amendment summary for the 2011 2015 tip
DESCRIPTION
ÂTRANSCRIPT
1
AMENDMENTS TO THE 2011-2015 TIP
DATE DESCRIPTION AMENDMENT #
October 6, 2010 PIN 5755.54 – ITS/Incident Management, Phase 4B and PIN 5759.05 –
ITS/Incident Management, Phase 4C. Combines two projects into one letting. The
design phase had progressed the projects as one under PIN 5755.54. The combination
will result in an anticipated construction inspection savings of $0.304 CMAQ therefore
no offset is required.
Amendment #1
(Resolution 2010-14)
Ballot-001
November 3, 2010 PIN 5T1802 – NFTA Hybrid Bus Purchase - New project. The NFTA was awarded
a $7,000,000 grant from FTA’s State of Good Repair Program for the purchase of 13
hybrid passenger buses. Net change = +$7.0 M new funding.
Amendment #2
(Resolution 2010-15)
Ballot-016
November 3, 2010 PINs 5307.96 – Rt. 62 [Cayuga to Walmore Highway Widening] and 5810.54 - Rt.
62 [Walmore to Military Pavement Rehabilitation] - Merges two projects entirely
under PIN 5307.96. A net savings in the construction inspection phase anticipated
therefore no offset is required.
Amendment #3
(Resolution 2010-16)
Ballot-012
December 1, 2010 PIN 5755.19 Wehrle Drive [Ellicott Ck-Transit Rd] – Added $1.2264M of STP
Urban and $0.2744M of STP Flex for Construction & CI.
PIN 5755.43 E. Robinson (N French) [Rt. 62-Sweet Home Rd] – Added $1.200M of
STP Urban finds for design, ROW incidentals and acquisition.
PIN 5753.74 N. Forest Rd [Rt. 263-Dodge Rd] – Reduced scope to produce a net
surplus of $2.4264M in STP Urban funding as a funding offset.
PIN 5T16.53 Infrastructure Block – Reprogrammed $0.2744M of STP Flex funds to
5755.19 as the remainder of the funding offset. Net change = 0.
Amendment #6
(Resolution 2010-19)
Ballot-025
December 10, 2010 Four (4) new projects added under pavement and culvert maintenance:
PIN 5811.54 (Rt.16; Catt. CL-Holland, Mill and Overlay), $1.36M STP Rural
PIN 5811.57 (Rt. 954D; Elm-Oak Arterial, Mill and Overlay), $1.026M NHS
PIN 5811.58 (Rt. 78; Lockport-Rt. 104, Mill and Overlay), $0.948M STP Flex
PIN 5810.69 (Large Culvert Repairs), $ 1.344M STP Flex
Eleven (11) new projects added under local bridge maintenance representing work on
240 bridges:
PIN 5760.12, Bridge Painting, Erie County, $0.400M HBR
PIN 5760.13, Deck Sealing, Erie County, $0.120M HBR
PIN 5760.16, Bridge Joints, City of Buffalo, $0.220M HBR
PIN 5760.17, Bridge Washing, City of Buffalo, $0.080M HBR
PIN 5760.18, Bridge Painting, City of Niagara Falls, $0.280M HBR
PIN 5760.19, Wash, Seal, Bearing & Joints, City Niag. Falls, $0.064M HBR
PIN 5760.20, Deck Overlays, City Niag. Falls, $0.080M HBR
PIN 5760.14, Deck Overlays, Niagara County, $0.080M HBR
PIN 5760.15, Vertical Down, Niagara County, $0.088M HBR
PIN 5760.21, Scour Protection, Niagara County, $0.160M HBR
PIN 5758.09, Bridge Washing & Painting, Other Municipalities, $0.0872M HBR
Also added $0.2768M of HBR funding to three (3) existing projects (PINs 5759.61,
5759.63 and 5759.64)
Amendment #4
(Resolution 2010-18)
Ballot-023
Amendment #5
(Resolution 2010-18)
Ballot-028
December 21, 2010 PIN 5757.15 Porter Ave, Phase II – Advanced let date from 6/15/11 to 1/15/11 Administrative
Modification #1
(TPS Action)
December 21, 2010 PIN 5759.46 Hopkins St./BPRR – Delayed let date from 12/15/2010 to 6/15/2011 Administrative
Modification #2
(TPS Action)
Ballot-009
December 21, 2010 PIN 5759.45 Seneca St [Hayden St to Indian Church Rd] – Removed multi-modal
funds and replaced with STP Flex. Overall construction cost decreased reflecting latest
engineer’s estimate. Net change = +$0.176M STP Flex,
-$0.250 Multi-Modal.
Administrative
Modification #3
(TPS Action)
Ballot-027
January 5, 2011 PIN 5759.44 Industrial Heritage Trail Enhancement – Approved cost increase for
additional landscaping and granite pavers. Net change = +$0.600M STP Flex
PIN 5759.68 Tifft Street Wharf - Approved cost increase to accomplish additional
work on the Tifft Street Wharf and Lake Kirsty Dock. Net = + $0.760M STP Flex.
Administrative
Modification #4
(PCC Action)
Ballot-029
2
January 5, 2011 PIN 5757.27 Taylor Drive/Little River – Approved cost increase for additional
ROW, Construction, and CI. Net change = +$0.730M HBRR.
Administrative
Modification #5
(PCC Action)
Ballot-030
January 5, 2011 FTA Section 5310: New Project Additions for SFY 2010/2011 (FFY 2010) Approved a NYSDOT purchase of thirteen (13) local vehicles through the Elderly
and/or Handicapped Specialized Transportation Funding Program. Net change =
+$470,244.78 §5310 New Funds.
Amendment #7
(Resolution 2011-1)
MO STIP Action
January 19, 2011 PIN 5757.11 Bicycle Mobility Project/Buffalo Demand Management /
GoodGoingWNY – Approved installation of bicycle pavement markings and bike
racks in City of Buffalo. Subject to results of CMAQtraq analysis. Approved 2011
work activities regarding the GoodGoingWNY program. Total cost is $0.276M
($0.214M CMAQ) taken from remaining funds in PIN 5757.11 Buffalo Niagara
Demand Management &Transportation Alternatives Program - Net change = 0.
Administrative
Modification #6
(TPS Action)
January 19, 2011 PIN 5932.09 Lake Av, Norfolk Southern & Buffalo Southern Lines – NYSDOT
railroad safety project was on the 2008-2012 TIP and was de-obligated. Project is now
ready to proceed. Project was re-obligated.
Administrative
Modification #7
(TPS Action)
Ballot-039
January 19, 2011 PIN 5933.88 Gowans Rd, RR Crossing of Norfolk Southern Main Line - NYSDOT
project has been off the TIP since 2006. Members felt the expediency of the safety
work and the fact this identical project had been TIP-approved in the past was
adequate rationale to re-obligate it.
Administrative
Modification #8
(TPS Action)
Ballot-033
February 15, 2011 PIN 5209.61 Rt. 263 and Rt. 78 Roadway Improvements - Improvements involve
resurfacing the roadway using preventive maintenance techniques to like new
condition and restoring bridge (BIN 1030350) deck/ wearing surface to a condition of
good repair. Offset comes from surplus funds from a previous federal ISTEA earmark
NY022. Net change = +$261,686 surplus earmark.
Amendment #8
(Resolution 2011-2)
Ballot-031
February 16, 2011 PIN 5756.80 Amherst Street Signal Replacement Project: Military Rd to Bailey
Ave, City of Buffalo, and Erie County – Cost increase (PE & CI) of $73K (CMAQ).
