AG&P Quality Management AG&P Quality Management
SystemSystem
Quality
Records and
Objective
Evidence
Atlantic Gulf & Pacific Company of Manila, Inc. (AG&P) quality management system (QMS) shall cover fabrication and erection of structural steel, piping, tanks, vessels, process equipment and modularized structures. AG&P shall ensure that quality is an integral part of AG&P product and services. To enable AG&P to meet this objective, a documented quality management system that satisfies the requirements of ISO 9001: 2008 and addresses the company’s business process was established. AG&P’S QMS focuses on problem and defect prevention and continuous improvement rather than detection and correction in order to supply quality products and services to its customers. The Quality Management System has been documented in the following hierarchy:
AG&P
QUALITY
MANUAL
PROJECT
QUALITY
PLAN
PROJECT
SPECIFIC
PROCEDURES
AG&P
QUALITY SYSTEM
PROCEDURES
PROJECT SPECIFIC
WORK INSTRUCTIONS
AG&P
QUALITY SYSTEM
WORK INSTRUCTIONS
SUPPORT
DOCUMENTATIONForms, Records, Job Description,
Job Specifications, Technical
Documentation, Codes and
Standards, Statutory Regulations,
etc.
SUPPORT
DOCUMENTATIONForms, Records, Job
Description/Classification,
Codes and Standards, Statutory
Regulations, , User’s Manual ,
etc.
AG&P Quality Management AG&P Quality Management
SystemSystem
Rev. 2, 02 Jun 2007
PROJ.
MANAGEMENT /
PRODUCTION
QUALITY
ASSURANCE
AG&P QMS / ISO 9001 PROCESS INTERACTION DIAGRAM
MA
NA
GE
MEN
T
RESP
ON
SIB
ILIT
Y
COST
ENGINEERING
ENGINEERINGSALES &
ESTIMATING
TOP MANAGEMENT
/ QMR
CONTRACTSMATERIALS
MANAGEMENT
MEA
SU
REM
EN
T A
NA
LYSIS
& IM
PR
OV
EM
EN
TPR
OD
UC
T R
EA
LIZ
ATIO
NR
ESO
UR
CE
MA
NA
GEM
EN
T
SECURITY &
COMMUNITY
RELATIONS
HEALTH , SAFETY,
AND
ENVIRONMENTAL
CONTROLLERSHIPOPERATIONS
PLANNING AND
CONTROL
PLANT &
EQUIPMENT
MAINTENANCE
HUMAN RESOURCE CONTRUCTION
INFORMATION
TECHNOLOGY
CONDUCT
MANAGEMENT
REVIEWS
ESTABLISH &
IMPROVE QMS
PROVIDE
RESOURCES
FACILITIES PLANNING FACILITIES
MAINTENANCE
IDENTIFY & REVIEW PROJECT
REQUIREMENTS
ASSURE SUPLLIER /
SUBCONRACTOR
QUALITY
PLAN & CONTROL PRODUCTION AND PROJECT
EXECUTION
DEVELOP PROJECT
QUALITY PLANS
ESTABLISH AND MAINTAIN PRODUCT IDENTIFICATION AND TRACEABILITY
PLAN AND
CONTROL DESIGN CONTROL AND PRESERVE CUSTOMER PROPERTY AND PRODUCT CONTROL MONITORING AND MEASURING
DEVICES
PURCHASE MATERIALS
/ SERVICES VALIDATE SPECIAL PROCESSES
CONDUCT INTERNAL
AUDIT
MONITOR AND
MEASURE CUSTOMER
SATISFACTIONMONITOR AND
MEASURE CUSTOMER
SATISFACTION
MONITOR PRODUCTION PROCESSES
MONITOR PRODUCT
QUALITY
QUALIFY AND TRAIN
WORKFORCE
PLAN AND MAINTAIN
DOCUMENTS AND
INFORMATION
SYSTEMS
CONTROL OF NONCONFORMING PRODUCTS
ANALYZE INTERNAL
AUDIT DATA
ANALYZE CUSTOMER
SATISFACTION DATAANALYZE PRODUCT
PERFORMANCE DATA
ANALYZE SUPPLIER /
SUBCONTRACTOR
PERFORMANCE DATA
ANALYZE PRODUCTION , PROCESS AND PROJECT PERFORMANCE DATA ANALYZE PRODUCT
QUALITY DATA
ANALYZE WORKFORCE
PERFORMANCE AND
COMPETENCY DATA
ANALYZE
DOCUMENTAION AND
INFORMATION SYSTEM
DATA
INITIATE CORRECTIVE AND PREVENTIVE ACTIONS
ESTABLISH HSE
PROGRAM
HSE PROGRAM
IMPLEMENTATION
AND MONITORING
ANALYZE HSE
PERFORMANCE DATA
INVOICING
PAYMENT TO
SUPPLIERS AND
