agenda - oki

51
Ohio STBG and KY SNK Eligibility and Available Funds Application Prioritization Process Questions Transportation Alternatives Eligibility and Available Funds Application Prioritization Process Questions Agenda 2020 OKI STBG/SNK/TA Federal Funds Project Selection OKI Board of Directors October 8, 2020

Upload: others

Post on 18-Dec-2021

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Agenda - OKI

Ohio STBG and KY SNK

Eligibility and Available Funds

Application

Prioritization Process

Questions

Transportation Alternatives

Eligibility and Available Funds

Application

Prioritization Process

Questions

Agenda

2020 OKI STBG/SNK/TA Federal Funds Project SelectionOKI Board of Directors

October 8, 2020

Page 2: Agenda - OKI

2020 Prioritization Process

• March 10 – Funding Workshop, Applications available

• June 5 – Applications due

• June/July/August – Staff review. Apply approved scoring process and prepare draft scores

• July 30 –Environmental Justice committee review

• September 8 – ICC Prioritization subcommittee review

• October 6 – Recommendation by ICC

Page 3: Agenda - OKI

Type Funding

Available

Applications

Received

Funding

Requested

Ohio STBG $30 m 13 $49 m

Ohio TA $2.5 m 11 $7 m

Kentucky SNK $7 m 11 $11.8 m

Kentucky TA $800,000 4 $800,000

Page 4: Agenda - OKI

Ohio STBG – 13 Applications

Page 5: Agenda - OKI

Cincinnati-Wasson Way Phase 7

• ¾ mile shared use path between MLK Jr. Dr and Blair Ct.

Federal Funds $4,180,000Local $1,045,000Total Estimate $5,225,000

Page 6: Agenda - OKI

Clermont County-Glen-Este Withamsville Ramps and CD Road

• Grade separated partial interchange at GEW

Federal Funds $6,000,000Local/Other $14,022,387Total Estimate$20,022,387

Page 7: Agenda - OKI

Deer Park-Blue Ash Road Improvement Phase 2

• Between Duneden Drive and south corp. limits, 2400’

• Pavement restoration/resurfacing

• Improve drainage

• Replace signals, improve

crosswalks

Federal Funds $4,600,000Local $1,150,000Total Estimate $5,750,000

Page 8: Agenda - OKI

Fairfield-South Gilmore Road Improvements• Mack Road to Planet

Drive

• Add 1 lane SB

• Add sidewalk and upgrade existing substandard sidewalk

Federal Funds $2,730,895Local $682,724Total Estimate $3,413,619

Page 9: Agenda - OKI

HCEO-Western Hills Viaduct Replacement• Replacement Estimate =

$273m

• Request is for Construction phase

Federal Funds Requested -$6,000,000

Previous Federal Funds Awarded by OKI = $15.7m

Page 10: Agenda - OKI

Lebanon-US42 and SR123 Improvements• Mill/fill, full-depth

replacement

• Curb, sidewalk and storm sewer replacements

Federal Funds $747,580Local $498,387Total Estimate $1,245,967

Page 11: Agenda - OKI

Norwood-Norwood Lateral (SR562) Modernization• Lighting and guardrail

replacement

Federal Funds $560,000Local $140,000Total Estimate $700,000

Page 12: Agenda - OKI

Oxford-Oxford Area Trail Network East-West Connector Phase 5

• 11,824’ between US 27 and SR 732.

• Northern spur to Chestnut St and intermodal hub.

Federal Funds $3,290,521Local $1,548,481Total Estimate $4,839,002

Page 13: Agenda - OKI

Sharonville-East Kemper Road Improvements• Between Chester and

Mosteller.

• Roadway resurfacing

• Curb/gutter repairs

• Replace and new sidewalks

Federal Funds $845,250Local $362,250Total Estimate $1,207,500

Page 14: Agenda - OKI

SORTA-Bus Replacements (START) Program• Replace with 15 new

green diesel buses.