Offset from cost savings in PIN 5755.38.
Administrative
Modification #9
(TPS Action)
February 16, 2011 PIN 5757.13 Lincoln Ave; Beattie Ave - Akron Rd – Construction cost increase of
$.270M ($.036M CMAQ, $.222M STP Flex). Offset comes from $270K reduction in
PIN 5758.57 - Feigle Rd Rehab.
Administrative
Modification #10
(TPS Action)
Ballot-034
March 2, 2011 Various Project Mergers to realize a savings in improved construction
administration, streamlined contractor bidding and possible bid cost savings.
PIN 5760.20 Niagara Falls Bridge Deck Asphalt Overlay and PIN 5760.19
Niagara Falls Bridge Maintenance. Merged PIN 5760.20 into PIN 5760.19 and
then deleted PIN 5760.20. Also added $0.024M Federal HBRR and $0.006 Local
from PIN 5758.09
PIN 5759.44 Industrial Heritage Trail and PIN 5759.68 Tifft Street Wharf.
Merged PIN 5759.44 into PIN 5759.68 and then deleted PIN 5759.44
PIN 5760.12 Local Bridge Painting and PIN 5759.60 Local Bridge Painting. Merged PIN 5760.12 into PIN 5759.60 and then deleted 5760.12
PIN 5759.92 Salt Road Bridge and PIN 5759.91 Salt Road Bridge. Merged PIN
5759.92 into PIN 5759.91 and then deleted PIN 5759.92
Amendment #9
(Resolution 2011-4)
Ballot-035
May 18, 2011 ITS Maintenance - Merged individual SFY PINs (5805.84, 5806.65, 5807.38,
5808.10, and 5808.11) into PIN 5805.84 for ease of project management and cost
savings. Created new PINs (5809.74, 5809.75, 5809.76 and 5811.79) out of existing
ITS blocks (5809.08 and 5809.73).
Administrative
Modification #12
(TPS Action)
Ballot-051
May 18, 2011 Transferred $175K of surplus funds resulting from low bid from PIN 5758.10 EC
Bridge Washing Program to PIN 5758.90 EC Bridge Painting Program to offset
cost increase.
Administrative
Modification #13
(TPS Action)
June 1, 2011 PIN 5758.17 Buffalo Harbor Bridge Project - Transferred $5.0M (from a total of
$6.2M) of TEA21 earmark funding for Demo ID NY100 from PIN 5755.80: Inner
Harbor Transportation Infrastructure Facility to 5758.17: Buffalo Harbor Bridge
Project. Revised title of PIN 5758.17 to "Buffalo Harbor Bridge and Transportation
Infrastructure Improvements, Inner Harbor"
Administrative
Modification #11
(PCC Action)
Ballot-054
3
June 1, 2011 PIN 5512.44 Rt. 33 Kensington Expressway - Changed original project limits from
[Rt. 198 to Dick Rd] to [Elm/Oak to Rt. 240]. Total lane-miles remain relatively
unchanged (41.82 vs. 41.76); same scope of work (mill and overlay) and no project
cost change.
Amendment #14
(PCC Action -
Resolution 2011-7)
June 13, 2011 §5317 New Freedom Program - Added three (3) new projects funded with a FTA
allocation for FFY 2009. Includes $54,020 to Hearts & Hands/Faith in Action
(5T1803); $195,925 to NFTA’s Metro Signage (5T1804) and $88,549 to NFTA’s
Paratransit Access Line program (5T1805).
Amendment #10
(Policy Action -
Resolution 2011-5)
Ballot-063
June 13, 2011 NFTA FFY 2011 Section 5307 Program Realignment - Incorporated program
changes, including the addition of one new project, LRRT Capital
Maintenance/Rehabilitation ($6M) as requested by the NFTA, to align program to
FFY 2011 congressional appropriations. Net change: +$1.126M.
Amendment #11
(Policy Action -
Resolution 2011-5)
Ballot-060
June 13, 2011 §5316 Job Access Reverse Commute (JARC) - Added three (3) new projects funded
with a FTA allocation for FFY 2009. Includes $93,128 to Community Services for the
Developmentally Disabled (5T1806); $206,180 to Buffalo Niagara Medical Campus,
Inc (5T1807). and $285,292 to the NFTA (5T1808).
Amendment #12
(Policy Action -
Resolution 2011-5)
Ballot-063
June 13, 2011 PIN 5209.62 - Exit 49@Rt. 78 (Transit Rd) – $0.435M to improve access, drainage,
safety and aesthetics of Park and Ride facility at NY State Thruway Exit 49. TEA 21=
$275K / NYSTA $105K / NYSDOT SDF $55K
Amendment #13
(Policy Action -
Resolution 2011-6)
Ballot-057
June 13, 2011 PIN 5RT1.10 - Sno-Seekers Trail Grooming Equipment – $0.189M from the
Recreational Trails Program to purchase a new trail groomer to properly maintain 120
miles of snowmobile trail system. Fall 2011 purchase.
PIN 5RT2.10 - Point of Meadow Gateway Enhancement Project – $0.175M
matched from the Recreational Trails Program to provide a connection trail linking
Meadow and Lake Sides with Delaware Park.
Amendment #15
(Policy Action -
Resolution 2011-9)
Ballot-056
June 15, 2011 Advances PIN 5755.46 - Elmwood Ave.; Forest Avenue - Scajaquada Expressway
from FFY 11/12 to FFY 10/11by delaying scheduling of PINs 5759.46 - Hopkins
Street Bridge, 5759.69 - Local Bridge Painting, and 5757.43 - Outer Harbor Trail
– Phase 2 to FFY 11/12.
Administrative
Modification #15
(TPS Action)
June 15, 2011 PIN 5807.77 – PMI Bridge Painting (11/12) separates funding block to create PIN
5811.75 – Bridge Painting Cattaraugus County; and separates funding block PIN
580778 – PMI Bridge Painting (12/13) to create PINs 5811.76 –Bridge Painting
Erie County & 5811.77 – Bridge Painting Cattaraugus & Chautauqua Counties.
Administrative
Modification #16
(TPS Action)
Ballot-061
June 15, 2011 PIN 5512.44 - Rt 33; Elm/Oak to Rt 240 – Letting date advanced from 6/12/14 to
2/14/13. Zero net offset for FFY11-FFY13.
Administrative
Modification #17
(TPS Action)
June 15, 2011 PIN 5392.43 - RT. 400/Rt. 16 Bridge Rehab – Letting date advanced from
12/15/2012 to 3/22/2012. $30K Construction Railroad Force Account added. Fiscal
constraint is conserved.
Administrative
Modification #19
(TPS Action)
Ballot-064
July 6, 2011 PIN 5105.38 – Rt. 39/Fisher Br. – Scope changed to add a second bridge replacement
(BIN 1024510 - RT 39 over Otis Creek) to the existing work scope. Project cost
increased by $2.437M. Fiscal constraint maintained by changing scheduling to other
NYSDOT projects.
Administrative
Modification #18
(PCC Action)
Ballot-064
July 6, 2011 PIN 5T14.41- PMI-PAVT MAINT LET & VPP SYF 12/13 – Separates the
pavement preventive maintenance block for Cattaraugus, Chautauqua, Erie & Niagara
Counties. CMAQ added to PIN 5811.70 for ADA compliance work.
Administrative
Modification #20
(PCC Action)
Ballot-065
July 6, 2011 PIN 5758.31 – Ewings Rd Bridge/18 Mile Creek – Increased funding for Prelim.
