Agenda• Project History• Allen Design Features• Project Schedule and Budget• Next Steps
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
ALLEN HISTORY
Project Setup• 2014-2015: District engages with HY
Architects and Greystone West to complete Facilities assessments
• 2017-2018: District Develops the Visioning Document ”Schools with Tomorrow Inside”
• May 2018: Board reviews preliminary project list with Allen Elementary noted as the first project
• July 2018: Board approves placement of G.O. Bond on the November ballot
• November 2018: Measure X passes with 69.71%
• December 2018-April 2019: District engages in process for selecting architects and program manager to work on District projects
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
ALLEN HISTORY
Site Committee• 5/30/19• 6/5/19• 6/19/19• 8/14/19• 9/4/19• 1/7/20
Board of Education• 4/24/19: Board selects HY Architects for
Allen Elementary School• 5/22/19: HY Authorized to proceed• 9/11/19: Project Update• 11/13/19: Schematic Design Approval –
Comments on total project cost of $62,618,591
• 1/15/20: Revised Design and Estimate Approval. Budget reduced to $59,013,000
• 7/29/20: CEQA Review
Engagement
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
ALLEN HISTORY
Additional Meetings and Outreach• 10/9/19: City of San Bruno• 10/17/19: SBPSD MOT• 11/4/19: City of San Bruno• 9/8/20: Public Hearing for CEQA
Engagement
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
Site Committee 5/30/19
ALLEN HISTORYKey Considerations• Phased Construction• Replacement in Kind• Design to include Visioning
Goals• Plan for future
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
Site Committee 6/19/19
ALLEN HISTORY
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
BOE 9/11/19
ALLEN HISTORY
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
BOE 11/13/19 (SD APPROVAL)
ALLEN HISTORY
RELOCATION OF DROP-OFF
SWAP KIND AND MPR
Key Considerations• Drop-off relocated per City
comments• MPR and Kind. Swapped to
keep Kind. closer to Admin. • Current design includes 14
classrooms plus 1 STEAM classroom
• Board approved but asks for continued cost saving evaluations
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
BOE 1/15/20 (SD REVISION)
ALLEN HISTORY
CONVERSION OF REGULAR CLASSROOM
TO STEAM
ELIMINATE PARENT ROOM
RELOCATE RSP/ SPEECH/
COUNSELING
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
ALLEN DESIGN FEATURES
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
ALLEN DESIGN FEATURES
Existing Campus
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
ALLEN DESIGN FEATURES
Replacement Campus
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
ALLEN DESIGN FEATURES
New Campus• 13 regular classrooms• 3 kindergarten• 1 pre-school• 1 SDC• 1 RSP• 1 STEAM• 2 SEAL Small Classrooms with
moveable divider• Library• 2 Breakout / specialty spaces
Existing Campus• 13 regular classrooms• 2 kindergarten• 1 pre-school• 1 SDC• 1 RSP• 1 SEAL Classroom• Library
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
1. Classrooms accommodate different types of learning: Design spaces that allow for experiential, hands-on learning and space for collaboration and that accommodate a variety of programs including art, science and music.
2. Spaces should be large and flexible: Classrooms should have the ability to be modified to suit differing needs.
3. Provide space for staff training and collaboration
4. Allow for the creation of both public and private zones, both within classrooms and within the campus as a whole
5. Teach to the student: Teaching to standards and not to grade levels, allowing flexibility in staffing and mentoring are important to the success of students.
6. Technology should be robust to allow for blended learning pedagogies it order to meet 21st Century teaching principles and to allow for future growth and change.
7. Indoor/Outdoor Connections: Take advantage of the climate and create useful connections between indoor and outdoor spaces to accommodate multiple learning styles and expand the educational opportunities afforded by outdoor environments.
8. Provide space for the community: Opportunity should be created for bringing the community into our schools in a secure way while also providing useful space for wraparound services.
9. Schools should be safe havens for students and staff
10. Facilities should consider the total environmental footprint by developing efficient buildings that reduce the need for maintenance and replacement with durable materials and robust systems.