Federal Funds $5,920,223Local $2,537,238Total Estimate $8,457,461

Page 15: Agenda - OKI

Springdale-Northland Blvd Reconstruction• Replace pavement

• Replace mast arm traffic signal

• Add sidewalks and provide ped crossing

• Median bio-swale

Federal Funds $5,934,388Local $1,483,597Total Estimate $7,417,985

Page 16: Agenda - OKI

Warren Co TID-Escort Drive Corridor Improvements• Roadway realignment

• Roundabout at BardesRoad and Escort Drive

Federal Funds $1,208,000Local $847,000Total Estimate $2,055,000

Page 17: Agenda - OKI

Warren Co Engineer-Fields Ertel Road Improvement

• Between Snider Road and Wilkens Boulevard

• Widen from two to five lanes

• New sidewalk on north side of Fields Ertel

Federal Funds $6,000,000Local $11,624,083Total Estimate$17,624,083

Page 18: Agenda - OKI

STB

G F

un

din

g R

eco

mm

en

dat

ion

sLPA Sponsor Project Name

TOTA

L P

OIN

TS

FED

$ R

EQU

ESTE

D

FED

$ R

eco

mm

end

ed

RU

NN

ING

TO

TAL

Cincinnati IR 71 & MLK Drive Interchange SIB loanxx $1,000,000 $1,000,000 $1,000,000

Hamilton County Engineer Western Hills Viaduct Replacement (Construction)

71 $6,000,000 $1,000,000 $2,000,000

Southwest Ohio Regional Transit

Authority (SORTA)

Smart Technologies Advancing Regional

Transportation (START) program 66 $5,920,223 $4,961,704 $6,961,704

Lebanon US 42 and SR 123 Improvements 59 $747,580 $672,822 $7,634,526

Warren County Engineer Fields Ertel Road Improvement Project between

Snider Road and Wilkens Boulevard 59 $6,000,000 $5,400,000 $13,034,526

Clermont County Engineer CLE 32 - 2.33 Glen-Este Withamsville Ramps and

CD Road 53 $6,000,000 $5,400,000 $18,434,526

Cincinnati Wasson Way Phase 7 52 $4,180,000 $3,762,000 $22,196,526

Springdale Northland Boulevard Reconstruction 50 $5,934,388 $5,340,949 $27,537,475

Fairfield South Gilmore Road Improvements - Mack Road to

Planet Drive 49 $2,730,895 $2,457,806 $29,995,281

Warren County TID Escort Drive Corridor Improvements46 $1,208,000 $0 $29,995,281

Oxford Phase 5: East - West Connector 45 $3,290,521 $0 $29,995,281

Norwood Norwood Lateral Infrastructure Modernization43 $560,000 $0 $29,995,281

Sharonville East Kemper Road Improvements 39 $845,250 $0 $29,995,281

Deer Park Blue Ash Road Improvement Phase 2 35 $4,600,000 $0 $29,995,281

Page 19: Agenda - OKI

Kentucky SNK – 11 Applications

Page 20: Agenda - OKI

Bellevue-Resurfacing and Sidewalk Improvements• Berry Avenue, Taylor Avenue, Bonnie

Leslie Avenue and Wilson Road Boulevard

• Resurfacing and partial sidewalk replacement

Federal Funds $216,000Local $54,000Total Estimate $270,000

Page 21: Agenda - OKI

Bellevue-Riverfront Commons• 1,200’ of shared-use path from near

Patchen Drive and Lafayette Avenue

Federal Funds $760,000Local $190,000Total Estimate $950,000

Page 22: Agenda - OKI

Boone County-KY 20 & Loomis Road Multi-Use Path

• 2.4 mile shared use path from Conner Road to KY 236 (Donaldson Road)

• Segment of CVG Trail

Federal Funds $1,200,000Local $1,200,000Total Estimate $2,400,000

Page 23: Agenda - OKI

Elsmere-Garvey Road Improvements and Multi-Use Path

• 4,000’ from Florence Court to just past Comanche Trail

• Resurfacing and correct drainage issues

• Replacement of existing MUP

Federal Funds $240,000Local $60,000Total Estimate $300,000

Page 24: Agenda - OKI

Elsmere-New Buffington Bridge Replacement

• Replace bridge over Norfolk Southern RR.

