1902 or 2012?
Are we all variations of Rodin’s Thinker
VersionOne 2011 Stage of Agile Survey says:
“64% of Agile Champions are in the management
layer”
In larger companies (>500 people)
•27% said lack of management support
•26% said “general resistance to change”
were major barriers to agile adoption.
This drops to 10% in smaller companies
![Page 3: Agile india2012 turning_into_an_agile_engg_manager_v0.2](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a9ae661a28ab220c8b45df/html5/thumbnails/3.jpg)
Who is an Agile Engineering Manager
http://www.guardian.co.uk/sport/2011/jun/06/gary-kirsten-south-africa-coach http://www.itsonlycricket.com/entry/548/ http://cricblitz.blogspot.com/2011/02/2011-cricket-world-cup-word-from.html
![Page 4: Agile india2012 turning_into_an_agile_engg_manager_v0.2](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a9ae661a28ab220c8b45df/html5/thumbnails/4.jpg)
Today’s Agenda
Arm yourself with The 4 Is and 3 Ps
Scenario Walkthrough; Leveraging the 4Is and 3 Ps
in agile (Scrum)
Separation Anxiety
Extinction Anxiety
UN-Certainity
xe-NO-phobia
A “?” on every face
Changing Lanes
Agile Behaviors managers can support
![Page 5: Agile india2012 turning_into_an_agile_engg_manager_v0.2](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a9ae661a28ab220c8b45df/html5/thumbnails/5.jpg)
Arming yourself with the 4 Is
http://www.questforanewperspective.com/personal-development/who-do-you-influence/
4Is
![Page 6: Agile india2012 turning_into_an_agile_engg_manager_v0.2](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a9ae661a28ab220c8b45df/html5/thumbnails/6.jpg)
Learn the 3 Ps and apply the 4Is
People – Who are the people doing it?
Project – When and How are they doing it?
Product – How is it built?
:http://www.zdnet.com/blog/doc/do-young-people-prefer-print-marketi http://www.bestlogcabinhomes.com/how-to-build-a-log-cabin.html ng/1651
4Is EM
![Page 7: Agile india2012 turning_into_an_agile_engg_manager_v0.2](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a9ae661a28ab220c8b45df/html5/thumbnails/7.jpg)
“Agile EM” Scenario Walkthroughs
Scrum Team – Cross Functional (Dev,QA,
Service Engg)
External Scrum teams
Scrum Master
Product Owners
Engineering Manager
Other company stakeholders (Directors/CEO)
Agile Methodology assumed
Scrum with 2 week sprints in a cross functional team
![Page 8: Agile india2012 turning_into_an_agile_engg_manager_v0.2](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a9ae661a28ab220c8b45df/html5/thumbnails/8.jpg)
Scenario 1: Separation Anxiety
One of the key members of the team decides to leave
or has to be let go? The team member is handling
critical sprint deliverables
![Page 9: Agile india2012 turning_into_an_agile_engg_manager_v0.2](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a9ae661a28ab220c8b45df/html5/thumbnails/9.jpg)
Scenario 2 : Extinction Anxiety
The scrum team is informed that the product has to be
scrapped in the middle of the sprint?
http://www.sciencephoto.com/media/172706/enlarge
![Page 10: Agile india2012 turning_into_an_agile_engg_manager_v0.2](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a9ae661a28ab220c8b45df/html5/thumbnails/10.jpg)
Scenario 3 : UN…Certainity
The scrum team is informed the company will be
acquired but is in the middle of a major product?
http://despair.com/acquisition.html
![Page 11: Agile india2012 turning_into_an_agile_engg_manager_v0.2](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a9ae661a28ab220c8b45df/html5/thumbnails/11.jpg)
Scenario 4 : xe-NO-phobia?
(Fear of Strangers…) You are a single location team but
now with new members across multiple geo locations
and also an outsourced vendor?
http://www.spanishdict.com/answers/148945/a-z-same-word-or-almost-the-same-both-languages
![Page 12: Agile india2012 turning_into_an_agile_engg_manager_v0.2](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a9ae661a28ab220c8b45df/html5/thumbnails/12.jpg)
Scenario 5 : A “?” On every face
The product has no concrete roadmap and product
owner appears disengaged and scrum team is not
happy
http://office.microsoft.com/en-us/redir/PN000064365.aspx?lc=en%2DUS&CTT=102&qu=road&xc=MP900438811&Origin=MP900438811
![Page 13: Agile india2012 turning_into_an_agile_engg_manager_v0.2](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a9ae661a28ab220c8b45df/html5/thumbnails/13.jpg)
Scenario 6 : Changing Lanes
The technology stack needs to be changed
http://www.drivingschool.ca/drivereducation/page6.html
![Page 14: Agile india2012 turning_into_an_agile_engg_manager_v0.2](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a9ae661a28ab220c8b45df/html5/thumbnails/14.jpg)
Agile Behaviors managers can support!
People:
People own backlogs as “Team” not function
Team pick their own tasks
Cross functional team members are open and give ongoing
peer feedback and use retrospectives effectively
Product
The product is built right in iterations
PO can release product versions at sprints if needed
Project:
Product owner sets backlog priority and changes
Timelines are committed by team
There is a single backlog
![Page 15: Agile india2012 turning_into_an_agile_engg_manager_v0.2](https://reader033.vdocuments.net/reader033/viewer/2022042817/55a9ae661a28ab220c8b45df/html5/thumbnails/15.jpg)
And finally……
INFLUENCE
INTUTION
INTENTION
INTERVENTION
PEOPLE
PROJECT
PRODUCT