SUBCONTRACTORS
BUDGET PLANNING
AND ALLOCATION
ANALYZE BUDGET
PERFORMANCE DATA
MONITOR BUDGET
SPENDING
MANAGE CUSTOMER
COMMUNICATIONS(inquieries, feedbacks and
complaints)
SECURE ALL
PRODUCTS
SECURE ALL
RESOURCES
SECURITY RISK
ASSESMENT
MONITOR SECURITY &
COMMUNITY
RELATIONS
PERFORMANCE
IDENTIFY & REVIEW
PROJECT
REQUIREMENTS
PLAN & CONTROL
PRODUCTION AND
PROJECT EXECUTION
MONITOR AND
MEASURE SUPPLIER /
SUBCONTRACTOR,
PRODUCTION AND
PROJECT COST
PERFORMANCE
AWARD
SUBCONTRACTED
SERVICES
IDENTIFY & REVIEW
PROJECT
REQUIREMENTS
PLAN & CONTROL
PRODUCTION AND
PROJECT EXECUTION
YES
NO
DESIGN?
IDENTIFY & REVIEW
PROJECT
REQUIREMENTS
CONTINUAL IMPROVEMENT
Quality Assurance/Quality Control Quality Assurance/Quality Control
DepartmentDepartment
Quality System CertificationQuality System Certification
ISO 9001:2000 &ASME Certificate of Authorization to Use “U” & “S” Stamps
National Board Certificate of Authorization to Use “R” Stamp and “NB” Marking
Quality System CertificationQuality System Certification
PED Module G Certificate of Conformity from HSBIQ & TUV-Sud
Quality System CertificationQuality System Certification
Quality Assurance SystemQuality Assurance System
Supplier’s Quality Audit
Internal Quality Audit
External Quality Audit
Project Quality Assurance SystemProject Quality Assurance System
�� 1. Project Quality Plan 1. Project Quality Plan
�� 2. Project Procedures2. Project Procedures
�� 3. Project Work Instructions 3. Project Work Instructions
�� 4. Inspection and Test Plans (per discipline)4. Inspection and Test Plans (per discipline)
�� 5. Manufacturer5. Manufacturer’’s Data Reports Data Report
�� 6. Internal Quality Audit6. Internal Quality Audit
�� 7. Supplier/Subcontractor7. Supplier/Subcontractor’’s Audits Audit
�� 8. Training and Orientation8. Training and Orientation
�� 9. Monitoring and Measuring Device Calibration9. Monitoring and Measuring Device Calibration
Project Quality Management System
Documentation
Project Quality Assurance SystemProject Quality Assurance System
Project Quality Assurance SystemProject Quality Assurance System
Training and Orientation
Project Manufacturer’s Data
Book(MDB)
Project Quality Assurance SystemProject Quality Assurance System
Project Quality Assurance SystemProject Quality Assurance System
Project Quality Assurance SystemProject Quality Assurance System
1.98%3.00%1.98%693489Total
1.98%3.00%3.77%33876July
1.38%3.00%0.61%5815June
1.72%3.00%1.14%4352May
1.87%3.00%0.32%1309Apr
2.29%3.00%0.51%1198Mar
2.66%3.00%0.00%0184Feb
3.31%3.00%0.00%086Jan
3.74%3.00%0.00%0235Dec
5.76%3.00%6.91%23333Nov
1.98%3.00%0.00%053Oct
4.17%3.00%0.00%033Sept
13.33%3.00%13.33%215Aug
Repair Rate (TO DATE)
LimitRepair Rate (THIS
PERIOD)RepairTestedMonth
Welding Welding PerformancePerformance MonitoringMonitoring
Piping Weld Repair Statistic
0.00%
5.00%
10.00%
15.00%
Month
Re
jec
tio
n R
ate
Repair Rate This Period (Monthly) Repair Rate To Date (Monthly) Repair Limit
Repair Rate This Period (Monthly) 13.33% 0.00% 0.00% 6.91% 0.00% 0.00% 0.00% 0.51% 0.32% 1.14% 0.61% 3.77%
Repair Rate To Date (Monthly) 13.33% 4.17% 1.98% 5.76% 3.74% 3.31% 2.66% 2.29% 1.87% 1.72% 1.38% 1.98%