• Length = 400’

• New sidewalk connection

Federal Funds $672,000Local $168,000Total Estimate $840,000

Page 25: Agenda - OKI

Fort Thomas-Chesapeake Sidewalk Project

• Construction of new sidewalks

• Length = 2050’

Federal Funds $859,784Local $214,947Total Estimate $1,074,731

Page 26: Agenda - OKI

KYTC-KY 1303 (Bristow Road) Drainage Improvement

• 2,700’ between Timber Lane Drive and KY 536

• Reconstruct and elevate roadway.

• Drainage improvements

Federal Funds $468,000Local $117,000Total Estimate $585,000

Page 27: Agenda - OKI

KYTC- KY 9 (AA Highway) J-turns

• Install J-turns to improve safety and mobility

• Vehicles maneuvering onto KY9 contend with a rolling terrain and high speeds resulting in an unsafe situation.

Federal Funds $2,600,000Local $650,000Total Estimate $3,250,000

Page 28: Agenda - OKI

Newport-Riverfront Commons Trail at Newport Festival Park

• Between Taylor-Southgate Bridge and Southbank Purple People Bridge

• Portion of NKY RiverfontCommons Trail

• SNK & TA portions

Federal Funds $2,428,428Local $607,107Total Estimate $3,035,535

Page 29: Agenda - OKI

NKU-3 Mile Road Sidewalk and Drainage Improvements

• Between existing roundabouts at Nunn Drive and Norse Blvd.

• Construct new sidewalk on west side of 3 Mile Road

• Curb, gutter and storm inlets.

Federal Funds $692,000Local $173,000Total Estimate $865,000

Page 30: Agenda - OKI

• assist with the renovation of the facility at 3375 Madison Pike in Ft. Wright.

• Phase 1-B: electrical systems and interior ADA accessibility improvements

TANK – Maintenance & Operations Facility Repair and Renovation

Federal Funds $1,623,517Local $405,879Total Estimate $2,029,396

Page 31: Agenda - OKI

SNK

Fu

nd

ing

Re

com

me

nd

atio

ns

LPA Sponsor Project Name

TO

TA

L P

OIN

TS

FE

D $

RE

QU

ES

TE

D

FE

D $

AW

AR

DE

D

RU

NN

ING

TO

TA

L

Newport Riverfront Commons Trail at

Newport Festival Park49 2,428,428$ 2,428,428$ 2,428,428$

Bellevue Bellevue Riverfront Commons 46 760,000$ 760,000$ 3,188,428$

Bellevue Bellevue Resurfacing and Sidewalk

Improvements39 216,000$ 216,000$ 3,404,428$

Elsmere New Buffington Bridge

Replacement36 672,000$ 672,000$ 4,076,428$

NKU 3 Mile Road Sidewalk and Drainage

Improvements38 692,000$ 692,000$ 4,768,428$

TANK Maintenance and Operations

Facility Repair and Renovation33 1,623,517$ 1,623,517$ 6,391,945$

Elsmere Garvey Road Resurfacing, Drainage

Improvements, and Multi-use Path

Improvements

32 240,000$ 240,000$ 6,631,945$

Boone County Fiscal

Court

KY 20 & Loomis Road Multi-Use

Path29 1,200,000$ -$ 6,631,945$

Fort Thomas Cheasepeak Sidewalk Project 25 859,784$ -$ 6,631,945$

KYTC Improve safety and mobility along

KY 9 from KY 915 to Shadow Lake

Drive

21 2,600,000$ -$ 6,631,945$

KYTC Improve mobility and drainage

along KY 1303 (Bristow Road)17 468,000$ -$ 6,631,945$

Page 32: Agenda - OKI

Ohio TA Applications (11)

Page 33: Agenda - OKI

Anderson – Little Miami Scenic Trail Elstun Road Connector

Multi Use Trail from existing sidewalk termini on Beechmont Avenue near Elstun Road to the Little Miami Scenic Trail Bridge termini.

