    CLIENT:

    PROJECT TITLE: 18" / 6" PIPELINE PIGGINGFEASIBILITY STUDY

    KOREA NATIONAL OIL COMPANY

    (KNOC Vietnam)

    DOCUMENT TITLE MECHANICAL DATASHEET FOR

    A2

    A1

    Rev

    DOCUMENT TITLE: MECHANICAL DATASHEET FOR

    6"NB CONDENSATE PIG LAUNCHER

    JOB NO.: AL-2208

    DOCUMENT NO: AL-2208-P03-001

    06 Sep. 12 L.D.T L.A.V L.N.BIssued for Review

    Client

    Approval

    18 July 12 Issued for Review L.A.V L.N.B L.N.B

    Date Description Issued By Checked By Approved By

  • 7/30/2019 AL2208

    3/6

    CLIENT: DOCUMENT NO: AL-2208-P03-001 REV NO: A2

    LOCATION: RONG DOI / RONG DOI TAY OFFSHORE VIETNAM EQUIPMENT TITLE: 6" CONDENSATE PIG LAUNCHER

    SERVICE: CONDENSATE / GAS EXPORT ITEM NO: 220-L-3501 NO. REQUIRED:

    PROJECT: P.O. NO: P.O. DATE: 29.06.2012

    JOB NO: ENQUIRY NO: PAGE: 2 OF 5

    REV.

    12 FLUID DATA

    3 Description CONDENSATE (See Note 1.2 & 1.3)

    4 Flammable/Explosive NO

    5 Toxic NO

    6 Corrosive/erosive YES (See Note 1.2)

    7 Special serv ice: Sour NO

    8 Lethal NO

    9

    10

    11 Design Pressure

    12 Full Vacuum design required @ Design Temp N/A

    13 Operating Pressure 15

    14 Shop Hydrotest Pressure

    15 Operating Temperature 30 60

    16 Pressure drop through internals N/A

    17 Maximum Design Temperature 105

    18 Minimum Design Temperature -29

    19 Minimum Ambient Temperature 15

    20 Steamout conditions - Pressure N/A

    21 Steamout conditions - Temperature N/A

    22 Corrosion Allowance 3.0

    23 Major / Minor Barrel Outside Diameter 219.1 / 168.3

    barg 28.6

    4800001648

    MECHANICAL DATA SHEET

    PIG LAUNCHER

    18" / 6" PIPELINE PIGGING FEASIBILITY STUDY

    AL-2208

    barg

    C

    barg

    oC

    KOREA NATIONAL OIL COMPANY (KNOC Vietnam)

    mm

    22

    mm

    oC

    barg

    oCoC

    1

    PROCESS DATA

    OPERATING CONDITIONS

    bargoC

    24 Wall thickness of Major / Minor Barrel 12.7 / 10.97

    25 Inside Diameter of Major / Minor Barrel

    26 Overall Length See Page 8/8

    27 Total Volume for field test 0.1

    28 Insulation None

    29

    30

    31

    32

    33

    34 Pigging of the gas export pipeline is primarily required for operational pigging for cleaning and corrosion inhibition.

    35 Pigging is also for required for pipeline monitoring by means of an intelligent pig.

    36

    37 Corrosive due to Water, HC, H2S, CO2.

    38

    39 Supplier shall ensure any components used e.g. seals etc. are not degraded by contact with these fluids.

    40

    41 As H2S present it is required to design pig launcher to NACE MR0175 / ISO 15156.

    42

    43

    44

    45

    46

    47

    4849

    50

    51

    52

    53

    54

    55

    56

    57

    58

    59

    60

    m

    mm

    146.36 / 193.7

    mm

    1.4

    1.1

    1.2

    1.3

    PROCESS NOTES

    mm

    mm

  • 7/30/2019 AL2208

    4/6

    CLIENT: DOCUMENT NO: AL-2208-P03-001 REV NO: A2

    LOCATION: RONG DOI / RONG DOI TAY OFFSHORE VIETNAM EQUIPMENT TITLE: 6" CONDENSATE PIG LAUNCHER

    SERVICE: CONDENSATE / GAS EXPORT ITEM NO: 220-L-3501 NO. REQUIRED:

    PROJECT: P.O. NO: P.O. DATE: 29.06.2012

    JOB NO: ENQUIRY NO: PAGE: 3 OF 5

    REV.