Repair Limit 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00%
Aug Sept Oct Nov Dec Jan Feb Mar Apr May June July
Project Quality Assurance SystemProject Quality Assurance System
Welding Welding PerformancePerformance MonitoringMonitoring
Project Quality Assurance SystemProject Quality Assurance System
Quality Control InspectionQuality Control Inspection
1. Civil Works Inspection 7. Welding Inspection
2. Structural Inspection 8. Electrical & Instrumentation
3. Architectural Inspection Inspection
4. Piping Inspection 9. Materials Inspection
5. Mechanical Inspection 10.Coating Inspection
6. Tanks/Pressure Vessel 11.Insulation , Fireproofing &
Inspection Refractory Inspection
Quality Control InspectionQuality Control Inspection
Material Receiving
Quality Control InspectionQuality Control Inspection
Structural Visual and Dimensional
Quality Control InspectionQuality Control Inspection
Piping Visual and Dimensional
Quality Control InspectionQuality Control Inspection
Instrument Calibration and Testing
Quality Control InspectionQuality Control Inspection
Painting and Insulation
1. Radiographic Testing1. Radiographic Testing
2. Ultrasonic Testing 2. Ultrasonic Testing
3. Magnetic Particle Testing 3. Magnetic Particle Testing
4. Dye4. Dye--PenetrantPenetrant TestingTesting
5. Positive Material Identification 5. Positive Material Identification
6. Hardness Testing6. Hardness Testing
7. Ferrite Testing7. Ferrite Testing
NonNon--destructive Testingdestructive Testing
NDT EQUIPMENTNDT EQUIPMENT1. Gamma Ray Exposure Devices1. Gamma Ray Exposure Devices
2. Ultrasonic Flaw Detectors2. Ultrasonic Flaw Detectors
3. Magnetic Yokes and Black Lights3. Magnetic Yokes and Black Lights
4. Portable Alloy Analyzers4. Portable Alloy Analyzers
5. Portable Hardness Testers5. Portable Hardness Testers
6. 6. FerritescopeFerritescope
NDT EQUIPMENTNDT EQUIPMENT
XMet 3000 XRF Alloy
Analyzer
POSITIVE MATERIAL POSITIVE MATERIAL
IDENTIFICATION(PMI)IDENTIFICATION(PMI)
Niton XL3T 800 XRF
Alloy Analyzer
Spectrotest OES Metal
Analyzer
ULTRASONIC TESTINGULTRASONIC TESTING
Epoch 1000i wt Phased
Array
Krautkramer DM4 UTG
Krautkramer USM 35
Flaw Detector
Magnetic Particle TestingMagnetic Particle Testing
Wet Flourescent Magnetic
Particle Testing
Visible Dry Powder
Magnetic Particle Testing
RADIOGRAPHIC TESTINGRADIOGRAPHIC TESTING
Sentinel 880 Delta Gamma
Ray Camera (2 units)
Tech Ops 660 Gamma
Ray Camera
Krutkramer Ultrasonic
Contact Impedance
Hardness Tester
Fischer Ferritescope
MP30
OTHER EQUIPMENTOTHER EQUIPMENT
Purge Monitor
OTHER EQUIPMENTOTHER EQUIPMENT
Fluke Infrared Thermometer
Weld Testing, Weld Testing, Training&QualificationTraining&Qualification
Welders’ Qualification & Certification /Welding Procedure Qualification Test
�� Equipped with 70 welding booths very well suited for Equipped with 70 welding booths very well suited for welders and welding operators training and testing welders and welding operators training and testing activities, the AG&Pactivities, the AG&P--WTTC is very much capable in WTTC is very much capable in complying with the project requirements pertaining complying with the project requirements pertaining to Welding Qualification.to Welding Qualification.
