising Officer: Executive Director Perth and Peel Planning Department of Planning File No: 21-50396-1 Report Date: 18 January 2016 Application Receipt Date: 8 December 2013 Application Process Days: 31 Days Attachment(s): 1: Metropolitan Region Scheme Zoning
2: Development Application Plans Recommendation: That the Metro East Joint Development Assessment Panel resolves to: 1. Accept that the DAP Application reference DP/12/01317 as detailed on the
DAP Form 2 dated 7 December 2015 is appropriate for consideration in accordance with regulation 17 of the Planning and Development (Development Assessment Panels) Regulations 2011;
2. Approve the DAP Application reference DP/12/01317 for the proposed minor
amendment to the approved Transport Depot at Lot 121 (No. 3241) Great Northern Highway, Bullsbrook, as detailed on the DAP Form 2 dated 7 December 2015 and accompanying plans date stamped “Department of Planning 8 December 2015” [Site Development Plan Revision P8, Site Setout Plan / Site Section Revision P8, Administration Office Revision P8, Off Site Receipting Revision P8, Internal Storage Warehouse Revision P8, Materials and Finishes Revision P8, Drawing Number 358014-GA and Drawing Number 358013-GA] in accordance with the provisions of the Metropolitan Region Scheme, subject to the following:
Advice Notes
i All conditions and requirements detailed on the approval dated 18 March 2013, the amendments to conditions dated 25 July 2013 and the extension of approval period dated 15 April 2015 shall remain.
ii If the development provided for by this approval is not substantially commenced by 18 March 2017, as per the extension of the approval period granted on 15 April 2015, the approval shall lapse and be of no further effect. Where an approval has so lapsed, no development shall be carried out without the further approval of the responsible authority having first been sought and obtained.
Page 1
Background: Property Address: Lot 121 Great Northern Highway, Bullsbrook Zoning MRS: Rural TPS: General Rural Use Class: Transport Depot "P" (permissible) on the
subject site under Schedule 2 - Additional Uses
Strategy Policy: Economic and Employment Lands Strategy: Non-Heavy Industry State Planning Policy 2.5 Land Use Planning in Rural Areas
Development Scheme: City of Swan Local Planning Scheme No. 17 Lot Size: 19.80009 ha Existing Land Use: Transport Depot Value of Development: $30,000 The application area is located on the western side of the Great Northern Highway and is located approximately 30 kilometres north of the Midland City Centre and approximately 1 kilometre south of the Metropolitan Region Scheme (MRS) boundary. On 18 March 2013, the Metro East Joint Development Assessment Panel (JDAP) granted development approval for the use of the site as a Transport Depot. That approval consists of the following key elements:
• Internal storage warehouse building (27,000m2); • Off-site receipting building (20,000m2); • Fleet parking area (15,350m2); • External hardstand storage area (30,500m2); • Administration office building (1,500m2): • Transport office (700m2); • Security office (32m2); • Drivers accommodation (200m2); • Fuelling station (150m2); • Truck workshop/Auto wash (840m2); and • Associated parking (250 bays), access, landscaping and drainage.
The application was referred to the Western Australian Planning Commission (WAPC) and a Responsible Authority Report (RAR) was provided in accordance with Clause 32 (2) of the MRS, and considered the proposals consistency with the 'Rural' zoning of the land. On 10 April 2015, Scheme Amendment No. 106 inserted 'Transport Depot' as a permissible use on the subject land under Schedule 2 - Additional Uses of the City of Swan Local Planning Scheme No. 17 (LPS No.17). On 15 April 2015 the Metro East JDAP approved an extension of two years within which any development approved must be substantially commenced.
This application seeks to amend the existing approval so as to include two additional sheds on the application area.
Page 2
Details: Outline of the Form 2 Application The applicant proposes to construct two additional sheds at the western portion of the application area for the purpose of housing a fire pump and an irrigation water and site pressure pump for fire services infrastructure. The sheds are 48.12m2 and 13.04m2 in area and approximately 3.8 metres and 2.8 metres in height respectively. The sheds are proposed to be constructed in Zincalume (Attachment 2 - Development Plans). This Form 2 application does not propose to amend any aspect of the previously approved development. Legislation & policy: Legislation
• Planning and Development Act 2005 • Metropolitan Region Scheme 1963
State Government Policies
• State Planning Policy 2.5 Land Use Planning in Rural Areas WAPC Development Control Policies
• Development Control Policy 1.2: Development Control - General Principles Local Policies • Refer to the Responsible Authority Report of the City of Swan. Consultation: Public Consultation The amended development plans have not been advertised as the changes are considered minor in nature. Consultation with other Agencies or Consultants The amended development plans have not been referred to other agencies as the proposed changes are considered minor. Planning assessment: This Responsible Authority Report (RAR) relates to the approval required under the MRS.
