37668274 - 1 - ALJ/MD2/lil/gd2/jt2 Date of Issuance 12/10/2012 Decision 12-11-051 November 29, 2012 BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of Southern California Edison Company (U338E) for Authority to, Among Other Things, Increase Its Authorized Revenues For Electric Service in 2012, And to Reflect That Increase In Rates. Application 10-11-015 (Filed November 23, 2010) (See Appendix A for Service List) DECISION ON TEST YEAR 2012 GENERAL RATE CASE FOR SOUTHERN CALIFORNIA EDISON COMPANY

Upload: vodiep

Post on 16-Mar-2018

406 views

Category:

Documents


23 download

TRANSCRIPT

  • 37668274 - 1 -

    ALJ/MD2/lil/gd2/jt2 Date of Issuance 12/10/2012 Decision 12-11-051 November 29, 2012 BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of Southern California Edison Company (U338E) for Authority to, Among Other Things, Increase Its Authorized Revenues For Electric Service in 2012, And to Reflect That Increase In Rates.

    Application 10-11-015 (Filed November 23, 2010)

    (See Appendix A for Service List)

    DECISION ON TEST YEAR 2012 GENERAL RATE CASE FOR SOUTHERN CALIFORNIA EDISON COMPANY

  • A.10-11

    Title DECISCALIF1. Sum

    1.11.21.3

    2. Po2.12.22.32.42.52.62.72.82.92.1

    3. SC4. Ge

    4.1

    1-015 ALJ/

    e

    SION ON TFORNIA EDmmary ...... Proce

    2. Burde3. Standlicy Matter. South

    2. Foreca3. Safety4. Cost-B5. Trans6. Envir7. Econo8. Just an9. Joint C0. Differ

    CEs Requeeneration ... Nucle

    4.1.1.4.1.4.1.4.1.

    4.1.

    4.1.

    4.1.4.1.2.

    /MD2/lil/

    TEST YEADISON CO..................dural Histen of Proof

    dard of Prors ..............

    hern Califoasting Met

    y .................Benefit Ansparency ...onmental

    omic Factond ReasonComparisorences in Pst .................................

    ear GeneraSONGS .

    .1.1. SO

    .1.2. SO

    .1.3. SOEx

    .1.4. SOEx

    .1.5. SO4.1.1.5.1.4.1.1.5.2.4.1.1.5.3.4.1.1.5.4.

    .1.6. SaPalo Ver

    /gd2/jt2

    TABLE O

    R 2012 GEOMPANY ...................tory ...........f .................

    oof .................................

    ornia Edisothodologie...................nalysis ..........................Responsib

    ors ..............nable Rateson Exhibit

    Parties Cap......................................ation .............................

    ONGS MemONGS SafeONGS 2 & xpenses: FONGS 2 & xpenses .....ONGS 2 &

    High PServicSite PaCafete

    an Diego Grde Nuclea

    OF CONTE

    - i -

    ENERAL R ...........................................................................................................

    on Companes ....................................................................

    bility ...........................s ................ .................pital Forec........................................................................morandumety ............. 3 OperatioERC 517, 5 3 Refuelin.................. 3 Capital EPressure T

    ce Air Pipinarking anderia Remod

    Gas & Electar Generati

    ENTS

    RATE CAS............................................................................................................nys (SCE)................................................................................................................................................

    casts ..................................................................................

    m Account ..................on and Ma524, 525, 5

    ng and Mai..................Expenditu

    Turbine Prong Project d Pedestriadeling Protric Compaion Station

    SE FOR SO............................................................................................................) Capital R.......................................................................................................................................................................................................................................... (SONGSM..................aintenance28, 530 .....intenance ..................

    ures ...........oject ......... .................an Lighting

    oject ...........any ...........n (Palo Ver

    Page

    OUTHERN............................................................................................................

    Requests ..............................................................................................................................................................................................................................................

    MA) .............................

    e (O&M) .................. Outage ........................................................................g Project ......................................rde) ...........

    N ...... 1...... 2...... 6...... 8...... 9...... 9.... 10.... 13.... 15.... 16.... 17.... 20.... 20.... 22.... 24.... 24.... 25.... 27.... 28.... 29.... 29.... 30

    .... 31

    .... 33

    .... 34

    .... 35

    .... 37

    .... 38

    .... 39

    .... 40

    .... 41

  • A.10-11

    Title

    4.2

    4.3

    4.4

    1-015 ALJ/

    e

    4.1.

    4.1.

    2. Coal G4.2.1.4.2.2.

    4.2.4.2.4.2.4.2.4.2.

    3. Hydro4.3.1.4.3.2.4.3.3.4.3.4.4.3.4.3.

    4.3.

    4.3.5.4.3.6.

    4. Gener4.4.1.4.4.4.4.4.4.2.4.4.

    /MD2/lil/

    .2.1. O&52

    .2.2. Ca4.1.2.2.1.

    4.1.2.2.2.Generation

    Mohave Four Corand 510-

    .2.1. Ba

    .2.2. SC

    .2.3. Ot

    .2.4. Di

    .2.5. Dioelectric G

    SCEs PoPositionsO&M ExCapital E

    .4.1. 20

    .4.2. Ea4.3.4.2.1.

    .4.3. LuFE

    FERC ReAddition

    ration GaMountai

    .1.1. O&

    .1.2. CaPeakers .

    .2.1. O&55

    /gd2/jt2

    TABLE O(

    &M Expen4, 528, 529

    apital ExpeCompDocumNATM

    n ................ Generatinrners Gene514 ............

    ackgroundCEs Positiother Partieiscussion oiscussion o

    Generationosition .......s of Other xpenses: FExpenditur10 Record

    astern HydLee Vi

    undy RelinERC 537 .....elicensing .nal Capitalas-Fired Ginview .......&M Expenapital Expe...................&M: 546.73.700, and

    OF CONTEContd)

    - ii -

    nses: FERC9, 530, 531, enditures .

    ponent Desmentation M Project ....................

    ng Station: erating Sta.................. .................on .............s Position

    of Pre-2012of Post-201 ................................... Parties .....ERC 535-5res ............ed Capital

    dro Substatining Subs

    ne Conveya....................................l Informatieneration ..................

    nses: FERCenditures ...................

    700, 548.700d 554.700 ...

    ENTS

    C accounts 532, and 5..................

    sign Basis R Project ......................................... 506.013 anation: FER......................................................

    ns ...............2 Expendit11 Expendi......................................................

    545 ...............................l Expendittion Projecstation .......ance Syste....................................ion ............ ....................................

    C 546, 548-....................................0, 549.700,..................

    s 517, 519, 556 ..............................Review ......................................................nd 514.013

    RC 500-502........................................................................tures .........itures .................................................................................................tures .........cts ...............................

    em (Lundy..........................................................................................-554 ..............................................., 550.700, 5..................

    Page

    520, 523, ....................................

    ..................

    ..................

    ..................3 ................, 505-507, ............................................................................................................................................................................................................................................................

    y) ................................................................................................................................................551.700, ..................

    .... 41

    .... 42

    .... 42

    .... 43

    .... 44

    .... 45 .... 46.... 47.... 49.... 50.... 51.... 54.... 55.... 56.... 56.... 58.... 59.... 59.... 60.... 61

    .... 63

    .... 65

    .... 67

    .... 69

    .... 69

    .... 69

    .... 70

    .... 72

    .... 73

  • A.10-11

    Title

    4.54.6

    5. TD5.1

    5.2

    1-015 ALJ/

    e

    4.4.4.4.

    5. Gener6. Gener

    4.6.1.4.6.4.6.4.6.4.6.4.6.2.4.6.4.6.4.6.4.6.3.

    DBU ............ SCEs

    5.1.1.5.1.2.5.1.3.

    2. Adva5.2.1.5.2.

    5.2.

    5.2.

    5.2.

    5.2.5.2.2.

    5.2.5.2.3.

    /MD2/lil/

    .2.2. Ca

    .2.3. Mcration Prration - Ot

    Solar PV.1.1. Ba.1.2. SC.1.3. Ot.1.4. Di

    Catalina .2.1. O&.2.2. Ca.2.3. Un

    Fuel Cell..................

    s TDBU ReOther PaRIIM ......Port of L

    nced TechO&M Re

    .1.1. TrEn

    .1.2. DiEn

    .1.3. Re(R

    .1.4. Plu5.2.1.4.1.

    .1.5. PESummarExpendit

    .2.1. PaDistribut

    /gd2/jt2

    TABLE O(

    apital ExpecGrath Pea

    roject Devether ............

    V FERC 54ackgroundCEs Requether Partieiscussion ... Diesel ......&M: 548.1apital Expendersea Cals ..................................equest ........arties Posi...................

    Long Beachhnology .....equest: 560ansmission

    ngineeringistributionngineeringesearch, De

    RD&D): 58ug-in Elect

    SCEs EV Readinery of Advatures Requ

    arties Position System

    OF CONTEContd)

    - iii -

    enditures .aker Constelopment D..................49, 550 ..... of the Sol

    est in the Gs Position....................................