�� Our welding technologist, welding engineers and Our welding technologist, welding engineers and welding trainers are able to provide inwelding trainers are able to provide in--plant welder/ plant welder/ welding operator training for most welding welding operator training for most welding processes such as SMAW, FCAW, GMAW, GTAW processes such as SMAW, FCAW, GMAW, GTAW and SAW and a wide range of materials.and SAW and a wide range of materials.
Weld Testing, Weld Testing,
Training&QualificationTraining&Qualification
�� Stainless SteelStainless Steel
�� Duplex/Super Duplex SA Duplex/Super Duplex SA 789/790 UNS S31803789/790 UNS S31803
�� SA 240 TP 410 UNS S41008SA 240 TP 410 UNS S41008
�� SA 312 TP 347H UNS SA 312 TP 347H UNS S34709S34709
�� SA 312 TP 317L UNS SA 312 TP 317L UNS S31703S31703
�� SA 312 TP 321H UNS SA 312 TP 321H UNS S32109S32109
�� Copper NickelCopper Nickel
�� 9090--10 SB10 SB--171 UNS C70600171 UNS C70600
�� 7070--30 SB30 SB--171 UNS C71500 171 UNS C71500
�� JIS H3300 C7060TJIS H3300 C7060T
�� CopperCopper
�� SBSB--42 UNS C1020042 UNS C10200
�� AluminumAluminum
�� ASTM 5086ASTM 5086
�� Chrome MolybdenumChrome Molybdenum
�� SA 335 Gr. P11 UNS K11597SA 335 Gr. P11 UNS K11597
�� SA 335 Gr. P22 UNS K21590SA 335 Gr. P22 UNS K21590
�� SA 387 Gr. 11, Cl.2 UNS SA 387 Gr. 11, Cl.2 UNS K11789K11789
�� High Nickel AlloysHigh Nickel Alloys
�� SB 424 UNS N08825SB 424 UNS N08825
�� SB 575 UNS N10276SB 575 UNS N10276
�� Hastelloy C 276 UNS N10276Hastelloy C 276 UNS N10276
�� MonelMonel
�� SB 127 UNS N04400SB 127 UNS N04400
�� Other AlloysOther Alloys
�� Carpenter 20Cb3Carpenter 20Cb3
�� SB 729 Alloy 20 UNS 08020SB 729 Alloy 20 UNS 08020
�� Proprietary AlloyProprietary Alloy
�� Lloyds T64Lloyds T64
�� Lloyds Burton T80Lloyds Burton T80
Weld Testing, Weld Testing,
Training&QualificationTraining&QualificationExperience on Welding
Exotic Materials
We have worked with various Codes and Standards. We have worked with various Codes and Standards. Some of them are:Some of them are:
∗∗∗∗∗∗∗∗ ASME Boiler and Pressure Vessel Code ASME Boiler and Pressure Vessel Code
(Sections II, V, VIII & IX)(Sections II, V, VIII & IX)
∗∗∗∗∗∗∗∗ ASTMASTM
∗∗∗∗∗∗∗∗ AWS (D1.1 & D 1.3)AWS (D1.1 & D 1.3)
∗∗∗∗∗∗∗∗ ASME B31.3 (Process Piping)ASME B31.3 (Process Piping)
∗∗∗∗∗∗∗∗ API 620, 650, 1104API 620, 650, 1104
∗∗∗∗∗∗∗∗ AS/NZS 1554.1, 2980,1210AS/NZS 1554.1, 2980,1210
∗∗∗∗∗∗∗∗ ABS & DNV RulesABS & DNV Rules
∗∗∗∗∗∗∗∗ EN 288 Parts 1 & 2EN 288 Parts 1 & 2
∗∗∗∗∗∗∗∗ Russian RegulationsRussian Regulations
Weld Testing, Weld Testing,
Training&QualificationTraining&Qualification
Welding Procedure SpecificationWelding Procedure Specification
Welders QualificationWelders Qualification
Welders QualificationWelders Qualification
QA/QC Personnel QA/QC Personnel
Training&QualificationTraining&Qualification
QA/QC Personnel QA/QC Personnel
Training&QualificationTraining&Qualification
QA/QC Personnel QA/QC Personnel
Training&QualificationTraining&Qualification
QA/QC Personnel QA/QC Personnel
Training&QualificationTraining&Qualification