Federal Funds $750,000Local $623,569Total Estimate $1,373,569

Page 34: Agenda - OKI

Cincinnati – Kirby Avenue Sidewalk ImprovementNew sidewalks along Kirby Avenue in the Mt. Airy neighborhood that will connect the Sun Valley Apartment Complex to the existing sidewalk infrastructure near North Bend Road. Minor realignment and bump-outs at Kirby and North Bend intersection to improve pedestrian safety.

Federal Funds $620,800Local $155,200Total Estimate $776,000

Page 35: Agenda - OKI

Colerain – Springdale and Poole Road Sidewalks

5,260 ft of new sidewalk filling in gaps between Springdale and Poole Road connecting to Main Street Trail and will connect Cheviot and Round Top Road.

Federal Funds $494,912Local $123,728Total Estimate $618,640

Page 36: Agenda - OKI

Deerfield – Irwin Simpson Multi Use Trail

Multi Use trail that will connect the existing trails on Mason Montgomery Road with Duke Boulevard.• Connect two existing

bus stops

Federal Funds $750,000Local $188,000Total Estimate $938,000

Page 37: Agenda - OKI

Fairfield – Great Miami River Trail Phase 1

Great Miami River Trail extension from its southern terminus at Waterworks Park to the border of Butler and Hamilton Counties

Federal Funds $697,242Local $392,198Total Estimate $1,089,440

Page 38: Agenda - OKI

Great Parks – Glenwood Gardens to Winton Woods Multi Use Trail Phase 1

Project involves construction of a bus stop connection near the intersection of Glendale Milford Rd and Springfield Pike, a new sidewalk from the bus stop to the existing West Fork Mill Creek Trail and a new signalized crosswalk at the entrance to Glenwood Gardens

Federal Funds $352,697Local $93,755Total Estimate $446,452

Page 39: Agenda - OKI

Hamilton – Hamilton Beltline North B Street

Conversion of abandoned rail corridor to a 10’ wide asphalt path that goes behind Mill No. 2 of the sports complex to the Great Miami River trailhead.

Federal Funds $720,000Local $180,000Total Estimate $900,000

Page 40: Agenda - OKI

Loveland – East Loveland Sidewalk

New sidewalk along south side of E. Loveland Avenue across from the Nature Preserve parking lot on the west end extending to 5th

Street on the east end.

Federal Funds $558,870Local $139,717Total Estimate $698,587

Page 41: Agenda - OKI

Miami Township – Branch Hill New Guinea Sidewalk

New sidewalk from existing sidewalk at intersection of Branch Hill-Guinea Pike and Bridlepath Lane continuing NW along the north side of Branch Hill-Guinea to connect to existing sidewalk at NE corner of Loveland Miamiville Road.

Federal Funds $739,525Local $398,205Total Estimate $1,137,730

Page 42: Agenda - OKI

Milford – Main Street/Lila Avenue Corridor Improvements

Enhanced mid-block pedestrian crossings with street lighting as well as Rectangular Rapid Flashing Beacons for pedestrian safety and wayfinding signage to readily locate points of attraction and public parking.