    140, 549.140enditures .able Write-......................................................itions ..........................

    h: Added F..................0.260, 580.n Operatio

    g: 560.260 .n Operationg: 580.260 .evelopmen0.261 ........tric Vehicl Forecast oess: 588.26nced Tech

    uest ...........tions ........m Projects

    ENTS

    ..................truction ....Division: F....................................ar Photovo

    GRC ...........ns ...................................................0, and 553..................-off: 588.2..........................................................................................Facilities a..................260, 580.2on Supervi..................n Supervis..................nt and Dem..................le (PEV) Reof PEV Ad60 ..............

    hnologys C.................................... and Expe

    ..................

    ..................FERC 549 ....................................oltaic Prog........................................................................

    3.140 ............................281 ......................................................................................................and Privat..................

    261, 588.26ision and ..................sion and ..................monstratio..................eadiness ..

    dditions .......................Capital ....................................

    enditures ..

    Page

    ..................

    ..................

    ..................

    ..................

    ..................gram .................................................................................................................................................................................................................................te Lines ......................0 ............... ..................

    ..................on ........................................................................

    ..................

    ..................

    ..................

    .... 74

    .... 75

    .... 77

    .... 79

    .... 79

    .... 79

    .... 81

    .... 81

    .... 83

    .... 84

    .... 85

    .... 86

    .... 90

    .... 92

    .... 95

    .... 95

    .... 97

    .... 98

    .... 99

    .. 102

    .. 103

    .. 104

    .. 105

    .. 107

    .. 108

    .. 108

    .. 109

    .. 112

    .. 113

    .. 114

  • A.10-11

    Title

    5.3

    5.4

    5.5

    5.6

    1-015 ALJ/

    e

    5.2.5.2.5.2.

    5.2.5.2.5.2.5.2.4.5.2.5.2.

    5.2.5.2.5.5.2.6.

    3. Trans561.21

    5.3.1.5.3.2.

    4. T&D L5.4.1.5.4.2.5.4.3.5.4.4.5.4.5.

    5. T&D I5.5.1.

    5.5.2.5.5.3.5.5.4.5.5.5.5.5.6.

    6. T&D E

    /MD2/lil/

    .3.1. Ci

    .3.2. Sm

    .3.3. DiPr

    .3.4. Int

    .3.5. Su

    .3.6. DiAdvance

    .4.1. On

    .4.2. PhAw

    .4.3. CeSmart GrAdvance

    smission an10, 587.210

    TransmisLoad SidInterfere

    Load GrowCapital ESubtransDistributSubstatioPEV Rea

    InfrastructCable ReRehabilitCable-InSubstatioDistribut4 kV Circ4 kV Sub

    Engineerin

    /gd2/jt2

    TABLE O(

    rcuit Automart Distribistributionoject (DSEtegrated Sm

    ubstation Aistributioned Technolnline Transhasor Measwareness (entralized rid Cyber Sed Technolnd Distribu0 .................ssion Inter

    de Supportence: 587.2wth ............Expenditursmission Ltion Substaon Equipmadiness ......ture Replaeplacementation ........

    n-Conduit Ron Transfotion Circuicuit Replac

    bstation Eling ..............

    OF CONTEContd)

    - iv -

    omation ....bution Tra

    n System EfEEP) ..........mart Distr

    Automationn Managemlogy Transsformer Msurement &(WASAS) .Remedial Security ...logy Laborution (T&D..................rconnectiot for Power210 ...............................res ............

    Lines Plan .ation Plan

    ment Repla..................

    acement (IRnt Program..................Replaceme

    ormers ......it Breakerscement Cuimination ..................

    ENTS

    ..................ansformersfficiency E..................

    ribution ....n 3 (SA3) ..

    ment Systemsmission S

    Monitoring & Wide-A.................. Action Sch..................ratory ProD) Electric..................n Planninr Quality, ........................................................................

    n ..................acement P..................R) ..............

    m and Wors..................ent ...............................s .................utovers ..... ....................................

    ..................s ................

    Enhanceme......................................................m (DMS) .

    System Pro .................rea Situati..................heme (C-R..................

    ojects .........c System P..................

    ng: 561.210 Radio & T..........................................................................................

    Program (S....................................st Circuit ..............................................................................................................................

    Page

    ..................

    ..................ent ........................................................................

    ojects ...........................ional ..................

    RAS) ..............................................

    Planning: ..................0 ................TV ..........................................................................................

    SERP) ............................................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    .. 114

    .. 115

    .. 117

    .. 118

    .. 119

    .. 120

    .. 121

    .. 121

    .. 123

    .. 124

    .. 127

    .. 129

    .. 132

    .. 133

    .. 134

    .. 136

    .. 137

    .. 139

    .. 141

    .. 143

    .. 144

    .. 146

    .. 147

    .. 151

    .. 153

    .. 155

    .. 156

    .. 158

    .. 160

  • A.10-11

    Title

    5.7

    5.8

    5.9

    5.1

    1-015 ALJ/

    e

    5.6.1.

    5.6.2.7. T&D C

    5.7.1.5.7.2.5.7.3.5.7.4.5.7.5.5.7.6.

    8. T&D I5.8.1.5.8.

    5.8.5.8.

    5.8.5.8.2.5.8.

    5.8.5.8.5.8.

    9. T&D5.9.1.

    5.9.5.9.5.9.

    0. T&D

    /MD2/lil/

    TransmisEngineerEngineer

    Customer-Rule 20ARule 20BDistributDistributCustomeCustomeand 2012

    InspectionO&M Ex

    .1.1. W58

    .1.2. Un

    .1.3. Ve5.8.1.3.1.

    .1.4. DiInspectio

    .2.1. Ca5.8.2.1.1.5.8.2.1.2.

    .2.2. W

    .2.3. Joi

    .2.4. ReDistribut

    Field AccExpenses

    .1.1. Fie

    .1.2. Joi

    .1.3. MiGrid Op

    /gd2/jt2

    TABLE O(

    ssion/Subring: 560.2ring, Plann-Driven Pr

    A ConversiB and 20C Ction Relocation Addeer Growth er Growth 2 .................n and Mainxpenses: 58ood Pole I3.120 .........ndergrounegetation M

    Prevenistributionon and Maapital Prev

    Asset Under

    ood Pole Rint Pole Cremoval of Ition Planncounting, Js: 588.130 eld Accounint Pole Oriscellaneouerations ....

    OF CONTEContd)

    - v -

    bstation Op220 ............ning and Programs ...ions ..........Conversioations .......d Facilities and Meter Expenditu..................ntenance ...83.120, 584Intrusive In..................

    nd Detail InManagementive Main

    n Apparatuaintenance ventive Ma Based Prerground StReplacemeredits and Idle Facilit

    ning and FJoint Pole .................nting ........rganizationus Expense..................

    ENTS

    perations S..................

    Protection S....................................

    ons ...............................s ................r Sets ........ure Summ....................................4.120, 593.1nspections..................nspectionsent: Portiontenance: us: 594.120 Capital

    aintenanceeventive Mtructure Rents ............ Wood Polties ............

    Field Accou Expenses ....................................n ...............es ................................

    Supervisio..................Studies: 5............................................................................................................

    mary in 2011....................................120, 594.12s: Portions..................s: 584.120 on of 593.1 Portion of0 ................ Request ...

    e Forecast .MaintenancReplacemen

    ..................le Disposa..................unting ...... and Misce..........................................................................................

    Page

    on, and ..................

    580.220 ..................................................................................................................1 ....................................20 ..............s of ....................................20 .............f 593.120 .........................................................e ...............nt .................................

    al ....................................................

    ellaneous ..........................................................................................

    .. 161

    .. 163

    .. 164

    .. 165

    .. 166

    .. 169

    .. 170

    .. 171

    .. 174

    .. 176

    .. 178

    .. 178

    .. 182

    .. 184

    .. 186

    .. 187

    .. 188

    .. 190

    .. 190

    .. 192

    .. 194

    .. 195

    .. 196

    .. 198

    .. 198

    .. 198

    .. 200

    .. 201

    .. 203

  • A.10-11

    Title

    5.1

    1-015 ALJ/

    e

    5.10.1.

    5.105.10

    5.10

    5.105.10

    5.10

    5.10.2.5.10

    1. T&D D5.11.1.

    5.115.115.115.115.11

    5.11.2.

    5.11

    /MD2/lil/

    O&M Ex583.170,

    0.1.1. Gr0.1.2. Tr

    Op0.1.3. Tr

    570.1.4. Ov0.1.5. Br

    590.1.6. Ot

    5.10.1.6.15.10.1.6.25.10.1.6.3

    5.10.1.6.4Grid Ope

    0.2.1. StrDistributio

    DistributO&M Ex

    1.1.1. Co1.1.2. Me1.1.3. Se1.1.4. Mi1.1.5. Ov

    Br59

    5.11.1.5.15.11.1.5.2

    DistributExpendit

    1.2.1. Di

    /gd2/jt2

    TABLE O(

    xpenses: 56588.170, 59rid Controansmissionperations Eansmission

    73.170 & 59verhead Lieakdown M3.170 .........ther Grid O1. Circui2. Outag3. Street

    Efficie4. Other erations: Creet Light on Constrution Const

    xpenses .....onstructioneter Relatervice Guariscellaneouverhead aneakdown M3.140 and

    1. Overh2. Under

    594.14tion Consttures .........istribution

    OF CONTEContd)

    - vi -

    61.170, 56293.170, & 5l Center Cn and DistExpenses: n and Dist

    98.170 ........ine OperatMaintenan..................Operationsit Mappingge Data Ma Light Mapent Street L Expenses Capital ReReplacemeuction andtruction an..................n Related Eed Expenserantees: 58us Distribund UndergMaintenan594.140 ....

    head Maintrground M40 ...............truction an..................

    n Storm Ca

    ENTS

    2.170, 573.1598.170 ......

