Alabama Appraisal Manual 2005 9-1 CHAPTER 9 COMMERCIAL/INDUSTRIAL STRUCTURES Commercial and Industrial structures contain a wide variation in interior framing and electrical cost. This edition of the Alabama Appraisal Manual uses multiple base rate tables to account for these variations. Each table contains cost for interior framing, electrical and built-ins typical to a specific occupancy. Construction units are applied in the same manner as residential and refer to the materials used to finish the exterior walls, interior walls, floors and ceiling. Factories, service occupancies and warehouses will contain large variations in the ratio of finished office areas to the total building area. Base rate tables for these three occupancies do not include the cost for office partitions. Office finish for these buildings is added based on the actual area of finished office instead of interior finish construction units. A table of office finish values is provided. This system combined with the unit system enables commercial and industrial structures to be calculated in much the same manner as residential. The same units apply, the same classification systems apply, and similar decimals apply. The important difference is in the application of what are called adjustments, which take care of such items as framing in heavier or taller buildings, excessive heights, adjustments for store front and interiors, apartment units, and partitions. The application of a system in the appraisal of a structure requires work to be performed in three areas: Fieldwork Classification Calculation Fieldwork : Fieldwork may be broken down into three components: Measurements, diagram, and construction data: Measurements : Equipment required: a 100-foot tape, clip board, and pencils. Measure each side of structure accurately, make diagram and place dimensions (rounded to nearest foot) inside each line they represent. All structural variations (canopies, loading docks, etc.) must be shown on the diagram, and dimensions shown in a way that will enable the area of each variation to be computed separately. In addition, heights must be measured and recorded. Diagram : Make a diagram to scale using the grid provided on the property record card. Label each appendage with an approved symbol (listed in Table 11). Lettering and numbers are to be neatly made. Story heights are indicated by use of the symbol +1, +2, etc. Heights are recorded by placing the number of feet represented by the difference in elevation between the ground level finished floor and eve height directly below the symbol for number of stories. On the perimeter sketch, solid lines designate the perimeter walls, a change in wall heights, or separation of one structure into two buildings. Broken lines designate partitions. See the examples that follow.

Upload: fdlkasdfj

Post on 08-Mar-2015

105 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-1

CHAPTER 9

COMMERCIAL/INDUSTRIAL STRUCTURES Commercial and Industrial structures contain a wide variation in interior framing and electrical cost. This edition of the Alabama Appraisal Manual uses multiple base rate tables to account for these variations. Each table contains cost for interior framing, electrical and built-ins typical to a specific occupancy. Construction units are applied in the same manner as residential and refer to the materials used to finish the exterior walls, interior walls, floors and ceiling. Factories, service occupancies and warehouses will contain large variations in the ratio of finished office areas to the total building area. Base rate tables for these three occupancies do not include the cost for office partitions. Office finish for these buildings is added based on the actual area of finished office instead of interior finish construction units. A table of office finish values is provided. This system combined with the unit system enables commercial and industrial structures to be calculated in much the same manner as residential. The same units apply, the same classification systems apply, and similar decimals apply. The important difference is in the application of what are called adjustments, which take care of such items as framing in heavier or taller buildings, excessive heights, adjustments for store front and interiors, apartment units, and partitions. The application of a system in the appraisal of a structure requires work to be performed in three areas: Fieldwork

Classification Calculation

Fieldwork: Fieldwork may be broken down into three components: Measurements, diagram, and construction data: Measurements: Equipment required: a 100-foot tape, clip board, and pencils. Measure each side of structure accurately, make diagram and place dimensions (rounded to nearest foot) inside each line they represent. All structural variations (canopies, loading docks, etc.) must be shown on the diagram, and dimensions shown in a way that will enable the area of each variation to be computed separately. In addition, heights must be measured and recorded. Diagram: Make a diagram to scale using the grid provided on the property record card. Label each appendage with an approved symbol (listed in Table 11). Lettering and numbers are to be neatly made. Story heights are indicated by use of the symbol +1, +2, etc. Heights are recorded by placing the number of feet represented by the difference in elevation between the ground level finished floor and eve height directly below the symbol for number of stories. On the perimeter sketch, solid lines designate the perimeter walls, a change in wall heights, or separation of one structure into two buildings. Broken lines designate partitions. See the examples that follow.

Page 2: AL Property Appraisal Manual Chapter 09 j

Building Information: Record the following information in the space provided on the property record card. Improvement type code, occupancy code (if different from improvement type code), occupancy override and date of extensive remodeling if applicable.

Improvement Type Code: This code is the building type and is entered in the improvement type code space provided on the property record card. The code number in this space will select the rate table used to calculate values.

Alabama Appraisal Manual 2005 9-2

Page 3: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-3

Occupancy Code: If the building is used for a purpose different than the improvement type, a separate occupancy code should be added in the occupancy code space. Occupancy Override: If the appraiser chooses to override the improvement code value, a check in the occupancy override box will override the improvement code value and use the occupancy code value.

BUILDING INFORMATION

IMP. CODE O.C. CODE OVERRIDE [ ] YEAR BUILT YEAR REMODELED EFF. YEAR BUILT

Age:

Year Built: Date that the building was constructed. Remodeled: Date of extensive remodeling. Effective Year Built: Adjusted date of construction due to depreciation cures. A date in this space overrides the year built for calculating physical depreciation.

Construction features are listed by checking the appropriate column under each subheading. Record the following information in the space provided: Total number of rooms in structure (excluding bathrooms), number of bedrooms and type of foundation.

ROOMS/UNITS TOTAL ROOMS No. EFF. APTS. No______ BR No______ BR No______ BR

Page 4: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-4

Foundation is defined as the sub-structure of a building. Record type of foundation and material utilized. Example: Slab.

FOUNDATION

PIERS S02 SLAB S01 WOOD SUBFLOOR S09

Commercial and industrial structures, by their nature often employ a wider range of materials and design than do residential structures. Construction units to cover additional materials and combinations of materials have been incorporated in the system. Exterior Walls: Materials involved in the walls or external vertical perimeter of a structure.

EXTERIOR WALLS

Not Applicable W00 Aluminum Siding W26 Brick on Wood W12 Cedar, Rough W20 Cedar, Beveled W30 C.B., 8" Plain W07 Conc., Precast (Plain) W24 Concrete, Tilt-Up W21 Dryvit W60 Hardboard – lap W22 Masonite 4' x 8' W23 Metal, Corrugated W03 Stone, Artificial W33 Vinyl Siding W27 Wood Frame, St W05 Wood & Sheathing W11

Page 5: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-5

If exterior wall material is other than one of the types listed, write in the name of the material in the space provided.

EXTERIOR WALLS Not Applicable W00 Aluminum Siding W26 Brick on Wood W12 Cedar, Rough W20 Cedar, Beveled W30 C.B., 8" Plain W07 Conc., Precast (Plain) W24 Concrete, Tilt-Up W21 Dryvit W60 Hardboard – lap W22 Masonite 4' x 8' W23 Metal, Corrugated W03 Stone, Artificial W33 Vinyl Siding W27 Wood Frame, St W05 Wood & Sheathing W11

If more than one type of material is in evidence under a sub-heading, indicate portion of each. Do not break down material in less than quarters.

