air quality control systems- technological solutions for...
TRANSCRIPT
Preeti Malhotra
19 November 2014
Air Quality Control Systems-Technological Solutions for Power
Sector
BAQ 14, Colombo
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 2
REDUCING COST OF ELECTRICITY
More than 80 years of experience, optimising designs and strong R&D activities,
has led to robust and reduced operating cost including more
efficiency use of reagents and power consumption reduction
LOWERING ENVIRONMENTAL
FOOTPRINT
480 GW & 2800 systems Unrivalled AQCS supplied for both power and industry
sector worldwide
INCREASING FLEXIBILITY
& RELIABILITY
Innovative Modular Design For power and industry have elevated operational flexibility
and reliability to a new high level
Air Quality Control System (AQCS)
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 3
Market/Customer Drivers AQCS
Market Driver Customer Driver
• Local Environmental regulations
• Guidelines of financing
institutions
• Plant permitting requirements
• Public pressure
• CSR initiatives
• Environmental compliance
• Cost for environmental
compliance including CAPEX
and OPEX
• Fuel and operational flexibility
• Lead time
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 4
Product Portfolio for Power Plants Air Quality Control Systems
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 5
Over 480 GW supplied for power & 2,800 systems for industry globally
World’s No. 1 AQCS Supplier
North America
Power 148+ GW
Industry 200+ Systems
Latin America
Power 6+ GW
Industry 200+ Systems
Russia & CIS
Power 11+ GW
Industry 55+ Systems
Europe
Power 115+ GW
Industry 1,000+ Systems
Middle East & Africa
Power 35+ GW
Industry 100+ Systems
India
Power 50+ GW
Industry 700+ Systems
Asia
Power 95+ GW
Industry 400+ Systems
Oceania
Power 20+ GW
Industry 90+ Systems
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 6
Product Portfolio for Industry Air Quality Control Systems
I &S
DFGD (NID and SDA)
SWFGD
ESP (Wet and Dry)
FF (high ratio and low ratio)
SCR
WtE
Alu
Oil & Gas
P&P
Cement
HQT, WCD,
FDC, HPC;
Drypac
DAS/DSI
Industry Specific GTC
FTC
Alfeed
HEX
Polishing &
condensing
scrubber;
DAS
HQT : Hot Quenching Tower WCD: Water Cooled Ducts FDC: Forced Draft Cooler HPC: Hair Pin Cooler DAS: Dry Absorption System HEX: Heat Exchanger
ACI (Hg)
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 7
Global Footprint
Milan,
ITALY
Knoxville,
USA
Headquarters
Regional Execution Centre
Local Unit
R & D Centre
Paris,
FRANCE
Oslo,
NORWAY
Växjö,
SWEDEN
Wiesbaden,
GERMANY
Kolkata,
INDIA
Moscow,
RUSSIA
Beijing,
CHINA
Kobe,
JAPAN
Mexico City,
MEXICO
Global knowledge and resources, local presence and insight
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 8
R&D for Best-in-Class Technology
In-house pilot of absorption system
Extensive analytical laboratory services
Leading technology innovator of environmental control systems
• World’s largest in house
AQCS lab/test facility used
to:
• Develop new products,
• Advance existing products
• Utilises pilot scale models
to reproduce real process
conditions
• Apply CFD models to
evaluate & optimize
product
• Awarded 120+ patents for
advancing technologies
• Employing 70+ professional
in the lab
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 9
Reduce Cost of Electricity
• Lower power consumption by
sulphite sensor control
• Lower lime consumption using
unique egg-crate nozzles &
Performance Enhancement Plate
Wet FGD – Open Spray Tower (OST)
The best just got better: Alstom latest 3rd generation WFGD-OST
Lower Environmental Footprint
• > 99% SO2 removal
• Up to 6.0% Sulphur in coal
Increase Flexibility & Reliability
• Largest fuel flexibility, including
various types of coals and oil
• Can successfully and economically
follow all boiler load changes
• 40+ years of
continuous innovation,
with latest 3rd
Generation WFGD-
OST
• 60+ GW installed in
Power
• Up to 1,300 MW unit
size
• Highly efficient
absorber design with
less spraying banks
and power & reagent
consumption
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 10
• Unique turbulent bed
reactor design with no
spraying nozzles,
piping and pumps
• Up to 360 MW unit
size in operation
• Superb SO2, PM and
SO3 removal
• Compact design and
low power
consumption
• Lower maintenance
requirement due to
design with less
moving parts
FlowpacTM Absorber
Highly Efficient and Compact WFGD
Reduce Cost of Electricity
• Lower power consumption by air lift
“triple duty” agitation, pumping and
oxidation
• Lower lime consumption using
intimate turbulent bed absorption
Lower Environmental Footprint
• > 99% SO2 removal
• High PM and SO3 removal
• Small footprint
Increase Flexibility & Reliability
• Excellent performance, even for
high sulphur fuel mixtures incl.