    Costs: 561.1tribution S 560.170, 5tribution S..................tions: 583.nce of Dist..................s Costs: 58g ................anagementpping andLight Evalu ..................

    equest ........ent Progra

    d Maintenand Mainten..................Expenses: es: 586.14087.140 .......ution Expeground Wonce Expens..................tenance Ex

    Maintenanc..................

    nd Mainten..................pital Expe

    170, 582.17..................170 ...........

    Substation 562.170 & 5Storm Expe...................170...........tribution L..................88.170 .........................t ................

    d Inventoryuation) .........................................am .............ance ..........nance: .................. 583.140 ...0 .................................enses: 588ork Order ses: ..................xpenses: 5ce Expense..................nance: Ca..................

    enditures ..

    Page

    70, .................................... 582.170 .....enses: ....................................

    Lines: ........................................................................

    y (Energy ..........................................................................................

    ..................

    ..................

    ..................

    ..................

    .140 .......... and

    ..................593.140 ......es: ..................pital ....................................

    .. 204

    .. 205

    .. 207

    .. 209

    .. 211

    .. 213

    .. 214

    .. 215

    .. 215

    .. 216

    .. 218

    .. 220

    .. 221

    .. 224

    .. 224

    .. 225

    .. 226

    .. 227

    .. 228

    .. 229

    .. 233

    .. 235

    .. 237

    .. 237

  • A.10-11

    Title

    5.1

    5.1

    5.1

    1-015 ALJ/

    e

    5.115.11

    5.115.11

    2. T&D 5.12.1.

    5.12

    5.125.12

    5.12.2.5.125.125.12

    3. T&D 5.13.1.

    5.135.13

    5.13

    5.135.135.135.13

    5.135.13.2.

    5.135.13

    4. T&D

    /MD2/lil/

    1.2.2. Di1.2.3. Di

    Ex1.2.4. Di1.2.5. To Substatio

    O&M Ex2.1.1. Tr

    Ma2.1.2. Su2.1.3. Di

    MaCapital E

    2.2.1. Su2.2.2. Ru2.2.3. Ad Transmi

    Operatio566.160,

    3.1.1. Ov3.1.2. Un

    563.1.3. Mi

    Tr3.1.4. Tr3.1.5. Tr3.1.6. Ins3.1.7. Ro

    573.1.8. Ca

    Capital E3.2.1. Tr3.2.2. Tr Business

    /gd2/jt2

    TABLE O(

    istributionistributionxpenditureistributionools and Won Construxpenses: 5ansmissionaintenance

    ubstation MistributionaintenanceExpenditurubstation Cule 20B anddded Facilssion .........

    ons and Ma567.160, 57verhead Trndergroun4.160 .........iscellaneouansmissionansmissionansmissionsulator Waoad and Ri71.160 .........apital-RelaExpendituransmissionansmission

    s Process a

    OF CONTEContd)

    - vii -

    n Claims Dn Breakdowes ...............n TransformWork Equip

    uction and70.150, 588n Substatioe: 570.150

    Miscellaneon Substatione: 592.150 res ............

    Capital Mad C ............ities ............................aintenance71.160 .......ransmissio

    nd Transm..................us Transmn Expensen Line Renn Maintenashing Expight of Wa..................

    ated O&M res ............n Deteriorn Mainten

    and Techno

    ENTS

    amage Cawn Mainten..................

    mers ..........pment........d Maintena8.150, 592.1on Inspect ..................ous Expenn Inspectio ....................................

    aintenance ......................................................e Expenses..................

    on Line Insmission Line

    ..................mission andes: 566.160nts: 567.16nance Expepenses: 57ay (ROW) M.................. Expenses:..................

    rated Polesnance Capiology Inte

    apital Expenance Cap......................................................ance ..........150 ...........tion and ..................

    nses: 588.1on and .................................... .......................................................................s: 563.160..................spections: e Inspectio..................d Other 0 ................60 ..............enses: 57171.160 .......Maintenan..................: 571.160....................s ................ital ............egration (B

    Page

    enditures .pital ..........................................................................................

    ..................50 .............

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................0, 564.160, .................. 563.160 ...ons: ..................

    ..................

    ..................

    .160 ..........

    ..................nce: ..........................................................................................

    BP&TI) ......

    .. 238

    .. 238

    .. 241

    .. 241

    .. 242

    .. 243

    .. 243

    .. 246

    .. 246

    .. 248

    .. 249

    .. 250

    .. 251

    .. 253

    .. 253

    .. 254

    .. 256

    .. 257

    .. 260

    .. 261

    .. 262

    .. 263

    .. 264

    .. 265

    .. 265

    .. 267

    .. 267

  • A.10-11

    Title

    5.1

    5.1

    5.1

    1-015 ALJ/

    e

    5.14.1.5.145.14

    5.14.2.5. T&D

    5.15.1.

    5.15.2.5.155.155.155.15.3.5.15.4.

    6. T&D5.16.1.

    5.165.16

    7. T&D O5.17.1.5.17.2.

    5.175.175.17.3.5.17.4.5.17.5.5.17.6.5.17.7.

    5.17

    /MD2/lil/

    O&M ex4.1.1. Te4.1.2. Tr

    IT)56

    BP&TI CTechnica

    O&M Ex598.250 ..TDBU Sa

    5.2.1. Sa5.2.2. Tr5.2.3. Tr

    TDBU EnTransmis573.250,

    BusinessO&M Ex

    6.1.1. Co6.1.2. Di

    58Other Cos

    TransmisDistributUtility L

    7.2.1. Ind7.2.2. Un

    Claims WFacility MTransmisDistributTDBUs O

    7.7.1. Me

    /gd2/jt2

    TABLE O(

    penses: FEechnology ansmission) Interdepa6.270 .........

    Capital Expal Services xpenses: 56...................afety and T

    afety Prograining Seaaining Delnvironmenssion and 598.250 .....

    s, Regulatoxpenses: 56ompliance,istribution8.280 .........

    sts and Othssion Wortion Workocating Sedividual WndergrounWrite-Offs:Maintenanssion Alloction AllocaOther Opeeter Dama

    OF CONTEContd)

    - viii -

    ERC subacSolution Imn Substatioartmental ..................

    penditures .................66.250, 588..................Training: 5rams ..........at-Time .....livery .......ntal ServicDistributio..................

    ory and Fi66.280, 580, Policy, C

    n Construct..................her Operatk-Order W-Order Wrervices: 58

    Work-Ordend Utility L: 583.281 ..

    nce Distribucated Costated Costserating Revage and Te

    ENTS

    ccounts 56mplementon Inform Market M..................

    s ...................................8.250, 582.2..................566.250, 58......................................................

    ces: 582.25on Toxic W..................

    inancial Pl0.280, 588.2ontracts, ation Contr..................ting Reven

    Write-Offs: rite-Offs a88.281........er Write-OLocating Se..................ution: 580ts: 568.281s: 590.281 .venues .....

    emporary S

    66.270 and tation: 588

    mation TechMechanism

    ..................

    ..................

    ..................250, 573.25..................88.250 .............................................................

    50 ...............Waste Disp..................anning .....280 ...........

    and Billingract Manag..................

    nue ............ 560.281 ..

    and Under..................

    Offs ............ervices .......................0.282 .........1 ....................................................Services: 4

    Page

    588.270 ....8.270 ..........hnology ( (IMM): ......................................................50, ............................................................................................................

    posal: ......................................................

    g: 566.280 .gement: ......................................................

    rground ................................................................................................................................................451.100 .....

    .. 268

    .. 268

    .. 272

    .. 274

    .. 275

    .. 275

    .. 276

    .. 276

    .. 278

    .. 280

    .. 281

    .. 282

    .. 283

    .. 283

    .. 284

    .. 286

    .. 288

    .. 289

    .. 292

    .. 292

    .. 294

    .. 294

    .. 296

    .. 296

    .. 298

    .. 299

    .. 299

  • A.10-11

    Title

    6. Cu6.16.2

    6.3

    6.4

    1-015 ALJ/

    e

    5.17

    5.17ustomer Se

    . SCEs2. Policy

    6.2.1.6.2.2.6.2.3.6.2.4.6.2.5.6.2.6.

    3. CustoFERC

    6.3.1.6.3.2.6.3.3.6.3.4.

    6.3.6.3.6.3.6.3.5.6.3.6.6.3.7.6.3.8.6.3.6.3.6.3.9.

    6.3.6.3.10.