EXTERIOR WALLS

Not Applicable W00 Aluminum Siding W26 Brick on Wood W12 ¾ Cedar, Rough W20 Cedar, Beveled W30 C.B., 8" Plain W07 Conc., Precast (Plain) W24 Concrete, Tilt-Up W21 Dryvit W60 Hardboard – lap W22 Masonite 4' x 8' W23 Metal, Corrugated W03 Stone, Artificial W33 Vinyl Siding W27 Wood Frame, St W05 ¼ Wood & Sheathing W11

Page 6: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-6

Roof Type refers to the shape of the roof line and its framing. Common types are listed on the property record card.

ROOF TYPE A Frame T14 Bar Joist, Metal Deck T15 Bar Joist, Wood Deck T03 Conc., Pre-Stressed T08 Flat-Shed T01 Gambrel T05 Hip-Gable T02 Mansard T06 Steel, Fr. Rigid Ins. T12 Steel Trusses T11 Wood Truss, WD T09

Roof Material refers to the finish or wearing surface of a roof. Most prevalent types are listed on the property record card.

ROOF MATERIAL Asphalt Shingle M04 Asphalt Shingle HV M22 Built-Up Tar & Gravel M03 Copper M18 Enamel Metal Shingle M11 Metal Corrugated M01 Metal Stand, Seam M20 Roll Composition M02 Rubber Membrane M17 Slate M09 Tile, Cement M06 Tile, Clay M07 Wood Shingles M13

Page 7: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-7

Floors include both the sub-floor (if any) and the finished floor or wearing surface.

FLOORS Not Applicable F21 Carpet & Underlay F14 Conc., Asphalt Tile F04 Conc., Precast/Formed F09 Conc., Raised F05 Conc. On Grade F03 Hardwood F08 Hardwood, Select F30 Marble F13 Parquet F10 Pine, Double F07 Plywood F01 Rubber Tile F28 Slate F18 Terrazzo F06 Tile, Ceramic F12 Tile, Cork F26 Tile, Quarry F11 Vinyl F16

Interior Finish refers to material used to finish the interior of exterior walls, as well as partition walls and ceiling.

INTERIOR FINISH Unfinished I01 Acoustical Ceiling I13 Acoustical Ceil., Susp. I14 Ceramic Tile I15 Drywall (Sheetrock) I07 Insulation I19 Painted I02 Plywood I11 Wood Panels I08

Page 8: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-8

Combinations of materials are often found in commercial structures. In such cases, estimate proportion of each material and list.

INTERIOR FINISH Unfinished I01Acoustical Ceiling I13Acoustical Ceil., Susp. I14Ceramic Tile I15Drywall (Sheetrock) I07Insulation I19Painted I02Plywood I11Wood Panels I08

Base rate tables for Factory, Light Manufacturing 200; Factory, Heavy Manufacturing 300; service (Low Partitions) 600 and Warehouse 637 do not contain cost for finished offices. When using these rate tables add office finish cost from the information below. Do not add units for office finish. Apply square foot cost to finished floor area.

Cost 1. Office, Low cost--open, finished floor, vinyl or asphalt tile, drywall, minimum counters $28.90 Sq Ft 2. Office, Average--average office finish, vinyl tile or carpet floors, acoustical ceiling, average office lighting $38.90 Sq Ft 3. Office, Good--good vinyl and carpet floors, drywall, wood panel partitions, suspended acoustical ceiling, good lighting $55.50 Sq Ft 4. Storage Mezzanine--open, unfinished wood floor over office or storage areas, unfinished stair $2.70 Sq Ft 5. Retail/Display--open, vinyl, or asphalt tile floor, some drywall/pegboard, minimal paneling and counters $31.00 Sq Ft 6. Retail, Average--average retail finish, vinyl tile or carpet floors, acoustical ceiling. $31.40 Sq Ft

Page 9: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-9

Plumbing refers to the quality of plumbing in a structure. Here commercial and industrial procedure differs from residential. In apartments, duplexes, hotels and condominiums, one three fixture bath per unit is included in the base rate. Additional bathrooms are added from the residential plumbing table. In all other commercial structures except for warehouses, factories and service buildings, plumbing units apply and all plumbing fixtures are priced from the commercial plumbing table.

PLUMBING None P01Poor P02Average P03

Adjustments: This portion of the property record card is devoted to various adjustments often necessary to recognize variations in construction.

ADJUSTMENTS No. Electric A00Fr. Open Steel Fr. Rein. Conc.Fr. Fireproof St.Height Apt. Equiv.Stalls

Framing: Might be timber, open steel, fireproof steel (structural steel encased in concrete), or reinforced concrete. Normally, although there are exceptions to this, buildings up to three stories will not have what is considered to be framing. Anything above this height probably will have framing. To say that a building has framing in this sense of the word means that the exterior walls could be removed and the structure would remain standing. Example: Should the exterior walls of a steel frame office building be removed, the structure would remain standing. The heavy steel bents support the building; the walls are not load bearing. Table 12 gives units that are to be applied to framing. Pre-engineered buildings do not carry framing units unless additional cost has been incurred for heavy framing. Height: Excessive heights of stories in structures have a bearing on cost. For this reason, a series of standard story heights has been determined, and excessive variation from them necessitates adjustments in wall units. For example, if a warehouse, instead of having a normal height of 12 feet, has 16-foot walls and if the normal wall units are 33, then the height adjustment of this building is 16÷ 12 or 1.33. Then 1.33 x 33 = 44 units or 11 extra wall units would be needed to compensate for

Page 10: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-10

excessive wall height; 33 units would be entered under Exterior Walls, and 11 units would be entered under Height in the Adjustment column. If a wall varies less than 2 feet from the normal, no adjustment is necessary. For exact wall heights, measurement must be made. For practical purposes, good sound estimates should be made; these based upon number of courses of block, brick, stone, boards, etc., after ascertaining measurements of same. Table 13 contains normal height information and Table 14 has upper floor decimals. Front and Interior: In many instances, store buildings may be found to have very elaborate and/or excessive amounts of plate glass. Also, interiors of structures may be elaborate. This may be due to original design or remodeling. In either case, additional cost exists. Rather than make a cost analysis for such work and material, a table (Table 15) has been developed to add units to recognize the addition cost. A normal store front is considered to be plate glass set in aluminum, approximately six feet in height and extending across the front of the structure except for doors. Higher or longer, or both, would be considered excessive. An elaborate interior is considered to be one with excessive millwork, counters of a permanent type, and excellent interior work in general. Apartment Equivalent: Apartment buildings with 4 or more units should be priced from Rate Table 113. This chart is based on a four unit building. When more than 4 apartment units exists within a structure, additional partitions, kitchens, etc. must be accounted for. A table of Apartment Equivalent units has been developed to recognize this additional cost, see Table 16. For example, six apartments in a single building would add 5 units. At the same time, plumbing in excess of one 3-fixture bath each would be added as an Extra Feature. Example: An eight unit two-story apartment house with two three-fixture baths in each unit would use 10 apartment equivalent units. Under plumbing extra features, eight three-fixture baths should be listed. Stalls: When a retail improvement has more than one stall or store area, it becomes necessary to add units for the partition work between. The Stall Widths table is so arranged as to handle this addition by consideration of store widths. See Table 17, Average Stall Width. Example: A store 75 feet wide is broken up into five store stalls: In this example, the lower floor of the building is broken into equal 15-foot widths; and, by use of the table, 10 units would be added for partitions. Another example would be in a store with unequal stall widths, all that is needed is the average stall width, or 75 feet divided by 4 stalls, or 19 feet. By use of Table 17, 7 units would be added for partitions.

