MANCHESTER AIRPORT AIRCRAFT PUSHBACK PROCEDURES REVISION Z Effective from 10 th July 2019. 00:01 hrs local. Changes from previous revision; Pushback procedure wording amended for Stands 101, 103, 105, 107, 109, 111 and 113. Push and Park locations amended. B787-10 added to Engine Test Bay Stop Positions list. Two new tug callsigns added. Points to remember; Always ensure that the current aircraft pushback procedures document is available inside the tug prior to carrying out any aircraft pushback or towing manoeuvre. Any deviation from the procedures described in this document will be issued by ATC as a ‘non- standard’ pushback instruction at the time of pushback request. JUNE 2019 AIRPORT SAFETY FOCUS As of the 10th July 2019 at 00:01hrs local, the new Zulu Pushback Procedures need to be adhered to by the airside community. The key changes that have been made are the amendments for stands 101, 103, 105, 107, 109, 111 and 113 as well as changes to push and park locations. In addition to this, the B787-10 has been added to the Engine Test Bay Stop Positions list and 2 new tug call signs have been added. Following on from discussions held at the Pushback Safety committee with both MAG and the ground handling community representatives present, it was decided that it would be a good idea to have defined gaps between the pushback procedures for each stand added. This should provide better clarity and reduce errors in performing the wrong pushback. It is vital that the latest version of the Pushback Procedures document and a copy of the Manchester Airport Manoeuvring Area Map are always in aircraft tugs and try to ensure that you are familiar to them and refer to them before a pushback begins. If you are unsure about an instruction given by ATC or you think an instruction needs to be challenged, give them a call to discuss your concerns. Don’t be afraid to query. Always ask and never assume – you either know or you don’t. NEW MANCHESTER AIRPORT PUSHBACK PROCEDURES – REVISION ZULU The Airfield Planning team are responsible for co-ordinating all of the work that occurs out on and around the airfield and creating OAN’s, Minor Works Briefs, tall equipment permits, aircraft pushback procedures and much more. The team have commissioned a new Works in Progress viewer that will enable them to view all works that pose an impact to the airfield. The software package will be used to plan, monitor and deconflict works to keep the airfield operational while undergoing major reconstruction and minor maintenance work. The areas highlighted in green represent the work that is taking place at any one time on the airfield and shows just how quickly change occurs and how busy it can get for the team. If you would like to know more about the Works in Progress viewer, please contact Airfi[email protected]. AIRFIELD WORKS IN PROGRESS VIEWER manchesterairport.co.uk/ops

Upload: others

Post on 25-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AIRPORT SAFETY FOCUS - Amazon Web Services · MANCHESTER AIRPORT AIRCRAFT PUSHBACK PROCEDURES REVISION ZULU v1.0 Effective from 10th July 2019. 00:01 hrs local. Changes from previous

MANCHESTER AIRPORT AIRCRAFT PUSHBACK PROCEDURES

RE

VIS

ION

ZU

LU v1.0

Effective from 10th July 2019. 00:01 hrs local.

Changes from previous revision;

Pushback procedure wording amended for Stands 101, 103, 105, 107, 109, 111 and 113.

Push and Park locations amended. B787-10 added to Engine Test Bay Stop Positions list. Two new tug callsigns added.

Points to remember;

Always ensure that the current aircraft pushback procedures document is available inside the tug prior to carrying out any aircraft pushback or towing manoeuvre. Any deviation from the procedures described in this document will be issued by ATC as a ‘non-standard’ pushback instruction at the time of pushback request. It is a mandatory requirement to use a serviceable headset at all times when carrying out any aircraft pushback, tow or push & park manoeuvre. NB: Headsets are not to be used during periods of thunderstorm activity, Aerodrome Manual, ASI 16 refers. Airside Standing Instructions 16 and 18 within the Manchester Airport Aerodrome Manual provide further guidance on pushback procedures and use of headsets. An up-to-date copy of the Manchester Airport Manoeuvring Area Map must be available in aircraft tugs at all times. Pushback clearance MUST NOT be requested by flight crew until the Headset Operative (Handling Agent or Ground Engineer) has confirmed to the aircraft commander that the aircraft and ground crew are fully ready for pushback and the tug driver is in the cab. Tug drivers have a responsibility to listen to ATC and the pushback clearance instruction given. Tug drivers MUST listen out on ATC Ground frequency, and listen specifically for the ATC pushback clearance, which will include the stand number. If in doubt about an instruction given, call ATC via the tug radio to seek confirmation/ clarification. Don’t be afraid to query. Always ask and never assume – you either know or you don’t. Aircraft parked on Left or Right centrelines use the procedure for the CENTRE/MAIN stand designator number, unless listed as otherwise in this document. Upon completion of a pushback manoeuvre;