HFO
• High reliability by minimizing
moving parts
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 11
• Pioneer in SWFGD
with 1st installation in
1968
• 50+ GW in Power
alone
• Proven experience
with 1,000 MW unit
• Unique packed tower
design
• No reagent and no by-
product, with superior
restoration quality of
discharged seawater
Seawater Flue Gas Desulphurisation – (SWFGD)
NO.1 in SWFGD with ~60% of installed base globally
Reduce Cost of Electricity
• Lower power consumption resulting
from packed tower design
• No additional cost for reagent and
end-product disposal
• Lower maintenance cost
Lower Environmental Footprint
• > 98% SO2 removal demonstrated
• Up to 4.5% Sulphur in Heavy Fuel
Oil (HFO)
Increase Flexibility & Reliability
• Largest fuel flexibility, including
coal, HFO and industrial flue gas
• Robust design without nozzles,
leading to high reliability
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 12
• 20+ years of
successful commercial
operation
• 15+ GW installed for
Power
• Compact footprint:
<50% footprint
compared to SDA
• Modular scalable
design
• Water, flyash, reagent
are blended outside
the flue gas stream.
• Low construction costs
Reduce Cost of Electricity
• Lower lime consumption with
optimized hydrator/mixer design
• Local Construction
• Zero Liquid Discharge, low water
consumption
Dry FGD NID™
Alstom patented technology, No.1 in Dry FGD globally
Lower Environmental Footprint
• > 98% SO2 removal
• Up to 4% Sulphur in coal
• Multi-pollutant control: SO2,
SO3,HCL, HF, PM, Hg (with ACI)
Increase Flexibility & Reliability
• Largest fuel flexibility, including
heavy fuel oils and petcoke
• Suitable for PC and CFB boilers
• Can successfully and economically
follow all boiler load swings
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 13
• 60+ years of
experience
• 15+ GW installed
capacity for power and
industry worldwide
• Alstom patented rotary
atomizer technology
• Dual fluid nozzle
design is also
available for industrial
applications
Reduce Cost of Electricity
• Lower lime consumption by
patented atomizer technology
• Zero Liquid Discharge, low water
consumption
Dry FGD Spray Dryer Absorber – (SDA)
Alstom proprietary Flex Shaft Atomizer (FSA) solution
Lower Environmental Footprint
• > 95% SO2 removal
• Up to 2.5% Sulphur in coal
• Multi-pollutant control: SO2,
SO3,HCL, HF, PM, Hg (with ACI)
Increase Flexibility & Reliability
• Multiple atomizers per reactor
• Online maintenance (2 atomizers
running, one down)
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 14
• 30+ years of
experience
• 46+ GW installation
• 80+ successful
installations worldwide
• Catalyst expertise
through partnerships
with leading catalyst
suppliers
• EPC capabilities with
design tailored to
existing site conditions
and optimized outage
time
Reduce Cost of Electricity
• Ammonia injection grid allows very
precise ammonia dosage to ensure
optimal system efficiency and
performance.