Page 11: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-11

Plumbing - Extra Features: refers to actual fixtures observed in the structure. Record the number of fixtures. See Table 19 (Commercial/Industrial Plumbing).

PLUMBING 5 Fix Bath 4 Fix Bath 3 Fix Bath 2 Fix Bath

Heating and Air Conditioning: refers to the method by which a structure is heated and/or cooled. Space heat is listed as None. Window cooling units are considered personal property and should not be listed. For other systems list description of the system. Example: Forced hot air (FHA). In commercial-industrial type structures the entire building is not always heated and/or cooled. Should this be the case, the square foot area being served must be noted and the charge made for only that part being heated or cooled. See Table 20 (Heating and Air Conditioning Square Foot Cost).

HEATING AND AIR CONDITIONING None 00Gravity Heat 01FHA 02Hot Water 03AC Only 04Thru-Wall H.P. 05FHA/AC 06Package Unit 07Eng. W/C Air 08Eng. H/C Water 09Susp. Heat 10FireplacePF FP Units

Page 12: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-12

Commercial/Industrial buildings often contain many cost items in addition to plumbing, heating and air conditioning that are appropriately listed as building extra features. Some of these items are elevators, escalators and sprinklers, etc.

COMMERCIAL/INDUSTRIAL OTHER FEATURES Quantity Description Unit Cost Amount

Page 13: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-13

BASE AREAS, ADJUSTED AREAS, DECIMALS

The calculation of base areas, adjusted areas, and the decimals for commercial-industrial work is essentially the same as for residential work. In order to assist in proper thinking as to what parts of structures are base areas and what are to be called decimal areas the following chart has been set up:

BASE AND DECIMAL AREAS Building Base Area Decimal Area Store, One Story, with Canopy Store Canopy Theater with Marquee Theater Marquee Apartment with Porches Living Area Porches Warehouse with Loading Dock Warehouse Dock Factory with Attached Open Factory Shed Two-Story Structure Ground Floor Upper Floors

The description, symbols and decimals for commercial/industrial buildings are listed in Table 11. Classification: In general, commercial-industrial structures are classified in the same manner as residences in that quality of material and workmanship is recognized by class. As in residential classing, plus and minus adjustments may be made in classification of commercial-industrial structures. The purpose again is to recognize costs due to features which cannot readily be expressed in construction units. As in residential work, select the base rate that corresponds to the building classification. Calculation: Calculations of commercial-industrial replacement costs utilize the same key factors as residential calculation. The most significant difference lies in the number of adjustments that will normally be required. The factors are:

Improvement Type Code Class of Construction Base Area Base Rate Adjusted Rate Extra Features Condition

Page 14: AL Property Appraisal Manual Chapter 09 j

Improvement Type Code: The appraiser must determine the improvement type of a structure so that the correct base rate table is used in the cost calculation. Class of Construction: The quality of the building construction is considered as it is in residential to determine the class of construction. Base Area: The base area of a structure is that area upon which the cost per square foot is based. It is the ground floor of the main body of the structure leaving off canopies, docks, upper floors, or other lesser costing areas.

Example: One-story warehouse with decimal areas. Class D

Base Area 30 x 70 = 2,100 S.F. Base Rate using 2,000 S.F. = $43.09

Example: Two-story office with decimal areas. Class D

Base Area 30 x 60 = 1,800 S.F. Base Rate using 1,800 S.F. =$40.67

Alabama Appraisal Manual 2005 9-14

Page 15: AL Property Appraisal Manual Chapter 09 j

Adjusted Area: As in residential calculation, decimal areas in commercial structures must also be included in computing total replacement cost. As in residential work, lesser costing structural features are adjusted in proportion to their relationship with the main body of the structure by use of decimals, or percentages (see Table 11). The result is an “adjusted area” to which the unit cost of the main structure may be applied.

Example: One-story warehouse with decimal areas.

Base Area 30 x 70 = 2,100 S.F. Loading Dock 8 x 30 x 0.2 = 48 Canopy & Dock 8 x 53 x 0.3 = 127

Total Decimal Area 175 Adjusted Area 2,275 S.F.

Example: Two-story store-office with decimal areas.

Base Area 30 x 60 = 1,800 S.F. Upper Floor 30 x 60 x 1.0 = 1,800 Canopy 10 x 30 x 0.2 = 60 Dock 8 x 20 x 0.2 = 32

Total Decimal Area 1,892 Adjusted Area 3,692 S.F.

Alabama Appraisal Manual 2005 9-15

Page 16: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-16

Base Rate: Square-foot rates are influenced by the size and quality of a structure. It is accepted fact that a large building will cost less per square foot than a smaller one with the same specifications. As the result of in-depth research, tables of rates have been developed which reflect the influence area has on square-foot costs. The deciding factor in choosing a table is the use of the structure. The base rate is taken from the appropriate table using the base area of the structure. Adjusted Rate: In view of the fact that the rate tables are based on the influence that class and area has on average structures, adjustments must be made for those above or below average. These adjustments are made by use of construction units. Construction units have been carefully assigned to each component part of a building. These units reflect cost of construction of the various component parts, in that they represent a degree of weight expressed by a number of points. It is this figure, when converted to a factor by pointing off two decimal places, that it is used to adjust the base rate to a true base rate for that particular building. The resultant figure is then called the “adjusted rate”.

Example: Assume 106 total units and a base rate of $33.66 1.06 x 33.66 = $35.68, Adjusted Rate

Total Adjusted Area: The sum of the Base Area and all of the decimal areas for that building. Sub Total: The construction cost of the building before any extra features are added and before the cost is indexed to reflect local building costs.

Example: Assume an adjusted rate of $35.68 and a total adjusted are of 3,692 sq. ft. $35.68 x 3,692 = $131,731, Subtotal

Extra Features: Those features in a structure which are not readily adaptable to construction units, but, which represent significant additional cost. In addition to those found in residential structures, many additional extra features are found to be applicable to commercial industrial buildings. As in calculation of residential structures, commercial-industrial extra features enter into replacement cost as dollar amounts. Figures contained in all tables and the cost section are 100 index amounts and will be adjusted for local costs in the calculation by the location index. Base Cost: The cost of the building with added extra features but before the cost is indexed to reflect local building cost.