Page 3
Metropolitan Region Scheme (MRS) Requirements Condition 13 of the original JDAP approval dated 18 March 2013 required a Stormwater Management Plan to be prepared and lodged with the City of Swan. The Stormwater Management Plan requires the provision a 'tank farm' pad area located at the western end of the subject land to accommodate irrigation tanks and irrigation pumps. The sheds subject of this application are for the purpose of housing this infrastructure, however, do not meet the exempted development provisions under Schedule 5 of LPS No.17 and subsequently require development approval under the scheme. Clause 30 of the MRS requires the determining authority to have regard to the purpose for which the land is zoned or reserved under the Scheme, the orderly and proper planning of the locality and the preservation of the amenities of the locality. The subject site and the surrounding land is zoned 'Rural' under the MRS (Attachment 1 - MRS Zoning). The scale, nature and purpose of the proposal is considered appropriate for the 'Rural' zone and it is ancillary to the use of the site as a transport depot. The use of 'Transport Depot' is a permissible use on the subject land under the City of Swan Local Planning Scheme No. 17. The proposal is therefore consistent with the zoning and purpose of the land under the local planning framework and is consistent with the orderly and proper planning of the locality. The proposed sheds are to be located at the rear of the subject lot and are of a scale which will create minimal impact on local amenity.
The 'tank farm' pad on which the sheds are to constructed is located approximately 60 metres from the nearest lot boundary, which exceeds the minimum setback requirement of 20 metres for the 'General Rural' zone under Local Planning Scheme No.17. Conclusion: The proposed changes to the approved transport depot on Lot 121 Great Northern Highway are considered minor in nature and consistent with the previous approval issued by the Metro East Joint Development Assessment Panel on 15 April 2015. It is recommended that the Metro East Joint Development Assessment Panel approve the application to modify the Metropolitan Region Scheme approval.
Page 4
ATTACHMENT 1
government or western AustraliaDepartment of Planning
Legend
Local Government Area
I I Cadastre (View 1)
Region Scheme Boundary
Bush Forever Areas
Region Scheme Zones and Resf
¦Parks and recreation
| Parks and recreation - restricted public
¦Primary regional roads
Railways
Rural
Notes:
The data that appears on the map may beout of date, not intended to be used at the
scale displayed, or subject to licenseagreements. This information is stored in
the relevant layers metadata. For these
reasons the map should not be distributedoutside of the Department.
Map was produced using DoP's
PlanViewWA.
Produced by: FUNCTIONALITY TO COME
Date produced:18-Jan-2016
DEPART Mi ATTACHMENT 2
ADMIN OFFICE1,500mz
WORKSHOPS/TRUCKWASH
840m2
4.25mH Acoustic Barriers along
North Sides of Car ParkingBoundary (Site Fence
DRivEns\Aesorv;?;i6bATioNi-' -V' ¦\ Ellen Brook Creek TributaryAdloii-aing
Rural Larad
Lot 1120, 3241 ;
©reat Northern 'jHigliway ,
WEIGHBRIDGE
TRANSPORT OFFICEOVER
700m2
t iBioretentiorfi'M 'iKIBasiriill )
EXTERNALHARDSTAND
STORAGE AREA18,500m2
INTERNALSTORAGE WAREHOUSE
27,000m2
FLEETPARKING AREA
15,350m2
OFF SITE RECEIPITING20,000m2
Q PumpShed 1
TANK('WARM
[Betention]Basin
iBioretentionlBasin
TRUCK LAY-BY
Y-;Y Y ' Y ' Y' Y -Y Y site Fence albna ^Xmerit North Border
South Site Boundary
Easement (Right of Carriageway) inSubject Site along South Boundary
Adjoinmg Rural Larad
3191 Great Northern Highway4.25mH Acoustic Barrier along
South Border of Hardstand Area
LEGEND!