    4. Custo6.4.1.

    /MD2/lil/

    7.7.2. TrNo

    7.7.3. Otervice Busins and Partiy Consider

    IntegratiCustomeDynamicPlug-In EHome ANovemb

    omer ServiC 901-905, 5

    BusinessMeter ReSmartCoCustome903.500,

    .4.1. Cr

    .4.2. Bil

    .4.3. CuUncollecMiscellanCSBU SaMeter Ex

    .8.1. Tu

    .8.2. TeEnergy Tand Supe

    .9.1. EnRepair B

    omer ServiCustome

    /gd2/jt2

    TABLE O(

    ansmissionon-CAISOther SCE Cness Unit .es Positiorations .......ion of Smaer Growth .c Pricing ...Electric Verea Netwo

    ber 30, 2011ce Operati580, 586, 58s Units Maeading Exponnect Opeer Records903.700 - 9

    redit: 903.2lling: 903.ustomer Coctible Expeneous Exp

    afety: FERxpenses: Furn Off andest and InsTheft, Custervision: F

    nergy Thefilling Metece and Info

    er Assistan

    OF CONTEContd)

    - ix -

    n ServicesO Services: Concerns ....................ns ...............................

    art-Connec....................................

    ehicle Costork Costs ..1 Windstorions Divisi87, 597 ......

    anagementpenses: FEerations Ce and Colle

    903.800 .....200 ............500 ...........ommunica

    ense: FERCpense: FERRC 580 .......FERC 586 ..d Turn Onpect Metertomer InstFERC 587 .ft: 587.200 ers: 597.40ormation D

    nce: FERC

    ENTS

    s for Gener 456.340 ............................................................................

    ct Costs an....................................

    ts ..................................rm Responion (CSOD..................

    t and SuppERC 902 ....enter (SOCections: - 90......................................................ation OrgaC 904 .........RC 905 ...........................................

    n Services: rs: 586.400

    tallation, an.................. ..................00 ..............Delivery ...

    C Account 9

    ration: 456..........................................................................................

    nd Benefits........................................................................nse ............

    D) O&M: ..................

    port: FERC..................C): 902.3003.100-903......................................................

    anization: ........................................................................ 586.100 ...0 ................nd Manag........................................................................908 ............

    Page

    6.308 & .......................................................................................... ...........................................................................................................

    ..................C 901 ...........................

    00 ...............3.300, ...................................................... 903.800 ................................................................................................................

    gement ..........................................................................................

    .. 300

    .. 301

    .. 302

    .. 303

    .. 304

    .. 305

    .. 309

    .. 310

    .. 312

    .. 313

    .. 317

    .. 319

    .. 320

    .. 322

    .. 323

    .. 325

    .. 327

    .. 329

    .. 332

    .. 336

    .. 337

    .. 338

    .. 339

    .. 339

    .. 339

    .. 341

    .. 341

    .. 342

    .. 344

    .. 345

  • A.10-11

    Title

    6.5

    6.6

    6.77. Inf

    7.17.2

    7.3

    1-015 ALJ/

    e

    6.4.6.4.6.4.6.4.2.6.4.3.6.4.4.6.4.5.6.4.6.

    5. Gener6.5.1.6.5.6.5.6.5.2.6.5.3.6.5.4.

    6. Capita6.6.1.6.6.2.6.6.3.6.6.4.6.6.5.6.6.6.6.6.7.6.6.

    7. Otherformation . Partie

    2. Policy7.2.1.7.2.2.7.2.7.2.3.

    3. O&M

    /MD2/lil/

    .1.1. Ac

    .1.2. En

    .1.3. PrBusinessRate ComLocal PuBusiness2013 For

    ral Plant CStructure

    .1.1. En

    .1.2. MeOffice FuSpecializMetering

    alized SoftAlerts anInteractivCustomeEnhanceHAN SuPlug-In ERegulato

    .7.1. DyTo

    r OperatingTechnolog

    es Positiony Consider

    Market REnterpris

    .2.1. ERProducti

    M: FERC 51

    /gd2/jt2

    TABLE O(

    ccount Manergy Centogram Ma

    s Unit Manmmunicatiublic Affairs License Tecasts base

    Capital Expes and Impnergy Centeter Shop .urniture anzed Equipmg Capital Rtware ........nd Notificave Voice Rer Relationd Meter an

    upport andElectric Veory Mandaynamic Priools ............g Revenuegy and Busns ...............rations .......Redesign &se Resourc

    RP Benefitsivity, Bene17, 920, 921

    OF CONTEContd)

    - x -

    anagementters: 908.6anagementnagement aions: 916.6rs: FERC 9

    Tax: FERCed on Sma

    pendituresprovementters .............................nd Equipmment .........Requireme..................ations .......Response ..nship Manand Usage C

    d Trouble Sehicle Suppate and Coicing Rate ..................es ...............siness Inte....................................

    & Technoloce Plannins ................

    efits and Sa1, 931 ........

    ENTS

    t: 908.600 .610 .............t: 908.640 .and Suppo600 ............920 .............

    C 408...........artConnect ..................ts ...................................................

    ment .............................

    ents ..................................................................agement ...CapabilitieShooting ...port Systemmpliance . Analysis a....................................gration (IT....................................ogy Upgra

    ng (ERP) ......................

    avings .........................

    ..................

    ..................

    ..................ort: 907.60......................................................t Integratio......................................................................................................................................................................................................es ................................ms ..............................and Manag....................................T&BI) ...........................................ade (MRTU........................................................................

    Page

    ..................

    ..................

    ..................00 .....................................................................on ............................................................................................................................................................................................................................................................................................gement ..........................................................................................

    U) ......................................................................................

    .. 345

    .. 347

    .. 349

    .. 353

    .. 353

    .. 354

    .. 357

    .. 357

    .. 358

    .. 359

    .. 360

    .. 361

    .. 362

    .. 363

    .. 364

    .. 366

    .. 367

    .. 368

    .. 370

    .. 371

    .. 372

    .. 374

    .. 375

    .. 376

    .. 378

    .. 379

    .. 380

    .. 383

    .. 383

    .. 385

    .. 385

    .. 386

    .. 388

  • A.10-11

    Title

    7.4

    7.5

    7.6

    1-015 ALJ/

    e

    7.3.1.7.3.

    7.3.2.7.3.3.7.3.7.3.

    4. Capita7.4.1.7.4.

    7.4.7.4.7.4.7.4.7.4.7.4.2.7.4.

    7.4.5. Capita

    7.5.1.6. Capita

    7.6.1.

    7.6.2.7.6.3.7.6.4.7.6.5.7.6.6.7.6.7.

    /MD2/lil/

    Applicat.1.1. O&

    FEO&M TeO&M Inf

    .3.1.Comp

    .3.2.O&M FERC

    al ExpendHardwar

    .1.1. UnEx

    .1.2. PC

    .1.3. Ru

    .1.4. Co

    .1.5. Fib

    .1.6. SaExpande

    .2.1. Ca(M

    .2.2. Neal Expend

    Projects Lalized Soft

    ComputeFacility MCustomeEnterprisEnterprisRevenueEnergy MDesign M(DSRP) aDerivatio

    /gd2/jt2

    TABLE O(

    tion Servic&M for NeERC 920, 92echnology frastructuruting ServBusiness O 920, 921 ....itures Hare ReplacencontestedxpenditureCs and Reluggedized opper Wireber Optic C

    atellite Termed Infrastruapital Expe

    MRN) and Dext Generaitures OpLess than $tware Soer Aided DManagemeer Data Wase Platformse Platform

    e ProtectionManager RManager Dand Capitaon Project .

    OF CONTEContd)

    - xi -

    ces: 920, 92ew Softwar21 ..............and Risk Mre Operativices: FEROperations..................ardware ...

    ement ........d Hardwares ...............ated Hard Laptops ..e ................Cable ........minal Equucture ......enditures: Disaster Ration Netwperating S$1 million

    oftware AsDesign (CAent (CAFMarehouse ..m User Intm Search an and Law

    ReplacemenDistributional Work Or..................

    ENTS

    21 ..............re Applica..................Managemeons: FERC

    RC 920, 921s Managem......................................................

    re Forecast..................

    dware ..............................................................

    uipment ....................... Mobile R

    Recovery ...work SCESoftware ....n ..................

    set ManagAD)/CompM) Replace

    ..................erface Refr

    and Classifw Claims M

    nt ..............n Service Rrder Unit E..................

    ..................ations: ..................ent: FERCC 920, 921,1 .................ment: ......................................................t Capital ..............................................................................................................................

    Radio Netw..................Enet II ...........................................gement (SAputer Aide

    ement ..........................resh ..........fication .....

    Manageme..................Request PrEstimate ..................

    Page

    ..................

    ..................C 920, 921 .., 931 ............................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................work

    ..................

    ..................

    ..................

    ..................AM) ...........ed ........................................................................nt ................................

    ricing

    ..................

    .. 388

    .. 390

    .. 392

    .. 394

    . 394

    . 395

    .. 397

    .. 399

    .. 399

    .. 400

    .. 401

    .. 402

    .. 404

    .. 405

    .. 406

    .. 406

    .. 407

    .. 408

    .. 410

    .. 412

    .. 413

    .. 415

    .. 416

    .. 417

    .. 418

    .. 420

    .. 422

  • A.10-11

    Title

    7.7

    7.88. Hu

    8.1

    8.2

    8.38.48.5

    8.6

    1-015 ALJ/

    e

    7. Other7.7.1.7.7.2.7.7.3.7.7.4.7.7.7.7.5.

    8. Informuman Reso. Partie

    8.1.1.8.1.2.