ALLEN DESIGN FEATURES
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
1. ACCOMMODATE DIFFERENT LEARNERSSPECIAL
EDUCATION STEAM• Accommodate students with physical disabilities
• Dedicated toilet and changing room
• Sensory room for students with emotional difficulties
• Increased storage
• Additional sinks for science and art
• Adjacent to outdoor learning area for experimentation and library for research
SEAL • Divisible space for multiple sessions or single session
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
1. ACCOMMODATE DIFFERENT LEARNERS
RSP / Speech / Counseling • Dedicated space for each program
• Accommodates students needing additional learning support
Breakout rooms for small group learning or
staff collaboration
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
2. FLEXIBLE SPACES
Tables designed for maximum flexibilty to reconfigure the
space
Roll-up doors provide direct
access to outdoor eating for events
Stacks on casters to recreate space allowing for alternative learning
and event environments
Soft seating for flexible study and research
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
2. FLEXIBLE SPACES
Classroom storage behind whiteboard
to free up wall space
Moveable partition to alter room size and accommodate
Additional classroom storage in moveable cabinets to allow for maximum classroom
flexibility
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
3. STAFF TRAINING AND COLLABORATION
Connecting doors to allow for shared supervision and
collaboration
Breakout rooms for small group learning or
staff collaboration
Adequate staff lounge and workroom with dedicated
outdoor patio
Stacks on casters to recreate space for all
staff meetings
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
4/8/9. PUBLIC AND PRIVATE ZONES
Community access point
Secure perimeter to
create safe/private internal zone
Only way onto campus once
gates are locked is through admin
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
6. ROBUST TECHNOLOGY
Short throw projector at
teaching wall
Wifi in all rooms
supporting 1:1 device
access
“Front Row” voice amplification system for increased ability to hear
the teacher
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
Wifi coverage for outdoor
learning
6. ROBUST TECHNOLOGY
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
7. OUTDOOR LEARNING
Outdoor classrooms for
K and Pre-K. Direct
connection into
classrooms
Provision for future garden
Amphitheater can be used as outdoor classroom or for spectators
Roll-up door connects the indoor and outdoor
stages
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
7. OUTDOOR LEARNING
Informal outdoor learning/teaching
environments
Designated outdoor
classroom spaces
“Nature Play” zones in playgrounds provide
opportunities for differential social and experiential learning
Roll-up doors provide direct
access to outdoor eating for events Multiple exit
points for access to outdoor spaces
Roll-up door connects the STEAM classroom directly to
outdoor learning
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
10. ENVIRONMENTAL SUSTAINABILITY
Following Board Policy BP 3510:The Governing Board believes everyone has a responsibility to be a steward of the environment and desires to integrate environmental accountability into all district programs and operations.
• Low flow fixtures• Infrastructure for Future Solar Panels• Shading devices to reduce energy need• Ultra-high efficiency AC units• Low VOC Materials• Rapidly-renewable resources• Focus on durability• Waste reduction part of demolition specification• Collaborative for High Performance Schools (CHPS) general guide• Bike Racks multiple locations on campus (36 student, 8 staff and 4 visitor)• Blast Chiller and enlarged cold storage (for fresh food)• Waste stream separation, including composting• Maintain local tree species
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
SCHEDULE HISTORY & CURRENT SCHEDULE
Schedule HistoryThe Board of Trustees approved an initial schedule included in the Schematic Design Presentation on 11/13/2019. This schedule included the following milestones:
1.) DSA Review Occurring 8/10/2020-1/21/2021.2.) Construction Occurring 5/31/2021-12/30/2022 Across Two Phases
Current ScheduleFollowing the Schematic Design Revision on 1/15/2020, the DSA Review Timetable was Updated as follows:1.) DSA Review 9/28/2020-3/25/2021* EstimatedBHM Construction has confirmed the projected construction schedule holds:2.) Construction Occurring 5/31/2021-12/30/2022.
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
Initial Concept Budget Based on 1:1 Replacement Square Footage was presented on 5/18/2018 prior to Measure X. This concept was based on a total of 45,816 square feet @ $1,123.48 per square foot for a total estimated cost of $51,473,359.
Following the successful Measure X vote, a post-bond Preliminary Concept Budget was presented on 8/26/2019. This concept was based on a total of 43,922 square feet @ $1,383.28 per square foot for a total estimated cost of $60,756,424.
BUDGET HISTORY
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
On 11/13/2019 The Board of Trustees reviewed and approved a Schematic Design and Budget totaling $62,618,591. This amount was based on 55,541 square feet @ $1,127.43 per square foot.
On 1/15/2020 The Board of Trustees reviewed and approved a revised Schematic Design and Budget totaling $59,013,368. Square footage was reduced to lower the required project expenditure. The revised SD Budget was based on 52,728 SF @ 1,119.20 per square foot.
The most current estimates by both BHM Construction and Greystone West total $56,353,636 dated December 2020. This budget is based on 52,728 SF @ 1,068.76 per square foot. Subcontractor quotes are anticipated in March following review of DSA Comments.