Example: Assume Extra Feature total of $1,760 and a Subtotal of $131,731 $1,760 + $131,731 = $133,491, Base Cost

Location Index: Since the cost of construction is not uniform throughout the state, the replacement cost figure must be adjusted to reflect the local building costs. A location factor, or index, based on a survey of local material and labor costs, and by investigation of many new buildings of known cost, must be developed for each area in which appraisals are to be made. See Chapter 6 of this appraisal manual for a detailed discussion on how to conduct an index cost study.

Page 17: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-17

Replacement Cost: The cost calculated to construct a building and cost adjusted to the local construction market. The Base cost is multiplied by the location index to determine the replacement cost of the structure.

Example: Assume a Location Index of 1.04 and a base cost of $133,491. 1.04 x $133,491 = $138,831 Replacement Cost Condition: The percent good remaining after subtracting depreciation from all causes. `A default condition is usually applied by CAMA systems; however, observed condition is the preferred method.

Example: A building with 2% depreciation would be at 98% condition. Value: The value of the building after all construction cost factors have been applied.

Example: Replacement cost $138,831 at 98% condition. $138,831 x .98 = $136,054 rounded to $136,100 Value Market Adjustment: A percentage adjustment to the construction cost value determined from sales analysis of the local real estate market.

Example: An analysis of the market indicates a shortage of office space and reveals that this indicated shortage increases the value of office building 10% above other properties.

Final Value: The market value of the building after all construction cost and sales analysis factors have been calculated. Note: Final Value is rounded to the nearest one hundred dollars ($100).

Example: Assume a small office building has a value of $138,100 and the market Adjustment for office buildings in this area is 10%. $136,100 + 10% = $149,710 rounded to $149,700 Final Value

The mechanics of computing replacement costs of commercial-industrial buildings is the same as that of residential buildings, in that the same formula is utilized. However, it is generally more complex due to many adjustments normally being required. The formula is:

Construction Units X Base Rate = Adjusted Rate X Total Adjusted Area = Subtotal + Extra Features = Base Cost X Location Index = Replacement Cost X Condition = Value

Assume a Class D one-story store, brick on masonry wall; one wall (80 feet) is party wall, has central heat and air conditioning, one 10 x 10 overhead door, wall height 16 feet, plate glass across front 8 feet high, two 2-fixture restrooms. Base area 4,000 square feet, base rate $40.24, adjusted area 4,160 square feet, 115 construction units; the condition is estimated at 85%, and location factor is 1.05. From the above specifications it is seen that the following adjustments must be made: Exterior wall units must be reduced to compensate for the party wall; height units must be added for the additional wall height; and front units must be added for excessive glass. Dollar amounts must be added for two 2-fixture restrooms, for forced hot air and air conditioning, and for one 10 x 10 overhead door. Methods used in making these adjustments follow:

Page 18: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-18

1. Adjust for party wall. The perimeter of this building is 260 feet. One 80-foot wall is a party wall, for which the building will be charged for one-half, or 40 feet, leaving only 220 feet of wall for which units are to be applied. For the entire perimeter (260 feet), brick on masonry units would be 38. In this case we have 220 feet after considering the party wall, or 85% x 38 units =32 units to be entered under “Exterior Walls”. 2. Adjust for excessive height. Wall height is 16 feet instead of 12 feet. 16÷ 12 = 1.33, 1.33 x

32 units = 42 units, or 10 extra walls units needed to compensate for excessive wall height. Write 10 units in height column under “Adjustments”.

Note: When necessary to adjust wall units for both party wall(s) and height, the party wall adjustment should be made first.

3. Add dollar amount for 2, 2-fixture restrooms. $2,560 (from Plumbing Table). 4. Add dollar amount for central heating and cooling. $4.90 (from Heating and A.C. Tables) x

4,000 S.F. (Area served by system) = $19,600. 5. Add dollar amount for 10 x 10 overhead door. $10.50 (from Cost Section) x 100 S.F. (10 x

10) = $1,050. The sum of plumbing, heating and air conditioning, and overhead door = $23,210. Enter this figure under “Extra Features.” Using the formula described above, calculation of depreciated replacement cost follows:

Base Area 4,000 S.F. Code 500 Class D Construction Units 115 Units x Base Rate 40.24= Adjusted Rate 46.28 x Adjusted Area 4,160 S.F. = Sub- Total 192,525 + Extra Features 23,210 = Base Cost 215,735x Location Factor 1.05= Replacement Cost 226,522 x Condition 85 % = Value 192,544 Rounded to..... 192,500

Page 19: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-19

PRE-ENGINEERED METAL BUILDINGS

Pre-engineered metal buildings are available in standard frame sizes and are available from manufactures as commodity products. The building is usually sold as a package and assembled as an shell with interior framing and finish according to the building use. 1. Procedure for the valuation of pre-engineered metal buildings:

a. Base rate: Use the base rate table that corresponds to the building use. b. Construction units: List in accordance with the Appraisal Manual. c. Adjustment:

1. Height adjustment as required 2. No framing units

Base Rate Tables for Factory, Light Manufacturing 200; Factory, Heavy Manufacturing 300; Service (Low Partitions) 600 and Warehouse 637 do not contain cost for finished offices. When using these rate tables add office finish cost from the table below. Do not add units for office finish. Apply Square foot cost to finished floor area.

Cost 1. Office, Low cost--open, finished floor, vinyl or asphalt tile, drywall, minimum counters $28.90 Sq Ft 2. Office, Average--average office finish, vinyl tile or carpet floors, acoustical ceiling, average office lighting $38.90 Sq Ft 3. Office, Good--good vinyl and carpet floors, drywall, wood panel partitions, suspended acoustical ceiling, good lighting $55.50 Sq Ft 4. Storage Mezzanine--open, unfinished wood floor over office or storage areas, unfinished stair $2.70 Sq Ft 5. Retail/Display--open, vinyl, or asphalt tile floor, some drywall/pegboard, minimal paneling and counters $31.00 Sq Ft 6. Retail, Average--average retail finish, vinyl tile or carpet floors, acoustical ceiling. $31.40 Sq Ft

Page 20: AL Property Appraisal Manual Chapter 09 j

Table 10 Commercial/Industrial Construction Units

C OD E F OUN D A TION UN IT C OD E R OOF TYP E UN IT C OD E UN IT

S02 P IERS 0 T14 A FRAME 10 F01 P LYWOOD 3S01 SLAB 0 T15 BAR J OIST, METAL DECK 14 F28 RUBBER TILE 13S09 WOOD SUBFLOOR 0 T03 BAR J OIST, WOOD DECK 8 F22 SINGLE P INE ON CONCRETE 15