• ADIS for aqueous ammonia
Selective Catalytic Reduction – (SCR)
Large portfolio of configurations with high NOx removal efficiency
Lower Environmental Footprint
• Up to 95% NOx removal
• < 2ppm ammonia slip
• New IsoSwirl™ mixing technology
improves flue gas-ammonia
contact for better performance
Increase Flexibility & Reliability
• Large portfolio with high dust, low
dust and tail-end configurations to
adapt to the most stringent plant
conditions and environmental
legislations
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 15
• 233+ GW installed in
power generation
• Effective Cleaning
System design with
robust tumbling
hammer
• Best-in-Class
Integrated ESP
Control systems: 3rd
Generation Intelligent
Controller (EPIC III)
• Switch Integrated
Rectifiers (SIR) for
increasing power input
into ESPs
Electrostatic Precipitators – (ESP)
Largest reference base on a variety of fuels
Reduce Cost of Electricity
• Lower capital cost through more
compact sizing
• Lower power consumption by
minimum 5% thanks to best-in-
class controllers
Lower Environmental Footprint
• > 99.95% removal efficiency
• <10 mg/Nm3 emissions
Increase Flexibility & Reliability
• Largest fuel flexibility, including
heavy fuel oils
• Constant efficiency for varying
boiler load conditions
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 16
Fabric Filters – (FF)
Consistent lower compliant costs for dynamic process requirements
• 46+ GW (standalone)
installed in Power
• Up to 12m tall filters
for reduced footprint &
operational costs
• Renowned Optipulse®
filtration technology
with gravimetric flow &
Optipow® plunger
valves for efficient bag
cleaning
• Standalone
applications or
integrated at the down
stream of SDA, NIDTM,
AbartTM, Mer-CureTM,
FilsorptionTM
Reduce Cost of Electricity
• Lower Capital Cost with tall bag
designs of up to 12 m
• Lower auxiliary consumption like
compressed air
Lower Environmental Footprint
• > 99.97% removal efficiency
• High PM10 & PM 2.5 removal
efficiency
• < 5 mg/Nm3 emissions
Increase Flexibility & Reliability
• Largest fuel flexibility and ability to
handle varying boiler loads
• Bag life of 5+ years achieved
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 17
• Mer-CureTM
Sorbent injection at
high temperatures for
faster oxidation
Uniform de-
agglomerating, particle
size reduction and
distribution of the
sorbent
Designed for use with
3rd party sorbents to
provide customer with
maximum flexibility
• FilsorptionTM
PAC* injection process
Upstream of AQCS
equipment
* Powdered Activated Carbon
Mercury Control
Achieve high removal efficiencies at drastically reduced sorbent consumption rates
Reduce Cost of Electricity
• Mer-CureTM consumes less than
50% of sorbent than conventional
PAC
Lower Environmental Footprint
• > 90% removal efficiency
Increase Flexibility & Reliability
• Flexibility in injection points and
downstream PM equipment
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 18
Pollutant Alstom Process References Removal Performance
NOx Selective Catalytic Reduction 46GW >95%
SOx
Open Spray Tower 60GW >99%
FlowpacTM Absorber 1GW >99%
Dry Flue Gas Desulphurisation 30GW >98%
Seawater Desulphurisation 50GW >98%
Particulates
Dry Electrostatic Precipitators 233GW <10mg/Nm3
Wet Electrostatic Precipitators 2GW <10mg/Nm3
Fabric Filters (standalone) 46GW <5mg/Nm3
SOx/HCI/HF/Hg NID & Spray Dryer Absorber 136 installations ≥98% for SO2
Mercury Mer-CureTM /FilsorptionTM 8GW >90%
NOX: Nitrogen Oxides SOX: Sulphur Oxides HF: Hydrogen Fluoride HCl: Hydrogen Chloride Hg: Mercury
ECS Performance in Power
Alstom ECS is a world leading supplier of AQCS
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 19
Key References
Largest References Worldwide
Spurlock 1, 2, 3 & 4
USA
Almost all back-end
equipment supplied by Alstom
SCR + WESP +
WFGD on #1 & 2
NID on #3 & 4, DESP on #1
Shoaiba
Saudi Arabia
All Alstom plant with high
Sulfur HFO
SWFGD + ESP
Cliffside
USA
Alstom patented ZLD
process, achieving
extremely low emissions
SDA + FF + WFGD
Sines 1, 2, 3 & 4
Portugal
Alstom DeNOx systems in a
plant with very high
operation temperature
(425C)
SCR
Indian River 4
USA
Latest NID design supplied
to large utility boiler with
440MW unit size
NID Dry FGD
EMAL
UAE
ABART GTCs & Anode Bake
FTCs with SWFGD and
ALFEED Alumina Feeding
System on World’s No.1
Single Site Aluminium
Smelter 1.25MT/Y
BUV/ Malmberget
Sweden
The largest pelletizing plant,
achieving extremely low
emissions in PM, SO2, Hcl
and HF
ESP + Dry FGD with FF
Manjung 1, 2, 3 & 4
Malaysia
AQCS for South-East Asia’s
first & largest supercritical
power plant
SWFGD + ESP on #1,2,3
SWFGD + FF on #4
Filborna
Sweden
AQCS for Europe most
modern Waste-to-Energy
facility
NID + Condenser
Megalopolis
Greece
Successful design for high
Sulphur coal with flue gas
flow of 16,500mg/Nm3, dry,
6% O2
WFGD
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 20
Market overview CO2 Capture technologies
Source: Vattenfall
Pre-combustion (New only)
Pre-combustion
• Pre-combustion (Integrated Gasification Combined Cycle - IGCC) is based on gasification which converts a fossil fuel into synthesis gas composed of CO and hydrogen. Following shift conversion (CO+H2O -> CO2+H2), the resulting H2
product is burned in a gas turbine.