    2. O&M8.2.1.8.2.8.2.8.2.8.2.8.2.2.

    3. Capita4. Short-5. Emplo

    566.25588.27

    6. Pensio8.6.1.8.6.8.6.2.8.6.3.8.6.8.6.

    8.6.8.6.

    /MD2/lil/

    r CapitalizeERP ProjData ArcBusinessTechnolo

    .4.1. CoNERC/C

    mation Tecources, Benes Position

    Total CoEqual Op

    M Human RSalaries a

    .1.1. HR

    .1.2. Ex

    .1.3. Ex

    .1.4. StoJoint Par

    al Expend-Term Inceoyee Recog50, 582. 17070, 588.280ons and Be

    Pensions.1.1.Pensio

    Post RetiOther Be

    .3.1. 40

    .3.2. Me8.6.3.2.1.

    .3.3. Di

    .3.4. Gr

    /gd2/jt2

    TABLE O(

    ed Softwarject ............chiving ......s Analyticsogy and Riommon EnCIP .............chnology Rnefits, and ns and Polimpensatiopportunity

    Resources Dand RelateR Departmxecutive Ofxecutive Ouock Optionrties Execuitures - Caentives (STgnition Pr0, 588.130, 0, 920/921,enefits: FEs .................on Policy Rirement Beenefits........1(k) Savinedical Pro

    Dentaisability Prroup Life I

    OF CONTEContd)

    - xii -

    re ..................................................s Improvemisk Manag

    nterprise Se..................Review in Other Comicy Considon Study (Ty and WorDepartmened Expense

    mental: FEfficers Coutside Servns and Lonutive Comapitalized STI): FERC ograms: 5 588.140, 5, and 926 ..ERC 926......................

    Recommenenefits Oth..................

    ngs Plan: Fgrams: FE

    al and Visiorograms ...Insurance .

    ENTS

    ..................

    ..................

    ..................ment .........gement ......ervices (CE..................Next GRCmpensatioderations ..TCS) .........

    rkforce Divnt: FERC es ...............

    ERC 920, 92ompensatiovices: FERng-Term I

    mpensation Software .. 500, 588, 9560.220, 56588.150, 588......................................................

    ndations ....her Than P..................

    FERC 926 ..ERC 926 ....on Plans .......................................

    ..................

    ..................

    ..................

    ..................

    ..................ES) .............................

    C ................on (HR).........................................versity ...... 920, 921, 9..................21, 923, 926on: FERCRC 923 ......Incentives Recomme..................905, and 922.170566.18.170, 588.........................................................................Pensions (P............................................................................................................

    Page

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................923, 926 ......................6 ................

    C 920, 921 .................... (LTI) ........endations ...................20/921 ......160, .250, ........................................................................PBOPS) ................................................................................................................

    .. 425

    .. 426

    .. 428

    .. 429

    .. 430

    .. 431

    .. 433

    .. 435

    .. 436

    .. 437

    .. 438

    .. 444

    .. 446

    .. 447

    .. 447

    .. 448

    .. 450

    .. 451

    .. 452

    .. 454

    .. 455

    .. 458

    .. 460

    .. 460

    .. 464

    .. 465

    .. 467

    .. 467

    .. 468

    .. 471

    .. 472

    .. 473

  • A.10-11

    Title

    9. Ad9.1

    9.29.3

    9.4

    9.5

    9.6

    9.79.89.9

    9.1

    10. Pow

    1-015 ALJ/

    e

    8.6.8.6.

    dministrati. Finan

    9.1.1.9.1.9.1.2.9.1.3.9.1.4.

    2. Risk C3. Law D

    9.3.1.9.3.2.9.3.3.

    9.3.4.4. Claim

    9.4.1.5. Work

    9.5.1.6. Ethics

    9.6.1.9.6.2.

    7. Regul8. Corpo9. Corpo

    9.9.1.9.9.2.9.9.3.

    0. Prope9.10.1.9.10.2.

    wer Procu

    /MD2/lil/

    .3.5. Mi

    .3.6. Exive and Ge

    ncial OrganControlle

    .1.1. CaAudit SeTreasureTax Dep

    Control: FDepartmen

    In-HouseOutside CorporatFERC 92Capital E

    ms: FERC 9Claims R

    kers CompWorkers

    s and ComOutside Capital EManagem

    latory Poliorate Memorate Com

    Labor anOutside Commun

    erty and LiPropertyLiability

    urement Bu

    /gd2/jt2

    TABLE O(

    iscellaneouxecutive Beeneral (A&nizations: er: FERC 9apital Expeervices: FEer: FERC 9artment: FERC 920/9

    nt: FERC 9e Legal ReCounsel: te Governa

    20/921, 930Expenditur920/921, 92Reserve Npensation: s Compens

    mpliance: FServices: 9

    Expenditurment Systeicy and Aff

    mbership Dmmunicationd ExpenseServices: Fnications Piability Insy Insurance Insuranceusiness Un

    OF CONTEContd)

    - xiii -

    us Benefit enefits ......

    &G) ............FERC 920/920/921, 9enditures: ERC 920/9920/921, 93FERC 920/921, 923 ...920/921, 9esources: FFERC 923,ance and M0 ................res Electr24, 925 .....

    Navajo Na FERC 925

    sation ClaiFERC 920/923 ...........re Enterpem (CMS) fairs (RP&

    Dues and Fons: FERC es: FERC 9FERC 923

    Products: surance: Fe: FERC 9e: FERC 92nit (PPBU)

    ENTS

    Programs..................................../921, 923,

    923, 926 ..... IFRS Proj

    921 .............30 ............../921 ............................

    923, 928, 93FERC 920/, 928 ..........Miscellane..................ronic Disc..................

    ation Royal5 .................ms Reserv

    /921, 923 .....................prise Com ..................

    &A): FERCees: 930.2 920/921, 9920/921.... ..................FERC 930

    FERC 924, 24 ..............25 .............. ..................

    s ..................................................... 926, 930 ....................ject ....................................................................................30 ............./921 ............................

    eous Expen..................

    covery Proj..................lty Litigati..................

    ve: FERC 9....................................

    mpliance ..................C 920/921 00 .............923, 930 ....................................... ................. 925 ................................................................

    Page

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................nses: ..................ject .............................ion ..............................925 ................................................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    .. 474

    .. 475

    .. 477

    .. 478

    .. 478

    .. 481

    .. 482

    .. 483

    .. 485

    .. 486

    .. 488

    .. 488

    .. 490

    .. 493

    .. 494

    .. 495

    .. 498

    .. 499

    .. 500

    .. 501

    .. 503

    .. 503

    .. 504

    .. 506

    .. 508

    .. 508

    .. 510

    .. 511

    .. 512

    .. 512

    .. 513

    .. 514

  • A.10-11

    Title

    10.10.10.10.10.10.10.

    11. Op11.11.

    11.

    11.11.

    1-015 ALJ/

    e

    .1. DRA

    .2. Marke

    .3. Marke

    .4. Energ

    .5. Renew

    .6. Powe

    .7. Capita10.7.1.10.7.2.

    10.7

    10.7

    10.7perations S.1. O&M.2. Corpo

    FERC11.2.1.11.2.2.

    .3. Corpo11.3.1.

    .4. Corpo

    .5. Opera

    /MD2/lil/

    s Position et Redesiget Strategy

    gy Supply wable and r Procuremal Expend

    CommunCapitaliz

    7.2.1. Po10.7.2.1.110.7.2.1.2

    10.7.2.1.3

    10.7.2.1.4

    7.2.2. Int10.7.2.2.110.7.2.2.210.7.2.2.310.7.2.2.410.7.2.2.5

    7.2.3. CoSupport Bu

    M - A&G: FEorate Envir

    C 920/921, Outside Corporat

    orate ResoRents: 93

    orate Securations Sup

    /gd2/jt2

    TABLE O(

    ..................gn and Tecy and Resoand Mana Alternativment Finanitures ........nication Eqzed Softwaost-MRTU 1. CAISO2. Future

    Enhan3. Long-

    Marke4. Data M

    (Phasetegrated D1. Aggre2. Risk M3. Energ4. Energ5. Energommodity usiness UnERC 920/9ronment, H923, 925 ....Services: Fte Safety: urces: FER31 ..............rity: FERCport Servi

    OF CONTEContd)

    - xiv -

    ..................hnology U

    ource Plannagement: Fve Power: nce: FERC..................quipment are ............. Energy MO Market Ee Market ancements (Term, Midet SimulatiManagemees 3 and 4)

    Demand Reegated DemManagemey Procuremy Procuremy Planning Managem

    nit (OSBU) 921, 923, 92Health & S..................FERC 923 FERC 925 RC 920/92..................C 920/921,ces (OS): F

    ENTS

    ..................Upgrade (Mning: FERFERC 557 .. FERC 557

    C 557 ............................ ....................................

    Market OpeEnhancemand Perform(2012-2014d-Term, anion Tools ..ent Platfor) .................esponse (Dmand Respent ADR ....ment Planment Plang Platform

    ment Platfo ..................25, 931, anSafety (CEH.................. .................. ..................

    21, 931, 935.................., 923 ..........FERC 920/

    ..................MRTU) .....RC 557 ........................7 .......................................................................................

    erations ....ment Progra

    mance ) ................

    nd Short-T..................rm Upgrad..................