Design and ROW Inc. phases to the IPP estimate, added a Detailed Design phase to the
project and changed Design & ROW funding to HBP. $0.157 M increase offset from
Detailed Design phase of PIN 5757.10 - Lockport Rd Intersection Improvements.
Amendment #17
(PCC Action-
Resolution 2011-10)
Ballot-062
July 6, 2011 PIN 5758.57 - Feigle Rd Pavement Rehab - Added ROW Incidentals and Acquisition
phases to the project. Increase of $0.045 offset from Design phases of this project
($0.025 from Prelim & $0.020 from Detailed).
Amendment #18
(PCC Action-
Resolution 2011-10)
Ballot-062
4
July 27, 2011 PIN 5936.52 – Active Warning Device Upgrade FFY 2011 – Schedule change from
12/15/12 to 10/15/14. Project to be deleted on next TIP.
Administrative
Modification #23
(TPS Action)
Ballot-068
July 27, 2011 PIN 5755.42 – Niagara Falls Signals – Advanced the letting from 6/26/12 to 9/27/11.
Scoping phase ($.54M CMAQ) of PIN 5757.11 – Buffalo Niagara Demand
Management & Transportation Alternatives will be moved to FFY 12
Administrative
Modification #24
(TPS Action)
Ballot-067
August 3, 2011 Reconciled the §5309 - Transit Capital Investment Program estimate with the
actual Congressional appropriation. The overall fiscal constraint was maintained.
Administrative
Modification #21
(TPS Action)
Ballot-071
August 3, 2011 PIN 5757.84 - Route 5 Gateway/Big Tree Road Intersection - Minor scope change
to a local earmark project to enable a small amount of ROW to be acquired. Existing
funding reallocated within project.
Administrative
Modification #22
(PCC Action)
Ballot-069
August 22, 2011 Moved the scheduled FFY 2011 let dates for several projects to FFY 2012 to realign
them with current project schedules.
Administrative
Modification #25 (TPS
Action)
Ballot-070 Proposed Let Changes
PIN Title Sponsor TIP
Let Date
Proposed
Let Date
AQ
Classification
Comments
513432 RT 5 ATHOL SPRINGS SHORE PROTECTION Army Corps 6/2011 6/21/2012 N/A
575759 BNMC PHASE 2 STREETSCAPE IMPROVEMENTS City of Buffalo 12/2010 12/16/2011 Exempt-C2
575940 FRUIT BELT REDEVELOPMENT; CARLTON & HIGH ST City of Buffalo 2/2011 12/15/2011 Exempt-C14
575965 LOCAL BRIDGE JOINTS; CITY OF BUFFALO; ERIE COUNTY City of Buffalo 6/2011 12/15/2011 Exempt-A2
576016 BRIDGE JOINT REPLACEMENTS; CITY OF BUFFALO; SFY 11/12 City of Buffalo 6/2011 12/15/2011 Exempt-A2
576017 BRIDGE WASHING; CITY OF BUFFALO; SFY11/12 City of Buffalo 8/2011 12/15/2011 Exempt-A2
582212 CARS ON MAIN STREET BUFFALO City of Buffalo 6/2011 5/1/2012 Non-Exempt
575546 ELMWOOD AVE; FOREST AVE - SCAJAQUADA City of Buffalo 6/2011 11/30/2011 Non-Exempt
575752 MEADOW DR EXTENSION City of N. Tonawanda 12/2010 4/24/2012 Non-Exempt
546028 RT 384; VETERANS DRIVE - I-190 (PHASE I) City of Niagara Falls 12/2010 10/25/2011 Exempt-A10
576018 BRIDGE PAINTING; CITY OF NIAGARA FALLS;SFY 11/12 City of Niagara Falls 6/2011 12/14/2011 Exempt-A2
576019 BRIDGE GENERAL REPAIRS; CITY OF NIAGARA FALLS;SFY 11/12 City of Niagara Falls 6/2011 12/14/2011 Exempt-A2
575796 BUFFALO NY INTERMODAL CENTER PARKING FACILITY ECHDA 6/2011 9/15/2014 Exempt-B8
575525 SENECA ST/NORFOLK SOUTHERN Erie County 6/2011 12/15/2011 Exempt-A19
575749 TOWN OF EVANS MULTI-USE PATHWAY, PHASE II Erie County 6/2011 11/1/2011 Exempt-C2
575802 TOWN OF EVANS MULTI-USE PATHWAY, PHASE III Erie County 6/2011 6/15/2012 Exempt-C2
576013 BRIDGE DECK SEALING; ERIE COUNTY; SFY 11/12 Erie County 6/2011 12/15/2011 Exempt-A2
576015 BRIDGE MAINTENANCE ON THREE BRIDGES, NIAGARA CTY; SFY 11/12 Niagara County 6/2011 12/14/2011 Exempt-A2
576021 BRIDGE SCOUR PROTECTION; NIAGARA COUNTY; SFY 11/12 Niagara County 6/2011 12/14/2011 Exempt-A2
520961 AMHERST & ERIE COUNTY; RT 263 AND RT 78; ERIE & NIAGARA CO NYSDOT 9/2011 deleted Exempt-A10 Earmark Rescinded
520962 RT 78; GENESEE ST - MAIN ST NYSDOT 12/2011 12/1/2011 Non-Exempt oblig moved Sept to Oct.
575757 NIAGARA ST/TWO MILE CREEK; CULVERT REHAB NYSDOT 3/2011 12/13/2012 Exempt-A10
575769 S PARK AVE & LAKE AVE STREETSCAPE NYSDOT 3/2011 8/6/2012 Exempt-C14
575780 RT 277 UNION RD;CAZENOVIA CREEK TO RT 400 AURORA EXPY RAMPS NYSDOT 6/2011 2/23/2012 Exempt-C14
581133 PMI-US RT 20 & NY RT 5 & RT 951M NYSDOT 6/2011 12/1/2011 Exempt-A10 Changed to SDF
593296 SOWLES RD BSOR NYSDOT 3/2011 8/15/2012 Exempt-A1
552839 MILESTRIP RD (SNI) OVER I-90 THRUWAY 9/2011 9/15/2013 Exempt-A19
575664 AMHERST TO LOCKPORT CANALWAY TRAIL THRUWAY 12/2010 9/30/2015 Exempt-C2
575970 ROGERS RD & CLOVERBANK RD RAILROAD QUIET ZONES Town of Hamburg 8/2011 9/14/2012 Exempt-A1
575779 NIAGARA GORGE BICYCLE/PED TRAIL Town of Lewiston 3/2011 4/24/2012 Exempt-C2
575837 FOREST DR/SMOKES CREEK Town of Orchard Park 6/2011 6/15/2012 Exempt-A19
575801 EAST AURORA AND ROYCROFT CAMPUS CORP SCENIC BEAUTIFICATION Village of East Aurora 3/2011 4/24/2012 Exempt-C11
Misc. changes
PIN Title Sponsor TIP Let Date Proposed Let Date Comments
Exempt-C2 $0.098M STP Enhance not
needed per PM6/10/2010
Proposed Changes to FFY11 on TIP
575675 TOWN OF EVANS MULTI-USE PATHWAY PHASE I Erie CountyUNDER
CONST
August 30, 2011 PIN 5807.84: PMI – Bridge Cleaning, SFY11/12 – Moved $0.489M HBRR funds to
PIN 5811.46: PMI – Rt 277 and Electric Ave, Bridge Repairs to offset increase in
repair costs based on a recent inspection of the bridges showing much more
deterioration than originally thought.
