al2208
TRANSCRIPT
-
7/30/2019 AL2208
1/6
-
7/30/2019 AL2208
2/6
CLIENT:
PROJECT TITLE: 18" / 6" PIPELINE PIGGINGFEASIBILITY STUDY
KOREA NATIONAL OIL COMPANY
(KNOC Vietnam)
DOCUMENT TITLE MECHANICAL DATASHEET FOR
A2
A1
Rev
DOCUMENT TITLE: MECHANICAL DATASHEET FOR
6"NB CONDENSATE PIG LAUNCHER
JOB NO.: AL-2208
DOCUMENT NO: AL-2208-P03-001
06 Sep. 12 L.D.T L.A.V L.N.BIssued for Review
Client
Approval
18 July 12 Issued for Review L.A.V L.N.B L.N.B
Date Description Issued By Checked By Approved By
-
7/30/2019 AL2208
3/6
CLIENT: DOCUMENT NO: AL-2208-P03-001 REV NO: A2
LOCATION: RONG DOI / RONG DOI TAY OFFSHORE VIETNAM EQUIPMENT TITLE: 6" CONDENSATE PIG LAUNCHER
SERVICE: CONDENSATE / GAS EXPORT ITEM NO: 220-L-3501 NO. REQUIRED:
PROJECT: P.O. NO: P.O. DATE: 29.06.2012
JOB NO: ENQUIRY NO: PAGE: 2 OF 5
REV.
12 FLUID DATA
3 Description CONDENSATE (See Note 1.2 & 1.3)
4 Flammable/Explosive NO
5 Toxic NO
6 Corrosive/erosive YES (See Note 1.2)
7 Special serv ice: Sour NO
8 Lethal NO
9
10
11 Design Pressure
12 Full Vacuum design required @ Design Temp N/A
13 Operating Pressure 15
14 Shop Hydrotest Pressure
15 Operating Temperature 30 60
16 Pressure drop through internals N/A
17 Maximum Design Temperature 105
18 Minimum Design Temperature -29
19 Minimum Ambient Temperature 15
20 Steamout conditions - Pressure N/A
21 Steamout conditions - Temperature N/A
22 Corrosion Allowance 3.0
23 Major / Minor Barrel Outside Diameter 219.1 / 168.3
barg 28.6
4800001648
MECHANICAL DATA SHEET
PIG LAUNCHER
18" / 6" PIPELINE PIGGING FEASIBILITY STUDY
AL-2208
barg
C
barg
oC
KOREA NATIONAL OIL COMPANY (KNOC Vietnam)
mm
22
mm
oC
barg
oCoC
1
PROCESS DATA
OPERATING CONDITIONS
bargoC
24 Wall thickness of Major / Minor Barrel 12.7 / 10.97
25 Inside Diameter of Major / Minor Barrel
26 Overall Length See Page 8/8
27 Total Volume for field test 0.1
28 Insulation None
29
30
31
32
33
34 Pigging of the gas export pipeline is primarily required for operational pigging for cleaning and corrosion inhibition.
35 Pigging is also for required for pipeline monitoring by means of an intelligent pig.
36
37 Corrosive due to Water, HC, H2S, CO2.
38
39 Supplier shall ensure any components used e.g. seals etc. are not degraded by contact with these fluids.
40
41 As H2S present it is required to design pig launcher to NACE MR0175 / ISO 15156.
42
43
44
45
46
47
4849
50
51
52
53
54
55
56
57
58
59
60
m
mm
146.36 / 193.7
mm
1.4
1.1
1.2
1.3
PROCESS NOTES
mm
mm
-
7/30/2019 AL2208
4/6
CLIENT: DOCUMENT NO: AL-2208-P03-001 REV NO: A2
LOCATION: RONG DOI / RONG DOI TAY OFFSHORE VIETNAM EQUIPMENT TITLE: 6" CONDENSATE PIG LAUNCHER
SERVICE: CONDENSATE / GAS EXPORT ITEM NO: 220-L-3501 NO. REQUIRED:
PROJECT: P.O. NO: P.O. DATE: 29.06.2012
JOB NO: ENQUIRY NO: PAGE: 3 OF 5
REV.