BUDGET HISTORY & CURRENT BUDGET
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
BUDGET HISTORY
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
BOE 1/15/20 (SD REVISION)
ALLEN HISTORY
CONVERSION OF REGULAR CLASSROOM
TO STEAM
ELIMINATE PARENT ROOM
RELOCATE RSP/ SPEECH/
COUNSELING
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
• City of San Bruno Grading Permit• SFPUC Grading Permit• City of San Bruno Water Connection Permits• City of San Bruno Encroachment Permits
• Subcontractor Bidding- March 2021• Board Approval of Guaranteed Maximum Price Contract- April
14th• Mobilization and Staging Plans• Truck Haul Routes and Traffic Management Plan• Update to Allen staff
NEXT STEPS
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
NEXT STEPS
Total projected needs:
• Rust Remediation, Fencing, Playgrounds & Paint: • Selected Site Utility Repairs, Selected Site Paving
Repairs & Selected HVAC Replacement:• Window Replacement:• Replacement Floor Coverings:• Portable Classroom Replacement:• 20% Mandated ADA on DSA Projects:• Construction Cost Escalation:• 5% Program Reserve:
TOTAL PROJECTED NEEDS ANALYSIS COSTS (GSW 9/19)
$ 2.98M$10.29M$ 5.39M$ 2.49M$ 1.40M$ 2.94M$ 3.59M$ 1.45M
$30.55M
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
PARKSIDE MIDDLE SCHOOLOVERVIEWParkside is one of our community’s oldest schools, built in 1954. Although much of the school has been renovated the existing science classrooms are inadequate for instruction in science. Our goal is to replace the “science wing” with modern facility. In addition, much of the performing arts programs are in portables that are inadequate. Along with an older multi-purpose building, these buildings will be replaced with a new flexible facility that supports the performing arts educational programs. Finally, the traffic conditions must be improved. This will require extensive re-working of the front of the school that will include a replacement for the main office to provide additional support spaces for teachers and students.
Project Details
• Demolition of the existing science/library building• Construction of a new, 2-story building that has
science labs on both floors with a new library on the ground floor.
• Construction of a new multi-purpose building that include 2 new performing arts classrooms
• Construction of a new main office building and improvements to traffic flow at the font of the campus.
• Renovation of the existing gymnasium and locker rooms.
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
BELLE AIR ELEMENTARY SCHOOLOVERVIEWThe multi-purpose building, pre-school and library date back to 1951 – 67 years. They are in poor condition and are awkwardly placed on the campus limiting the ability to control entry onto the school site, and providing for a difficult pick-up and drop-off condition. Although a number of the classroom buildings were built as recently as 2001 and are in decent shape they need modernization. The remaining parts of the school including the Multi-Purpose room, Library building and support offices are all inadequate and need to be demolished.
Project Details
• Demolish existing library, office and multi-purpose buildings.
• Construction of a new multi-purpose building Library and Main Office
• Construction of a new Health Center• Conversion of the existing main office to 2 pre-
school/Special Education classrooms (goal of 4 SPED spaces on campus).
• Removal of the existing Health Center portable.• Modernization of all remaining campus buildings• Revised parking, pick-up and drop-off
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
JOHN MUIR ELEMENTARY SCHOOLOVERVIEWJohn Muir Elementary School has been a valuable part of our community for over 58 years. Like other schools in our community it is need of significant renovation and modernization. We need to improve the educational facilities, renovate and restore buildings with older infrastructure, provide more space for play, improve traffic safely , resolve awkward site conditions to increase security for children. Ultimately the school will have 18 standard classrooms, plus 3 kindergarten.
Project Detail
• Demo existing multi-purpose building.• Convert main office and library into classrooms• Construct new 5 standard and 1 specialty -
classroom building on the site of the existing multi-purpose building
• Construction of a new multi-purpose building and specialty classroom
• Construction of a Library• New administration building at the front of the
campus for improved access, student services (learning center) and better security of the campus.
• Provide access and an improved student pick-up and drop-off from Crestmoor Dr.
• Relocation of 2 portables to the front of the campus for before and after school programs.
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
PORTOLA ELEMENTARY SCHOOLOVERVIEWWhile in good shape, Portola Elementary School needs both renovation and reconfiguration to improve safety on the campus and to provide better instructional space. These improvements include a new multi-purpose building at the front of the campus and converting the existing office into student support spaces. The existing undersized multipurpose room will be converted into a library.
Project Details
• Construction of a new multi-purpose building• Construction of a new administrative space.• Conversion of the existing main office into
student support spaces including learning center and 1 special education classroom (goal of 4 SPED spaces on campus)
• Conversion of library into specialty classroom space
• Conversion of the existing multi-purpose space into an expanded library and resource center.
• Modernization of all campus buildings
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
Cash FlowMeasure X Bonds $79,000,000Cost of Issuance $ 338,000Other Projects $ 555,137Balance $78,106,863 (interest not included)
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
NEXT STEPS
• District Campus Needs (per 2019 assessments): • Parkside Modernization/Renovation:• Belle Air Modernization/Renovation:• John Muir Modernization/Renovation:• Portola Modernization/Renovation:• Rollingwood Modernization/Renovation:
• Furniture, Fixtures & Equipment (FF&E):• Program Reserve:
POTENTIAL PROJECTS SUMMARY
$ 30.55M$ 42.4M$ 19.4M$ 22.8M$ 19.3M$ TBD
$ 1.5M$ 8.9M
ALLEN ELEMENTARY SCHOOLBOARD WORKSHOPFEBRUARY 24, 2021
HIBSER YAMAUCHIARCHITECTS, INC.
NEXT STEPS
Recommendation:Complete a Master Facilities Plan based on:• Past work completed• Identified needs• Updated assumptions re. school closures• Updated demographics• Available funds• Feedback from the Board and community.