T08 CONCRETE, P RE-STRESSED 10 F18 SLATE 21EXTER IOR WA LLS T01 FLAT-SHED 7 F24 STEEL P LATES/GRATES 8

W00 NOT AP P LICABLE 0 T05 GAMBREL 9 F06 TERRAZZO 17W26 ALUMINUM SIDING 33 T02 HIP -GABLE 8 F12 TILE, CERAMIC 17W08 ASBESTOS, CORRUGATED 32 T06 MANSARD 9 F26 TILE, CORK 14W58 ASP HALT SHINGLES 30 T07 MONITOR 9 F11 TILE, QUARRY 17W12 BRICK ON WOOD 38 T04 SAWTOOTH 8 F17 TORGINAL 14W13 BRICK ON MASONRY 38 T13 STEEL FR. CONCRETE 26 F16 VINYL 10W14 BRICK, 8" 38 T12 STEEL FR. RIGID INS 23W15 BRICK, 12" 41 T11 STEEL TRUSSES 15W36 BRICK, 16" 43 T17 TIMBERS, HEAVY WOOD DECK 13 IN TER IOR F IN IS HW48 BRICK, STUCCO 40 T09 WOOD TRUSS, WOOD DECK 13 I01 NOT AP P LICABLE 0W59 BRICKCRETE 35 I13 ACOUSTICAL CEILING 30W28 CEDAR, TEXTURE III, 4 X 8 33 I14 ACOUSTICAL CEILING, SUSP . 34W20 CEDAR, ROUGH 33 R OOF M A TER IA L I10 CELOTEX 18W30 CEDAR, BEVELED 38 M05 ASBESTOS SHINGLES 5 I15 CERAMIC TILE 50W37 CEDAR, ROUGH B & B 43 M04 ASP HALT SHINGLES 4 I07 DRYWALL(SHEETROCK) 30W51 CEDAR LAP SIDING 43 M22 ASP HALT SHINGLES HVY 5 I19 INSULATION ONLY 5W07 C. B., 8" P LAIN 31 M16 ALUMINUM SANDWICH P ANEL 11 I16 FORMICA 30W32 C. B., 12" P LAIN 33 M03 BUILT-UP TAR & GRAVEL 5 I18 METAL, CORRUGATED 24W61 C. B., SP LIT FACE 34 M18 COP P ER 12 I09 METAL, ENAMEL 50W09 C, B., STUCCO 33 M11 ENAMEL METAL SHINGLES 8 I17 METAL, CEILING TILES 24W45 C. B., STUCCO SCORED BR. 36 M15 FIBERGLASS P ANELS 6 I02 P AINTED 5W34 CONCRETE, P RECAST(AGG) 38 M14 FIBERGLASS(COMMERCIAL) 8 I05 P LASTER, NO FURRING 24W24 CONCRETE, P RECAST(P LAIN) 31 M01 METAL, CORRUGATED 5 I06 P LASTER & FURRING 30W35 CONCRETE, P RECAST(dblT) 40 M20 METAL, STAND. SEAM LT 7 I11 P LYWOOD 24W16 CONCRETE, REINFORCED 43 M02 ROLL COMP OSITION 2 I04 WALL BOARD 18W21 CONCRETE, TILT-UP 29 M17 RUBBER MEMBRANE 5 I03 WOOD CEILING BOARDS 15W55 COP P ER SIDING 45 M09 SLATE 10 I08 WOOD P ANELS 35W50 FIBERGLASS P ANELS 16 M19 TERNE 12W60 DRYVIT (EIFS) 35 M06 TILE, CEMENT 7W43 DRYVIT, REINFORCED (EIFS) 38 M07 TILE, CLAY 10 P LUM B IN GW42 GLASS, P LATE, ALUM TRIM 67 M13 WOOD SHINGLES 8 P 01 NONE 0W41 GLASS, WINDOW WALL 50 P 02 P OOR 3W22 HARDBOARD-LAP 32 P 03 AVERAGE 8W29 LOGS, SINGLE WALLS 37W23 MASONITE, 4' X 8' 30 F LOOR SW62 METAL, BONDED P ANEL 30 F21 NOT AP P LICABLE 0 A D J US TM EN TSW03 METAL, CORRUGATED 16 F25 ASP HALT ON GRADE 3 A00 NO ELECTRIC -5W40 METAL, SANDWICH P ANEL 50 F19 BRICK IN MORTAR 17 A01 FRAMING, OP EN STEELW18 METAL ON STEEL 60 F14 CARP ET & UNDERLAY 12 A02 FRAMING REINF. CONCRETEW57 P LYWOOD P ANELS 33 F04 CONCRETE, ASP HALT TILE 10 A03 FRAMING, FIREP ROOF STEELW33 STONE, ARTIFICAL 38 F09 CONCRETE, P RECAST/FORMED 12 A04 HEIGHTW17 STONE ON MASONRY 44 F05 CONCRETE, RAISED 8 A05 AP ARTMENT EQUIVALENTW47 STONE ON WOOD FRAME 44 F03 CONCRETE ON GRADE 6 A06 STALLSW19 STONE, ROUGH 70 F27 CONCRETE ON GRADE W/DRAINS 10 A07 FRONT AND INTERIORW25 TERRA COTTA TILE 31 F29 FLAGSTONE 19 A08 FRAMING TIMBERW10 TERRA COTTA TILE, STUCCO 33 F08 HARDWOOD 16 A099 MISCELLANEOUSW53 TERRA COTTA TILE, 12" 38 F30 HARDWOOD, SELECT 19W27 VINYL SIDING 33 F13 MARBLE 36W06 WOOD FRAME, NO SH. 30 F10 P ARQUET 18W05 WOOD FRAME, STUCCO 32 F07 P INE, DOUBLE 10W39 WOOD SHAKES 35 F20 P INE, DOUBLE & A. TILE 11W11 WOOD & SHEATHING 33 F15 P INE, SINGLE & A. TILE 6

Alabama Appraisal Manual 2005 9-20

Page 21: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-21

Table 11 Commercial/Industrial Symbols and Decimals

Symbol Decimal

Open Porches Stoop, Floor, Roof, No Posts ................................................................... O.P. 0.1 Floor, Roof, and Posts.............................................................................. O.P. 0.2 Floor, Roof, Posts and Railing................................................................. O.P. 0.3

Screened Porches Roof, Floor, Posts, Walls Screened to Floor.............................................S.P. 0.4 Roof, Floor, Posts, Walls Screened to Rail...............................................S.P. 0.5 Same with Tile Floor ................................................................................S.P. 0.6

Closed Porches Roof, Floor, Walls, Unfinished Interior................................................... C.P. 0.6 Roof, Floor, Walls, Low Cost Interior Finish .......................................... C.P. 0.7 Roof, Floor, Walls, Normal Interior Finish ............................................. C.P. 0.8

Utility Rooms At Rear of Carport ................................................................................... U. 0.4 Attached to Residence.............................................................................. U. 0.5 Finished Interior....................................................................................... U. 0.6