    DR) ............ponse (AD..................

    nning .........nning Manam ................orm (CMP)..................nd 935 ......H&S): ......................................................5 ..................................................../921 .........

    Page

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................ams ...........

    ..................Term

    ..................de ....................................

    DR) .................................................agement .....................) .....................................................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    .. 516

    .. 518

    .. 519

    .. 522

    .. 526

    .. 528

    .. 531

    .. 532

    .. 532

    .. 533

    .. 534

    .. 535

    .. 536

    .. 537

    .. 538

    .. 539

    .. 540

    .. 540

    .. 541

    .. 541

    .. 542

    .. 544

    .. 545

    .. 546

    .. 548

    .. 548

    .. 550

    .. 552

    .. 553

    .. 555

  • A.10-11

    Title

    11.11.

    11.11.

    11.

    11.11.11.11.

    12. Ra12.12.12.12.12.

    13. Sal13.

    14. Co14.

    15. Oth

    1-015 ALJ/

    e

    .6. Real P

    .7. Suppl11.7.1.

    .8. Trans

    .9. Capita11.9.1.11.9.2.11.9.3.

    .10. Corpo11.10.1.11.10.2.11.10.3.

    11.111.1

    11.10.4.11.10.5.11.10.6.

    .11. CEH&

    .12. Corpo

    .13. Trans

    .14. Other11.14.1.

    temaking..1. Elimin.2. Sale o.3. Other.4. Credi.5. Shareles and Cu.1. Sales

    ost Escalati.1. Laborher Opera

    /MD2/lil/

    Properties:lier Divers

    Parties Psportation al Expend

    Parties PContingeFurnitur

    orate ResoNew BuiHeadquaCritical F

    10.3.1. AD10.3.2. Ro

    ExField FacNew FielBlankets

    &S Capitorate Secursportation r Capital P

    OnBoard..................nation or M

    of Four Corr Operatingt to Catalinholder Sha

    ustomer FoForecast ...ion .............r Escalationting Reven

    /gd2/jt2

    TABLE O(

    : FERC 92sity and DePositions ...Services Ditures ........

    Positions ....ency and Pe Costs .....urces - Capildings ......arters ........Facilities ...DC .............osemead Dxtension ....cility Assetld Facilitie ..................al ...............rity CapiServices

    Projects ......d Technolo...................Modificatiorners .........g Revenuena Electricaring of Pe

    orecast .............................................n ................nue (OOR)

    OF CONTEContd)

    - xv -

    0/921 .......evelopmen..................

    Division (T....................................Project Ma..................pital .................................................................................

    Data Center..................t Preservates ...................................................ital ............ Capital .....................

    ogy Project..................on of Acco..................es (OOR) Sc for A&G ension and........................................................................) ................

    ENTS

    ..................nt: FERC ..................

    TSD) ...............................................

    anagement............................................................................................................r (RDC) ..................tion .......................................................................................................................t ...................................

    ounts ...........................

    Service Fee Allocationd Benefit C..........................................................................................

    .................. 920/921 ..........................................................................t Costs .................................................................................................................. Useful Lif........................................................................................................................................................................................................................e Implemen ................Costs ..................................................................................................

    Page

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................fe ........................................................................................................................................................................................................................ntation ...................................................................................................................................

    .. 556

    .. 558

    .. 559

    .. 562

    .. 565

    .. 566

    .. 568

    .. 570

    .. 571

    .. 572

    .. 574

    .. 575

    .. 576

    .. 577

    .. 578

    .. 580

    .. 581

    .. 584

    .. 585

    .. 587

    .. 588

    .. 589

    .. 591

    .. 592

    .. 593

    .. 594

    .. 594

    .. 595

    .. 595

    .. 596

    .. 596

    .. 597

    .. 599

  • A.10-11

    Title 16. Po

    16.16.16.16.

    17. Pro18. Ele

    18.18.

    19. Tax19.

    19.19.

    20. Ra20.20.

    20.

    1-015 ALJ/

    e

    st Test-Yea.1. SCEs.2. DRA.3. Aglet.4. Discuoductivity ectric Plant.1. Corpo.2. Gainsxes .............1. Incom

    19.1.1.

    19.1.2.19.1.3.19.1.4.

    .2. Payro

    .3. Propete Base ......1. Fixed .2. Adjus

    20.2.1.20.2.2.

    .3. Work20.3.1.20.3.2.

    20.320.320.320.320.320.320.320.3

    /MD2/lil/

    ar Ratemas Position ..s Position s Position

    ussion ........ ..................t .................orate Cents and Losse..................

    me Taxes ...Effects oReauthorMeals anResearchEmploye

    oll Tax .......erty taxes .................... Capital ....stments .....

    CustomeCustome

    king CapitaMaterialWorking

    3.2.1. Ca3.2.2. Pr3.2.3. Ga3.2.4. Ot3.2.5. Lo3.2.6. De3.2.7. Le3.2.8. Le

    /gd2/jt2

    TABLE O(

    king (PTY................... ..................

    n ..........................................................................er Capital es on Sale ......................................f Tax Relierization, an

    nd Entertaih and Deveee Stock Ow...............................................................................................er Advanceer Depositsal ................s and Supp

    g Cash .......ash Balancepaymentas Optionsther Accouong-Term Ieductions tead/Lag Stead/Lag St

    OF CONTEContd)

    - xvi -

    YR) ......................................................................................................................... Budget .... of Propert....................................ef, Unempnd Job Creinment (Melopment (wnership ..........................................................................................es ..............s ..................................plies (M&S..................es ..............s ...............

    s .................unts ReceivIncentive Pto Claims tudy Revtudy Exp

    ENTS

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................ty ...................................................

    ployment Ineation Act

    M&E) Expen(R&D) CrePlan (ESO................................................................................................................................................S) ......................................................................................vable (OARPlan ..........Reserves ..

    venue Lag pense Lag .

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................nsurance of 2010 (Tnditures ..edits ..........

    OP) .......................................................................................................................................................................................................................................................R) ................................................. ...................................

    Page

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    ..................

    TRA) ....................................................................................................................................................................................................................................................................................................................................................................................................

    .. 599

    .. 600

    .. 602

    .. 604

    .. 606

    .. 609

    .. 610

    .. 611

    .. 611

    .. 613

    .. 614

    .. 615

    .. 620

    .. 621

    .. 622

    .. 623

    .. 624

    .. 624

    .. 625

    .. 625

    .. 625

    .. 627

    .. 630

    .. 630

    .. 633

    .. 634

    .. 635

    .. 637

    .. 639

    .. 639

    .. 639

    .. 640

    .. 640

  • A.10-11

    Title

    20.20.

    20.20.

    21. No22. De

    22.22.22.

    22.

    22.22.

    23. Set23.23.

    23.

    23.

    1-015 ALJ/

    e

    20.3.4. Unfun.5. Legac

    20.5.1.20.5.2.

    .6. Four C

    .7. Mohaon-Tariffedepreciation.1. SCEs.2. Partie.3. Mass

    22.3.1.22.3.2.

    .4. Mass 22.4.1.22.4.2.22.4.3.

    22.422.4

    .5. Accou

    .6. Reporttlements ..1. Stand.2. Disab

    23.2.1.23.2.2.

    .3. Vote S23.3.1.23.3.2.

    .4. CCUE23.4.1.

    /MD2/lil/

    20.3.2.8.120.3.2.8.2

    3.2.9. Bended Penscy Meters ..

    Other PaDiscussio

    Corners ....ave .............d Productsn .................s Depreciates Position Property L

    TransmisDistribut

    Property NParties PDiscussioNet Salv

    4.3.1. Tr4.3.2. Diunting Reqrting Requ..................

    dard of Revbility Right

    SettlemeDiscussio

    Solar InitiaSettlemeDiscussio

    E and ReliaBackgrou

    /gd2/jt2

    TABLE O(

    1. Taxes .2. Fundeenefits Othsion Reserv...................arties Posion ....................................................s and Servi...................tion Studyns ...............Lives .........ssion Plantion Plant .Net SalvagPositions ...on ..............age Rates ansmissionistributionquirementsuirements .....................view ..........ts Advocatent Agreemon ..............ative (VSI)ent Agreemon ..............ability Invund ...........

    OF CONTEContd)

    - xvii -

    ..................ed Pensionher Than Peves ..............................itions ..............................................................ices .............................

    y .....................................................

    nt ..................................ge ..................................................by Accounn Plant .....

    n Plant .......s ......................................................................tes .............

    ment ............................ .................

    ment #2 .......................estment In..................

    ENTS

    ..................n Provisionensions ....................................................................................................................................................................................................................................................................................................nt .......................................................................................................................................................................................................................................

    ncentive M..................

    ..................ns and PBO............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

    Mechanism..................

    Page

    ..................OPs .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

    m (RIIM) ......................

