allston campus development huit slt service delivery group · •improved in-building cellular...
TRANSCRIPT
![Page 1: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/1.jpg)
Allston Campus DevelopmentHUIT SLT Service Delivery Group
Nov. 30, 2017 Thursday 9-10am Smith 561
Eric D’Souza, Senior Project Manager, HUIT
![Page 2: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/2.jpg)
Purpose and Intended Outcome
Purpose and Intended Outcome
• Provide an overview of Allston Campus Development – emphasis on scale and timeframe
• Provide an overview of associated regional IT infrastructure projects, and operational technologies
• Initiate the conversation about on-going HUIT service delivery to the new, growing community and physical campus in Allston
2
![Page 3: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/3.jpg)
HUIT Service Delivery to the new Allston campus and community
Planning Questions / Topics to consider through this presentation
• How can we improve the Harvard community member experience in Allston and better support cross-school collaboration?
– differences in HUIT and HBS networking and IAM services as a baseline issue
• What services will HUIT provide to the Allston Campus and Community?
• How, and what resources are needed?
• Where – what are the physical / location considerations?
• What additional collaboration is needed with other IT service provider groups (HBS IT, FAS MTS, FAS Research Computing, SEAS Computing, Wyss Institute IT, others)?
• How do we need to think about HUIT service delivery to the Allston community, given the longer term, planned expansion of the Allston campus (beyond 2020)?
Key Dates
• The Art Lab is scheduled to open in ~Jan-2019 (13 months away)
• Daycare to move in and open in 114 Western Avenue ~Dec-15-2019 (24 months away)
• Allston SEC to open Summer 2020. SEAS has an initial target to complete moving all occupants into SEC and 114 Western Avenue, at least 2 weeks before Fall 2020 classes start. (31 months to end June 2020)
3
![Page 4: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/4.jpg)
Allston Campus Development:Harvard Capital Projects
![Page 5: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/5.jpg)
5
Property Ownership in AllstonThe University owns approximately 240 acres of land in Cambridge, and 360 acres of land in Allston.
![Page 6: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/6.jpg)
Western Avenue: Today
6
![Page 7: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/7.jpg)
Projects Underway
7
![Page 8: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/8.jpg)
Projects Status
Recently Completed
Construction Underway
Next Phase
Later Phase
![Page 9: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/9.jpg)
![Page 10: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/10.jpg)
Building a 21st Century Academic AreaScience and Engineering Complex - Western Avenue
• Will house approximately two-thirds of the Harvard John A. Paulson School of Engineering and Applied Sciences (SEAS) in approximately 500,000 SF when it opens in 2020
• Will be among the most cutting-edge teaching and research facilities in the country
11/21/2017 10
![Page 11: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/11.jpg)
SCIENCE AND ENGINEERING COMPLEX VIEW FROM WESTERN AVENUE
![Page 12: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/12.jpg)
9/19/17Allston General Update 12
![Page 13: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/13.jpg)
SCIENCE AND ENGINEERING COMPLEX INCLUDING 114 WESTERN AVENUE
WESTERN AVENUE
ROTTERDAM STREET
ACAD
EMIC
WAY
0 50 100
PARKING
PARKING
MULTI FUNCTIONALLAWN
HAGUE STR
EET
![Page 14: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/14.jpg)
Supporting Energy Needs for the District
14
District Energy Facility – supplying power to the SEC and other projects in Allston.
![Page 15: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/15.jpg)
Adding Art as a Node of Innovation Art Lab – Planning Underway
• A raw, flexible, and open space
• Permeable building, with activities that could spill outside while engaging the community
• Provide an unprecedented opportunity to cross boundaries of disciplines in pursuit of artistic innovation
11/21/2017 15
![Page 16: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/16.jpg)
Public Realm
16
![Page 17: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/17.jpg)
A Regional Impact
11/21/201717
![Page 18: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/18.jpg)
Improving the I-90 Interchange
18
![Page 19: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/19.jpg)
Future Projects
19
![Page 20: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/20.jpg)
Preserving Land for Future Academic Growth Future Academic Quads
• Site of the former Charlesview Apartments
• As per Work Team recommendations, preserved for future academic growth, including Gateway Building
11/21/2017 20
![Page 21: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/21.jpg)
Planning for Enterprise Real Estate Opportunities
21
The area south of Western Avenue and east of the Science and Engineering Complex (denoted by the red boundary) provides opportunity for mixed-use real estate development that could complement the academic pursuits in Allston.
![Page 22: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/22.jpg)
Allston Campus Development:HUIT IT Infrastructure
![Page 23: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/23.jpg)
IT Infrastructure Approach is Regional
Given the extensive needs for the Allston campus, HUIT has taken a regional approach to IT infrastructure instead of a building by building approach, in order to reduce overall costs, and improve resiliency.
23
Red lines reflects existing and planned IT infrastructure – network pathways
![Page 24: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/24.jpg)
Regional IT Infrastructure: Near-Term Needs
24
Project Approval Status Description Key Benefits Operating Tail*
Network Conduit and Fiber
Construction (FY15-17).Rev. budget FY18 approved
Program Manager, Senior Technical Consultant (0.25 FTE), ProjectManager (External Plant) and annual amount for regional conduit and fiber construction.
Establish physical foundation for building network connectivity.
Maintenance costs.
Replacement:40 year life for conduit ,15 year life for fiber.
Regional Wireless Network Core
FY18 approved Assessment & design(FY18)Implement wireless core (FY19)Incremental implementation of exterior wireless (FY20+)
Increase site and exterior Harvard wireless coverage as the Allston campus is developed.
Support – FTEs, hardware, software support.Replacement: 6 year lifecycle - hardware.
Regional Network Core
Term position approved. Approved.
