all plant up

Upload: praveen-prabhakar

Post on 03-Jun-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/12/2019 All Plant UP

    1/7

    S.No. Sold To name SO Distance

    1 ACC India Pvt. Ltd 23

    2 Adora Constructions Pvt. Ltd. 4

    3 Bhushan Power & Steel Ltd 22

    4 BPTP Limited 235 Damyanti Devi 26

    6 GANNON DUNKERLEY & CO. LTD 20.2

    7 H S Contracts 13.4

    8 IIMT Group Of College 12.8

    9 Immediate Construction Co. Pvt. Ltd 22

    10 Ishan Insitute Of Management 14.2

    11 Kanta Chemicals Pvt. Ltd 22

    12 KDS Infratech Pvt. Ltd. 8

    13 Larsen & Tuobro Limited 27.6

    14 M/S IL&FS ENGINEERING& CONSTRUCTION 18

    15 M/s Patel Advance JV 7

    16 Om Prakash Mathur 23.6

    17 Puneet Kapoor 14

    18 Ram Ratan Real Estate Pvt. Ltd 18

    19 Renuka Enterprises 16

    20 Repro Print Bold Pvt. Ltd. 20.5

    21 Royal Construction 12

    22 Saha Infratech Pvt. Ltd. 23

    23 Sewakram 14

    24 Skyline InternatioNot Verifiedl Services Pvt. 32.6

    25 St. Johns Orthodox Church Society, 5.626 Star Residency 2.5

    27 Sterling Ornaments Pvt. Ltd. 8

    28 U S Water Seal Co 15.4

    * Some of the sites has been visited

    Distance for the Mon

  • 8/12/2019 All Plant UP

    2/7

    One way Distance varified GPS Distence Dist. Saved/ Trip No of Trips lDistance S

    22.8 21 2 5 20

    3.5 3 1 28 56

    20 20 2 8 32

    22 18 5 9 9025 26 0 3 0

    20.2 21 -0.8 31 -49.6

    11.6 8 5.4 14 151.2

    12.8 12 0.8 17 27.2

    16 6 4 48

    12.6 11 3.2 20 128

    27 -5 5 -50

    9 9 -1 7 -14

    22 5.6 10 112

    18 0 12 0

    7 0 1 0

    23 0.6 9 10.8

    20 -6 5 -60

    17.6 16 2 61 244

    16 0 7 0

    20 18 2.5 32 160

    12 0 15 0

    20.5 16 7 53 742

    11.5 12 2 28 112

    26 6.6 1 13.2

    5.2 5 0.6 7 8.42.5 0 2 0

    11 -3 9 -54

    13.6 12 3.4 11 74.8

    18 2Total Distances saved by visiting sites 717.2

    16.94 14.77 2.18

    nd distances has been verified.

    Total Distances can be saved

    h of April - 2014 *all distances are in KM

    Greater Noida

    Average reduction in dist. Per trip

  • 8/12/2019 All Plant UP

    3/7

    Verified Savings

    2

    28

    32

    186

    0

    50.4

    0

    Not Verified

    64

    Not Verified

    -14

    Not Verified

    Not Verified

    Not Verified

    Not Verified

    Not Verified

    48.8

    Not Verified

    32

    Not Verified

    265

    140

    Not Verified

    5.6Not Verified

    Not Verified

    39.6

  • 8/12/2019 All Plant UP

    4/7

    Plant Site Old DPR Dist. GPS Distance Savings/Trip

    NS 31 Bhushan Power & Steel Ltd 3.3 2 1.3

    NS 31 Damyanti Devi 20.9 14 6.9

    NS 31 Gannon Dunkerley & Co.,Ltd. 3.5 3 0.5

    NS 31 Gopaljee Dairy Foods Pvt. Ltd 28.3 27 1.3

    NS 31 GUL PROPERTIES PRIVATE LIMITED 15.6 15 0.6NS 31 Hariprakash Sharma 4.2 NA NA