1 2.1 The Pig Launcher shall be designed in accordance with DnV OS-F101, ASME B31.8 and ASME VIII Div.1 (Latest Editions) and2 Project Specification J26081A-M-SP-13001.
3 2.2 All standard nozzle flanges ASME B16.5. Nozzle N1 weld neck flange shall be ASME B16.5 compatible and have specified internal diameter
4 of pipeline. Flange bolt holes to straddle natural centrelines. All nozzle attachments to be set-in, full penetration welded.
5
6 2.3 Supplier is to select wall thickness of major and minor barrels to withstand design pressure plus all additional loads, environmental loadings
7 and fatigue.
8
9 2.4 Design of pig launcher shall guarantee long term pressure integrity of the closure and relevant sealing systems.
10
11 2.5 Pig launcher shall be supported on two saddle / pipe supports (one sliding, one fixed). The sliding baseplate shall have slotted
12 holes to enable free movement of the sliding end.
13
14 2.8 One non-intrusive type signaller (local and remote indication) - HOLD is required for mounting on the pig launcher. Signaller c/w junction box (JB)
15 - HOLD shall be Supplied by Others. Supplier shall ensure adequate space provision for mounting of signaller and bracket for JB on equipment.
16
17 2.9 Pig launcher length shall be based on the overall length of intelligent pig + 10%. Supplier shall confirm overall, major
18 and minor barrel lengths.
19
20 2.10 End closure and end closure materials shall be designed in accordance with design code with the functional safety requirement of ASME
21 VIII Div.1, section UG-35(b) and shall include a vent plug/PWS. End closure shall be capable of being included as part of an interlock system;
22 installed and supplied by others.
23
KOREA NATIONAL OIL COMPANY (KNOC Vietnam)
MECHANICAL DATA SHEET
PIG LAUNCHER
MECHANICAL NOTES
1
18" / 6" PIPELINE PIGGING FEASIBILITY STUDY
AL-2208
4800001648
24 2.11 STA denotes Supplier to advise, STC denotes Supplier to confirm.
25
26 2.12 The internal diameter of the minor barrel and girth flange (N1) shall match the connecting pipeline.
27
28 2.13 End closure type : GD Bandlock 2 Closure
29
30 2.14 Materials shall comply with Project Specification VN01-200-30-L-SP-0001 and NACE MR0175 / ISO 15156 requirements.
31
32 2.15 Paintng shall be carried out in accordance with KNOC Project Specification for Painting and Coating VN01-000-40-N-AA-0211.
33
34 2.16 RT or UT shall be carried out in the final condition.
35
36 2.17 Supplier shall ensure that conical section small end reinforcement does not influence stated internal diameter for minor barrel.
37
38 2.18 (Deleted)
39
40 2.19 Pressure and Temperature Cycling data for fatigue calculations shall be as follows;
41
42 2.20 Most stringent design code requirements shall apply.
43
44 2.21 All nozzle reinforcing shall be integral, reinforcing pads not permitted.
45
46 2.22 All bolting shall be metric. Bolting shall be coated in accordance with KNOC specification VN01-000-40-N-AA-0211, class 3A1.
47
48 Basis (HOLD):49 Pig Launcher is pressurised when not in use
50 It is only depressured to recover / deploy pigs or for maintenance during shutdowns.
51
52
53 Normally launcher will be at ambient condi tion, minimum 18.2C, maximum 35.1C
54 Maximum operating temperature during pigging is 60C
55 Operating Pressure rises by 5 bar during pigging.
56 Design Life: 20 years = 7300 Days
57
58
59
-
7/30/2019 AL2208
5/6
CLIENT: DOCUMENT NO: AL-2208-P03-001 REV NO: A2
LOCATION: RONG DOI / RONG DOI TAY OFFSHORE VIETNAM EQUIPMENT TITLE: 6" CONDENSATE PIG LAUNCHER
SERVICE: CONDENSATE / GAS EXPORT ITEM NO: 220-L-3501 NO. REQUIRED:
PROJECT: P.O. NO: P.O. DATE: 29.06.2012
JOB NO: ENQUIRY NO: PAGE: 4 OF 5
REV.
