airborne isr/ unmanned aircraft systems (uas) …

12
AIRBORNE ISR/ UNMANNED AIRCRAFT SYSTEMS (UAS) LETTERS OF ASSIST (LOA)

Upload: others

Post on 22-Feb-2022

33 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: AIRBORNE ISR/ UNMANNED AIRCRAFT SYSTEMS (UAS) …

AIRBORNE ISR/ UNMANNED AIRCRAFT SYSTEMS (UAS) LETTERS OF ASSIST (LOA)

Page 2: AIRBORNE ISR/ UNMANNED AIRCRAFT SYSTEMS (UAS) …

Slide 2

Current Situation Achievements and Challenges

• Development of UN UAS regulatory

framework. New DOS Aviation Manual

includes UAS dedicated chapter.

Definition of requirements. Generation

process

• Establishment of a UAS stakeholders

network and forum within UNHQ

working together on UAS issues. (

SURs, LOAs, MOU, COE, Contracts,

SOPS, etc).

• Common approach in generation,

acquisition, deployment and utilization

of UAS.

• LOA and contract negotiation and

management.

UAS Joint Cell

• UAS/RPAS is growing in UN

environment

• Multi discipliner and joint effort

• Permanent members; OMA, ATS, PD,

OICT (brindisi/Valencia), Av Safety

and OCT. Leading DOS/LD/ATS (CM)

• Regular meetings focal points

• Overall supervision and joint

coordination of UAS issues UN clients

• Planning, generation, procurement

deployment and operation.

Page 3: AIRBORNE ISR/ UNMANNED AIRCRAFT SYSTEMS (UAS) …

UN Peacekeeping UAS/RPAS Table

Page 4: AIRBORNE ISR/ UNMANNED AIRCRAFT SYSTEMS (UAS) …

Generating an Aviation Unit

MANDATORYAAV

MANDATORYPDV

Page 5: AIRBORNE ISR/ UNMANNED AIRCRAFT SYSTEMS (UAS) …

AvionicsProtectionSOPs

Generating an Aviation Unit

RECOMMEND

QualificationsExperienceType, age, state, etc.

Maintenance proceduresRegulatory documentsSpare partsOperational proceduresSafety proceduresSecurity procedures

ASSESS / GUIDE ASSESS / GUIDE

Page 6: AIRBORNE ISR/ UNMANNED AIRCRAFT SYSTEMS (UAS) …

Generating an Aviation Unit

As recommendedbyAAV

CHECK

QualificationsExperienceType, age, state, etc.

Maintenance proceduresRegulatory documentsSpare partsOperational proceduresSafety proceduresSecurity procedures

CHECK CHECK

Page 7: AIRBORNE ISR/ UNMANNED AIRCRAFT SYSTEMS (UAS) …

Pre-Deployment Visit

7

BRIEF

National Officials

Key Contingent Personnel

ASSESS

Equipment Technical

Specifications

Deployment Readiness

Operational Capability

Pre-Deployment

Training

DETERMINE

Amendments to Negotiated

MOU

Deviations to Negotiated

MOU

DISCUSS & REPORT

(MIL) Unit Certification Document

Wrap up Meeting

Final Report

Team Tasks

Page 8: AIRBORNE ISR/ UNMANNED AIRCRAFT SYSTEMS (UAS) …

UN Aviation Regulatory Regime

ICAO SARPS

CAA (JAA, FAA, MOT…)

UN Aviation Manual 2018

Missions’ SOPs

IATA

TCC –National

Military Directives

New Edition 2020/21

Page 9: AIRBORNE ISR/ UNMANNED AIRCRAFT SYSTEMS (UAS) …

Sourcing Process Military Aircraft

DPO/ OMA

Mission

DOSTCCs

PD

ATSLOAs

HCC

On average it takes 6-9 Months from start to finish

Page 10: AIRBORNE ISR/ UNMANNED AIRCRAFT SYSTEMS (UAS) …

LOA STRUCTURE

➢ SUR OPERATIONAL REQUIREMENTS

➢ TECHNICAL AVIATION REQUIREMENTS

➢ FINANCIAL REQUIREMENTS

➢ Ideally, LOA signed before deployment

Contract- UNFRR

Page 11: AIRBORNE ISR/ UNMANNED AIRCRAFT SYSTEMS (UAS) …

Wednesday, 04 November, 20204th International Symposium 2018 l Partnership for

Technology in Peacekeeping

Issues and challenges

• Financial. Reimbursement rates. High cost and limited PKO budgets. Potential delay or disagreement

• Operational. Effectiveness. SUR compliance, potential impact on operations

• Technical. UN Aviation standards, potential delays

• Logistics. Big logistic efforts to deploy , operate and maintain these capability. Limited Mission support (AAV critical step). Potential delays

• Generation military Unit. Complex generation process. Time consuming

Page 12: AIRBORNE ISR/ UNMANNED AIRCRAFT SYSTEMS (UAS) …

Questions?