  • 7/13/2019 Air Quality Control

    1/26

    Daniel Chang, P.E.

    Daniel Chang is an Air Quality Control Engineer for

    Black & Veatch Energy. His experience on AQCS

    implementation projects encompasses AQCS

    planning studies, preliminary engineering,

    equipment specification and purchase, process

    design review and implementation, and start-

    up/commissioning/performance testing. In 2009-

    2010, he was a field engineer involved in the start-

    up and commissioning of a Wet FGD system in Ohio.

    Daniel was also involved in the emissions and

    performance testing program during thecommissioning of PLNs Tanjung Jati B Units 3 and 4

    in 2011. He is currently serving as the AQC Engineer

    for 3 major AQC retrofit projects in the USA.

    Office Location

    Overland Park, Kansas

    City - USA

    Education

    B.S. Mechanical

    Engineering

    M.S. Engineering

    Technology

    Air Quality Control

    Engineer

  • 7/13/2019 Air Quality Control

    2/26

    AIRQUALITYCONTROLENGINEERDANIELCHANG

    AIRQUALITYCONTROL

    25Nove

    mber2013

  • 7/13/2019 Air Quality Control

    3/26

    TOPICS

    AQCS DrivenbyRegulation

    ChallengesinAQCS Implementation

    Black&VeatchCapabilities

    2

  • 7/13/2019 Air Quality Control

    4/26

    AQCS DRIVENBYREGULATION

    3

  • 7/13/2019 Air Quality Control

    5/26

    ReferencedbytheInternationalFinanceCorporation(IFC)

    Performance

    Standards

    on

    Environmental

    and

    SocialSustainability PerformanceStandard1

    IndustrySpecificGoodInternationalIndustryPractice

    (GIIP)Environmental,HealthandSafety(EHS)Guidelinesfor

    ThermalPowerPlants

    Version:

    19

    December

    2008

    WORLDBANK

    STANDARDS

    25November2013BVI |

    4

  • 7/13/2019 Air Quality Control

    6/26

    WORLDBANK

    EHS

    GUIDELINES

    25November2013BVI |

    FuelPM

    (mg/Nm3) SO2

    (mg/Nm3) NO2

    (mg/Nm3)NDA DA NDA DA NDA DA

    SolidFuel(>50 MWth

    to600MWth) 50 30 200

    850* 200 510** 200

    *Consideringfactors: fuel,costeffectivenessforsmallerunits,auxpowerusageforsecondarycontrols.

    **1,100mg/Nm3iffuelvolatilematter

  • 7/13/2019 Air Quality Control

    7/26

    Financialindustryriskmanagementframework

    Environmentalandsocialriskinprojects

    78financialinstitutionsasEPFIs

    70%ofInternationalprojectfinancedebtinemergingcountries

    Principle3:Applicableenvironmentalandsocialstandards

    IFC performancestandardsonenvironmentalandsocial

    sustainabilityWorldbankenvironmental,healthandsafetyguidelines

    EQUATORPRINCIPLES

    25November2013BVI |

    6

  • 7/13/2019 Air Quality Control

    8/26

    EQUATORPRINCIPLES

    APPLICABLE

    STANDARDS

    25November2013BVI |

    Equator

    PrinciplesEquator

    Principles

    IFCPerformance

    Standards(PS

    1)

    IFCPerformance

    Standards(PS

    1)

    WorldBankEHSGuidelines

    forThermalPower

    Plants

    WorldBankEHSGuidelines

    forThermalPower

    Plants

    7

  • 7/13/2019 Air Quality Control

    9/26

    EUREGULATIONS

    Pollutant Dust(PM) SO2 NO2

    50to100MW 30mg/m3 400mg/m3

    300mg/m3

    450mg/m3

    (lignite)

    100to

    300

    MW 25

    mg/m3 250

    mg/m3 200

    mg/m3

    >300 MW 20mg/m3

    200mg/m3 200mg/m3

    FromDirective2010/75/EUoftheEuropeanParliamentandoftheCouncil,24November2010,onIndustrialEmissions(IntegratedPollutionPreventionandControl).