    .. 641

    .. 642

    .. 643

    .. 645

    .. 645

    .. 647

    .. 649

    .. 650

    .. 651

    .. 653

    .. 658

    .. 659

    .. 660

    .. 662

    .. 665

    .. 667

    .. 669

    .. 669

    .. 671

    .. 674

    .. 675

    .. 677

    .. 681

    .. 683

    .. 686

    .. 686

    .. 687

    .. 688

    .. 688

    .. 690

    .. 690

    .. 691

    .. 692

    .. 692

  • A.10-11

    Title

    24. Jur25. Oth

    25.26. Pen27. Co28. AsFindinConcluORDER

    APPENAPPENAPPENAPPEN

    1-015 ALJ/

    e

    23.4.2.23.4.3.23.4.4.

    risdictionaher Issues .1. Allownding Mot

    omments osignment

    ngs of Fact usions of LR ..............

    NDIX A SNDIX B GNDIX C RNDIX D P

    /MD2/lil/

    SettlemeResponseDiscussio

    al Cost Sep ..................

    wance for Ftions .........

    on Proposeof Proceed..................

    Law ..............................

    Service ListGlossary Results of OPost-Test Y

    /gd2/jt2

    TABLE O(

    -

    ent Agreemes to the Ron ..............

    paration ........................Funds Used...................

    ed Decisionding ....................................................................

    t

    OperationsYear Result

    OF CONTEContd)

    - xviii -

    ment #3 .....RIIM Settle......................................................d During C..................n ........................................................................................

    s 2012 ts

    ENTS

    ..................ement ..............................................................Constructi............................................................................................................

    ..................

    ..................

    ..................

    ..................

    ..................ion (AFUD............................................................................................................

    Page

    ..................

    ..................

    ..................

    ..................

    ..................DC) ........................................................................................................................

    .. 694

    .. 696

    .. 698

    .. 701

    .. 703

    .. 703

    .. 706

    .. 706

    .. 708

    .. 708

    .. 820

    .. 880

  • A.10-11-015 ALJ/MD2/lil/gd2/jt2

    - 2 -

    DECISION ON TEST YEAR 2012 GENERAL RATE CASE FOR SOUTHERN CALIFORNIA EDISON COMPANY

    1. Summary

    In this decision, we authorize Southern California Edison Company (SCE)

    to recover from ratepayers an increase of $271.9 million 5.04% over present rates,

    representing the reasonable costs of providing safe and reliable electrical service

    to its customers in 2012.

    The decision is the result of the Commissions detailed review of the future

    operations and service requirements claimed by one of the largest utilities in the

    country. The Commission holds safety, reliability, and just and reasonable rates

    for customers as the basis of our review. SCE, like other electric utilities, is in a

    period of transitionwith dual responsibilities to inspect, maintain and replace

    vast existing infrastructure, and also to respond to national, state, and

    Commission policies requiring additional renewable energy sources and new

    technologies for tomorrows more efficient energy service. The technological

    changes are expected to result in efficiencies, better service, and lower costs to

    ratepayers over time.

    On the other hand, southern California has severely felt the effects of the

    recent economic recession, and most ratepayers have reduced resources to

    support rate increases. In order to keep rates just and reasonable, our decision

    imposes some belt tightening on SCE, including more efforts at cost

    effectiveness, slower implementation of some activities, and disallowance of

    non-essential costs and projects. The decision reduces SCEs Test Year 2012

    company-wide request for Operations and Maintenance (O&M) expenses by

    approximately $258 million and reduces SCEs 2010-2012 capital spending

    request by approximately $756 million.

  • A.10-11-015 ALJ/MD2/lil/gd2/jt2

    - 3 -

    SCE serves 4.9 million customers in a 50,000 square mile area of central,

    coastal, and southern California. SCEs service territory includes hundreds of

    cities and communities with a collective population of more than 13 million

    people. To provide electrical service, SCE employs over 19,000 people, and

    works with thousands of contractors to operate and maintain its infrastructure,

    including 88,207 miles of overhead and underground distribution lines, as well

    as its nuclear, hydroelectric, and gas- and diesel-fired plants.

    This decision authorizes $5.671 billion base revenue requirement for Test

    Year (TY) 2012 for SCE. We find that the authorized revenue requirement

    provides SCE with sufficient funding to provide safe and reliable service at just

    and reasonable rates. The adopted revenue requirement represents a 17.44%

    increase over the 2009 authorized revenue requirement of $4.829 billion, a 18.57%

    increase over SCEs 2009 recorded base revenue requirement of $4.783 billion,

    and 5.04% increase over the projected revenue requirement at present rate levels

    of $5.399 billion, and a 9.9% reduction from the updated 2012 revenue

    requirement requested by SCE of $6.294 billion.1

    The adopted methodology for calculating post-test year revenue

    requirement results in a revenue requirement for 2013 of $6.078 billion and for

    2014 of $6.426 billion. This decision also authorizes a 20.73% increase in SCEs

    total company rate base between 2009 and 2012. In 2009, the authorized rate base 1 When SCE filed its request for a 2012 TY revenue requirement with the Commission on November 23, 2010, it requested a revenue requirement of $6.285 billion. In July 2011, SCE reduced parts of its request by approximately $71.4 million to reflect agreed-upon changes with Division of Ratepayer Advocates and intervenors, corrections to the Results of Operations model, and updated numbers. Exhibit SCE-25, Vol. 01 at 1. Later, in SCEs update testimony filed on October 24, 2011 SCE presented an updated revenue requirement of $6.294 billion.

  • A.10-11-015 ALJ/MD2/lil/gd2/jt2

    - 4 -

    was $14.77 billion. Today, we increase the authorized rate base to $17.814 billion.

    However, when SCEs sale of the Four Corners Generating Station is completed,

    all associated assets will be removed from rate base.

    As a result of this decision, SCE total projected company revenue

    requirement for 2012 is approximately $6.126 billion.

    It is an enormous challenge for the Commission and the public to review

    SCEs proposal within the time available, particularly when few issues were

    resolved by settlement. Several parties asked the Commission to improve the

    transparency of SCEs testimony and data responses. The decision includes

    initiatives and orders to SCE to improve the consistency and clarity of crucial

    information SCE will provide in future general rate cases.

    Safe operations continue to be a top priority, and we recognize the

    importance of SCE knowing the condition of its assets, particularly poles and

    wires which can cause great damage if downed. In this decision, we authorize

    enhanced equipment inspections and new technology to better track the

    condition and service record of SCEs assets. We also order an independent

    assessment of SCEs system utility poles to determine whether current loads

    meet legal standards.

    SCE has faced two significant challenges to operations in the preceding

    12 months: the December 2011 windstorms and extended shut down of the two

    nuclear power plants at San Onofre (SONGS). In this decision, we find it is in the

    best interest of ratepayers for Test Year O&M and post-2011 capital expenditures

    related to SONGS to be tracked in a memorandum account for separate review

    and be subject to refund. Regarding SCEs much-criticized response to the

    windstorm, in 2013, SCE is required to provide the Commission with a progress

  • A.10-11-015 ALJ/MD2/lil/gd2/jt2

    - 5 -

    report on various initiatives SCE stated it would take to improve its emergency

    communications and responses to service communities and customers.

    We remain committed to authorizing recovery only for those expenses

    necessary to provide safe and reliable electric service. Going forward, SCE

    proposes to invest billions of dollars in Information Technology (IT) solutions.

    These capitalized costs are substantial, the assets are short-lived, project costs are

    difficult to estimate and benefits can be tough to quantify. Therefore, to assist

    the Commission with reviewing these expenses in SCEs next GRC, the decision

    requires SCE to provide specific testimony in its next GRC about SCEs

    capitalized software cost estimation methodology, approach to cost-effectiveness,

    and whether reasonable metrics exist to measure benefits.

    Another significant change in this rate cycle, is the full deployment of

    Edison SmartConnect, or smart meters, scheduled for the end of 2012. The

    decision integrates SmartConnect into regular operations in 2013 with separate

    forecasts, and shifts funding into general rates from a dedicated balancing

    account. We have also reduced rate recovery for the replaced electromechanical

    meters.

    In addition, SCE has reached three settlements on specified issues with

    intervening parties: Disability Rights Advocates, Vote Solar Initiative, and

    California Coalition of Utility Employees (CCUE). This decision finds that the

    proposed settlements are a reasonable resolution of the specified issues in light of

    the record that are consistent with the law and in the public interest.

    Consequently, the decision approves these settlements. However, in relation to

    the settlement with CCUE, we order SCE to obtain an independent audit of

    SCEs Reliability Investment Incentive Mechanism.

  • A.10-11-015 ALJ/MD2/lil/gd2/jt2

    - 6 -

    1.1. Procedural History On November 23, 2010, SCE filed its TY2012 GRC application. In support

    of its application, SCE provided thousands of pages of testimony and supporting

    work papers, and sponsored more than 88 witnesses. The prehearing conference

    in this proceeding was held on January 31, 2011.

    SCE proposed a procedural schedule based on the Commissions 1989 Rate

    Case Plan, as modified by numerous subsequent decisions. The Division of

    Ratepayer Advocates (DRA) and The Utility Reform Network (TURN) proposed

    a more extended schedule similar to the schedules adopted by the Commission

    for other large energy utility GRCs for the last ten years. Both parties were

    concerned about use of their limited resources given the fact that San Diego

    Gas & Electric Company and Southern California Gas Company also had just

    filed applications for their consolidated GRCs. Other parties sought delayed

    schedules for a number of different reasons.

    On December 29, 2010, TURN filed a motion asking the Commission to

    authorize a GRC Revenue Requirement Memorandum Account (RRMA) to track

    the change in revenue requirement ultimately adopted in this proceeding during

    the period between January 1, 2012 and the date a final decision is adopted.