Federal Funds $750,000Local $690,250Total Estimate $1,440,250

Page 43: Agenda - OKI

Sycamore – East Kemper Road SidewalkNew sidewalk segments along sections of East Kemper and New Solzman Road from East Kemper to Clete McDaniels Sports Complex. New ADA crossing at Northlake Drive and East Kemper

Federal Funds $649,194Local $278,225Total Estimate $927,419

Page 44: Agenda - OKI

Oh

io T

ran

spo

rtat

ion

Alt

ern

ativ

es

Fun

din

g R

eco

mm

en

dat

ion

s

LPA Sponsor Project Name

TOTA

L P

OIN

TS

FED

$ R

EQU

ESTE

D

FED

$ R

ECO

MM

END

ED

RU

NN

ING

TO

TAL

Hamilton The Hamilton Beltline - North B Street 61 $720,000 $720,000 $720,000

Great Parks Glenwood Gardens to Winton Woods Shared Use Trail Ph 1 59 $352,697 $352,697 $1,072,697

Anderson Township Little Miami Scenic Trail Elstun Road Connector 58 $750,000 $750,000 $1,822,697

Deerfield Township Irwin-Simpson Shared Use Path 56 $750,000 $750,000 $2,572,697

Fairfield Great Miami River Trail - Fairfield Extension Phase 1 54 $697,242 $0 $2,572,697

Colerain Twp Springdale Road and Poole Road Sidewalks 51 $494,912 $0 $2,572,697

Milford Main Street/Lila Avenue Corridor Improvements 48 $750,000 $0 $2,572,697

Miami Township Miami Township Pedestrian Connectivity Plan 47 $739,525 $0 $2,572,697

Sycamore Township Kemper Road Sidewalk Project 45 $649,194 $0 $2,572,697

Cincinnati Kirby Avenue Sidewalk Improvement 43 $620,800 $0 $2,572,697

Loveland East Loveland Sidewalk 33 $558,870 $0 $2,572,697

Page 45: Agenda - OKI

Kentucky TA Applications (4)

Page 46: Agenda - OKI

Bellevue – Van Voast Pedestrian Bridge

Maintenance of pedestrian bridge that connects two sections of Van Voast that were separated by the railroad. Sanding and painting of truss and replacement of wood decking and stairs.

Federal Funds $124,000Local $31,000Total Estimate $155,000

Page 47: Agenda - OKI

Boone County Fiscal Court – Sam Neace Sidewalk

New sidewalk along Sam Neace Drive from Mt. Zion Road to Weaver Road and along Technology Way to Gateway College.

Federal Funds $420,000Local $105,000Total Estimate $525,000

Page 48: Agenda - OKI

Elsmere – Garvey Avenue Sidewalk

Replacement of poor sections of sidewalk along Garvey Avenue from Shaw to Florence

Federal Funds $188,000Local $47,000Total Estimate $235,000

Page 49: Agenda - OKI

Union – Sweet Harmony Sidewalk

New sidewalk along Sweet Harmony from US 42 to entrance of Union Fire Department.

Federal Funds $68,000Local $17,000Total Estimate $85,000

Page 50: Agenda - OKI

Ke

ntu

cky

Tran

spo

rtat

ion

Alt

ern

ativ

es

Fun

din

g R

eco

mm

en

dat

ion

s

LPA Sponsor Project Name

TOTA

L P

OIN

TS

FED

$ R

EQU

ESTE

D

FED

$ R

ECO

MM

END

ED

RU

NN

ING

TO

TAL

Elsmere Howell Elementary - Replace poor sidewalk on Garvey Avenue 49 $188,000 $188,000 $188,000

Bellevue City of Bellevue Pedestrian Bridge 48 $124,000 $124,000 $312,000

Union Erpenbeck Elementary - Fill in Missing Sidewalk on Sweet Harmony Ln 41 $68,000 $68,000 $380,000

Boone County Fiscal Court Sam Neace Drive Sidewalk 38 $420,000 $420,000 $800,000

Page 51: Agenda - OKI

STBG/SNK

Andy Reser – [email protected]

513-619-7688

Transportation Alternatives

Summer Jones – [email protected]

513-619-7674