Fall, 2002
22
Exam 2
0 0
1
8
6
20
12
0
5
10
15
20
25
< 40 < 50 <60 <70 <80 <90 <100
33
Scores
• Average 81
• Std. Dev: 11
• Remember: All questions about grading submitted IN WRITING
• Probably made mistakes
• Happy to review grading
• Unwilling to discuss grading
44
Causes of Bullwhip Today
• Product Proliferation/Mass Customization– More varieties of products
• Build-to-Order – Prohibits pooling orders to smooth
requirements
• Lean– Prevents pooling releases to smooth
demand on the supply chain
55
Why Lean (Just-In-Time)?
• Reduces inventory– Capital requirements– Etc
• Reduces handling – Direct-to-Line
• Improves Quality – See problems quickly
• Increases launch speed
66
Why Not Lean?
Capacity
• Changes in requirements create upstream inventory
• Changes in requirements raise transport costs
Reliability
• Distant supplies subject to disruption
77
Lean Works
When
• Total volume is relatively constant
• Product variety is limited
• Changeovers are fast and cheap
• Suppliers are nearby
88
US Auto Industry
• Total volume is relatively constant
• Product variety is limited
• Changeovers are fast and cheap
• Suppliers are nearby
99
How Lean Works
• Manufacturer has standing PO with supplier– Releases permission to supply against that PO
– Daily quantities or even more frequent to match planned production
1010
How Lean Works
Daily Reciept
0
200
400
600
800
1000
1200
1400
01-Apr-02 06-Apr-02 11-Apr-02 16-Apr-02 21-Apr-02 26-Apr-02
1111
A Financial Model
Cash Acct
From Revenues
Cash Expenses
1212
Invest
Sell Assets
A Financial Model
Cash Acct
From Revenues
Cash Expenses
1313
Controls
When Cash balance reaches here
Invest enough to bring it to here
1414
Controls
When Cash balance falls to here
Sell assets to bring it to here
1515
Controls
T
b
t
1616
Trade-offs
• Opportunity cost of Cash Balance• Transaction costs of investing and
selling assets• Set the controls, T, t and b to balance
these costs
1717
Inventory Analogy
• Cash Expenses Daily Production reqs.• From Revenue Constant supplies• Sell Assets Expedited order• Invest Excess Curtailed order
1818
Trade-offs
• Opportunity cost of Cash Balance
• Transaction costs of investing and selling assets
• Cost of holding Inventory
• Supply chain costs of expediting and curtailing orders
• Set the controls, T, t and b to balance these costs
1919
Cost Components
Cost of Inventory
• H: an interest rate on the value of the goods ($/item/year)
Cost of Expediting• E: extra transport costs (above std) ($/event)
Cost of Curtailing• C: disruption costs - savings over std transport
($/event)
2020
Total Cost
• Minimize H*Average Inventory Level E*Expected number of times we expedite C*Expected number of times we curtail
2121
Simple Model
• Simple model of production requirements
Probability
• Avg demand: a units/day 1 – 2p
• Above avg demand: a + units p
• Below avg demand: a - units p
• Standard Supply: a units/day
2222
A Markov Process
0 2 b Tt… … …
“Cash Balance”
p p p p p
p p p p p
1
1
1-2p
2323
Transition Matrix
0 … b … t … T0 0 0 0 0 0 1 0 0 0 0 p 1-2p p 0 0 0 0 0 0 0 0 p 1-2p p 0 p 1-2p p… 0 p 1-2p p
b 0 p 1-2p p… 0 p 1-2p pt 0 p 1-2p p
… 0 p 1-2p pT 0 0 0 0 0 0 0 1 0 0
Drop . So k refers to k
Instead of b, t, T we find b, t, T
2424