Administrative
Modification #26 (TPS
Action)
Ballot-073
5
September 6, 2011 PIN 5512.51: Rt 33 [Rt 240 to Rt 952A] – New project addition to rehabilitate the
Kensington Expressway (Rt 33) between Harlem Rd (Rt 240) and Genesee St (Rt
952A); $4.788M NHS/$1.196M SDF; FFY13.
Amendment #16
(Policy Action-
Resolution 2011-11)
September 22, 2011 PIN 5934.19: Rural - Informational – Moved $0.273M of STP Rail funds to PIN
5936.40 – Eden Evans Center Road/CSXT Crossing, Town of Evans.
Administrative
Modification #27
(TPS Action)
Ballot-073
September 22, 2011 PIN 5TR3.05 – Rails to Trails Town of Pendleton – Project was withdrawn 3/22/10
and needed to be reauthorized and placed back on TIP/STIP. Additional funds being
allocated from Statewide Recreational Trails Program (RTP).
Administrative
Modification #28
(TPS Action)
Ballot-074
October 19, 2011 PIN 5758.32 – Wilson Burt Road over 18 Mile Creek – Approved adding $0.355M
to preliminary design phase by de-obligating preliminary design ($0.180M), detailed
design ($0.150M) and ROW Inc ($0.025M) from PIN 5758.31 - Ewings Rd over 18
Mile Creek.
Administrative
Modification #29
(TPS Action)
October 19, 2011 PIN 5086.22 - Sheridan Dr @ Kenmore - Moved $0.117M of HSIP Rail funds to
PIN 5936.59 - Roberts Rd/NS, Dunkirk. Administrative
Modification #30
(TPS Action)
Ballot-081
November 16, 2011 PIN 5757.13 – Lincoln Ave; Beattie Ave to Akron Rd - Adds $0.135M to the ROW
Inc. Phase and $0.402M to the ROW Acq. Phase due to revised cost estimate. Offset
from PIN 5006.98.
Administrative
Modification #31
(TPS Action)
Ballot-075
November 16, 2011 PIN 5811.70 – Broadway from US 62 to NY 277 and PIN 581147—NY Rt. 354
from the Buffalo ECL to Harlem Rd. Combine two projects into one letting under
PIN 5811.70.
Administrative
Modification #32
(TPS Action)
Ballot-078
November 16, 2011 PIN 5811.71 – PMI-NY RT 33; Harris Hill - Genesee County Line and PIN
5209.62 – RT 78; Genesee St - Main St (Park & Ride Facility Improvements).
Combines two projects into one letting under PIN 5209.62.
Administrative
Modification #33
(TPS Action)
November 18, 2011 PIN 5460.28 – Rt. 384; Veterans Drive to I-190 (Phase I) - Increased the
programmed Construction (+ $1.356M) and Inspection (+ $.654M) funding to the
PS&E estimate. Net=+$1.6M CBI new funding + match.
Administrative
Modification #14
Ballot-077
December 12, 2011 Added the following four (4) projects (all new funding – no offsets):
PIN 5T1821 Niagara Street Corridor Program - Niagara Frontier Transportation
Authority, $4.472M (Federal Transit Administration 2011 Bus Livability Grant
$3.577M / NFTA $.447M / NYSDOT $.447M)
PIN 5760.26 Ohio Street Inner Harbor Infrastructure Improvements - Erie
Canal Harbor Development Corporation, $9.60M (FHWA $7.68M / $1.92 ECHDC)
PIN 5T1820 Amherst-Buffalo Corridor Alternative Analysis - Niagara Frontier
Transportation Authority, $1.535M (Federal Transit Administration $1.228M /
NYSDOT $0.153M / NFTA $0.153M)
PIN 5760.25 - Tonawanda, Delaware St Reconstruction - City of Tonawanda,
$0.080M (NY052 $0.065M / $0.015M Local)
Amendment #21
Policy Action
(Resolution 2011-12)
Ballot-122
Ballot-115
Ballot-122
Ballot-083
December 21, 2011 PIN 5755.25 - Seneca Street over NS Railroad: Added $0.353M
PIN 5758.74 - Abbott Road over Neumann Creek: Added $0.075M Fiscal
constraint maintained by rescheduling ROW Acq. phase of PIN 5753.74 N. Forest
Rd.- Rt. 253-Dodge Rd: Moved $0.502M from FFY12 to FFY15 as offset
Administrative
Modification #34
(TPS Action)
Ballot-082
January 4, 2012 FTA §5310 Elderly and/or Disabled Specialized Transportation Program:
Federal Fiscal Year 2011 Program Awards: Approved the purchase of twenty-two
(22) vehicles for twelve agencies recommended by the NYSDOT’s Transit Bureau at
an estimated cost of $940,631. Net=+$752,505 FTA §5310
Amendment #20
PCC Action
(Resolution 2012-1)
MO STIP Action
January 25, 2012 PIN 5528.39 – Milestrip Rd over I-90 Bridge Rehab and PIN 5041.01 – Rt. 438
over I-90 Bridge Replacement deferred from FFY 2013 to 2014 as part of NYSTA
Capital Program Update
Administrative
Modification #35
(TPS Action)
January 25, 2012 PIN 5034.98 – Rts. 5 &20 Bridge over Catt Creek – Changed funding source for DD
from MISC FA to HBRR and moved funding from FFY 2010 to FFY 2012. Offset
comes from C & CI from PIN 5006.80 - CI Services for Bridge Painting at Various
Locations on Various Construction Projects
Administrative
Modification #36
(TPS Action)
Ballot-085
6
February 24, 2012 Major Program Realignment: Amends the 2011- 2015 TIP with a series of project
changes to delivery schedules, work scopes and costs in response to new funding
targets reducing anticipated federal highway allocations statewide. Agency changes are
as follows: Buffalo ($10.48M); Niagara Falls $16.67M; Erie Co. ($1.59M); Niagara
Co. ($11.63M); Misc. $11.22M; NYSDOT ($83.96M). Net reduction: ($79.76M.)
2012 (6 Mo.) 2013 2014 2015 2016 2017
5.644 11.070 11.287 11.400 4.481 6.099 49.981
12.251 24.502 24.502 24.747 25.242 25.746 136.990
5.327 10.655 10.655 10.761 7.119 11.196 55.713
3.440 6.857 6.834 6.913 7.099 7.286 38.429
6.434 12.867 12.867 12.996 13.256 13.521 71.941
3.615 7.231 7.231 7.303 7.449 7.598 40.427
0.453 0.906 0.906 0.915 0.933 0.952 5.065
0.800 1.599 1.599 1.615 1.647 1.680 8.940
1.757 3.513 3.513 3.548 3.619 3.692 19.642
State Dedicated Funds 23.439 46.937 47.100 47.548 45.485 47.723 258.232
Total Federal Amount 39.721 79.200 79.394 80.198 70.845 77.770 427.128
Total Amount 63.160 126.137 126.494 127.746 116.330 125.493 685.360
National Highway System
Region 5 Planning Targets
August 18, 2011
Fund SourceFederal Fiscal Year
Row Total
Surface Transportation Program Rural
Highway Safety Improvement Program
Column Totals
HBRR
Interstate Maintenance
Congestion Mitigation & Air Quality
Surface Transportation Program Flexible
Surface Transportation Program Large Urban
Surface Transportation Program Small Urban
Amendment #19
Policy Action
(Resolution 2011-18)
Ballot-079
March 7, 2012 Created eleven (11) new projects for local bridge maintenance activities from a block
of Federal Highway Bridge Program (HBP) funding previously reserved for this type
of work.