¦=¦¦=— Site boundary
Easement (Right of Carriageway)within setback zone
Chain link fence to boundaryand easement
Existing creek
20m / 50m setback landscapebuffer to landscape details
Site buffer & service area
Office/service building
Storage building
Fueling station
Fleet parking area
External hardstand storage area
Detention & Bioretention basinsrefer civil engineer's drawings
I j I [ Car parking
Internal roadway
direction as shown
COO Site services
Proposed Free-standing
Signage location
Administration OfficeHEIGHT - 9m (total 2 levels)FOOTPRINT - 33m x 24m (800m2)O/A AREA -1500mzSETBACK - min, 20m setback from site boundary
Security OfficeHEIGHT-4mFOOTPRINT - 9m x 3.6m (32m2)
Visitor/Staff Car ParkingQUANTITY - 250 car spaces (incl. 8no. disabled)SETBACK - nom, 20m setback from site boundary
Small Truck WaitingQUANTITY - 24 lay-by spaces
Truck Lay-byAREA - varies
Truck Workshop/Auto Wash/Transport OfficeHEIGHT-12m (total 3 levels)WORKSHO/AUTO WASH - 840m2TRANSPORT OFFICE - 700m2 (over 2 levels)
Fueling StationFOOTPRINT-13m X 13m (169m2)
Off Site ReceiptingHEIGHT-15mFOOTPRINT -168m x 119m (20000m2)
Fleet Parking AreaAREA - o/a 198m x 93m (net 17000m2)
Pump Shed 1AREA - 4,45m x 2.93m (13m2)
Pump Shed 2AREA - 8,06m x 5,97m (48m2)
Internal Storage Warehouse
HEIGHT-16mFOOTPRI NT -191 m x 141 m (27000m2)
External Hardstand Storage AreaHEIGHT - n/a (open air)AREA-18500m2SETBACK - min. 20m setback from site boundary
WeighbridgeAREA - 30m x 3m (90m2)
Driver Accommodation
AREA - 200m2QUANTITY - 4no, 12mL x 4mW x 3mHSETBACK - min, 20m setback from site boundary
80m
12 09 08 LDNIFOX BULLSBROOEC DEVELOPEDEMT PROPOSAL Revision Date Drawn Scale: Fags Y© <| R3241 Sreat Northern Hicjhwav. Western Australia Site Development Plan P8 01 Dec 2015 FF/GO 1:2000 @ A3 Li b ÿ U
F2 Architecture
T 613 9867 2233F 613 9867 2288
Level 1 Suite 3450 St Kilda RoadMelbourne 3004Victoria Australia
© copyright
Detention / BioretentionBasins
SITE SECTION A-A
F2 Architecture
80m
12 09 OB LIMFOX BULLSBROOK DEVELOPMEMT PSOPOSAIL Revision Date Drawn Scale: Page cPfo) cf]3241 Gireai Northern Hisshwav. Western Australia Site Setout Plaw | Site Section P8 01 Deo 2015 FF/GO 1:2000® A3 U L n li ®
T 613 9867 2233F 613 9867 2288
Level 1 Suite 3450 St Kilda RoadMelbourne 3004Victoria Australia
© copyright
Acoustic bamer_f
at foreground
IGreaiNorthern
Hwy Minimum 20m Setback
I I .: ...: /-Iv. . . ; I- ^ , II
—"T I —1-1
ADMIN OFFICE Car Parking
TORTH ELEVATION
Car Parking
SOUTH ELEVATION
ADMIN OFFICEMinimum 20m Setback
HGr.eatpNorthern
Hwy
HBbtTttt8<tv aM^HaaHi r rf-
ADMINISTRATION OFFICEGROUND FLOOR PLAN
12 09 06 LINFOX BULLSBROOK3241 Qreat Morthem Highway, Western Awstralia
ADMINISTRATION OFFICEFIRST FLOOR PLAN
1.Entry
2.Waiting / Reception - 60m2
3.Office - 1250m2
4.Staff Break-out - 120m2
5.Amenities - 80m2
6.Landscape Buffer
7.Car Park
8.4.25mH Acoustic Barrier
DEVELOPE/IEMT PBOFOSfil,Administration Office
RL 62.5 _ _i
FFL RL 57.3 z
FFL RL 53.5
DEPARTMENTOFPLANN IN GDATE
8 DEC 2015
Minimum 20m Setback
WEST iLEVATIOM
ABiy™ OFFICE Car Parking
RL 62.5
FFL RL 57.3
FFL RL 53.5 i&ui
EAST ELEVATIONMinimum 20m Setback
BENCHMARK IMAGELINFOX HA2ELMERE, W.A.