Attached Garages Unfinished Interior, Floor, No Door ........................................................ G. 0.3 Unfinished Interior, Floor, Door.............................................................. G. 0.4 Finished Interior, Floor, No Door ............................................................ G. 0.5 Finished Interior, Floor, Door.................................................................. G. 0.6

Basements Dirt Floor, Primitive Walls ...................................................................... B. 0.1 Concrete Floor, No Finish........................................................................ B. 0.2 Garage Under Living Area, No Finish..................................................... G. 0.3 Concrete Floor, Partially Finished Walls & Ceiling ................................ B. 0.4 Concrete Floor, Full Finish, No Partitions............................................... B. 0.5 Concrete Floor, Full Finish, Few Partitions............................................. B. 0.6 Prepared For Living Quarters .................................................................. B. 0.7

Upper Floors 1-1/2 Low................................................................................................+1-1/2L 0.3 1-3/4 Low................................................................................................+1-3/4L 0.4 1-1/2 High ...............................................................................................+1-1/2H 0.5 1-3/4 High ...............................................................................................+1-3/4H 0.7 2-Story ....................................................................................................+2 1.0 2-1/2 Story ..............................................................................................+2-1/2 1.5 3-Story ....................................................................................................+3 2.0

Canopy on Warehouse, No Pavement.................................................................. Can. 0.1 Canopy on Warehouse, With Pavement .............................................................. Can. 0.2 Canopy and Loading Dock on Warehouse ........................................................Can.+D 0.3 Dock Only on Warehouse..................................................................................... D. 0.2 Closed Shed on Store, etc. ................................................................................... Can. 0.5 Marquee and Elaborate Canopies ........................................................................ Can. 0.2 Low-Cost Store Canopies .................................................................................... Can. 0.1

Page 22: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-22

Table 12 Framing Units

Stories

Timber Open Steel

Fireproof Steel

Reinforced Concrete

1 & 2 10 18 35 25 3 & 4 11 19 36 26 5 & 6 12 19 38 27 7 & 8 13 20 39 28 9 & 10 14 21 41 29 11 & 12 15 22 42 30 13 & 14 22 43 31 15 & 16 23 45 32 17 & 18 24 46 33 19 & 20 24 48 34 21 & 22 25 50 35 23 & 24 26 51 36 25 & 26 26 52 37 27 & 28 27 54 38 29 & 30 28 55 39

Page 23: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-23

Height: Excessive heights of stories in structures have a bearing on cost. For this reason, a series of standard story heights has been determined, and excessive variation from them necessitates adjustments in wall units. For example, if a warehouse, instead of having a normal height of 12 feet, has 16-foot walls and if the normal wall units are 33, then the height adjustment for this building is 16 12 or 1.33. Then 1.33 x 33 = 44 units or 11 extra wall units would be needed to compensate for excessive wall height; 33 units would be entered under “Exterior Walls”, and 11 units would be entered under “Height” in the “Adjustment” column. If a wall varies less than 2 feet from the normal, no adjustment is necessary. Following is a table showing normal heights. For exact wall heights, measurement must be made. For practical purposes, good sound estimates should be made; these based upon number of courses of block, brick, stone, boards, etc., after ascertaining measurements of same. Wall height is estimated from the top of the finished floor to the eave height of the building. Do not count wall height for foundation walls, decorative facia or store fronts over eave height.

Table 13 Normal Heights

Stories Normal Height Feet Stories Normal Height Feet

1 12 16 162 2 22 17 172 3 32 18 182 4 42 19 192 5 52 20 202 6 62 21 212 7 72 22 222 8 82 23 232 9 92 24 242 10 102 25 252 11 112 26 262 12 122 27 272 13 132 28 282 14 142 29 292 15 152 30 302

Page 24: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-24

To calculate the total upper floor adjusted area for a multistory building using Table 14, multiply the base area by the decimal indicated for that story height.

Table 14 Upper Floor Decimals

Symbol Decimal Symbol Decimal

+2 1.0 +17 16.0 +3 2.0 +18 17.0 +4 3.0 +19 18.0 +5 4.0 +20 19.0 +6 5.0 +21 20.0 +7 6.0 +22 21.0 +8 7.0 +23 22.0 +9 8.0 +24 23.0 +10 9.0 +25 24.0 +11 10.0 +26 25.0 +12 11.0 +27 26.0 +13 12.0 +28 27.0 +14 13.0 +29 28.0 +15 14.0 +30 29.0 +16 15.0 +31 30.0

Front and Interior: In many instances, store buildings may be found to have very elaborate and/or excessive amounts of plate glass. Also, interiors of structures may be elaborate. This may be due to original design or remodeling. In either case, additional cost exists. Rather than make a cost analysis for such work and material, a table has been developed to add units to recognize the additional cost. A normal store front is considered to be plate glass set in aluminum, approximately six feet in height and extending across the front of the structure except for doors. Higher or longer, or both, would be considered excessive. An elaborate interior is considered to be one with excessive millwork, counters of a permanent type, and excellent interior work in general.

Page 25: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-25

Table 15 Front and Interior

Stories Elaborate Front Units

Elaborate Interior Units

Excessive Front Units

1 7 7 3 2 7 3 2 3 3 3 1 4 1 1 0

Table 16 Apartment Equivalent

Number of Apartments Per Building Units 4 0 6 5 8 10 10 15 12 21 16 34

Table 17 Stall Widths

Average Stall Width Units 10 feet 12 15 feet 10 20 feet 7 25 feet 6 30 feet 4 over 30 1

Rules:

1. Use table as is for one-story stores. Average stall width=total store width divided by number of stalls.

2. For buildings of more than one story having storage areas on the upper

Floors, which are separated by partitions in the same manner as the Store below, use table as is.

3. For buildings of more than one story with only one large room on each

Upper floor, use table for units then divide these units by number of floors.

Page 26: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-26

Table 18 Service Station Canopies

Cost

Type Low Cost Fair Good Excellen

t Wood $9.90 $11.30 $12.80 $14.90 Steel Frame $14.50 $18.40 $22.60 $27.50 Concrete tees $16.80 $19.50 $23.00 $26.80

Cost is based on square foot of covered area and includes lighting and wiring.

Table 19 Commercial/Industrial Plumbing

Item Cost 2-Fixture Restroom $1,280 Water Closet Only $790 Lavatory Only (Pedestal Type) $1,130 Urinal $980 Industrial Washfountains:

Circular 36" $2,330 Circular 54" $2,710 Semicircular 36" $2,080 Semicircular 54" $2,460

Industrial Wash Sinks: Wallhung 4' $1,450 Wallhung 5' $1,690 Wallhung 6' $1,940 Wallhung 8' $3,150

Janitor's Sink $690 Kitchen Sink, Single $510 Kitchen Sink, Double $770 Laundry Sink, Single $400 Laundry Sink, Double $510

Apartment houses, motels, and hotels, use residential plumbing tables. Commercial plumbing units do not include fixtures. Count all fixtures and price from Table 19.

