ALICE Forward Detectors Technical Design Report. Editorial team: I.G. Bearden (NBI) H. Bøggild (NBI) C.Holm (NBI) J.J. Gaardhøje (NBI), ch J.Y. Grossiord (Lyon) T. Malkiewicz (Jyvaesk.) B.S. Nielsen (NBI) G. Paic (Mexico) W. Trzaska (Jyvaeskyla). FMD ’inner’ protype before dicing. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ALICE  Forward Detectors Technical Design Report

8-3-05 Jens Jørgen Gaardhøje. NBI. ALICE-CR5

1

ALICE Forward DetectorsTechnical Design Report

Editorial team:I.G. Bearden (NBI)

H. Bøggild (NBI)

C.Holm (NBI)

J.J. Gaardhøje (NBI), ch

J.Y. Grossiord (Lyon)

T. Malkiewicz (Jyvaesk.)

B.S. Nielsen (NBI)

G. Paic (Mexico)

W. Trzaska (Jyvaeskyla)

Page 2: ALICE  Forward Detectors Technical Design Report

8-3-05 Jens Jørgen Gaardhøje. NBI. ALICE-CR5

2

Page 3: ALICE  Forward Detectors Technical Design Report

8-3-05 Jens Jørgen Gaardhøje. NBI. ALICE-CR5

3

FMD ’inner’ protype before dicing

2 sectors of 512 strips

Test structures on 6” wafer

Hamamatsu

Page 4: ALICE  Forward Detectors Technical Design Report

8-3-05 Jens Jørgen Gaardhøje. NBI. ALICE-CR5

4

Bonding pads and bias resistors

Page 5: ALICE  Forward Detectors Technical Design Report

8-3-05 Jens Jørgen Gaardhøje. NBI. ALICE-CR5

5

ALICE-FMD inner sensor

Page 6: ALICE  Forward Detectors Technical Design Report

8-3-05 Jens Jørgen Gaardhøje. NBI. ALICE-CR5

6

First 3 inner sensors delivered at NBI-Feb 2005

TDR Specs: Full depletion voltage 50-100V

Measure: full depletion voltage: 75 -80V.

TDR specs: thickness = 310 μm +- 10 μm

Measure: t= 323 μm +- 1 μm

Page 7: ALICE  Forward Detectors Technical Design Report

8-3-05 Jens Jørgen Gaardhøje. NBI. ALICE-CR5

7

First test of FMD inner Si sensorsLeakage currents

0

50

100

150

200

250

300

350

400

0 50 100 150 200 250 300 350

Bias voltage (V)

Cu

rren

t (n

A)

Serial no 1

Serial no 2

Serial no 3

Stability test

0

50

100

150

200

250

0 20 40 60 80 100 120 140 160

Time (hours)

Leak

age

curr

ent (

nA) Serial no 1 ?

TDR Specs: < 3 μA

Measure: < 0.3 μA

< 0.3 nA /strip

Full-depletion voltage: 75 V

Measure: < 2.5 pF/strip (bulk)

168 hr long-term stability test of leakage current at 200V

1/C^2

0,000

0,020

0,040

0,060

0,080

0,100

0,120

0,140

0,160

0,180

0,200

0 50 100 150 200 250 300

Bias voltage (V)

1/C

^2

(1

0^

-6 p

F^

-2)

Serial no 1

Serial no 2

Serial no 3

Page 8: ALICE  Forward Detectors Technical Design Report

8-3-05 Jens Jørgen Gaardhøje. NBI. ALICE-CR5

8

FMD Hybrid card w. 8 x (128 ch) preamplifiers

Page 9: ALICE  Forward Detectors Technical Design Report

8-3-05 Jens Jørgen Gaardhøje. NBI. ALICE-CR5

9

VA_ALICE 128 ch preampl

Page 10: ALICE  Forward Detectors Technical Design Report

8-3-05 Jens Jørgen Gaardhøje. NBI. ALICE-CR5

10

Test of FEE card with 8 VA_ALICE preamplifier chips

Page 11: ALICE  Forward Detectors Technical Design Report

8-3-05 Jens Jørgen Gaardhøje. NBI. ALICE-CR5

11

FEE card test results

I MIP 22400 e-

3.5 fC

Gain 20 mV/fC =>

20MIP 1.4 V

TDR: C=0pF => N=310e-, C=25pF => N=410e-

Measure: C=0pF : N=200e-

Expect for C=25pF: N~300e- => S/N= 22400/300=75.

Page 12: ALICE  Forward Detectors Technical Design Report

8-3-05 Jens Jørgen Gaardhøje. NBI. ALICE-CR5

12

RCU-USB test at NBI with PC&TPC-FEE card

Page 13: ALICE  Forward Detectors Technical Design Report

8-3-05 Jens Jørgen Gaardhøje. NBI. ALICE-CR5

13

FMD milestones adjusted to new ALICE installation schedule • Production of VA_ALICE chip

done• Delivery of prototype hybrid cards done• Delivery of prototype Si sensors Feb-05

done• Prototype digitizer boards produced April-05• Lab tests Si-FEE-Digitizer-RCU Jun-05• Rad. hardness studies of FEE&digitizer May-05• Place Si production order Jun-05• Delivery Si & FEE Nov-05• Bonding at CERN Dec-05• Mechanics RB26 completed Feb-06• Full system test with DAQ Dec-05• Sector (half ring) rad. test Jan-06• Detector assembly RB26 Mar-06• Detector assembly RB24 Jun-06• Ready for installation RB26 May-06• Ready for installation RB24 Sep-06