Steady State Probabilities (i): Steady state probability “cash balance is
i* (0) = p(1) • 2p(1) = p(2) • 2p(i) = p(i-1)+p(i+1), i=2, 3, …, b-1• 2p(b) = (0) + p(b-1)+p(b+1) • 2p(i) = p(i-1)+p(i+1), i=b+1, b+2,…, t• 2p(t) = (T) + p(t-1)+p(t+1)• 2p(i) = p(i-1)+p(i+1), i=t+1, t+2,…, T-2• 2p(T-1) = p(T-2) (T) = p(T-1)
2525
Steady State Probabilities (i): Steady state probability “cash balance is i* (0) = p(1) => (1) = (0)/p• 2p(1) = p(2) => (2) = 2(1) = 2(0)/p• 2p(i) = p(i-1)+p(i+1), i=2, 3, …, b-1• 2p(b) = (0) + p(b-1)+p(b+1) • 2p(i) = p(i-1)+p(i+1), i=b+1, b+2,…, t• 2p(t) = (T) + p(t-1)+p(t+1)• 2p(i) = p(i-1)+p(i+1), i=t+1, t+2,…, T-2• 2p(T-1) = p(T-2) == (T-2) = 2(T-1) = 2(T)/p (T) = p(T-1) == (T-1) = (T)/p
2626
Steady State Probabilities (i): Steady state probability “cash balance is i* (0) = p(1) => (1) = (0)/p• 2p(1) = p(2) => (2) = 2(1) = 2(0)/p• 2p(i) = p(i-1)+p(i+1), i=2, 3, …, b-1
• 2p(2) = p(1)+p(3) == 4(0) = (0)+p(3) (3) = 3(0)/p
• 2p(i) = p(i-1)+p(i+1) • 2i(0) = (i-1)(0)+p(i+1) • (i+1) = (i+1)(0)/p
2727
Steady State Probabilities (i): Steady state probability “cash balance is i* (T) = p(T-1) => (T-1) = (T)/p• 2p(T-1) = p(T-2) => (T-2) = 2(T-1) = 2(T)/p• 2p(i) = p(i-1)+p(i+1), i=t+1, t+2,…, T-2• 2p(T-2) = p(T-1)+p(T-3) == 4(T) = (T)+p(T-3)
(T-3) = 3(T)/p
• 2p(T-i) = p(T-i+1)+p(T-i+1) • 2i(T) = p(T-i-1)+(i-1)(T) • (i+1)(T) = p(T-i-1) (T-i-1) = (i+1)(T)/p
2828
Summary
(i) = i(0)/p, i=1, 2, …, b (T-i) = i(T)/p, i=1, 2, …, T-t
• Still have to solve• 2p(b) = (0) + p(b-1)+p(b+1) • 2p(i) = p(i-1)+p(i+1), i=b+1, b+2,…, t• 2p(t) = (T) + p(t-1)+p(t+1)
2929
Between b and t
• 2p(b) = (0) + p(b-1)+p(b+1)
• 2b(0) = (0) + (b-1)(0)+p(b+1) • b(0) = p(b+1) (b+1) = b(0)/p
3030
Summary
(i) = i(0)/p, i=1, 2, …, b (T-i) = i(T)/p, i=1, 2, …, T-t
• We just solved• 2p(b) = (0) + p(b-1)+p(b+1) (b+1) = b(0)/p• Now we have to solve…• 2p(i) = p(i-1)+p(i+1), i=b+1, b+2,…, t• 2p(t) = (T) + p(t-1)+p(t+1)
3131
Between b and t
• 2p(t) = (T) + p(t-1)+p(t+1)• 2(T-t)(T) = (T) + p(t-1)+(T-t-1)(T)• (T-t)(T) = p(t-1) (t-1) = (T-t)(T)/p
3232
Summary
(i) = i(0)/p, i=1, 2, …, b (T-i) = i(T)/p, i=1, 2, …, T-t (b+1) = b(0)/p
• We just solved• 2p(t) = (T) + p(t-1)+p(t+1) to get (t-1) = (T-t)(T)/p
• Now we have to solve…• 2p(i) = p(i-1)+p(i+1), i=b+1, b+2,…, t
3333
Between b and t
• 2p(i) = p(i-1)+p(i+1), i=b+1, b+2,…, t• 2b(0) = b(0)+p(i+1) (i+1) = b(0)/p
3434
Summary (i) = i(0)/p, i=1, 2, …, b (T-i) = i(T)/p, i=1, 2, …, T-t (i) = b(0)/p, i = b, b+1, …, t
• And (t-1) = (T-t)(T)/p
• So• b(0)/p = (T-t)(T)/p (T) = b(0)/ (T-t) and (T-i) = i(T)/p, i=1, 2, …, T-t becomes (T-i) = [ib/(T-t)](0)/p
3535
Summary (i) = i(0)/p, i=1, 2, …, b (i) = b(0)/p, i = b, b+1, …, t (i) = [(T-i)/(T-t)]b(0)/p, i=t, t+1, …, T-1 (T) = b(0)/(T-t)
• 1 = (i) = • = (0) + (i(0)/p: i = 1, .., b-1) + (b(0)/p: i = b, .., t)
+ (ib(0)/[p(T-t)]: i = 1, .., T-t-1) + b(0)/[T-t]
= (0) + b(b-1) (0)/2p + 2(t-b+1)b(0)/2p
+ (T-t-1)b (0)/2p + b(0)/[T-t]
= (0) + [T+t-b]b(0)/2p + b(0)/[T-t] = (0)[2p(T-t+b) + b(T-t)(T+t-b)]/[(T-t)2p]
3636
Calculating (0)
• 1 = (0)[2p(T-t+b) + b(T-t)(T+t-b)]/[(T-t)2p] (0) = 2p(T-t)/[2p(T-t+b) + b(T-t)(T+t-b)]
3737
Costs
• Expected number of times we expedite (0)*Number of “Days” in Year
• Expected number of times we curtail (T)*Number of “Days” in Year
• Average Inventory Level (i(i): i = 0, .., T)