Page 27: AL Property Appraisal Manual Chapter 09 j

a Appraisal Manual 2005 9-27

TABLE 20

HEATING AND AIR CONDITIONING SQUARE FOOT COST

Occupancy Rate Table Gravity FHA Hot

Water AC Only Thru-Wall FHA/AC Package Engineered Engineered Suspended

HP Unit Warm/Cool Hot/Chilled Heat Air Water 01 02 03 04 05 06 07 08 09 10

Single Family 111 1.10 2.40 4.00 3.10 2.00 4.30 4.00 5.40 8.50 Duplex 112 1.10 2.40 4.00 3.10 2.00 4.30 4.00 5.40 8.50 Apartments 113 1.10 2.40 4.00 3.10 2.00 4.30 4.00 5.40 8.50 Motel 150 1.10 2.40 4.00 3.10 2.00 4.30 4.00 5.40 8.50 Factory Lt Mfg 200 1.00 2.40 4.30 3.50 5.40 4.60 6.10 10.60 1.30 Factory Hvy Mfg 300 1.00 2.40 4.30 3.50 5.40 4.60 6.10 10.60 1.30 Retail 500 1.10 2.40 4.40 2.50 4.90 4.40 6.00 10.40 1.30 Restaurant 580 4.10 8.60 12.60 Fast Food 583 4.10 8.60 12.60 Convenience Store 590 1.10 2.40 4.40 2.50 4.90 4.40 6.00 10.40 1.30 Other High Partition 598 1.40 3.60 6.30 4.00 2.60 7.30 5.40 8.60 14.50 Service (Low Partition) 600 1.00 2.40 4.30 3.50 5.40 4.60 6.10 10.60 1.30 Office 610 1.40 3.60 6.30 4.00 2.60 7.30 5.40 8.60 14.50 Bank 611 1.40 3.60 6.30 4.00 7.30 5.40 8.60 14.50 Warehouse 637 1.00 2.40 4.30 3.50 5.40 4.60 6.10 10.60 1.30 Medical Office 651 1.40 3.60 6.30 4.00 2.60 7.30 5.40 8.60 14.50 Veterinary Office 652 1.40 3.60 6.30 4.00 2.60 7.30 5.40 8.60 14.50 Hospital 653 1.40 3.60 6.30 4.00 2.60 7.30 5.40 8.60 14.50 Nursing Home 656 1.40 3.60 6.30 4.00 2.60 7.30 5.40 8.60 14.50 Post Office 670 1.40 3.60 6.30 4.00 2.60 7.30 5.40 8.60 14.50 Notes: Apply square foot cost to total building living area.

For commercial occupancies, add 5% for each 2' increase in ceiling height over 12'.

Alabam

Page 28: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-28

Table 21 Hydraulic Elevators

Type Capacity Cost For single family residence or handicapped, 2-Floor To 700 lbs. $20,780 Commercial, 2 floor hydraulic 1500 lbs. $37,550 Commercial, 2 floor hydraulic 2000 lbs. $42,340 Commercial, 2 floor hydraulic 2500 lbs. $47,960 Commercial, 2 floor hydraulic 3000 lbs. $55,800 Commercial, 2 floor hydraulic 4000 lbs. $60,810 Commercial, 2 floor hydraulic 5000 lbs. $68,710 For each additional story add: $8,090

Note: Many of the elevators found in apartments, motels and offices up to five stories high are hydraulic. See the Cost Section for additional elevator types.

Table 22 Escalators

32" Width 48" Width 5,000 persons per hour 8,000 persons per hour Rise Cost Rise Cost 10' $114,100 10' $124,150 12' $118,150 12' $127,800 14' $121,600 14' $132,500 18' $127,800 18' $141,200 22' $135,300 22' $151,200 25' $141,200 25' $158,050

Table 23

Fire Protection (Automatic Sprinklers) Cost All Buildings Area (Sq Ft) Wet Dry

To 10,000 $2.50 $2.60 10,001 to 20,000 $2.10 $2.40 20,001 to 50,000 $1.90 $2.00 50,001 to 100,000 $1.60 $1.90 100,001 to 200,000 $1.50 $1.60 over 200,001 $1.30 $1.50

Wet Pipe: Pipe system contains water under pressure at all times.

Wet pipe systems are most common.

Dry Pipe: Pipe system contains air (or nitrogen) under pressure. Used where piping is subject to freezing.

Page 29: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-29

COMMERCIAL-INDUSTRIAL MISCELLANEOUS IMPROVEMENTS

Frequently various items of construction are found on commercial-industrial properties which do not lend themselves to a unit system. These items such as curbs docks, greenhouses, fences, etc. Such items are called miscellaneous improvements and must be listed, priced and depreciated apart from stores, factories, and like structures. See table for pricing information. All cost figures are estimated 2005 cost.

Table 24 Miscellaneous Improvements

Item Cost Unit of Cost Dock, heavy piling, 4" wood deck $31.10 Sq. Ft. Dock, heavy piling, concrete deck $76.00 Sq. Ft. Dock, light piling, 2" wood deck $18.30 Sq. Ft. Dock, medium piling, 3" wood deck $21.00 Sq. Ft. Fence, Industrial, Chain Link, 9 Ga., in concrete, 10 Feet $17.80 Lin. Ft. Fence, Industrial, Chain Link, 9 Ga., in concrete, 12 Feet $21.30 Lin. Ft. Fence, Industrial, Chain Link, 9 Ga., in concrete, 4 Feet $7.40 Lin. Ft. Fence, Industrial, Chain Link, 9 Ga., in concrete, 6 Feet $11.00 Lin. Ft. Fence, Industrial, Chain Link, 9 Ga., in concrete, 8 Feet $14.40 Lin. Ft. Fence, Privacy, Chain Link with Aluminum Strips, 6 Feet Lin. Ft. Fence, Privacy, Chain Link with Aluminum Strips, 8 Feet Lin. Ft. Fence, Privacy, Wood, Basket Weave, 6 Feet $16.40 Lin. Ft. Fence, Privacy, Wood, Notched Top, 6 Feet $13.50 Lin. Ft. Fence, Privacy, Wood, Vertical Shadow Box, 6 Feet $13.90 Lin. Ft. For Western Cedar add 23% more, Redwood add 50% Fence; Metal, Steel or Aluminum $7.10 Sq. Ft. Fence; Wrought Iron or Modular, Steel or Aluminum $13.10 Sq. Ft. Floodlights, pole and fixture $2,400 Each Lumber sheds, Frame $9.90 Sq. Ft. Patio/Pavement, Brick Pavers on Concrete $9.40 Sq. Ft. Patio/Pavement, Brick Pavers on Sand $7.20 Sq. Ft. Patio/Pavement, Concrete 4" $2.90 Sq. Ft. Patio/Pavement, Concrete 4" Color Added $3.30 Sq. Ft. Patio/Pavement, Concrete 4" Decorative Pattern $6.50 Sq. Ft. Patio/Pavement, Concrete 4" Exposed Aggregate $3.40 Sq. Ft. Patio/Pavement, Concrete Brick on Sand $5.10 Sq. Ft. Patio/Pavement, Flagstone, Grouted on Concrete $9.30 Sq. Ft. Patio/Pavement, Quarry Tile on Concrete $8.00 Sq. Ft. Kiosk, Wood, Low Cost $12.00 Sq. Ft.