Post-combustion Oxy-combustion (New + retrofit) (New + retrofit)
Oxy-combustion
• Fuel is burned in a mixture of oxygen and re-circulated flue gas. Due to the absence of Nitrogen, the resulting flue gas is rich in CO2.
• After water condensing and further purification, CO2 is compressed and sent for storage or re-use.
Post-combustion
• Chemical absorption of CO2 (advanced amines and chilled ammonia).
• Flue gas is contacted with a chemical solvent which reacts with the CO2 or is captured by physical process. Raising the temperatures reverses the above reaction – releasing CO2 and allowing the solvent to be recycled
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 21
CCS is happening
Completed TESTS COMPLETE
AEP Mountaineer USA – 58 MWth Chilled Ammonia, Coal
EoN Karlshamn Sweden - 5 MWth Chilled Ammonia, Fuel
WE - Energie USA WI - 5 MWth Chilled Ammonia, Coal
DOW Chemical Co. USA, WV Adv. Amines - Coal
OPERATING Vattenfall Schwarze Pumpe, Germany 30 MWth, Oxy - Lignite
Total Lacq France - 30 MWth Oxy - Gas
Alstom BSF Windsor US - 15 MWth Oxy - Coals
2nd Gen
DOE/Alstom Windsor US - 3 MWth Chemical Looping, Coal
Alstom Labs Växjö Sweden – 0.25 MWth Post C.-multi purpose
RFCS EU - Darmstadt Germany - 1 MWth Chemical Looping - Coal
2nd Gen
TCM Mongstad Norway 40 MWth, Chilled Ammonia, CHP & Refinery Offgas (RCC)
Alstom GPU Pilot (Mobile) 0.3 MWth
OPERATING
LARGE-SCALE PROJECTS (under development)
White Rose CCS Project UK - 426 MWe Oxy Hardcoal
Alstom – title of the presentation - P 21
EDF Le Havre France - 5 MWth Adv. Adv. Amines - Coal
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 22
• Preferred Bidder in the UK’s £1Billion CCS Commercialisation Programme
• FEED Contract awarded - signed by the UK Government on 20th December 2013
• FEED underway: detailed risk reduction and planning programme leading to financial close, FID and construction commencement.
• Continuing work with the UK Government (DECC) towards Project Contract and Contract for Difference (CfD)
• NER 300 Award Decision: On 8 July 2014, White Rose project secured award decision on funding up to €300M, sponsored by UK Government; only CCS project in the NER competition
• Engaging with funding community after strong interest shown during the pre-FEED phase
• White Rose on track for a Final Investment Decision end 2015
White Rose Project: January 2014
Oxy-Power
Plant
CO2 Transport &
Storage
Location: Drax Power Station, North Yorkshire, UK
PROJECT DEVELOPERS:
Alstom Drax BOC-Linde
National Grid &
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 23
Partnerships and references
Alstom collaborates with multiple international companies
to realise the scale-up of CO2 Capture and Storage
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 17/11/2014 – P 24
Capture-Ready study
Identified pre-investments for future capture retrofit - Coal
Alstom Capture Ready solutions developed upon three pillars:
Early and substantial investment in Capture technologies development
Integrated power plant expertise (EPC supplier of turnkey power plant)
Component supplier experience (major equipment in 25% of the world installed base)
Partnership with Schlumberger to cover the entire CCS chain
Provisions in arrangement planning
Steam Turbine: reservations in turbine design for future
steam extraction
Electrical & Control Building:
Extra space
Transformer Area: installing an isolated bus
Stack duct: potential longer
stack duct
Waste Water Treatment System: foresee interconnection with power block WWTS
FGD: leaving space for upgrade
Optimisation of the Boiler heat transfer surfaces
according Modifications of heat load sharing
Optimisation of the cooling system recovery of heat in CO2 capture and
compression
www.alstom.com
With Alstom, preserve the environment.
Is printing this presentation really necessary?
www.alstom.com