AMENDMENT OF SOLICITATION 1. AMENDMENT NO. 001 2. EFFECTIVE DATE – 06/07/2016 3. PAGE 1 OF 2 4. ISSUED BY: Fluor-B&W Portsmouth LLC P.O. Box 548 Piketon, OH 45661 5. NAME AND ADDRESS OF CONTRACTOR (Name, street ,county, state &,zip code) 6. AMENDMENT OF (RFP) SOLICITATION NO. FBP16SC51555 DATE 05/18/2016 7. The above numbered solicitation is amended as set forth in Item 8. The hour and date specified for receipt of Offers _X_ is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods: (a) By completing Items 5 and 9, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 8. DESCRIPTION OF AMENDMENT Except as provided herein, all terms and conditions of the document remain unchanged and in full force and effect. 1. Change Block 6. Date and Time Proposals are Due: From: June 8, 2016 @ 4:00PM To: June 22, 2016 @ 4:00PM 2. Change Block 10 to read as follows: “The undersigned agrees this offer maybe accepted within 120 calendar days from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at designated points(s), within the time specified in the schedule.” 3. Provide attendance sheet(s) for Pre-proposal Meeting held May 25, 2016. 4. Provide Questions and Answers as received in response to the Request for Proposal (See Attached) 5. Provide Procedures/Referenced Documents reflected in Attachment J-13, but not previously provided. 9A. NAME AND TITLE OF SIGNER (Type or print) 10A. Fluor B&W Portsmouth LLC 9B. CONTRACTOR/OFFEROR ______________________________________ (Signature of person authorized to sign) 9C. DATE SIGNED 10B. ___________________________________ (Signature) 10C. DATE SIGNED

Upload: others

Post on 10-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AMENDMENT OF SOLICITATION - Fluor-BWXT Portsmouth · 4. ISSUED BY: Fluor-B&W Portsmouth LLC P.O. Box 548 Piketon, OH 45661 5. NAME AND ADDRESS OF CONTRACTOR (Name, street ,county,

AMENDMENT OF SOLICITATION

1. AMENDMENT NO. 001 2. EFFECTIVE DATE – 06/07/2016

3. PAGE 1 OF 2

4. ISSUED BY: Fluor-B&W Portsmouth LLC

P.O. Box 548 Piketon, OH 45661

5. NAME AND ADDRESS OF CONTRACTOR (Name, street ,county, state &,zip code)

6. AMENDMENT OF (RFP) SOLICITATION NO.

FBP16SC51555

DATE 05/18/2016

7. The above numbered solicitation is amended as set forth in Item 8. The hour and date specified for receipt of Offers _X_ is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods: (a) By completing Items 5 and 9, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 8. DESCRIPTION OF AMENDMENT Except as provided herein, all terms and conditions of the document remain unchanged and in full force and effect. 1. Change Block 6. Date and Time Proposals are Due: From: June 8, 2016 @ 4:00PM To: June 22, 2016 @ 4:00PM 2. Change Block 10 to read as follows: “The undersigned agrees this offer maybe accepted within 120 calendar days from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at designated points(s), within the time specified in the schedule.” 3. Provide attendance sheet(s) for Pre-proposal Meeting held May 25, 2016. 4. Provide Questions and Answers as received in response to the Request for Proposal (See Attached) 5. Provide Procedures/Referenced Documents reflected in Attachment J-13, but not previously provided. 9A. NAME AND TITLE OF SIGNER (Type or print)

10A. Fluor B&W Portsmouth LLC

9B. CONTRACTOR/OFFEROR ______________________________________

(Signature of person authorized to sign)

9C. DATE SIGNED 10B.