    25November2013BVI |

    8

  • 7/13/2019 Air Quality Control

    10/26

    FORCESTHAT

    DRIVE

    AQCS

    REQUIREMENTS

    Increasing

    awareness

    regarding

    health

    impacts

    of

    power

    plant

    emissions

    Regulatory

    Financing

    GovernmentRequirements

    Regulatory

    Financing

    GovernmentRequirements

    SocialAwareness

    HealthImpacts

    EnvironmentalImpacts

    PublicPerception

    SocialAwareness

    HealthImpacts

    EnvironmentalImpacts

    PublicPerception

    25November2013BVI |

    9

  • 7/13/2019 Air Quality Control

    11/26

    TYPICALEVOLUTION

    OF

    AQCS REGULATION

    Technology

    selection

    progression

    is

    dependent

    on

    plant

    specific

    AQCS

    implementation

    scenario

    PM

    ESP

    SO2

    CoalSelection

    FGD

    NOx

    LNB

    PM

    FabricFilter

    NOx

    SCR

    Hg

    Cobenefit

    Capture

    ACI

    25November2013BVI |

    10

  • 7/13/2019 Air Quality Control

    12/26

    CHALLENGES

    INAQCS

    IMPLEMENTATION

    11

  • 7/13/2019 Air Quality Control

    13/26

    Black

    &

    Veatch

    assists

    clients

    with

    identifying

    challenges

    and

    develops

    AQCS

    implementation

    plans

    Identifyinganddesigningto

    applicable

    emissionsregulation

    Identifyinganddesigningto

    applicable

    emissionsregulation

    Distributed

    powergeneration

    systems

    Distributed

    powergeneration

    systems

    Retrofitvs.new

    AQCS

    implementation

    Retrofitvs.new

    AQCS

    implementation

    AQCSIMPLEMENTATION

    CHALLENGES

    FOR

    PLN

    25November2013BVI |

    12

  • 7/13/2019 Air Quality Control

    14/26

    Without

    planning

    that

    accounts

    for

    all,

    it

    is

    easy

    to

    get

    boxed

    into

    a

    corner

    Scenarioplanning Figureoutoptions

    Costsassessment

    Sensitivityanalysis

    EmissionsStandardsCompliance

    Planningfor

    non

    air

    regulations

    TechnologySelection

    Constructionplanning

    ImplementationofAQCSintothe

    existingfacility

    PLANNINGFOR

    FUTURESUCCESS

    25November2013BVI |

    13

  • 7/13/2019 Air Quality Control

    15/26

    Sizeofpowerplantvariesforeachgeographic

    region

    Unitsizeclasses:

    600MW

    AQCSImplementationtakesintoaccountunitsize

    AQCSFOR

    VARIOUS

    UNIT

    SIZES

    25November2013BVI |

    14

  • 7/13/2019 Air Quality Control

    16/26

    NEWVERSUS RETROFIT

    AQCS

    NEW

    Regulatoryrequirements

    Technologyselection

    RETROFIT

    Regulatoryrequirements

    Existingplant

    constraints

    Impactstoexistingplant

    25November2013BVI |

    15

  • 7/13/2019 Air Quality Control

    17/26

    DraftSystemandDuctwork

    Fans

    AuxiliaryElectricSystems

    Air

    HeatersWaterandWastewater

    CompressedAir

    PlantControl

    System

    AshHandlingSystem

    IMPACTTO

    EXISTING

    PLANT

    IN

    AQCSRETROFIT

    25November2013BVI |

    16

  • 7/13/2019 Air Quality Control

    18/26

    Constructionplanningforthefuture

    Locatepotentialfutureequipmentnow

    Leavespaceforfutureequipment

    Designplanning

    Fansizing

    and

    purchase

    Ductworkandequipmentsizing

    Auxiliaryelectricsystems

    Ashhandling

    Waterandwastewater

    DESIGNINGFOR

    THE

    FUTURE

    25November2013BVI |

    17

  • 7/13/2019 Air Quality Control

    19/26

    BLACK&VEATCH

    CAPABILITIES

    18

  • 7/13/2019 Air Quality Control

    20/26

    BOARDOF

    PUBLIC

    UTILITIESNEARMAN CREEKUNIT1AQCUPGRADE

    SCR,

    CDS/PJFF,

    PAC

    for

    Total

    AQC

    Solution

    25November2013BVI |

    19

  • 7/13/2019 Air Quality Control

    21/26

    Plants

    QuindaroUnit

    2

    NearmanUnit1

    Scope

    Permitting

    SpecDevelopment

    Engineering

    ConstructionSupport

    Startup/Testing

    Schedule

    QuindaroUnit2 Q42011

    NearmanUnit1 Q22012

    BOARDOF

    PUBLIC

    UTILITIESLOWNOXBURNERRETROFIT

    25November2013BVI |

    20

  • 7/13/2019 Air Quality Control

    22/26

    Alliance

    partners

    developed

    early

    in

    the

    project

    to

    collaborate

    on

    construction

    execution

    plan

    287MWbaseload

    Highsulfurcoal,withthepotentialforSO3condensationonfabricfilter

    BuiltinsamelocationasexistingESP

    Minimizedoutagetimebymaximizingmodularization

    Removed5weeksfromoriginaloutageschedule

    VECTREN CULLEY UNIT3FABRICFILTERADDITION

    25November2013BVI |

    21

  • 7/13/2019 Air Quality Control

    23/26

    KingPlanthasachievedrecordgenerationthreeyearsinarow,andwearewellonourwaytoexceedingourpreviousrecordforafourthyear. TheBlack&Veatchdesignhasprovenitselfthrough

    operationto

    be

    of

    high

    quality.

    ThomasSmith,PlantDirector,KingPlant,XcelEnergy

    Dryscrubber

    andPJFF

    SCRsystem

    Boilermodifications

    Replacementofthesteamturbine

    Replacementofthegeneratorexcitationsystem

    Balanceddraftconversion

    DCSUpgrade

    XCELKING

    STATION

    REHABILITATION

    PROJECT

    25November2013BVI |

    22

  • 7/13/2019 Air Quality Control

    24/26

    AQCSDriven

    by

    RegulationAQCS

    Driven

    by

    Regulation

    Challenges

    in

    AQCS

    ImplementationChallenges

    in

    AQCS

    Implementation

    Black&

    Veatch

    CapabilitiesBlack

    &

    Veatch

    Capabilities

    WHATHAVE

    WE

    TALKED

    ABOUT?

    25November2013BVI |

    23

  • 7/13/2019 Air Quality Control

    25/26

    Q&A

    25November2013

    24

    BVI|

  • 7/13/2019 Air Quality Control

    26/26

    www.bv.com