1. PIN 5760.27 Bridge Painting (4 Bridges); Erie County, $0.340M HBP/$0.085M
Match; 2/15/2013
2. PIN 5760.28 Bridge Washing (230 Bridges); Erie County, $0.240M HBP/0.060M
Match; 2/15/2013
3. PIN 5760.29 Deck Sealing (18 Bridges); Erie County, $0.100M HBP/$0.025M
Match; 12/6/2012
4. PIN 5760.30 Bridge Joints (3 Bridges); Erie County, $0.212M HBP/$0.053M
Match; 12/6/2012
5. PIN 5760.31 Bridge Washing & Sealing (37 Bridges); Niagara County, $0.056M
HBP/$0.014M Match; 4/25/2012
6. PIN 5760.15 Bridge Vertical Down (3 Bridges), Expansion Joint (1 Bridge) and
Superstructure Repairs (2 Bridges); Niagara County, $0.348M HBP/$0.087M
Match; 7/24/2012
7. PIN 5760.32 Bridge Washing (80 Bridges); Niagara County, $0.080M
HBP/$0.020M Match; 2/15/2013
8. PIN 5760.21 Bridge Scour Protection / Channel Erosion (7 Bridges); Niagara
County, $0.088M HBP/$0.022M Match; 5/29/2012
9. PIN 5759.65 Bridge Joints and Deck Overlay (2 Bridges); City of Buffalo,
$0.080M HBP/$0.020M Match; 6/13/2012
10. PIN 5759.69 Bridge Painting (1 Bridge); City of Buffalo, $0.1504M
HBP/$0.0376M Match; 6/13/2012
11. PIN 5760.33 Bridge Bearing Repairs (2 Bridges) and Bridge Approach Wall
Repairs (1 Bridge); City of Buffalo, $0.552M/$0.138 M Match; 12/13/2012
Amendment #23
PCC Action
(Resolution 2012-4)
Ballot-091
March 7, 2012 PIN 5759.68 - Tifft Street Pier, Industrial Heritage Trail, Lake Kirsty Dock -
Added $0.403M TEP funds to cover costs of low bid. These new funds were made
available by Main Office using Statewide TEP funds remaining from previous
program. No offset required.
Administrative
Modification #37
(PCC Action)
Ballot-089
March 15, 2012 PIN 5045.24 – Lewiston Rd [Ontario St to NF NCL] – Added $4.364M CBI funds
to increase the programmed Construction and Inspection funds for screening and
disposal of radioactive contaminated material as well as contract item adjustments. +
$3.491M CBI, $.873M Local. New funding so no offset required.
Amendment # 24
(PCC Action)
Resolution 2012-7
Ballot-090
March 21, 2012 PIN 5760.16 – Bridge Joint Replacements merged into PIN 5759.65 – Local Bridge
Joints and PIN 5760.16 deleted. No offset is required. Overall project cost remains
the same. Combining these projects will result in improved construction
administration, easier contractor bidding & possible bid cost savings.
Administrative
Modification #38
(TPS Action)
Ballot-094
March 21, 2012 PIN 5933.69 – BSOR Active Warning Device Upgrade - This project was on the
2002-2006 TIP and was under funded. An additional $0.076M STP Rail needed to
bring the project to construction. Funding offset from PIN 5936.46 Walker Rd
Crossing (Chautauqua County) which is slipping from FFY12 to FFY14.
Administrative
Modification #39
(TPS Action)
Ballot-093
7
March 21, 2012 PIN 5936.50 - Ensminger Rd; CSX Niagara and PIN 5936.51 - Franklin St.; CSX
Niagara – Let dates for both projects moved from FFY12 to FFY13. The railroad has
fallen behind on current projects and cannot make the current schedule.
Administrative
Modification #40
(TPS Action) Ballot-093
March 21, 2012 PINs 5936.53 and 5936.54 - Active warning device upgrade, Norfolk Southern
various locations - Let dates for both projects moved from FFY13 to FFY15. They are
slipping due to over programming in FFY12
Administrative
Modification #41
(TPS Action)
Ballot-093
March 22, 2012 Added the following two (2) new projects:
1. PIN 5760.39 – Buffalo Main Street Revitalization: 500 Block, City of Buffalo,
$18.75M (New TIGER III FHWA Grant $15.0M / Buffalo $3.757M); FFY12
2. PIN 5934.25 – West Blood Rd. RR Crossing Improvements, Town of Elma,
$0.220M (STP Rail $0.198M / NYSDOT $0.022M) ; FFY12; Funding offset from
2 deleted projects (5933.86 & 5934.17)
Amendment #22
Policy Action
(Resolution 2012-3)
1. Ballot-103
2. Ballot-095
April 18, 2012 Modified three (3) projects:
1. PIN 5756.15 – Lehigh Valley Multi-Use Trail: slipped the project let date.
Federal funds have been withdrawn and the request for a waiver to reinstate
funding was denied.
2. PIN 5822.12 – Cars on Main Street (600 Block): moved detailed design funds
(SAFETEA-LU) to Construction and Construction Inspection.
3. PIN 5757.45 – Graycliff Public Access Enhancement: added ROW Incidental,
ROW Acquisition & Preliminary Design phases & increased the Detailed Design
phase. Funds were transferred from the Construction phase.
Administrative
Modification #42
(TPS Action)
1. Ballot-098
2. Ballot-097
3. Ballot-099
April 18, 2012 1. PIN 5051.10 – I-190 Buffalo Avenue: changed the fund source in Preliminary &
Detailed Design from Intermodal (IM) to Coordinated Border Infrastructure (CBI).
$0.060M in Preliminary Design transferred to Detailed Design.
2. PIN 5757.14 Niagara Street Gateway (Carolina to Elmwood): Additional funds
were needed to design the project. Moved $75K allocated funds from Construction
to Design. No offset required as overall project cost remains the same.
Administrative
Modification #43
(TPS Action)
1. Ballot-100
2. Ballot-121
May 2, 2012 PIN 5757.76 – Fillmore Ave (N. Parade to E. Ferry): Added $1.1M of City of
Buffalo bond funds to facilitate construction of entire project. Fiscal constraint
maintained without additional state or federal funds.
Administrative
Modification #44
(PCC Action)
Ballot-114
May 16, 2012 PIN 5512.53 – Ped Bridges over Rt. 33: Slipped let date and changed funding from
HBRR to STP Flex. No offset needed.
PIN 5086.22 – Sheridan Dr EXT (Rt. 325) from Rt. 266 to Rt. 324: Moved excess
federal funds for design phase to a needed RR Force Account and C & CI. No offset
needed.
PIN 5822.12 – Cars on Main St (600 Block): Increased construction by $450K due to
funding shortage to integrate LRRT train control system. Offset provided by
NYSDOT. Buffalo will transfer $450K from PIN 5758.23 – South Ogden/Mineral
Springs to NYSDOT PIN 5807.80: PMI Bridge Painting.
Administrative
Modification #45
(TPS Action)
1. Ballot-105
2. Ballot-101
3. Ballot-102
June 12, 2012 Added four (4) new projects funded by the Federal Fiscal Year (FFY) 2010 §5316 Job
Access Reverse Commute (JARC) Program:
1. PIN 5T1810 - Fill-in the Gap Transportation Program; $0.186M ($0.093M
§5316 / $0.093M local match).