___________________________________ (Signature)

10C. DATE SIGNED

Page 2: AMENDMENT OF SOLICITATION - Fluor-BWXT Portsmouth · 4. ISSUED BY: Fluor-B&W Portsmouth LLC P.O. Box 548 Piketon, OH 45661 5. NAME AND ADDRESS OF CONTRACTOR (Name, street ,county,

1. AMENDMENT NO. 001 2. EFFECTIVE DATE – 06/07/2016

3. PAGE 2 OF 2

Attachments: 1. Attendance Sheets – Pre-proposal Meeting May 25, 2016 @ 9:00AM 2. RFP FBP16SC51588 Q&A 3. Attachment J-13 Referenced Procedures

Page 3: AMENDMENT OF SOLICITATION - Fluor-BWXT Portsmouth · 4. ISSUED BY: Fluor-B&W Portsmouth LLC P.O. Box 548 Piketon, OH 45661 5. NAME AND ADDRESS OF CONTRACTOR (Name, street ,county,
Page 4: AMENDMENT OF SOLICITATION - Fluor-BWXT Portsmouth · 4. ISSUED BY: Fluor-B&W Portsmouth LLC P.O. Box 548 Piketon, OH 45661 5. NAME AND ADDRESS OF CONTRACTOR (Name, street ,county,
Page 5: AMENDMENT OF SOLICITATION - Fluor-BWXT Portsmouth · 4. ISSUED BY: Fluor-B&W Portsmouth LLC P.O. Box 548 Piketon, OH 45661 5. NAME AND ADDRESS OF CONTRACTOR (Name, street ,county,

    6/7/2016 9:02 AM RFP FBP 16SC46841 – OSWDF CQC Support

Questions

Questions Answers

1. During the pre-bid we were informed the roofing crew would need approximately 40 hours of onsite training. What are the training requirements for project leadership to gain access to the work sites during the project; i.e., Project Manager & Superintendents?

The training listed as mandatory in the J-13 appendix 1 will apply to all personnel. The specifically marked training in the J-13 appendix 1 will be required for those doing the work.

2. The Statement of Work, section 3.2.10 Roof Repairs X-744G C. states, “No fossil fuels are permitted on the X-744G roof”, and 480V outlets are available at ground level. Since an onsite walk down was not possible, can you provide the approximate distance from the available outlets to the work location.

The 480V receptacles are located in various locations throughout the building’s first floor.

3. Statement of Work, section 3.2.10 Roof Repairs X-744G C. states, “All areas where existing gravel is heavy or in piles shall be dispersed as to create uniform areas of gravel”. Will this dispersing/disturbance of the rooftop gravel require active radiological monitoring during these roof activities?

Yes

4. Are there any roof system manufacturer requirements for the membrane materials?

No

5. The J-8 Submittal register lists a “Contractor’s Corporate Safety Plan and Written Commitment to Follow FBP Safety Plan”. Will a contractor’s established Corporate Safety Plan suffice for this requirement or will the contractor be required to develop a project and site specific ‘Worker Safety and Health Program’ that includes all applicable sections of the Attachment J-13 Environmental, Health, and Safety Requirements for On-Site Work and includes the contractor’s work performance as it relates to that section?

The contractor will be required to develop a project specific plan.

6. The J-8 Submittal register lists a “Contractor’s Work Plan”. Is this submittal required to include building and site specific safety requirements with hold points and required signatures from company personnel?

Yes

7. Attachment J-13 Environmental, Health, and Safety Requirements for On-Site Work, under section 6.6.6 Temperature Extreme, states that the contractor shall observe the requirements of the Company’s Temperature Extremes Program, FBP-IH-PRO-00069. Please provide this document and explain the work regiment requirements.

Will provide document

8. Attachment J-13 Environmental, Health, and Safety Requirements for On-Site Work, under section 6.21 Tools, (and SOW section 5.2.13 B) states that the contractor shall use only self-retracting blade utility knives. Will an exception be provided for standard non-self retracting utility blades to be allowed onsite for use during roofing activities? 