3838
Average Inventory
i(i) = • = (i2(0)/p: i = 1, .., b-1) + (ib(0)/p: i = b, .., t-1) +
(i(T-i)b(0)/[p(T-t)]: i = t, .., T-1) +Tb(0)/[T-t]
= b[3T(T-t) – 2(T-t)2 + 3(t2 – b2) + 6b-4] (0)/6p
5 points extra credit for first to find any errors
3939
Average Inventory
i(i) = b[3T(T-t) – 2(T-t)2 + 3(t2 – b2) + 6b-4] (0)/6p
(0) = 2p(T-t)/[2p(T-t+b) + b(T-t)(T+t-b)]
i(i) = b[3T(T-t) – 2(T-t)2 + 3(t2 – b2) + 6b-4] (T-t)/
[6p(T-t+b) + 3b(T-t)(T+t-b)]
4040
Costs
• Expected number of times we expedite (0)*Number of “Days” in Year• 2p(T-t)N/[2p(T-t+b) + b(T-t)(T+t-b)]• Expected number of times we curtail (T)*Number of “Days” in Year• 2pbN/[2p(T-t+b) + b(T-t)(T+t-b)]• Average Inventory Level (i(i): i = 0, .., T) b[3T(T-t) – 2(T-t)2 + 3(t2 – b2) + 6b-4] (T-t)/
[6p(T-t+b) + 3b(T-t)(T+t-b)]
4141
Convert Variables
• Focus on the differences
• b, x, yT
b
t
b
x
y
4242
Optimize• Expected number of times we expedite• E*(0)*Number of “Days” in Year• E2pyN/[2p(y+b) + by(y+2x+b)]• Expected number of times we curtail• C*(T)*Number of “Days” in Year• C2pbN/[2p(y+b) + by(y+2x+b)]• Average Inventory Level• H(i(i): i = 0, .., T) • Hby[3Ty – 2y2 + 3x(x+2b) + 6b-4]/ [6p(y+b) + 3by(y+2x+b)]
4343
Optimize• Total Cost• {6pN(Ey+Cb) + Hby[3(b+x+y)y – 2y2 + 3x(x+2b) + 6b-4]}/ [6p(y+b) + 3by(y+2x+b)]
4444
DellParameter Value Solution Solve forp 0.5 b 4 b 4 69 t 10 x 6 Max YN 250 T 12 y 2 2E 500C 300H 10a 147State Probability Inventory Adjust Total Cost Average Inventory Avg. Days of Supply
0 0.013333333 0 1666.666667 8156.267 448.96 3.05414971 0.026666667 1.84 02 0.053333333 7.36 0 Max Inventory Max Days of Supply3 0.08 16.56 0 828 5.63265314 0.106666667 29.44 05 0.106666667 36.8 0 Total Adjustment Costs Total Inventory Costs6 0.106666667 44.16 0 3,666.67$ 4,489.60$ 7 0.106666667 51.52 08 0.106666667 58.88 09 0.106666667 66.24 0
10 0.106666667 73.6 011 0.053333333 40.48 012 0.026666667 22.08 200013 0 0 014 0 0 015 0 0 016 0 0 017 0 0 0
4545
Additional Constraint
• Can’t curtail more than one days usage
• On average y a
4646
Parameter Value Solution Solve forp 0.5 b 4 b 4 69 t 10 x 6 Max YN 250 T 12 y 2 2E 500C 300H 10a 147State Probability Inventory Adjust Total Cost Average Inventory Avg. Days of Supply
0 0.013333333 0 1666.666667 8156.267 448.96 3.05414971 0.026666667 1.84 02 0.053333333 7.36 0 Max Inventory Max Days of Supply3 0.08 16.56 0 828 5.63265314 0.106666667 29.44 05 0.106666667 36.8 0 Total Adjustment Costs Total Inventory Costs6 0.106666667 44.16 0 3,666.67$ 4,489.60$ 7 0.106666667 51.52 08 0.106666667 58.88 09 0.106666667 66.24 0
10 0.106666667 73.6 011 0.053333333 40.48 012 0.026666667 22.08 200013 0 0 014 0 0 015 0 0 016 0 0 017 0 0 0
4747
Differences
• Constant Stream of Releases punctuated by Expediting and Curtailing
• If supplier can see inventory and knows T, can anticipate and plan for coming expedited and curtailed orders
• Have to set a lower bound > 0 to protect against disruptions – safety stock
• Complicates the calculation of cost of Expediting
4848
Example: Shipments
0
50
100
150
200
250
300
1 8
15
22
29
36
43
50
57
64
71
78
85
92
99
10
6
11
3
12
0
12
7
13
4
14
1
14
8
15
5
16
2
16
9
17
6
18
3
19
0
19
7
20
4
21
1
21
8
22
5
23
2
23
9
24
6
4949
Example: Inventory
0
100
200
300
400
500
600
700
800
900
1000