2. PIN 5T1811 - The BNMC Guaranteed Ride Home Program; $0.050M
($0.036M §5316 / $0.014M local match).
3. PIN 5T1812 - Late Night & Weekend Public Transportation Service; $0.604M
($0 .302M §5316 / $0.302M local match).
4. PIN 5T1813 - Heritage Centers Mobile Work Crew Transportation Program;
$0.231M ($0.128M §5316/ $0.103M local match).
Added three (3) new projects funded by the FFY 2010 §5317 New Freedom Program:
1. PIN 5T1814 - Hearts & Hands: Faith in Action Transportation Program; $0.225M ($0.1125M §5317 /$0 .1125M local match).
2. PIN 5T1815 - The Liberty Mobility Service Program; $0.248M ($0 .198M
§5317 / $0.050M local match).
3. PIN 5T1816 - Assessing the Need: Seniors and the Disabled with Buffalo
CarShare; $0.026M ($0.021M §5317 / $0.005M local match).
Amendment #25
Policy Action
(Resolution 2012-8)
Ballot-106
Ballot-107
8
June 12, 2012 Added four (4) new highway/railroad crossing projects for 2013 using Highway Safety
Improvement Program funding. 2012 Construction:
PIN 5933.23 - Rogers Road, CR 464 Crossing of CSX Lakeshore Mainline, $.326M
PIN 5933.24 - Rogers Road, CR 464 Crossing of Norfolk Southern Mainline, $.300M
PIN 5933.26 - Cloverbank Road crossing of CSX Lakeshore Mainline, $.326M
PIN 5933.27 - Cloverbank Road crossing of Norfolk Southern Mainline, $.300M
Amendment #26
Policy Action
(Resolution 2012-10)
Pending
June 12, 2012 Added three (3) new safety projects:
1. PIN 5812.14 – Signal Pedestrian Upgrades: $1.22M from existing 12/13 Safety
Block 5T1453 funds. Let date 2/13.
2. PIN 5806.58 – Pavement Markings: $.677M from existing 12/13 Safety Block
5T1453 funds. Let date 11/12.
3. PIN 5758.22 – Strickler Rd (CR 269) @ County Road (CR 282) intersection safety
improvements: $440K from High Risk Rural Roads Funding program. Let date
6/12.
Amendment # 27
Policy Action
(Resolution 2012-10)
1. Ballot-107
2. Ballot-107
3. Ballot-111
June 20, 2012 PIN 5755.43- E. Robinson (N. French); Rt 62 – Sweet Home Road: Transferred
funds ($0.810M STP Urban) from the Construction Phase to the ROW Phase.
Transferred unobligated dollars ($0.343M STP Urban) from PIN 5755.19 - Wehrle
Dr; Ellicott Creek – Transit.
Administrative
Modification #46
(TPS Action)
Ballot-108
June 20, 2012 PIN 5757.53 – Erie Canalway National Heritage Corridor: Added $0.242M to
Detailed Design Phase from Construction Phase. This project is funded solely by a
SAFETEA-LU Earmark. Project was on previous 2008-2012 TIP & STIP.
Administrative
Modification #47
(TPS Action)
Ballot-109
July 18, 2012 PIN 5757.13 – Lincoln Ave Corridor Improvements: Delayed letting from 6/5/13 to
12/17/13 due to length of ROW acquisition phase.
Administrative
Modification #48
(TPS Action)
Ballot-112
July 18, 2012 Funding within the NFTA’s FFY 2012 Section 5307 program was realigned in
anticipation of congressional appropriations and added three (3) new projects to the
NFTA’s Section 5307 program-of-projects for Federal Fiscal Year (FFY) 2012:
Bus Maintenance: $0.160M FTA §5307 / $0.040M Local
Transit Planning Projects: $0.520M FTA §5307/ $0.130M Local
LRRT Capital Maintenance/Rehabilitation: $3.66M FTA §5307/$0.916M
Local
PIN 5T1534:NYSDOT Pavement Preventive Maintenance work in State Fiscal
Year (SFY) 13/14 was split into fifteen (15) specific projects throughout Erie and
Niagara Counties utilizing $0.799M NHS/$0.200M SDF, $5.934M STP
Flex/$1.484M SDF, and $0.778M STP Large Urban/$0.194M SDF.
Amendment # 28
Policy Action
(Resolution 2012-14)
(See AdMod #49)
Ballot-116
9
July 18, 2012 NFTA 5307 Program Adjustment - Final FTA §5307 grant appropriation was
~$224K less than anticipated in Amendment #28 (Resolution 2012-14) for FFY
2012.
Administrative
Modification #49
(TPS Action)
Ballot-118
August 31, 2012 Moved the scheduled FFY 2012 let dates for several projects to FFY 2013 to realign
them with current project schedules.
Administrative
Modification #50
(TPS Action)
Ballot-120
Existing TIP Projects with Construction Phase Moving from FFY12 to FFY13
PIN Title Sponsor
A-Q
Designation
Current
Let Date
Proposed
Let Date
575743 OUTER HARBOR TRAIL PHASE 2 City of Buffalo Exempt -C2 6/15/2012 2/26/2013
575969 LOCAL BRIDGE PAINTING; CITY OF BUFFALO City of Buffalo Exempt -A19 6/1/2012 12/14/2012
575776 FILLMORE AVE; NORTH PARADE AVE. - EAST FERRY ST. City of Buffalo Exempt -A10 10/16/2012 12/17/2012
575628 NIAGARA FALLS INTERNATIONAL RAIL STATION / INTERMODAL CENTER City of Niagara Falls Exempt -C14 3/1/2012 1/15/2013
576018 BRIDGE PAINTING; CITY OF NIAGARA FALLS;SFY 11/12 City of Niagara Falls Exempt -A19 12/1/2011 12/18/2012
576019 BRIDGE GENERAL REPAIRS; CITY OF NIAGARA FALLS;SFY 11/12 City of Niagara Falls Exempt -A19 12/1/2011 12/18/2012
575727 TAYLOR DR/LITTLE RIVER City of North Tonawanda Exempt -A19 3/15/2012 1/29/2013
575752 MEADOW DR EXTENSION City of North Tonawanda Non-Exempt 4/1/2012 3/26/2013
575749 TOWN OF EVANS MULTI-USE PATHWAY PHASE II Erie County Exempt -C2 5/17/2012 3/1/2013
575775 ECC TRANSPORTATION IMPROVEMENTS Erie County Exempt -C3 6/1/2012 1/15/2013
575543 E ROBINSON(N FRENCH);RT 62-RT 952T Erie County Non-Exempt 10/11/2012 3/1/2013
593369 FAIRGROUNDS RD BSOR NYSDOT Exempt -A8 8/1/2012 10/15/2012
575358 PEACE BRIDGE CONG. RELIEF Peace Bridge Authority Non-Exempt 6/4/2012 6/15/2015
575838 REIN ROAD/ELLICOTT CREEK Town of Cheektowaga Exempt -A19 4/2/2012 3/1/2013
575970 ROGERS RD & CLOVERBANK RD RAILROAD QUIET ZONES Town of Hamburg Exempt -A8 9/1/2012 5/1/2013
575779 NIAGARA GORGE BICYCLE/PED TRAIL Town of Lewiston Exempt -C2 6/1/2012 11/19/2013
575837 FOREST DR/SMOKES CREEK Town of Orchard Park Exempt -A19 6/15/2012 12/13/2012
575769 S PARK AVE & LAKE AVE STREETSCAPE Village of Blasdell Exempt -C14 8/15/2012 1/10/2013
575801 CONSTRUCTION OF AND IMPROVEMENTS TO MAIN ST TOWN OF AURORA Village of East Aurora Exempt -C11 5/1/2012 12/18/2012
September 5, 2012 PIN 5756.89 Seneca Creek Road Pathway – Scope change. West/east project
termini were changed to Indian Church Rd and Borden Rd respectively.