An exception is possible with safety approval

9. What are the requirements for eye wash stations on the roof? 

Eye wash stations shall meet OSHA regulations

 

 

 

Page 6: AMENDMENT OF SOLICITATION - Fluor-BWXT Portsmouth · 4. ISSUED BY: Fluor-B&W Portsmouth LLC P.O. Box 548 Piketon, OH 45661 5. NAME AND ADDRESS OF CONTRACTOR (Name, street ,county,

    6/7/2016 9:02 AM RFP FBP 16SC46841 – OSWDF CQC Support

Questions

10. There are numerous references to procedures and documents not provided with the solicitation, but required to be followed by the contractor (e.g. FBP-OS-PL-00002, FBP-EM-PR0-00026, FBP-FP-PR0-00004, FBP-FP-PDD-00001, FBP-FP-PR0-00072, FBP-FP-PR0-00005, FBP-IH-PR0-00028, FBP-IH-PR0-00051, FBP-IH-PR0-00069, FBP-IH-PDD-00003, FBP-SM-PDD-00001-F02, FBP-RP-PL-00002, DOE Guide 440.1-18, FBP.OS.PDD-00001, FBP-PM-PDD-00001, FBP-EP-PDD-00008, FBP-NSE-POL-00005, FBP-IH-PRO-00022, FBP-OS-PRD-00002, FBP-OS-PRO-00020-F01, DOE-STD-1090-2011). Please provide copies of all of the required procedures and reference material.

Will provide documents

11. The Statement of Work, section 3.2.4 states, “the Contractor shall allow one day for radiological survey and inspection for use and or release of materials and equipment”. If the inbound or outbound surveys take longer than one day will the contractor be compensated for the additional labor and equipment costs for this delay?

No. Please refer to Clause H.40 Delays

12. Attachment J-16 Quality Assurance Requirements includes the requirement to, “4.8 Contractor shall maintain acceptance testing/inspection and at the conclusion of the Work, shall submit the required number of copies thereof to the Company” and the J-8 Submittal Register includes the submittal titled, “Acceptance Testing Reports”. What tests are required as part of this contract?

Any quality related forms completed by the contractor. Also, the test results from the response to question 16 will specifically be required.

13. Attachment J-16 Quality Assurance Requirements includes the requirement to, “4.8 Contractor shall maintain acceptance testing/inspection and at the conclusion of the Work, shall submit the required number of copies thereof to the Company” and the J-8 Submittal Register includes the submittal titled, “Acceptance Testing Reports”. What tests are required as part of this contract?

Any quality related forms completed by the contractor. Also, the test results from the response to question 16 will specifically be required.

14. The Statement of Work, section 3.2.11 Roof Repairs X-720. states, “Contractor shall evaluate the existing roof conditions and make additional repair recommendations, beyond the scope described above, to the company for consideration”. Can you provide an estimated time frame from the contractor recommendation to the authorization from the company to perform the repairs?

Recommendations to be considered by the company. Any new scope is to be captured in a new contract or contract modification as determined by the company.

15. The Statement of Work, section 3.2.11 Roof Repairs X-720 A states that the Contractor shall perform repairs to leaks in the roof near roof drains caused by damaged drains, and there are approximately 50 drains. Since an onsite walk down was not possible during the pre-proposal conference, can you provide the approximate number of damaged drains and the approximate sq.ft. of roof repairs necessary around each damaged drain?

Assume 36 square feet of repairs per drain (6’ x 6’ area) and all 50 need repairs.

 

Page 7: AMENDMENT OF SOLICITATION - Fluor-BWXT Portsmouth · 4. ISSUED BY: Fluor-B&W Portsmouth LLC P.O. Box 548 Piketon, OH 45661 5. NAME AND ADDRESS OF CONTRACTOR (Name, street ,county,

    6/7/2016 9:02 AM RFP FBP 16SC46841 – OSWDF CQC Support

Questions

16. The Statement of Work, section 3.2.11 Roof Repairs X-720 B states that the Contractor, “Must provide a 10 year labor and material warranty to cover failure to prevent water penetration”. Due to the existing conditions of the roof and limited scope regarding drain and roof system replacement, the requested warranty is beyond the typical expectation for the roofing industry. This requested warranty also presents a high risk to the contractor since leaks in the existing roof or portion of the drain outside the scope of this contract are likely to leak in the future.