1 DESIGN SPECIFICATION J26081A-M-SP-13001 & VN01-200-30-L-SP-00012 DESIGN CODE (See Note 2.20) DnV OS-F101, ASME B31.8 and ASME VIII Div.1 (Latest Editions)
3 WIND LOADING In accordance with J26081A-M-SP-13001
4 SEISMIC LOADING N/A
5 BLAST LOADING 0.7 BARG
6 NOZZLE LOADING Refer to AL2208-M05-001_Mechanical Design Calculation Sheet
7 TRANSPORTATION LOADING In accordance with J26081A-M-SP-13001
8 PRESSURE CYCLING N/A
9 MECHANICAL FATIGUE LOADING N/A
10 OUTDOORS YES
11 EXPOSED YES
12 TYPE OF SUPPORT SADDLE / PIPE SUPPORTS DESIGN BY SUPPLIER - See Note 2.5
13 FOUNDATION STEEL PLATFORM DECK
14
15 ASME CODE U STAMP YES
16 INDEPENDENT DESIGN AND FABRICATION REVIEW REQUIRED / A.I ASME
17 THIRD PARTY INSPECTION N/A
18 FABRICATION TOLERANCES Per DESIGN CODE
19 TRACEABILITY / CERTIFICATION REQUIRED / EN10204 Type 3.1
20
21 RADIOGRAPHY - RT For Full Penetration Weld Joints
22 ULTRASONIC - UT For Full Penetration Weld Joints where RT method is impractical
23 MAGNETIC PARTICLE - MT For all weld joints, for Nozzle and Shell butt weld joints MT for outside only
REGULATION, FABRICATION, INSPECTION AND MATERIAL CERTIFICATION
NON-DESTRUCTIVE AND MATERIAL TESTING
PIG LAUNCHER
LOCATION
MECHANICAL DATA SHEET
MECHANICAL DESIGN DATA
1
18" / 6" PIPELINE PIGGING FEASIBILITY STUDY
AL-2208
PIG LAUNCHER
KOREA NATIONAL OIL COMPANY (KNOC Vietnam)