10 15 20m
Revision
P8Date
01 Dec 2015
Drawn
FF/GOScale:
1:500 @ A3Page ;;:'fpraii
F2 Architecture
T 613 9867 2233F 613 9867 2288
Level 1 Suite 3450 St Kilda RoadMelbourne 3004Victoria Australia
© copyright
- Great- -
Northern" Minimum
Hwy MORTH iLEVATIOM 20m Setbackscale 1:1000 @ A3
Car ParkingB_4f.
nFPARTMFNT OF PLANNINGDATEFILE
e DEC 2015
RLS7^5RL 64.5
Fleet Parking
EAST ELEVATIONscale 1:1000@ A3
Easement
(Right of Carriageway)>
Minimum20m Setback
Minimum 20m Setback
west ELEVATIONscale 1:1000® A3
Minimum20m Setback
: i, s I
mmm m%u , '«
Minimum20m Setback
-Easement
(Right of Carriageway)
1.Receipting Dispatch Facility - 5100m22.Receipting Storage - 14580m2
3.Staff Amenities & Training Area - 320m2
4.Small Truck Waiting Area BENCHMARK IMAGELINFOX HASELMERE, W.A.
off site fseceiptbngfloor plan scale 1:2000 @ A3
1:1000 -10 0Ivww ¦
1:2000 -20
¦J 2 09 06 L1MF03C BULLSSROOBC DEVELOPMENT PROPOSAL Revision loate Drawn Scale: msi3241 Great Worthern EHliaihwav. Western Australia Off Site Receipting P8 |oi Dec 2015 FF/GO 1:2000/1:1000® A3
F2 Architecture
T 613 9867 2233F 613 9867 2288
Level 1 Suite 3450 St Kilda RoadMelbourne 3004Victoria Australia
© copyright
£g^Fleet Parking
morth elevatdomscale 1:1000 @ A3
External Hardstand Storage
Acoustic barrierat background
Bioretention /Detention Basin Minimum
50m Setback
Easement
(Right of Carriageway)/k Existing—Creekeast elevatiom
scale 1:1000 @ A3Minimum
20m Setback
Minimum20m Setback
Existing Creek
¦rficzy }-c=3'iiT~^=rWTnor r!
Minimum 20m Setback Acoustic Barrier Easement
(Right of Carriageway)WEST ELEVATIONscale 1:1000 @ A3
Minimum
/ 3
ft 2" 7 '
—jl T
— 1
1
f-
11I
— i 4 11
; ; : ; : i 11
i11111
—— j 11
1
¦ i 411-1—11
_ 111
Ai 2 1. X 1
5 V),\ ^
!¦!imteriml storage warehousefloor plan scale 1:2000 @ A3
12 09 06 LINFOX BULLSBROOK3241 Great Wortherra Highway, Western Australia
5. 4.25mH Acoustic Barrier
DEWEtOPijaEMT PROPOSALInteraaO Storage Warehouse
Date
01 Dec 2015
BENCHMARK IMAGELINFOX HAZELMERE, W.A.