In lieu of 10 year warranty, please provide a recommended test plan/procedure on how you will validate your installation/repairs and add provisions in your bid to implement this test plan/procedure.

The test results will be submitted to the company.

17. Specification, EVAL-DE-2012-0113 R4 states, “The new vault in the X-720 necessitates the removal of the existing roofing down to but not including the original 18 gauge minimum metal decking. The new vault is an area approximately bounded from column lines 1 - 7 (E-W direction) and A- D (N-S direction). Reroofing of a section 10 feet east of column line 7, running from grids "A" to "C" is also required.” Is this part of this contract to perform?

No.

18. Specification, EVAL-DE-2012-0113 R4, attachment titled X-720 Roof Supplemental Information, under section 3.0 Roof Inspection, states, Weight Restrictions: 300 pounds limit per person and maximum of six persons. a. Will more than 6 persons be allowed on the X-720 building at a time? b. Will more than 300lbs per person be allowable when lifting materials on the roof?

Yes – more weight will be allowed on the roof per a different Engineering Evaluation that will be completed prior to work.

19. Attachment J-13 Environmental, Health, and Safety Requirements for On-Site Work, under section 6.6.9 Ergonomics, states “Do not lift more than 1/3 of your body weight or 50 pounds (whichever is less) without assistance”. Will an exception be provided for this lifting restriction?

No.

20. Specification, EVAL-DE-2014-0284 R0, under section 2.0 SUMMARY OF ROOF STRUCTURAL INTEGRITY ASSESSMENT, Table 1, states, # of workers as 6 and total weight distributed as 1800 for the each of the listed X-744G roof areas (Lower Roof, Middle Roofs, and Upper Roof). a. Will more than 6 people be allowed on either of these sections at a time? b. Will more total weight than 1800 be allowed during this roofing project for the personnel, equipment, and materials?

Yes – more weight will be allowed on the roof per a different Engineering Evaluation that will be completed prior to work.

21. Specification, EVAL-DE-2014-0284 R0, under section 7.0 DISCUSSION OF X-744G ROOF CONDITION, Table 4: Possible Work Requests lists possible work requests (e.g. repair rips in membrane, reconnect downspouts, reroute downspout drainage, close the openings in the Cupola structure to remove nuisance birds, etc.). Are these items included in the work scope of this contract?

No

 

Page 8: AMENDMENT OF SOLICITATION - Fluor-BWXT Portsmouth · 4. ISSUED BY: Fluor-B&W Portsmouth LLC P.O. Box 548 Piketon, OH 45661 5. NAME AND ADDRESS OF CONTRACTOR (Name, street ,county,

    6/7/2016 9:02 AM RFP FBP 16SC46841 – OSWDF CQC Support

Questions

22. Regarding the radiological requirements: a. What are the radiological requirements for these two buildings? b. Will workers be required to do radiological scanning in and out of the areas? c. Will boot covers be required during roof work? d. Is it possible for the contractor to put a port o potty on the roof?

a. Determined based on pre job scan of the work area. The contractor are asked to bid the project assuming full radiological controls will be required on the X-744 roof.

b. Workers will be required to scan out but not in.

c. Determined based on pre job scan of the work area. The contractors are asked to bid the project assuming full radiological controls will be required on the X-744 roof.

d. No

23. Section L.3 of the Solicitation states, "NNSA Ariba eSourcing: Fluor BWXT Portsmouth LLC, intends to use the National Nuclear Security Administration (NNSA) online Ariba eSourcing system in order to record proposals submitted in response to this solicitation." Is this solicitation going to go through the eSourcing website, and if so how do we obtain access to the solicitation in order to submit our proposal?

The information will be uploaded to the Ariba eSourcing website and you will receive a notification from the website to login and input your proposed price.