4800001648
24 DYE PENETRANT - PT N/A
25 POST WELD HEAT TREATMENT - PWHT N/A
26 PRODUCTION TEST PLATES N/A
27 IMPACT TESTING N/A
28
29 Shell Major / Minor Barrel SA-333 Gr.6 Seamless
30 Shell Reducer SA-420 WPL6
31 Closure Hub / Door SA-350 LF2
32 Nozzle forgings SA-350 LF2
33 Nozzle necks SA-350 LF2 / A333 Gr.6
34 Welded nozzle fittings (if applicable) SA-420 WPL6
36 Blind flanges SA-350 LF2
37 External attachments welded to pressure shell SA-516 GR.70N
38 Bolts for external (pressure) joints SA-193 Gr.B7 (See Note 2.22)
39 Nuts for external (pressure) joints SA-194 Gr.2H (See Note 2.22)
40 Supports and base plates SA-516 GR.70N
41 Gaskets for external (pressure) joints Per Specification VN01-200-30-L-SP-0001 GASKET DIMENSIONS TO ASME B16.20
42
43 Inside NO PAINT, INSIDE TO BE CLEAN AND FREE OF DIRT AND DEBRIS.
44 Outside IN ACCORDANCE WITH VN01-200-30-L-SP-0001
45 SYSTEM : RD-(HOLD) / COLOUR: RAL (HOLD)
46 Insulation - supplied and installed by others NONE
47 Fireproofing - supplied and installed by others HOLD
48 Preservation and preparation for shipment HOLD
4950 Supports (See Note 2.5) REQUIRED - SUPPLIER DESIGN (HOLD) Insulation supports / rings NOT REQUIRED
51 Lifting Lugs / Attachments REQUIRED - SUPPLIER DESIGN Fireproofing clips NOT REQUIRED
52 Rating / Nameplate TO CODE AND J26081A-M-SP-13001 Platform clips NOT REQUIRED
53 Earth bosses 2 OFF REQUIRED Ladder clips NOT REQUIRED
54 End Closure REQUIRED (See Note 2.10) Platforms NOT REQUIRED
55 End Closure handling device REQUIRED Ladders NOT REQUIRED
56 Pig Signaller 1 OFF REQUIRED - HOLD (See Note 2.8) Closure key interlock system REQUIRED (See Note 2.10)
57 Instruction Plate REQUIRED
MATERIALS OF CONSTRUCTION (STC)
SURFACE PREPARATION AND CONSERVATION
STANDARD CONSTRUCTION DETAILS
-
7/30/2019 AL2208
6/6
CLIENT: DOCUMENT NO: AL-2208-P03-001 REV NO: A2
LOCATION: RONG DOI / RONG DOI TAY OFFSHORE VIETNAM EQUIPMENT TITLE: 6" CONDENSATE PIG LAUNCHER
SERVICE: CONDENSATE / GAS EXPORT ITEM NO: 220-L-3501 NO. REQUIRED
PROJECT: P.O. NO: P.O. DATE: 29.06.2012
JOB NO: ENQUIRY NO: PAGE: 5 OF 5
REV.
1 VESSEL SKETCH
2 NOT TO SCALE. ALL DIMENSIONS IN mm UNLESS OTHERWISE STATED
3 Based on Maximum (Intelligent Pig) Tool length = 2800mm
4
5
6
7
8
9
10
11
12
13
14
15
1617
18
19
20
21
22
23
KOREA NATIONAL OIL COMPANY (KNOC Vietnam)
MECHANICAL DATA SHEET
PIG LAUNCHER
'1:200
4800001648
AL-2208
1
NOZZLE ORIENTATION END VIEW
18" / 6" PIPELINE PIGGING FEASIBILITY STUDY
N5, N2B
K2,N7,N4
N1
N3B
K1
6"NB
S.P. F.P.
TOSEL800
schXS
146.36
N6
4000ref.
VIEWON'A'
K2
8"NB
N5N4
N2A
2733SupportCRS 403
800
N3A
PS1
N7
SchXS193.7
N2B
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40 Note : Flange faces shall be
41 perpindicular to natural centreline
42
43
44
45
46
47 Outlet See note 2.12
48 Balance line
49 Drain c/w Blind flange, bolting, gasket
50 Kicker line
51 PSV Connection / Balance Size 1'' x 2'' - PSV by others
52 Quick Opening Closure See note 2.10
53 Vent c/w Blind flange, bolting, gasket
54 K1 2 Pressure gauge
55 K2 2 Pressure Transmitter
56 Pig signaller (see note 2.8) Type HOLD - By Others
57
58 Shipping weight kg
59 kg
-
110
110
110
-
N5 1 2
300 WN RF
300 WN RF
2 2
N4 1 3
N3A/B
N2A/B
2 2
N1 1 6 See note 2.2 WN RF -
WN RF
Special
WN RF
300
300 WN RF
PS1
ESTIMATED WEIGHTS
462
1 2 300 WN RF
110
110
124
110
1
-1
21 300
1
300 WN RF
300 WN RF
300
N6
N7
SERVICE REMARKS
NOZZLE SCHEDULE
MARKNo
OFF
SIZE
(INCH
NB)
TYPE
STANDOUT
FROM OUTSIDE
OF SHELL
FLANGE
RATING LB
N1,N6
N5,N2BN2A,K1,PS1
N3A/B
HINGELOCATION
VIEW 'A'