airtrollis 1 slide
TRANSCRIPT
![Page 1: Airtrollis 1 slide](https://reader031.vdocuments.net/reader031/viewer/2022020217/556268edd8b42aed7d8b51eb/html5/thumbnails/1.jpg)
@Gadong
Another Project by
BELLANOVA Sdn. Bhd. 672121-D
![Page 2: Airtrollis 1 slide](https://reader031.vdocuments.net/reader031/viewer/2022020217/556268edd8b42aed7d8b51eb/html5/thumbnails/2.jpg)
INTRODUCTION
• Integrated Development on the Labu-Sendayan-Gadong Growth Belt
![Page 3: Airtrollis 1 slide](https://reader031.vdocuments.net/reader031/viewer/2022020217/556268edd8b42aed7d8b51eb/html5/thumbnails/3.jpg)
KLIA
ENSTEK
LCCT
via Google Earth
AIRTOLLIS LOCALITY PLAN
SEREMBAN 2
SENDAYAN
SEREMBAN
LABU SEPANG
![Page 4: Airtrollis 1 slide](https://reader031.vdocuments.net/reader031/viewer/2022020217/556268edd8b42aed7d8b51eb/html5/thumbnails/4.jpg)
11 10
9
3 2 1
4
8
7
6
5
SITE LAYOUT PLAN • 11 blocks of 10-storey Condominium
Block Numbers Of Units
1 – 3 = 116 per-block
(10 Storey Block )
4 – 8 = 80 per-block
(10 Storey Block )
9 – 10 = 92 per-block
(8 Storey Block )
11 = 92 per-block
(8 Storey Block&
Shopping Mall)
![Page 5: Airtrollis 1 slide](https://reader031.vdocuments.net/reader031/viewer/2022020217/556268edd8b42aed7d8b51eb/html5/thumbnails/5.jpg)
VIBRANT LOCATION
![Page 6: Airtrollis 1 slide](https://reader031.vdocuments.net/reader031/viewer/2022020217/556268edd8b42aed7d8b51eb/html5/thumbnails/6.jpg)
AIRTROLLIS CONCEPT
![Page 7: Airtrollis 1 slide](https://reader031.vdocuments.net/reader031/viewer/2022020217/556268edd8b42aed7d8b51eb/html5/thumbnails/7.jpg)
AIR = KLIA and LCCT International Airport.
TRANSIT = Focal Centre with Integrated Transport System.
METROPOLIS = Integrated and Self-Sustaining In between two
Metropolitans, Bandar Enstek & Bandar Sendayan.
AIRTROLLIS CONCEPT
![Page 8: Airtrollis 1 slide](https://reader031.vdocuments.net/reader031/viewer/2022020217/556268edd8b42aed7d8b51eb/html5/thumbnails/8.jpg)
AIRTOLLIS FUTURE DEVELOPMENT PLAN
![Page 9: Airtrollis 1 slide](https://reader031.vdocuments.net/reader031/viewer/2022020217/556268edd8b42aed7d8b51eb/html5/thumbnails/9.jpg)
PRIME LOCATION
4 KM
1 KM
![Page 10: Airtrollis 1 slide](https://reader031.vdocuments.net/reader031/viewer/2022020217/556268edd8b42aed7d8b51eb/html5/thumbnails/10.jpg)
AIRTROLLIS SURROUNDINGS
![Page 11: Airtrollis 1 slide](https://reader031.vdocuments.net/reader031/viewer/2022020217/556268edd8b42aed7d8b51eb/html5/thumbnails/11.jpg)
Airtrollis
GOVERNMENT MASTER PLAN
RAPID DEVELOPMENT of
Nearby, Increase the Land VALUE
OF AIRTROLLIS
![Page 12: Airtrollis 1 slide](https://reader031.vdocuments.net/reader031/viewer/2022020217/556268edd8b42aed7d8b51eb/html5/thumbnails/12.jpg)
PROPOSED NEW HIGHWAY
AIRTROLLIS is STRATEGIC now,
But, it is going to be MORE STRATEGIC
AIRTROLLIS
Proposed new Highway
![Page 13: Airtrollis 1 slide](https://reader031.vdocuments.net/reader031/viewer/2022020217/556268edd8b42aed7d8b51eb/html5/thumbnails/13.jpg)
HIGH SPEED TRAIN
• Linked to Integrated Transit Network of Kuala Lumpur
High Speed Rail
![Page 14: Airtrollis 1 slide](https://reader031.vdocuments.net/reader031/viewer/2022020217/556268edd8b42aed7d8b51eb/html5/thumbnails/14.jpg)
BUILDING LAYOUT PLAN
930 Sq.ft2 820 Sq.ft2
![Page 15: Airtrollis 1 slide](https://reader031.vdocuments.net/reader031/viewer/2022020217/556268edd8b42aed7d8b51eb/html5/thumbnails/15.jpg)
FLOOR LAYOUT PLAN
![Page 16: Airtrollis 1 slide](https://reader031.vdocuments.net/reader031/viewer/2022020217/556268edd8b42aed7d8b51eb/html5/thumbnails/16.jpg)
LAYOUT
![Page 17: Airtrollis 1 slide](https://reader031.vdocuments.net/reader031/viewer/2022020217/556268edd8b42aed7d8b51eb/html5/thumbnails/17.jpg)
STRUCTURE DESCRIPTION
Wall Reinforced concrete frame work.
Light weight non load bearing wall to all internal walls of all units.
Cement sand brick or approved equivalent to all external walls
except
for party wall with clay brick.
Roof Steel roof truss system with metal roofing.
Ceiling Skim coat with paint to selected Foyer, balcony, yard
Fibrous Plaster Ceiling for all internal area (excluding
bathrooms).
Asbestos free ceiling board for bathrooms.
Door Fire rated door to main entrance.
PVC flush door to bathrooms.
Plywood flush door / PVC flush door to other areas.
Natural Anodized aluminum frame with glass to sliding door.
Windows Natural Anodized aluminum frame with glass.
STRUCTURE DESCRIPTION
Flooring Ceramic tiles to Foyer, Living, Dining, Kitchen, Bedrooms,
Utility ( Type B & B1 only )
Non-slip tiles to bathrooms, yard, and balcony.
Wal Finishes Ceramic tiles 1.50 meter height to bathrooms and kitchen.
Plaster and weather resistant paint to external wall.
Plaster and emulsion paint to internal wall
Electrical
Installation Lighting point : 11 nos ( Type A & A1 only )
(concealed
Conduit
Wiring)
: 12 nos ( Type B & B1 only )
13 Amp Power Point : 10 nos
Fan point : 1 nos
Telephone point : 1 nos
Door Bell point : 1 nos
Sanitary
Installation Shower : 2 nos
(Concealed
Piping) Sitting WC : 2 nos
Wash basins : 2 nos
Tap : 4 nos
Single bowl aluminium sink : 1 nos
Common
Staircase Mild steel handrail and balustrades.
BUILDING SPECIFICATION
Subject to change without further notice
![Page 18: Airtrollis 1 slide](https://reader031.vdocuments.net/reader031/viewer/2022020217/556268edd8b42aed7d8b51eb/html5/thumbnails/18.jpg)
SITE PROGRESS
August
September October
November
![Page 19: Airtrollis 1 slide](https://reader031.vdocuments.net/reader031/viewer/2022020217/556268edd8b42aed7d8b51eb/html5/thumbnails/19.jpg)
Artist impression only
Thank you