align integrate accelerate - connectall...synchronizer between qc and jira • what problem does it...

27
© 2013 The Go To Group, Inc. ConnectALL Align Integrate Accelerate

Upload: others

Post on 24-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2013 The Go To Group, Inc.

ConnectALL

Align

Integrate

Accelerate

Page 2: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

Go2Group: Who We Are • Founded in 2002

• Leading Industry Experts in ALM

• Services and solutions focused on SCM / Build

Automation / Test Automation

• First Atlassian Platinum Expert in North America

• World’s largest reseller of Atlassian Tools

• Globally operational. Sterling, VA in USA

(Headquarters), Maryland and Los Angeles

(R&D)

• Global, 40 Full Time Employees + Additional

support

Page 3: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

Go2Group: Who We Work With

Our Clients

Our Partners

Page 4: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

Go2Group: Our Services

• Software Product Line Automation

• Emphasize increased efficiencies in automation

• Focus on software development, release

process

• Value in local and distributed environments

• Best Practice Deployment Packages

• Box of services, software, training,

documentation

• Project-based Services

Page 5: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

Go2Group: Our Solutions

• “Connectors” of systems, ideas, people

• Test, Development Environments (JaM)

• Sales, Support, Development Environments

(CRM)

• Development, Support Environments (P4J, SBM)

• Connect the entire organization!

Page 6: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

Go2Group: ConnectALL

Page 7: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

Go2Group: ConnectALL

•A platform and framework to easily

connect your teams, systems, and

processes

•True knowledge sharing, across your

entire organization

•Simple installation, easy

configuration, quick deployment

•Because complexity sucks

Page 8: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

Go2Group: ConnectALL

QTR / YR Activity Notes

Q1,12

Continue Testing Market Acceptance Build Brand Awareness Signup initial clients Review GTM Metrics Widen Marketing Campaign via Partners, Events, etc Widen Brand Awareness via Social / Online Campaigns

Use initial client signups as validation. Make sure what we’re doing is working. Expand visible footprint.

Q2,12

Landscape Review Provide Online Sandbox / Demos Is It Cloud Time? Build Case Studies Around Current Clients Understand Feature Needs

Formal Competitive Review. How is ConnectALL adding value in specific environments?

2H,12 Enter Strategic Partner Discussions Expand Working Connectors More Features, More Enhancements, More Sales

Expand distribution, channels, etc. More of anything? More of everything!

Page 9: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

Go2Group: Discussion

Page 10: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

ConnectAll Features

• Reliable Message Delivery

• Push/ Pull/ Stream

• Scalable (Embedded to Cluster to Online)

• Configuration - Versions / Templates

• Checkin / Checkout Records (eg Test Case)

• Record Relationships

• Distributed Transaction Rollback

• Conflict Management

• Visual administration tools for synchronization mapping design and

performance monitoring

Page 11: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

Go2Group: Discussion

Inject business logic at any

point

Page 12: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

Go2Group: Discussion

Demo Time

Page 13: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

Go2Group JaM Plugin

•What Is JaM?

•A Defect, Requirement and Test Case

synchronizer between QC and JIRA

•What Problem Does It Solve?

•Testing team and development team normally use

two different systems;

•Communication disruptions and delays can create

a bottleneck.

Page 14: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

JaM Mapping:

Requirement

Test Case

Defect

QUALITY CENTER

JIRA

Issues

Defects

Stories

JaM

Page 15: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

NEW

INTEGRATED WORKFLOWS

OPEN

FIXED

CLOSED

NEW

ASSIGNED

RESOLVED

CLOSED

QC DEFECT

Test Lead Assign Bug to Dev Team

JIRA ISSUE

AUTOMATICALLY UPDATE

ASSIGN TO TEST TEAM

AUTOMATICALLY UPDATE

Page 16: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

What Version Do We Support

•QC 9 to 11

•JIRA 3.13 to JIRA 5 RC 2

Page 17: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

JaM Configuration 1

Page 18: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

JaM Configuration 2

Page 19: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

JaM Configuration 3

Page 20: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

JaM Configuration 4

Page 21: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

A Defect on QC Side

Page 22: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

Linked Entities of the Defect

Page 23: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

The Defect Replicated to JIRA

Page 24: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

Linked Test Case on JIRA

Page 25: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

Linked Test Case on JIRA

Page 26: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.

Linked Requirement on JIRA

Page 27: Align Integrate Accelerate - ConnectALL...synchronizer between QC and JIRA • What Problem Does It Solve? • Testing team and development team normally use two different systems;

© 2012 The Go To Group, Inc.