alane e. boyd, p.e. desert rose environmental · from: alane boyd, desert rose environmental to:...

1
From: Alane Boyd, Desert Rose Environmental To: Doug Smith Cc: [email protected] Subject: FW: DRC Workflow - BARCLAY SUBDIVISION (Small Scale) Date: Wednesday, July 16, 2014 4:22:59 PM Attachments: Barclay Sm Sub - APP - 2-19-14.pdf C14-002 Final Plat 6-30-14.pdf C14-002 Vicinity Map 2-12-14.pdf Water Board meeting minutes.pdf water board minutes.pdf Doug, I have a couple of questions on this subdivision. How is lot 2 accessed? And can the access easement for lot 1 be through a flood plain? Will I have any input during the Building Permit phase because I would like to see them put up erosion control fencing during construction to protect Little Hobble Creek. Thanks! Alane E. Boyd, P.E. Desert Rose Environmental (801) 580-9692 [email protected] From: Sherry Lawrence [mailto:[email protected]] Sent: Monday, June 30, 2014 4:48 PM To: Andy Dahmen; Alane Boyd Subject: DRC Workflow - BARCLAY SUBDIVISION (Small Scale) Please review the attached files for the following item. This is a small scale subdivision, so it will not be going to Planning Commission: This proposal is a two lot subdivision at the same location as the rezone that was approved last year in Wallsburg at the end of Little Valley road. The proposal is now zoned RA-5 with the boundary following the new piped irrigation line. The proposal is in Section 29, Township 5 South, Range 5 East. This proposal is adjacent and east of the Little Hobble Creek Ranch subdivision that was on the Planning Commission agenda for June. Doug Smith Wasatch County Planning Department 55 South 500 East Heber City, UT 84032 [email protected] 435-657-3205

Upload: phungdiep

Post on 19-Aug-2018

233 views

Category:

Documents


0 download

TRANSCRIPT

  • From: Alane Boyd, Desert Rose EnvironmentalTo: Doug SmithCc: [email protected]: FW: DRC Workflow - BARCLAY SUBDIVISION (Small Scale)Date: Wednesday, July 16, 2014 4:22:59 PMAttachments: Barclay Sm Sub - APP - 2-19-14.pdf

    C14-002 Final Plat 6-30-14.pdfC14-002 Vicinity Map 2-12-14.pdfWater Board meeting minutes.pdfwater board minutes.pdf

    Doug,I have a couple of questions on this subdivision. How is lot 2 accessed? And can the access easement for lot 1 be through a flood plain? Will I have any input during the Building Permit phase because I would like to see them put up erosion control fencing during construction to protect Little Hobble Creek. Thanks! Alane E. Boyd, P.E.Desert Rose Environmental(801) [email protected]

    From: Sherry Lawrence [mailto:[email protected]] Sent: Monday, June 30, 2014 4:48 PMTo: Andy Dahmen; Alane BoydSubject: DRC Workflow - BARCLAY SUBDIVISION (Small Scale) Please review the attached files for the following item. This is a small scale subdivision, so it will not be going to Planning Commission: This proposal is a two lot subdivision at the same location as the rezone that was approved last year in Wallsburg at the end of Little Valley road. The proposal is now zoned RA-5 with the boundary following the new piped irrigation line. The proposal is in Section 29, Township 5 South, Range 5 East. This proposal is adjacent and east of the Little Hobble Creek Ranch subdivision that was on the Planning Commission agenda for June. Doug SmithWasatch County Planning Department55 South 500 EastHeber City, UT [email protected]

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]
  • Structural Civil Surveying

    BARCLAY SUBDIVISION

    BOUNDARY DESCRIPTION

    SURVEYOR'S CERTIFICATE

    GRAPHIC SCALE

    OWNER'S DEDICATION

    ACKNOWLEDGEMENT

    2 LOT SUBDIVISION IN WALLSBURG

  • GRAPHIC SCALE

    Structural

    Civil

    S

    urveying

    BA

    RC

    LA

    Y S

    UB

    DIV

    IS

    IO

    N

    VIC

    IN

    IT

    Y M

    AP

    Se

    ctio

    n 2

    9, T

    5S

    , R

    5E

    , S

    LB

    &M