Net change = 0.
Amendment # 29
PCC Action
(Resolution 2012-12)
September 19, 2012 PINs 5933.95 (Sheldon/DLW); 5936.49 (Buffalo Rd/CSX); 5936.50
(Ensminger/CSX) & 5936.51 (Franklin St/CSX) – All railroad crossing
improvements (new gates and flashers with new circuitry) moved to FFY 2015.
Administrative
Modification #52
(TPS Action)
Ballot-124
10
September 19, 2012 PINs 5808.27; 5034.98; 5086.27; 5808.28; 5808.29 & 5T14.54 – ADA project
mergers to consolidate work under fewer contracts, along with a minor reallocation
of existing funds to maintain fiscal constraint.
Administrative
Modification #53
(TPS Action)
Ballot-125
October 3, 2012 PIN 5051.10: I-190/Buffalo Ave / PIN 5019.17: Rt. 265 & I-190/Power Res.; Ph1
– Approved cost increase from $7.06M to $ 9.067M offset with $1.407M 2012
Highways for LIFE grant and a $0.750M increase of Coordinated Border
Infrastructure (CBI) funds. $0.150M of extra CBI funds transferred from PIN
5051.10 to PIN 5019.17 [Rt. 265 & I-190/Power Reservoir; Phase 1]. Fiscal
constraint is maintained with new funding.
PIN 5758.38: Rein Rd over Ellicott Creek - New Right of Way Incidental and
Right of Way Acquisition phases created by moving $0.020M from construction.
Fiscal constraint is maintained.
PIN 5812.14: Signal Pedestrian Upgrades - $0.728M transferred to a new PIN
5812.23 [ADA Compliance and Signal Pedestrian Upgrades, US Route 62
(Niagara Falls Boulevard) and NY Rt. 950K (Niagara Falls Boulevard)] to
separately advance a portion of this project scope to bring various locations within
the project limits into compliance with ADA requirements for pedestrian
accessibility. Fiscal constraint is maintained.
Amendment # 31
PCC Action
(Resolution 2012-17)
Ballot-127
October 17, 2012 PIN 5756.28: NIAGARA FALLS INTERNATIONAL RAIL STATION -
Moved funding ($0.365M of $24.732M – Federal Transit Administration TIGER
Grant) from Construction Inspection Phase to the Detailed Design Phase. No offset
needed.
Administrative
Modification #51
(TPS Action)
Ballot-128
November 21, 2012 Added $0.12M funding to PINs 5933.22: New automatic gates, flashers with new
circuitry at Main St/CSX, Town of Angola and 5933.43: New automatic gates,
flashers with new circuitry at Robinson St/City of North Tonawanda. The
construction for both these projects has been completed. Due to over runs,
additional funds are needed to finalize both projects. Offsets for this action are
from PINs 5936.55: Active warning device upgrade, Erie/Chautauqua Counties
and 5936.56: Active warning device upgrade, Erie/Chautauqua Counties which
will be slipping from FFY13 to FFY15.
Administrative
Modification #55
(TPS Action)
Ballot-131
November 21, 2012 Merged two existing projects into PIN 5086.22: Sheridan Dr Ext. (Rt.325) from
Rt. 266 to Rt. 324 so all three could be let together under one PIN.
PIN 5086.22: Sheridan Dr Ext. (Rt.325) Rt. 266 to Rt. 324 (PIN retained)
PIN 5756.76: Sherwood – Two Mile Creek Gateway (PIN deleted)
PIN 5812.21: PMI-NY 324 from NY 325 to NY 384 (PIN deleted)
Additionally a $0.448M share from NYS Thruway is being added to PIN 5086.22
Administrative
Modification #56
(TPS Action)
Ballot-134
December 5, 2012 PIN 5759.91 Salt Road Bridges - Added new right-of-way (ROW) incidental and
acquisition phases at a cost increase of $0.035M ($0.028M HBRR / $0.007M local
match). Offset from deleted PIN 5760.38.
Amendment # 33
PCC Action
(Resolution 2012-24)
Ballot-133
December 5, 2012 PIN 5760.26 Ohio St. & Inner Harbor Infrastructure - Moved $760K from
Preliminary Design & Construction phases into Detailed Design phase. Fiscal
constraint is maintained as funds are being transferred within the same PIN and
same FFY.
Administrative
Modification #54
PCC Action
Ballot-132
December 14, 2012 Two (2) new projects were added:
PIN 5812.10 PMI-Bridge General Repairs: I-190@Virginia/Carolina Ramps;
City of Buffalo. This action allocates maintenance block funds for a new project
to repair or replace deficient bridge elements and extend the service life of the
bridge. Total cost is $1.959M and construction is anticipated in spring
PIN 5759.01 Ransomville Rd (CR17) at Braley Rd; Town of Porter. This
requested change would utilize High Risk Rural Road program funds to improve
sight distance at the intersection at a total cost of $0.104M. Construction is
anticipated in spring 2015.
Amendment # 30
Policy Action
(Resolution 2012-18)
December 14, 2012 Three (3) new projects were added:
PIN 5758.98 and PIN 5758.99: Local Bridge Maintenance projects (SFY 13-4
and SFY 14-15) to perform maintenance work on 460 bridges located in Buffalo,
Erie and Niagara Counties at a total cost of $5.085M. HBBR funds will be used
Amendment # 32
Policy Action
(Resolution 2012-20)
Ballot-135 (all)
11
for PIN 5758.98. NHPP and STP funds will be used for PIN 5758.99. Fiscal
constraint will be maintained as these projects use existing block funds. Work is
anticipated to commence in spring 2013.
PIN TWY B.18 to perform panelized deck replacement on the North Grand
Island Bridge, southbound structure and substructure repairs of the Northbound
and Southbound Bridges at a total cost of $76.75M: $54.36M NHPP / $22.39M
Thruway. Construction is anticipated in spring 2013 and fiscal constraint will be
maintained as this uses new funds.
December 14, 2012 Six (6) new projects funded with Federal Transit Administration allocations for
Federal Fiscal Year (FFY) 2011 were added:
§5316 Job Access Reverse Commute Program (3 projects): $249,852 to
Buffalo Niagara Medical Campus, Inc.(5823.50); $169,606 to NFTA (5823.51)
and $139,546 to Heritage Centers (5823.52).
§5317 New Freedom Program (3 projects): $130,150 to Hearts & Hands: Faith
in Action (5823.53), $109,765 to Liberty Transportation, Inc. (5823.54) and
$94,011 to Erie County Department of Senior Services (5823.55).
Amendment # 34
Policy Action
(Resolution 2012-23)
Ballot-146
December 19, 2012 Two (2) projects were modified.
PIN 5812.10 - Bearing Replacements City of Buffalo, Erie County. Changed a
portion of the funding source in Construction from SDF to HBRR. This action is
part of a funding swap for PIN 5757.55 Millennium Parkway, Chautauqua
County. Overall project cost did not change.