    1 2.1 The Pig Launcher shall be designed in accordance with DnV OS-F101, ASME B31.8 and ASME VIII Div.1 (Latest Editions) and2 Project Specification J26081A-M-SP-13001.

    3 2.2 All standard nozzle flanges ASME B16.5. Nozzle N1 weld neck flange shall be ASME B16.5 compatible and have specified internal diameter

    4 of pipeline. Flange bolt holes to straddle natural centrelines. All nozzle attachments to be set-in, full penetration welded.

    5

    6 2.3 Supplier is to select wall thickness of major and minor barrels to withstand design pressure plus all additional loads, environmental loadings

    7 and fatigue.

    8

    9 2.4 Design of pig launcher shall guarantee long term pressure integrity of the closure and relevant sealing systems.

    10

    11 2.5 Pig launcher shall be supported on two saddle / pipe supports (one sliding, one fixed). The sliding baseplate shall have slotted

    12 holes to enable free movement of the sliding end.

    13

    14 2.8 One non-intrusive type signaller (local and remote indication) - HOLD is required for mounting on the pig launcher. Signaller c/w junction box (JB)

    15 - HOLD shall be Supplied by Others. Supplier shall ensure adequate space provision for mounting of signaller and bracket for JB on equipment.

    16

    17 2.9 Pig launcher length shall be based on the overall length of intelligent pig + 10%. Supplier shall confirm overall, major

    18 and minor barrel lengths.

    19

    20 2.10 End closure and end closure materials shall be designed in accordance with design code with the functional safety requirement of ASME

    21 VIII Div.1, section UG-35(b) and shall include a vent plug/PWS. End closure shall be capable of being included as part of an interlock system;

    22 installed and supplied by others.

    23

    KOREA NATIONAL OIL COMPANY (KNOC Vietnam)

    MECHANICAL DATA SHEET

    PIG LAUNCHER

    MECHANICAL NOTES

    1

    18" / 6" PIPELINE PIGGING FEASIBILITY STUDY

    AL-2208

    4800001648

    24 2.11 STA denotes Supplier to advise, STC denotes Supplier to confirm.

    25

    26 2.12 The internal diameter of the minor barrel and girth flange (N1) shall match the connecting pipeline.

    27

    28 2.13 End closure type : GD Bandlock 2 Closure

    29

    30 2.14 Materials shall comply with Project Specification VN01-200-30-L-SP-0001 and NACE MR0175 / ISO 15156 requirements.

    31

    32 2.15 Paintng shall be carried out in accordance with KNOC Project Specification for Painting and Coating VN01-000-40-N-AA-0211.

    33

    34 2.16 RT or UT shall be carried out in the final condition.

    35

    36 2.17 Supplier shall ensure that conical section small end reinforcement does not influence stated internal diameter for minor barrel.

    37

    38 2.18 (Deleted)

    39

    40 2.19 Pressure and Temperature Cycling data for fatigue calculations shall be as follows;

    41

    42 2.20 Most stringent design code requirements shall apply.

    43

    44 2.21 All nozzle reinforcing shall be integral, reinforcing pads not permitted.

    45

    46 2.22 All bolting shall be metric. Bolting shall be coated in accordance with KNOC specification VN01-000-40-N-AA-0211, class 3A1.

    47

    48 Basis (HOLD):49 Pig Launcher is pressurised when not in use

    50 It is only depressured to recover / deploy pigs or for maintenance during shutdowns.

    51

    52

    53 Normally launcher will be at ambient condi tion, minimum 18.2C, maximum 35.1C

    54 Maximum operating temperature during pigging is 60C

    55 Operating Pressure rises by 5 bar during pigging.

    56 Design Life: 20 years = 7300 Days

    57

    58

    59

  • 7/30/2019 AL2208

    5/6

    CLIENT: DOCUMENT NO: AL-2208-P03-001 REV NO: A2

    LOCATION: RONG DOI / RONG DOI TAY OFFSHORE VIETNAM EQUIPMENT TITLE: 6" CONDENSATE PIG LAUNCHER

    SERVICE: CONDENSATE / GAS EXPORT ITEM NO: 220-L-3501 NO. REQUIRED:

    PROJECT: P.O. NO: P.O. DATE: 29.06.2012

    JOB NO: ENQUIRY NO: PAGE: 4 OF 5

    REV.