Aircraft nose to be pointing towards the airfield identification point, eg: ‘facing runways’.

Aircraft nose wheel to be on taxiway centreline. Aircraft nose wheel to stop on relevant Tug Release Point (TRP) mark or to stop abeam

the relevant CENTRE/MAIN stand centreline number unless otherwise stated. If pushing to a taxiway Intermediate Holding Point (IHP), both aircraft and tug must be

stopped behind the IHP markings, clear of adjacent taxiway routes.

JUN

E 2019

AIRPORT SAFETY FOCUS

As of the 10th July 2019 at 00:01hrs local, the new Zulu Pushback Procedures need to be adhered to by the airside community.

The key changes that have been made are the amendments for stands 101, 103, 105, 107, 109, 111 and 113 as well as changes to push and park locations. In addition to this, the B787-10 has been added to the Engine Test Bay Stop Positions list and 2 new tug call signs have been added.

Following on from discussions held at the Pushback Safety committee with both MAG and the ground handling community representatives present, it was decided that it would be a good idea to have defined gaps between the pushback procedures for each stand added. This should provide better clarity and reduce errors in performing the wrong pushback.

It is vital that the latest version of the Pushback Procedures document and a copy of the Manchester Airport Manoeuvring Area Map are always in aircraft tugs and try to ensure that you are familiar to them and refer to them before a pushback begins.

If you are unsure about an instruction given by ATC or you think an instruction needs to be challenged, give them a call to discuss your concerns.

Don’t be afraid to query. Always ask and never assume – you either know or you don’t.

NEW MANCHESTER AIRPORT PUSHBACK PROCEDURES – REVISION ZULU

The Airfield Planning team are responsible for co-ordinating all of the work that occurs out on and around the airfield and creating OAN’s, Minor Works Briefs, tall equipment permits, aircraft pushback procedures and much more.

The team have commissioned a new Works in Progress viewer that will enable them to view all works that pose an impact to the airfield. The software package will be used to plan, monitor and deconflict works to keep

the airfield operational while undergoing major reconstruction and minor maintenance work. The areas highlighted in green represent the work that is taking place at any one time on the airfield and shows just how quickly change occurs and how busy it can get for the team.

If you would like to know more about the Works in Progress viewer, please contact [email protected].

AIRFIELD WORKS IN PROGRESS VIEWER

manchesterairport.co.uk/ops

Page 2: AIRPORT SAFETY FOCUS - Amazon Web Services · MANCHESTER AIRPORT AIRCRAFT PUSHBACK PROCEDURES REVISION ZULU v1.0 Effective from 10th July 2019. 00:01 hrs local. Changes from previous

Since the launch of the app in December we have made quite a few updates including baggage notifications, a new airfield banner, how to report a drone sighting and there are many more still to come so keep your eyes peeled!

Here are a couple of the newer developments in the past month:1. Disruptive Passenger Reporting

This links through to a survey that anyone across the airport site can use to report disruptive passengers and notify colleagues of incidents across the passenger journey. An email / text alert is then sent in real time to a distribution list controlled by the Manchester Airport Retail Team. Please email [email protected] to add employees to the distribution list.

2. Airfield Operations and Safety Section This is now the main area for airside related information such as airside procedures e.g. OANs, safety reporting, baggage hall handbook and a direct link to this newsletter!

We are constantly collecting feedback and ideas on the app, please email these to [email protected]. We are also happy to help demo the app and answer any questions you have so let us know how we can help!