Revision
P8
20m Setback
TB'MIE NT OFP LANNIMG
LINFDX
DATE
8 DEC Z015
1:1000 -10 01fWW
1:2000 -20 0 20
Drawn
FF/GO
F2 Architecture
T 613 9867 2233F 613 9867 2288
Level 1 Suite 3450 St Kilda RoadMelbourne 3004Victoria Australia
© copyright
OFF SITE RECEIPTINGELEVATION MODULE
INTERNAL STORAGE WAREHOUSEELEVATIOIM MODULE
01Profiled metal roof deckZinclaume
02Polycarbonate/Fibreglass roof lightTranslucent
03Profiled metal canopy roofingZincalume
04Profiled metal wall claddingColourbond light grey
05Concrete wail/ Fibre cement claddingPaint dark grey
06Concrete wall/ Fibre cement claddingNatural cement/ Paint light grey
07Metal clad window shade/ Canopy frameColourbond red
08High performance window glassLight grey tinted
09Steel roller shutterColourbond dark grey
10Aluminium window frameNatural anodised silver
MATERIAL LiGEiTO
12 09 06 LINFOX BULLSBROOK3241 Qreat Morthem Hiqliiiwav. Western iUisti'aliia
DEVEILOPMEMT PROPOSALR/latenals anil Finishes
D E PARTM E NT 0 FPL AN N1N GDATE
8 DEC 2015
FILE
Revision
P8Dale
01 Dec 2015
Drawn[Scale:
FF/ GON.T.S, @ A3Pa9e IP.30
F2 Architecture
T 613 9867 2233F 613 9867 2288
Level 1 Suite 3450 St Kilda RoadMelbourne 3004Victoria Australia
© copyright
© ©
RIDGE
4030
8060 O/A
FRAME ROOF PLAN
ELEVATION GRID B
© ©
ELEVATION GRID A
©T
4030
SECTION GRID 2
ELEVATION GRID 1
CDmor-oCZD
C7
m
On
rn
m—l
OT!"Dr~
CD
HIGHLINE Copyright 2015Lysaght BuildingSolutions Pty Ltd
CLADDINGITEM PROFILE (mSn) FINISH COLOURROOF TRIMDEK 0.42 BMT ZL ZL
WALLS TRIMDEK 0.35 BMT ZL ZL
CORNERS . ZL ZL
BARGE . ZL ZLGUTTER SHEERLINE ZL ZL
OOWNPIPE 100x50 ZL ZL
0.35bmt=0.40tct; D.42bmt=0.47tct; 0.48bmt=0.53tcl
ACCESSORY SCHEDULE & LEGENDQTY MARK DESCRIPTION
1 RD1 BaD, Flrmadoor, R.D, Residential "RIF", 2600 highx 2750 wide Clear Opening Z/L
2 KADI Access Door Kit, 38 Recess Z/L (D).
ARCHITECTURAL DRAWING ONLY, NOT FOR CONSTRUCTION USE
WIND DESIGNIMPORTANCE LEVEL REGION TERRAIN Ms
2 A 2.5 1.0
CLIENT
Alen Perkov
3241 Great Northern Highway
BULLSBROOK WA 6084BUILDING
SUNDOWN DELUXE5970 SPAN x 3000 EAVE x 8060 LONG
TITLE
GENERAL ARRANGEMENT
SCALEA4 SHEET 1:125
DRAWING NUMBER
358014-GAPAGE
1/1
© © ©
SECTION GRID2
FRAME ROOF PLAN
ELEVATION GRID B
® © ®
ELEVATION GRID A
ELEVATION GRID 3
® ^
ELEVATIONGRID 1
COa omc-) —Im
Om-a
30—H
—s'i
O;
-C|! I
5>!
CD
HIGHLINE0UA1ITY • STBfHCTH • VAlUt
Copyright 2015Lysaght Building
Solutions Pty Ltd
CLADDINGITEM PROFILE (min) FINISH COLOUR
ROOF TRIMDEK 0.42 BMT CB BY
WALLS TRIMDEK 0.35 BMT CB BY
CORNERS - CB BY
BARGE . CB BY
GUTTER SHEERLINE CB BY
DOWNPIPE 100x50 CB BY
0.35bmt=0.40tct; 0.42bmt=0.47tct; 0.48bmt=0.53tct
ACCESSORY SCHEDULE & LEGENDQTY MARK DESCRIPTION
1 RD1 B&D, Firmadoor, R.D, Residential "RIP, 2000 highx' 2750 wide Clear Opening C/B
ARCHITECTURAL DRAWING ONLY, NOT FOR CONSTRUCTION USE
WIND DESIGNIMPORTANCE LEVEL REGION TERRAIN Ms
2 A 3 1.0
CLIENT
Alen Perkov
SITE
3241 Great Northern Highway
BULLSBROOK WA 6084
BUILDING
SUNDOWN DELUXE2930 SPAN x 2400 EAVE x 4450 LONG
TITLE
GENERAL ARRANGEMENT
SCALEA4 SHEET 1:125
DRAWING NUMBER
358013-G APAGE
1/1