    1 DESIGN SPECIFICATION J26081A-M-SP-13001 & VN01-200-30-L-SP-00012 DESIGN CODE (See Note 2.20) DnV OS-F101, ASME B31.8 and ASME VIII Div.1 (Latest Editions)

    3 WIND LOADING In accordance with J26081A-M-SP-13001

    4 SEISMIC LOADING N/A

    5 BLAST LOADING 0.7 BARG

    6 NOZZLE LOADING Refer to AL2208-M05-001_Mechanical Design Calculation Sheet

    7 TRANSPORTATION LOADING In accordance with J26081A-M-SP-13001

    8 PRESSURE CYCLING N/A

    9 MECHANICAL FATIGUE LOADING N/A

    10 OUTDOORS YES

    11 EXPOSED YES

    12 TYPE OF SUPPORT SADDLE / PIPE SUPPORTS DESIGN BY SUPPLIER - See Note 2.5

    13 FOUNDATION STEEL PLATFORM DECK

    14

    15 ASME CODE U STAMP YES

    16 INDEPENDENT DESIGN AND FABRICATION REVIEW REQUIRED / A.I ASME

    17 THIRD PARTY INSPECTION N/A

    18 FABRICATION TOLERANCES Per DESIGN CODE

    19 TRACEABILITY / CERTIFICATION REQUIRED / EN10204 Type 3.1

    20

    21 RADIOGRAPHY - RT For Full Penetration Weld Joints

    22 ULTRASONIC - UT For Full Penetration Weld Joints where RT method is impractical

    23 MAGNETIC PARTICLE - MT For all weld joints, for Nozzle and Shell butt weld joints MT for outside only

    REGULATION, FABRICATION, INSPECTION AND MATERIAL CERTIFICATION

    NON-DESTRUCTIVE AND MATERIAL TESTING

    PIG LAUNCHER

    LOCATION

    MECHANICAL DATA SHEET

    MECHANICAL DESIGN DATA

    1

    18" / 6" PIPELINE PIGGING FEASIBILITY STUDY

    AL-2208

    PIG LAUNCHER

    KOREA NATIONAL OIL COMPANY (KNOC Vietnam)