Average $15.00 Sq. Ft. Good $19.00 Sq. Ft. Excellent $23.00 Sq. Ft.

Page 30: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-30

Table 24 (Continued) Item Cost Unit of Cost

Kiosk, Steel Frame, Low Cost $14.00 Sq. Ft. Average $17.00 Sq. Ft. Good $22.00 Sq. Ft. Excellent $28.00 Sq. Ft.

Pavement, Asphalt 1 1/2" $1.10 Sq. Ft. Pavement, Asphalt 1 1/2" (over 20,000 sq. ft.) $0.90 Sq. Ft. Pavement, Asphalt 3 1/2" $1.80 Sq. Ft. Pavement, Asphalt 3 1/2" (over 20,000 sq. ft.) $1.40 Sq. Ft. Pavement, Concrete 10" $5.70 Sq. Ft. Pavement, Concrete 10" Color $6.40 Sq. Ft. Pavement, Concrete 10" Decorative Pattern $9.60 Sq. Ft. Pavement, Concrete 10" Exposed Aggregate $6.50 Sq. Ft. Pavement, Concrete 6" $3.60 Sq. Ft. Pavement, Concrete 6" Color $4.10 Sq. Ft. Pavement, Concrete 6" Decorative Pattern $7.40 Sq. Ft. Pavement, Concrete 6" Exposed Aggregate $4.30 Sq. Ft. Pavement, Concrete 8" $4.80 Sq. Ft. Pavement, Concrete 8" Color $5.30 Sq. Ft. Pavement, Concrete 8" Decorative Pattern $8.50 Sq. Ft. Pavement, Concrete 8" Exposed Aggregate $5.40 Sq. Ft. Patio/Pavement, Curbs, Concrete, Long Runs $11.10 Lin. Ft. Patio/Pavement, Curbs, Concrete, Short Runs $11.90 Lin. Ft. Retaining Walls, Concrete, 6" Reinforced $8.90 Sq. Ft. Retaining Walls, Concrete, 8" Reinforced $9.80 Sq. Ft. Retaining Walls, Concrete, 12" Reinforced $12.80 Sq. Ft. Retaining Walls, Concrete Block, 8" Reinforced $9.80 Sq. Ft. Retaining Walls, Concrete Block, 12" Reinforced $12.80 Sq. Ft. Sheds, Boat Storage, Timber, Wood or Metal $9.60 Sq. Ft. Sheds, Boat Storage, Concrete with Conc. Roof $13.40 Sq. Ft. Wall, Brick, 8 inch $12.90 Sq. Ft. Wall, Concrete Block, 8 Inch $7.10 Sq. Ft. Wall, Concrete Block, Stucco, 4 inch $8.30 Sq. Ft. Wall, Concrete Block, Stucco, 6 inch $8.60 Sq. Ft. Wall, Concrete Block, Stucco, 8 inch $8.90 Sq. Ft. Wall, Retaining, Precast 8" $9.60 Sq. Ft. Wood Deck, Detached-Redwood or Cedar $17.00 Sq. Ft. Wood Deck, Detached-Redwood or Cedar with Rail $20.30 Sq. Ft. Wood Deck, Detached-Softwood $11.30 Sq. Ft. Wood Deck, Detached-Softwood with Rail $13.40 Sq. Ft. Wood on Grade, 2" $5.30 Sq. Ft.

Page 31: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-31

Table 25 Swimming Pools

Reinforced Concrete Sq. Ft. Cost Area Smooth Tiled

1,000-2,000 $47.10 $54.60 2,000-4,000 $45.00 $52.40 4,000-6,000 $43.40 $50.80 6,000-8,000 $42.80 $50.30 Over 8,000 $41.80 $49.30

Deduct 20% for gunite pools. Note: Costs include ladder and diving board, as well as the mechanical building itself.

Table 26 A-Frame Buildings

Ground Floor Cost Area (Sq Ft) Pine Cedar

300 $14,250 $19,000 400 $18,250 $24,500 500 $22,000 $29,750 600 $26,000 $34,750 700 $29,750 $39,750 800 $33,500 $44,750

1,000 $40,500 $54,250 1,200 $47,500 $63,750 1,400 $54,250 $72,750 1,600 $64,000 $82,000 1,800 $67,750 $90,750 2,000 $74,000 $99,500

Add for: loft area, per sq ft…..Pine…$14.00 Cedar…$18.25

Prices are for prefabricated A-frame kit buildings and include interior finish, electrical and plumbing. Add cost for heating and cooling. Use first floor area for rate.

Page 32: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-32

Table 27 Galvanized Steel Quonset

(Base Height = 20' Center of Arch) Square Foot Cost

Length Width (feet) 30' 40' 60' 70'

30' $15.90 ------- ------- ------- 36' $15.30 ------- ------- ------- 48' $14.25 $13.05 ------- ------- 60' $13.30 $11.00 $11.70 ------- 72' $12.90 $11.75 $11.20 $10.80 84' $12.45 $11.35 $10.75 $10.45 96' $12.00 $10.95 $10.45 $10.05 108' $11.65 $10.65 $10.10 $9.75 120' $11.00 $10.40 $9.80 $9.45 160' $10.50 $9.65 $9.10 $8.85 200' ------- $9.10 $8.60 $8.40 240' ------- $8.70 $8.25 $8.05

Price does not include floor or interior finish. Add interior finish from pre-engineered buildings.

Page 33: AL Property Appraisal Manual Chapter 09 j

Alabama Appraisal Manual 2005 9-33

BUILDING COMPLETION PERCENTAGES

Buildings not completed by the end of a tax year must be appraised on the basis of percentage of construction which has been completed as of October 1. The table below suggests what has been tested in many instances as an equitable method of applying percentage.

Table 28

Percentage Of Completion Construction Complete Percent 1. Excavation, forms, water/sewage hookup 6 2. Concrete 14 3. Rough framing 35 4. Windows and exterior doors 37 5. Roof cover 40 6. Rough-in plumbing 44 7. Insulation 45 8. Rough-in electrical and mechanical 56 9. Exterior cover 62 10. Interior drywall and ceiling finish 70 11. Built-in cabinets, interior doors, trim, etc. 83 12. Plumbing fixtures 88 13. Floor covers 91 14. Built-in appliances 94 15. Light fixtures and finish hardware 96 16. Painting and decorating 100

It should be noted in the above table that unless building plans are available the actual structure cannot be measured, drawings made, classification done, and other necessary information collected until the building is nearly completed. However, it will be found in most cases that some kind of drawing is available. Further judgement must be used in the application of the percentages themselves. For example, a structure could be between two of the above items, in which case it is permitted to use average percentages.