COMMUNITY APP – HERE’S WHAT’S NEW IN 14-2019 AIRFIELD VIEWER

In 2018 the Airfield Community decided to use the infringement fund to invest in airfield photography and mapping to aid pilot and driver training and situational awareness.

The airfield viewer is a web-based tool and operates much like Google Street View. Access is via the Manchester Airport Airfield Operations Web page. The system has open access, but a username and password are required to enter the system, details are found at www.manchesterairport.co.uk/airfieldviewer.

Manchester Airport will undertake regular updates of the system to ensure the information contained remains as accurate as possible and if you require any further information, please contact the Airfield Duty Manager on +44 (0)161 489 3331.

manchesterairport.co.uk/ops

Page 3: AIRPORT SAFETY FOCUS - Amazon Web Services · MANCHESTER AIRPORT AIRCRAFT PUSHBACK PROCEDURES REVISION ZULU v1.0 Effective from 10th July 2019. 00:01 hrs local. Changes from previous

AIRFIELD OPERATIONS SUMMER READINESS EVENT IPAD WINNERS

DOUGHNUT WORRY, BE HAPPY!

FOD REMOVAL

COMMUNITY ACHIEVEMENTS – NORTH AIR

Congratulations to lucky winners Chris Renshaw, GSE Fleet Supervisor at Swissport and Nathan Powell, Airfield Security Officer for winning the prizes from Airfield Summer Readiness Event as part of AOA Safety Week 2019.

The event saw great collaboration between MAN Airside Teams and our Ground Handling Community to demonstrate key safety themes.

Thank you to Joanna Jureczko who helped coordinate the event and its success.

On Friday 21st June Sean Wismann and Nena Adrienne from the MAN Performance team went out and about delivering 1000 Greggs doughnuts to operational colleagues.

The doughnuts were a thank you for the resilience and hard work that all teams have put in during May and June, really showcasing the team Manchester approach.

There has been an increasing trend of aircraft cleaning and catering waste left on stand. Not only is this a FOD hazard, it is also a bird and vermin attractant.

All are reminded of their obligations to comply with legislation on Category 1 International Catering Waste as well as Airfield Safety and to ensure that aircraft cleaning and catering waste is secure (in tied bags or catering carts) and is taken in a timely manner to in-flight catering centre or to West Gate Waste Management Area only. Under no circumstances should waste be left on stand or deposited into North Road or any other airport waste facilities.

A huge congratulations to Garry Scully and the North Air team who, for an unprecedented second year in a row, have won the JIG Sustained Performance Award as a global recognition for continued and sustainable outstanding performance in their field of work.

In order to win the award, North Air successfully met criteria including: – No fatalities – No fires, aircraft incidents, major spills, misfuelling or serious PQI

– Reported near misses and safety walks/sport checks

– 3 successive “good” inspection results (2015-2018)This is such a great achievement for all

the North Air team here at Manchester Airport. Keep up the good work and here’s to a successful 2019!

CONTACT US

Kelly SharkeyTechnical [email protected]

Airfield [email protected]

We would like to ensure that content is relevant, so if you wish to contribute, and provide details of any specific topics to cover in the next edition or safety initiatives that are being implemented, please do get in touch via above contact details.

Please ensure that Manchester Airport are in receipt of correct Airside Operator contact details, so that we can get the right information to the right people.

manchesterairport.co.uk/ops

Page 4: AIRPORT SAFETY FOCUS - Amazon Web Services · MANCHESTER AIRPORT AIRCRAFT PUSHBACK PROCEDURES REVISION ZULU v1.0 Effective from 10th July 2019. 00:01 hrs local. Changes from previous

manchesterairport.co.uk/ops

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

KEEP OUR AIRFIELD FOD FREE

FOD

FOD

FOD

FOD

FOD

FOD

FOD

FOD

manchesterairport.co.uk/ops

Manchester Airport supports a Just Culture

JUSTCULTURE

FOREIGN OBJECT DEBRIS

Manchester Airport supports a Just Culture

JUSTCULTURE

015

ISO 9001

QUALITYMANAGEMENT

CLEAN AS YOU GO THROUGHOUT THE WORKING DAY