    4800001648

    24 DYE PENETRANT - PT N/A

    25 POST WELD HEAT TREATMENT - PWHT N/A

    26 PRODUCTION TEST PLATES N/A

    27 IMPACT TESTING N/A

    28

    29 Shell Major / Minor Barrel SA-333 Gr.6 Seamless

    30 Shell Reducer SA-420 WPL6

    31 Closure Hub / Door SA-350 LF2

    32 Nozzle forgings SA-350 LF2

    33 Nozzle necks SA-350 LF2 / A333 Gr.6

    34 Welded nozzle fittings (if applicable) SA-420 WPL6

    36 Blind flanges SA-350 LF2

    37 External attachments welded to pressure shell SA-516 GR.70N

    38 Bolts for external (pressure) joints SA-193 Gr.B7 (See Note 2.22)

    39 Nuts for external (pressure) joints SA-194 Gr.2H (See Note 2.22)

    40 Supports and base plates SA-516 GR.70N

    41 Gaskets for external (pressure) joints Per Specification VN01-200-30-L-SP-0001 GASKET DIMENSIONS TO ASME B16.20

    42

    43 Inside NO PAINT, INSIDE TO BE CLEAN AND FREE OF DIRT AND DEBRIS.

    44 Outside IN ACCORDANCE WITH VN01-200-30-L-SP-0001

    45 SYSTEM : RD-(HOLD) / COLOUR: RAL (HOLD)

    46 Insulation - supplied and installed by others NONE

    47 Fireproofing - supplied and installed by others HOLD

    48 Preservation and preparation for shipment HOLD

    4950 Supports (See Note 2.5) REQUIRED - SUPPLIER DESIGN (HOLD) Insulation supports / rings NOT REQUIRED

    51 Lifting Lugs / Attachments REQUIRED - SUPPLIER DESIGN Fireproofing clips NOT REQUIRED

    52 Rating / Nameplate TO CODE AND J26081A-M-SP-13001 Platform clips NOT REQUIRED

    53 Earth bosses 2 OFF REQUIRED Ladder clips NOT REQUIRED

    54 End Closure REQUIRED (See Note 2.10) Platforms NOT REQUIRED

    55 End Closure handling device REQUIRED Ladders NOT REQUIRED

    56 Pig Signaller 1 OFF REQUIRED - HOLD (See Note 2.8) Closure key interlock system REQUIRED (See Note 2.10)

    57 Instruction Plate REQUIRED

    MATERIALS OF CONSTRUCTION (STC)

    SURFACE PREPARATION AND CONSERVATION

    STANDARD CONSTRUCTION DETAILS

  • 7/30/2019 AL2208

    6/6

    CLIENT: DOCUMENT NO: AL-2208-P03-001 REV NO: A2

    LOCATION: RONG DOI / RONG DOI TAY OFFSHORE VIETNAM EQUIPMENT TITLE: 6" CONDENSATE PIG LAUNCHER

    SERVICE: CONDENSATE / GAS EXPORT ITEM NO: 220-L-3501 NO. REQUIRED

    PROJECT: P.O. NO: P.O. DATE: 29.06.2012

    JOB NO: ENQUIRY NO: PAGE: 5 OF 5

    REV.

    1 VESSEL SKETCH

    2 NOT TO SCALE. ALL DIMENSIONS IN mm UNLESS OTHERWISE STATED

    3 Based on Maximum (Intelligent Pig) Tool length = 2800mm

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    1617

    18

    19

    20

    21

    22

    23

    KOREA NATIONAL OIL COMPANY (KNOC Vietnam)

    MECHANICAL DATA SHEET

    PIG LAUNCHER

    '1:200

    4800001648

    AL-2208

    1

    NOZZLE ORIENTATION END VIEW

    18" / 6" PIPELINE PIGGING FEASIBILITY STUDY

    N5, N2B

    K2,N7,N4

    N1

    N3B

    K1

    6"NB

    S.P. F.P.

    TOSEL800

    schXS

    146.36

    N6

    4000ref.

    VIEWON'A'

    K2

    8"NB

    N5N4

    N2A

    2733SupportCRS 403

    800

    N3A

    PS1

    N7

    SchXS193.7

    N2B

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    34

    35

    36

    37

    38

    39

    40 Note : Flange faces shall be

    41 perpindicular to natural centreline

    42

    43

    44

    45

    46

    47 Outlet See note 2.12

    48 Balance line

    49 Drain c/w Blind flange, bolting, gasket

    50 Kicker line

    51 PSV Connection / Balance Size 1'' x 2'' - PSV by others

    52 Quick Opening Closure See note 2.10

    53 Vent c/w Blind flange, bolting, gasket

    54 K1 2 Pressure gauge

    55 K2 2 Pressure Transmitter

    56 Pig signaller (see note 2.8) Type HOLD - By Others

    57

    58 Shipping weight kg

    59 kg

    -

    110

    110

    110

    -

    N5 1 2

    300 WN RF

    300 WN RF

    2 2

    N4 1 3

    N3A/B

    N2A/B

    2 2

    N1 1 6 See note 2.2 WN RF -

    WN RF

    Special

    WN RF

    300

    300 WN RF

    PS1

    ESTIMATED WEIGHTS

    462

    1 2 300 WN RF

    110

    110

    124

    110

    1

    -1

    21 300

    1

    300 WN RF

    300 WN RF

    300

    N6

    N7

    SERVICE REMARKS

    NOZZLE SCHEDULE

    MARKNo

    OFF

    SIZE

    (INCH

    NB)

    TYPE

    STANDOUT

    FROM OUTSIDE

    OF SHELL

    FLANGE

    RATING LB

    N1,N6

    N5,N2BN2A,K1,PS1

    N3A/B

    HINGELOCATION

    VIEW 'A'