PIN 5811.49 - Large Culvert Replacements on RTs 5, 31, 277, 353. Changed
the funding in Detailed Design phase from SDF to STP Flex. This project has
federal funding for all phases except design. $0.350M STP Flex available from
ROW phases. Fiscal constraint is maintained.
Also approved a revised IPP for PIN 5757.95 BNMC Phase 3 consistent with the
intent of the original earmarked funding language, removed all Marchiselli funding,
and adjusted costs to match final NY691 obligation authority.
Administrative
Modification #57
PCC Action
Ballot-134
Ballot-149
January 16, 2013 Merged two projects: PIN 5760.44 – Bridge Deck Overlay Project & PIN 5760.45
– Bridge Joint Replacement Project, into one letting (PIN 5740.44) to facilitate
improved administration, construction, and streamline contractor bidding with
possible bid cost savings. No offset required as project funding just combined.
Administrative
Modification #58
TPS Action
Ballot-135
January 16, 2013 PIN 5757.14 – Niagara Street Gateway: Carolina to S. Elmwood – Changed
letting date and increased cost $300K to accommodate expanded intersection work
at Carolina/Niagara necessary to mitigate safety concerns with I-190 ramp flows. (+
$240K Federal (STP Urban/NHS) / +$12K State / +$48K Local) Funding offset
from PIN 5758.64 - Project Development Technical Modeling Services.
Administrative
Modification #59
TPS Action
Ballot-137
February 9, 2013 PIN 5757.57 Niagara St/Two Mile Creek Culvert Rehab - Right-of-way
(ROW) phases added along with a cost increase to Construction and Construction
Inspection phases of $0.419M (+ $0.365M STP Urban / -$0.047M SDF /
+$0.101M local match). The offset is from surplus STP Urban funds from PINs
5807.85 and 5812.09.
Ten (10) new projects added under the statewide Safe Routes to School (SRTS)
program totaling $3.64M in new SRTS funding. PIN 5760.65 – Town of
Amherst $0.642M, PIN 5760.66 – Green Options Buffalo/Go Bike Buffalo
$0.15M, PIN 5760.67 – City of Buffalo $0.494M, PIN 5760.68 – Town of
Grand Island $0.205M, PIN 5760.69 – Village of Orchard Park $0.392M, PIN
5760.70 – Village of Williamsville $0.463M, PIN 5760.71 – Village of
Gowanda $0.65M, PIN 5760.72 – Town of Lockport $0.570M, PIN 5760.73 –
Town of Porter $0.015M, PIN 5760.74 – Lewiston Police Department
$0.055M
Amendment # 35
PCC Action
(Resolution 2013-1)
Ballot-137
Ballot-142
March 6, 2013 PINs 5760.33 & 5760.50 Buffalo Bridge Repairs - Moved the approach wall
repairs ($0.260M fed+match) for Ohio Street over CSX RR ( BIN 2260620 ) from
PIN 5760.33 to PIN 5760.50. The reason for the change is that acquiring the permit
for BIN 2260620 will impact the proposed March letting for PIN 5760.33. In
addition, BIN 2260620 and the 2 structures for PIN 5760.50 require similar railroad
permitting. Fiscal constraint is maintained by transferring of funds between the two
similar projects.
Administrative
Modification #60
PCC Action
Ballot-139
12
March 6, 2013 PIN 5755.43 E. Robinson Road - Additional funds ($2.807M STP Urban matched)
were needed for construction. Funds will be transferred from PIN 5753.74 North
Forest Road. Transferred funds provide offset to cost increase and fiscal constraint
is maintained.
Administrative
Modification #61
PCC Action
Ballot-140
March 20, 2013 PIN 5934.04 Martin Rd - Slipped the let date for this project from FFY13 to
FFY15 as it is a low priority for BPRR. No cost change. Fiscal constraint is
maintained.
Administrative
Modification #63
TPS Action
Ballot-143
March 25, 2013 PIN 5760.80 U.S., N.Y. Gateway Connections Improvements To Peace Bridge (+$19.255M NY 680, +$2.745 SDF = $22M) split from existing PIN 5753.58 Peace
Bridge Congestion Relief (-$19.255M NY 270, NY 680) to advance access
improvements to the Peace Bridge consistent with the intent of the original
earmarked funding language. No increase in overall cost & funds are federal
earmarks. Fiscal constraint is maintained.
Administrative
Modification #62
TPS Action
Ballot-144
April 3, 2013 PIN 5812.26 - General Bridge Repairs - created a new project to perform general
repairs on (10) ten area bridges, and will utilize $1.209M of federal HBRR funding
($1.76M matched total) previously reserved for such purposes as block funding
under PIN 5T15.24. Fiscal constraint is maintained as this action uses existing block
funds.
Amendment # 36
PCC Action
(Resolution 2013-2)
Ballot-148
April 17, 2013 PIN 5756.28 – CNF Rail Station - Transferred $0.181M of earmark funding to
PIN 5757.92 CSX RAILROAD BRIDGES OVER RT 104, both parts of the same
intermodal project.
Administrative
Modification #64
TPS Action
May 1, 2013 PIN 5809.08 Regional Arterial Mgmt System - Transferred $1.7M CMAQ to PIN
5755.54 ITS/Incident Management Phase 4B. In addition, the remainder of
SAFETEA-LU Earmark NY 572 ($0.098M) transferred from PIN 5209.62 RT 78;
Genesee St - Main St & Rt 33; Harris Hill -Genesee CL to PIN 5809.08
Regional Arterial Mgmt System.
Administrative
Modification #65
PCC Action
Ballot-147
May 1, 2013 PIN 5760.26 - Ohio Street & Inner Harbor Infrastructure; Rt 5 - Michigan
Avenue. - Funding transfers affecting three separate projects to cumulatively
increase the total project cost from $6.296M to $11.49M:
Shifted $20K from ROW phase
PIN 5755.80 (Inner Harbor Infrastructure Facility) - moved $866K from
C&CI. Also deleted $7.1M that was rescinded via Feingold amendment.
PIN 5757.43 (Outer Harbor Trail – Phase 2) - moved $1.200M from C&CI.
PIN 5758.17 (Outer Harbor Bridge) - moved $3.109M from Detail Design.
Administrative
Modification #66
PCC Action
Ballot-151
May 1, 2013 PIN 5757.53 Erie Canalway National Heritage Corridor – Flight of 5 Locks -
Moved up the letting from 6/15/2016 to 6/24/2013. Federal earmark, no offset is
required. Overall project cost remains the same.
Administrative
Modification #67
PCC Action
Ballot-150
May 15, 2013 PIN 5760.18 Bridge Painting of Porter Ave over CSX RR - Added $212K HBRR
funding to cover the low bid amount. Additional funding transferred from PIN
5758.99 – Local Bridge Maintenance Program block. Fiscal constraint is
maintained.
Administrative
Modification #68
TPS Action
June 5, 2013 PIN 5757.17 – Niagara Street Gateway; Carolina/Virginia to Niagara Sq –
Merged existing federal-aid project (PIN 5757.14) with adjacent $2M City of
Buffalo local project (+$2M local funding) on Niagara Street between Virginia and
Porter Ave. Combining will result in improved administration, easier contractor
bidding and possible savings.. Original federal-aid project is unmodified. Added
project uses all local funding. Fiscal constraint is maintained.
Administrative
Modification #69
PCC Action
NOTE:
All TIP amendments and their associated changes have been included in the fund source project tables. Full descriptions of each TIP
Amendment and Administrative Modification are available through the GBNRTC or the NYSDOT Region 5 office.