    The assigned Commissioner adopted a schedule with the goals of

    providing sufficient time for DRA to competently produce Results of Operation

    and for other parties to review SCEs extensive application and testimony. In the

    Scoping Memorandum and Ruling, issued March 2, 2011, the Commissioner

    found that the public interest was best served by adopting a realistic procedural

    schedule and authorizing the RRMA in case the final decision was not adopted

    prior to December 31, 2011.

  • A.10-11-015 ALJ/MD2/lil/gd2/jt2

    - 7 -

    Parties were encouraged to engage in alternative dispute resolution and

    settlement discussions. Three parties reached a settlement with SCE on discrete

    issues within the GRC. On August 22, 2011, SCE and DisabRA filed a joint

    motion for approval of settlement agreement. On September 19, 2011, SCE and

    VSI filed a joint motion for approval of settlement agreement. On October 20,

    2011, SCE and CCUE also filed a joint motion for approval of a settlement.

    SCEs application generated a significant amount of interest from

    customers residing in SCEs service area. In response to this interest, the

    Commission held PPHs between June 8, 2011 and June 23, 2011 in

    San Bernardino, Garden Grove, Oxnard, Visalia, Long Beach, Palm Springs, and

    San Clemente. Evidentiary hearings were held in Los Angeles on July 25 and

    July 26, 2011 and continued in San Francisco on August 8 through 26, 2011.

    Parties submitted concurrent opening and reply briefs on September 26, 2011 and

    October 17, 2011, respectively.

    Pursuant to the Rate Case Plan, SCE, Pacific Gas and Electric Company,

    and DRA submitted Update Testimony on October 24, 2011 to reflect changes in

    cost of labor, non-labor escalation factors, and governmental action. A hearing

    was held regarding the Update Testimony on November 3, 2011. Some parties

    submitted opening and reply briefs related to the Update Testimony on

    November 15, 2011 and November 22, 2011, respectively.

    Beginning on November 30, 2011, electric utility customers across

    Southern California experienced power outages as heavy winds ripped through

    the region. The severe wind conditions resulted in downed trees and power

    lines, road debris, and other safety-related problems across SCEs service

    territory. Some SCE customers were still without service one week later. The

    Administrative Law Judge scheduled a January 26, 2012 PPH in Temple City, the

  • A.10-11-015 ALJ/MD2/lil/gd2/jt2

    - 8 -

    heart of the damaged area, to hear firsthand from the public about the sufficiency

    of SCEs emergency response. Four Commissioners participated in the well-

    attended hearing. At the request of the Commission, SCE submitted information

    on February 8, 2012 about its damage claims outreach to low-income and

    minority communities affected by the power outages.

    Lists of all parties, their acronyms, and other acronyms used in the GRC

    are attached as Appendices A and B to this decision.

    1.2. Burden of Proof Pub. Util. Code 4512 provides, in part, that all charges demanded or

    received by any public utility shall be just and reasonable.

    Section 454 provides:

    Except as provided in 455, no public utility shall change any rate or so alter any classification, contract, practice, or rule as to result in any new rate, except upon a showing before the commission and a finding by the commission that the new rate is justified.

    Where a utility fails to demonstrate that its proposed revenue

    requirements are just and reasonable, the Commission has the authority to

    protect ratepayers by disallowing expenditures that the Commission finds

    unreasonable. As the applicant, SCE has the burden of affirmatively establishing

    the reasonableness of all aspects of its application, including that it is entitled to

    the relief it is seeking in this proceeding. Other parties do not have the burden of

    proving the unreasonableness of SCEs showing.

    2 Unless otherwise indicated, all other references to Code or Section means the California Public Utilities Code.

  • A.10-11-015 ALJ/MD2/lil/gd2/jt2

    - 9 -

    As a general matter, with respect to individual uncontested issues in this

    proceeding, we find that SCE has made a prima facie just and reasonable

    showing, unless otherwise stated in this opinion.3

    1.3. Standard of Proof With the burden of proof placed on the applicant in rate cases, the

    Commission has held that the standard of proof the applicant must meet is

    that of a preponderance of evidence.4 Evidence Code 190 defines proof as

    the establishment by evidence of a requisite degree of belief.5 We have

    analyzed the record in this proceeding within these parameters.

    2. Policy Matters We confirm that the Commissions mandate is specific and requires a

    balancing of interests to authorize rate recovery only for those just and

    reasonable costs necessary for safe and reliable service. This requires a hard look

    at each proposed expense, including whether it is necessary during the coming

    rate cycle and is appropriately calculated. Given the Commissions

    forward-looking charge to move the utilities toward more diverse and renewable

    sources of energy, and a substantial emphasis on operational and public safety,

    we must look beyond mere maintenance of the status quo.

    3 In this context, uncontested means there was never opposition to the issue. It does not include issues resolved by settlement or stipulation. 4 The Commission has, at times, incorrectly referred to this standard as clear and convincing evidence; see, In the Matter of the Application of California Water Company, Decision (D.) 03-09-021 at 17. 5 Application of Pacific Gas and Electric Company, D.00-02-046 at 38, quoting Application of PT&T Co. for A General Rate Increase (1970) 2CPUC2d 89, 98-99.

  • A.10-11-015 ALJ/MD2/lil/gd2/jt2

    - 10 -

    Under cost-of-service ratemaking principles, the utility is generally entitled

    to its reasonable costs and expenses, as well as the opportunity, but no

    guarantee, to earn a rate of return on the utilitys rate base. Generally, requests

    for additional funds have to be justified or established as reasonable by

    comparison to other alternatives. For example, it is not enough for the utility to

    merely assert that equipment failures would occur or safety would be

    compromised absent approval of a certain expense.

    Ratepayers are entitled to the Commissions sharp eye and consideration

    of other options before committing their hard-earned cash. Therefore, we have

    neither accepted all requests nor adopted across-the-board percentage

    reductions. Instead, the decision is the result of scrutinizing each request

    according to the standards and policy articulated here.

    2.1. Southern California Edison Companys (SCE) Capital Requests

    SCEs capital spending requests are forecast to grow substantially

    during the five year period (2010-2014) covered in SCEs testimony. In this

    General Rate Case (GRC), we are primarily focused on California Public Utilities

    Commission (CPUC or Commission) jurisdictional expenditures which increase

    from 2010 recorded spending of $2.23 billion to almost $3 billion in 2012, and

    much more in the following years.

    The main drivers of SCEs application are the capital expenditures SCE

    claims it must make to replace an aging infrastructure and to expand the system

    to accommodate the increased loads and new power sources that have

    developed since the system was built.6 SCE relies on various projections of its

    6 SCE-01 at 1.

  • A.10-11-015 ALJ/MD2/lil/gd2/jt2

    - 11 -

    aging assets and equipment failures to support much of its capital request.

    Another significant component is SCEs estimates of capital spending necessary

    to quickly implement a variety of advanced technologies and programs related

    to state and Commission policies associated with smart grid implementation,

    including smart meters, demand side management, and dynamic pricing.

    A portion of SCEs revenue request is for capital investments for which

    SCE received authorized funding in the 2009 GRC, but did not actually fund.

    Another reason for the size of SCEs revenue request is that it spent more than

    authorized in the 2009 GRC, which SCE claims caused deferred maintenance and

    undermined its ability to earn the authorized return for its shareholders. SCE

    contends that ratepayers are not disadvantaged as long as the utility is investing

    capital at authorized levels, and does not over-earn.

    Contrary to SCEs claim it was underfunded in the 2009 GRC and had to

    spend more than authorized, The Utility Reform Network (TURN) points out

    that if one excludes one-time costs, amounts the Commission expressly excluded

    from rates, and amounts subject to balancing account treatment, SCEs spending

    was below authorized levels. According to TURN, instead of resulting in a low

    return for shareholders, the actual 2009 rate of return was 9.55%, 80 basis points

    higher than authorized.

    TURN, Division of Ratepayer Advocates (DRA), Aglet Consumer Alliance

    (Aglet), and Joint Parties7 reject the proposition that all $2.259 billion in capital

    additions are essential and protest that SCE often failed to adequately justify, or

    7 Joint Parties is comprised of three organizations which participated jointly: Black Economic Council, National Asian American Coalition, and Hispanic Business Chamber of Greater Los Angeles.

  • A.10-11-015 ALJ/MD2/lil/gd2/jt2

    - 12 -

    quantify the benefits of, a project. TURN also criticizes SCE for failing to

    prioritize any of its spending requests, essentially taking the position that all are

    equally necessary.

    SCE and Coalition of California Utility Employees (CCUE) vigorously

    attack nearly all proposals to cut SCEs capital spending as leading to many

    negative consequences, including layoffs and compromised reliability. In

    addition, SCE contends that basic principles of cost-of-service ratemaking

    provide SCE with flexibility to shift funding from categories that formed the

    basis of a prior GRC forecast to other, more pressing needs if intervening facts

    require it.

    However, the Commission has found that this management flexibility is

    not absolute. For example, in the 2009 GRC, we rejected SCEs additional

    funding for deferred activities purportedly made to accommodate unanticipated

    customer and load growth, because the growth was not unique circumstances.8

    In