Hardware and software for Allston regional network core. Design (FY18)Implement (FY19-20)
Establish redundant, major, data network traffic aggregation points for Allston campus
Support – FTEs, hardware, software support. Replacement: 6 year lifecycle -hardware.
Cellular Enhancement Program
Approved Role to coordinate cellular enhancement activities with AT&T and Verizon for SEC, DEF, 114 Western Ave and other Allston buildings.
Establish cellular (voice and data) coverage within buildings and sites
Carriers (AT&T, VZ) have historically funded capital and operating costs.**
*These annual operating tail costs are not included in the project budgets.** Oct-2017 update: The technology and funding models are changing dramatically. Carriers are shifting away from funding all capital and operating costs.
![Page 25: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/25.jpg)
Network Conduit and Fiber – External Plant
11/21/201725HUIT
![Page 26: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/26.jpg)
26
![Page 27: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/27.jpg)
Regional Network Core and Networking for
the Art Lab, DEF, SEC and 114W
11/21/201727HUIT
![Page 28: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/28.jpg)
Allston Regional Network Core & Third Campus Core
28
SEC
SEC
SEC
![Page 29: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/29.jpg)
Optical Back Bone – Allston
29
![Page 30: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/30.jpg)
Regional Wireless Networking
11/21/201730HUIT
![Page 31: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/31.jpg)
Regional Wireless RF RFP and Implementation• RFP issued in July 2017. Dewberry Engineers selected.
• Two components. Outdoor design for wifi and Cellular Report as baseline this fall and again when building is enhanced for cellular service and substantially complete.
– RF Study as baseline for researchers in SEC
• Wifi – 60’ radius in dense areas, 100’ in open/line sight areas
• Aruba AP 370 outdoor series as guidance for budget place holder for SEC outdoor spaces. Can be updated/changed.
• Wifi: Utilize existing or to be built infrastructure. Blue Phones as example of the former and the ArtLab building as the latter.
31
![Page 32: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/32.jpg)
Cellular Enhancement Program
11/21/201732HUIT
![Page 33: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/33.jpg)
Strategy for In Building Cellular CoverageGoal: Improve cellular coverage within Harvard owned buildings
33
•Use of mobile devices expanding across campus
•Students, faculty, and staff increasingly depend on cellular devices for instruction, research and administration
•Cellular network coverage for carriers is robust throughout Cambridge and Boston, however, coverage is inconsistent within Harvard buildings
•Complaints regarding poor coverage within Harvard buildings and tunnels are increasing
•Users want choice of cellular service provider
Current State Future Vision•Improved in-building cellular coverage through partnership with service providers
•Provide access to multiple cellular service networks utilizing a system that ideally is carrier agnostic
•Reduce complaints and improve cellular, mobile device user experience
![Page 34: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/34.jpg)
Likely Future Cellular Enhancement Deployment
• Enterprise Radio Access (E-RAN) – Spider Cloud
• Offers an alternative to legacy distributed antenna systems (DAS)
• Easier and quicker to deploy than DAS
• Operates at the Physical Layer
– Is deployed over an Ethernet LAN, just like Wi-Fi - uses Harvard's Infrastructure
– E-RAN can securely share the LAN with Wi-Fi
34
![Page 35: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/35.jpg)
Operational Technology (OT) in Allston
11/21/201735HUIT
![Page 36: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/36.jpg)
The Harvard OT landscape
• Building access control• Security cameras• Building automation
– Lighting, HVAC/temp., fire detection/suppression, boilers, refrigeration, chilled water, UPS
• Lab automation– Fumes, oxygen, toxic gas, lighting, etc.– Lab device automation
• Physical plants– Power, Steam, Chilled water
• Garages doors and gates• Faculty/students experimentation with open hardware technologies (Arduino,
etc.)
36
![Page 37: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/37.jpg)
OT: Allston Science and Engineering Complex (SEC)
Total Cost of Ownership
37
![Page 38: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/38.jpg)
OT: Allston Science and Engineering Complex (SEC)
38
Numerous Low Voltage Systems
Wireless Access Points (device, support, patch cord)
AV Conduit/Box/Cable
AV Cameras/Equipment
AV Fittings (cabinets, podiums)
Security Conduit/Box
Security CableSecurity Devices - Access Control (Proximity)Security Devices - Video (cameras, housings, NVR)IT End User Devices (workstations, mounts, monitors, printers, tablets)
Wall mounted displays (non-AV, informational signage, room reservation)Distributed Antenna - CellularDistributed Antenna (Emergency Radio) -Public SafetyVideo Intercom
BAS/BMS with IT Requirements
Fire Alarm SystemPhysical Access Control C-Cure 9000
Room Reservation - EMS
Electrical Metering
Water metering
Aicuity
Call for Assistance
Windows
Exterior / Courtyard Security
ADA Doors
Library
Environmental Monitoring
Bike Parking Pavilions
Laboratory Needs
Laboratory EquipmentCore Research Facility Needs & Equipment
Vending Machines
Clock System
**Not an exhaustive list
![Page 39: Allston Campus Development HUIT SLT Service Delivery Group · •Improved in-building cellular coverage through partnership with service providers •Provide access to multiple cellular](https://reader036.vdocuments.net/reader036/viewer/2022070810/5f08a0167e708231d422eeea/html5/thumbnails/39.jpg)
OT: Allston Science and Engineering Complex (SEC)
New Building Management System – Schneider Electric BMS (ENE Systems)High performance energy recovery system (Konvekta) Digital Irrigation control systemDigital lighting control systemDigital shade control systemCommissioning system (Clockworks)Green screen displaysDigital locker systemBicycle parking access controlWayfinding application
39
NEW TO HARVARD (to be deployed or have been explored)
**Not an exhaustive list