    NS 31 Kanta Chemicals Pvt. Ltd 27 27 0

    NS 31 Kay Kay Construction 29.2 NA NA

    NS 31 M/S IL&FS ENGINEERING& CONSTRUCTION 8.5 5 3.5

    NS 31 QUANTUM COLONIZERS PVT. LTD. 11.6 11 0.6

    NS 31 Repro Print Bold Pvt. Ltd. 42 38 4

    NS 31 Rohit Build Estate Pvt. Ltd 7.3 3 4.3

    NS 31 Skyline International Services Pvt. 13.7 7 6.7

    NS 31 Surendar Singh 29.2 26 3.2

    NS 31 Valecha Engineering Limited 31.4 20 11.4

    * Some of the sites has been visited and distance has been varified as mentioned above

    Total distance that can b

    Total distance saved from

    Gaziabad Plant (April

    Over all reducti

  • 8/12/2019 All Plant UP

    5/7

    Verified dist. No of Trips In April Dist. Saved GPS Saved dist. Varified

    3.3 80 208 0

    13.7 1 13.8 14.4

    3.5 15 15 0

    9 23.4 Not Varified

    14.6 10 12 20NA NA Not Varified

    7 0 378

    NA NA Not Varified

    7 80 560 240

    11.6 7 8.4 0

    4 32 Not Varified

    9 77.4 Not Varified

    10.3 30 402 204

    5 32 Not Varified

    24.8 6 136.8 79.2

    1520.8

    935.6

    10.18 7.29

    2.89

    e saved from GPS

    PS and visiting site

    n dist./trip

  • 8/12/2019 All Plant UP

    6/7

    Plant Site SAP Distance GPS Distance Dis. Saved/Trip

    NS 46 A. A. CBD Maintenance Service Pvt. 10 NA NA

    NS 46 Abhishek Engineers 2 2 0

    NS 46 Akhandjyoti Tranmissiom Developers 15.4 12 3.4

    NS 46 BPTP Limited 22.5 19 3.5

    NS 46 Chaudhary Construction Company Pvt. 10 7 3NS 46 Damyanti Devi 10 8 2

    NS 46 GANNON DUNKERLEY & CO. LTD 13.5 13 0.5

    NS 46 GUL PROPERTIES PRIVATE LIMITED 11.6 7 4.6

    NS 46 Harbel Singh & Sons 24 24 0

    NS 46 Hariom Enterprises 24.2 20 4.2

    NS 46 Immediate Construction Co. Pvt. Ltd 16 16 0

    NS 46 JMC PROJECTS (INDIA) LTD 18 17 1

    NS 46 KDS Infratech Pvt. Ltd. 22 37 -15

    NS 46 Larsen &Toubro Construction 36 32 4

    NS 46 M/S PURNANAND 33 31 2

    NS 46 NKG Infrastructure Ltd. 22.5 NA NA

    NS 46 Numerous Builders Pvt. Ltd 13.5 13 0.5

    NS 46 Parmanand Soni 12 11 1

    NS 46 Precision Moulds & Dies Pvt.Ltd 1.5 1.5 0

    NS 46 S P Singla Constructions Pvt. Ltd. 7 10 -3

    NS 46 Shree Paras Sanitations (P) Ltd 4.5 6 -1.5

    NS 46 Stivan Construction Co 13 12 1

    NS 46 Unnati Fortune Hotmart Pvt. Ltd. 3 3 0

    NS 46 Valecha Engineering Limited 10 10 0

    NS 46 Vilwadri Infrastructure Pvt. Ltd. 10 6 4

    NS 46 Vishnu Sharan & Co 4 5 -1NS 46 WINNER CONSTRUCTION PVT. LTD. 32.5 35 -2.5

    Shahibabad Plant (April)

    Total distance that can be saved through GPS

    Reduction in average distance per trip

  • 8/12/2019 All Plant UP

    7/7

    No of Trips in April Dist. Saved GPS

    9 NA

    110 0

    7 47.6

    2 14

    38 2285 20

    14 14

    25 230

    9 0

    50 420

    4 0

    45 90

    1 -30

    32 256

    8 32

    6 NA

    44 44

    8 16

    14 0

    16 -96

    14 -42

    7 14

    20 0

    50 0

    14 112

    10 -208 -40

    1309.6

    12.67 11.13

    1.54