Bringing Machine Bringing Machine Control to California Control to California
DOT (Caltrans) DOT (Caltrans) Construction ProjectsConstruction Projects
Kevin Akin, LS Kevin Akin, LS
Office of Land SurveysOffice of Land Surveys
22
CaltransCaltrans 22,000 Employees22,000 Employees Most designs are done in-houseMost designs are done in-house Most projects are staked and Most projects are staked and
inspected in-houseinspected in-house 15,000 centerline lane miles15,000 centerline lane miles 12,500 Bridges12,500 Bridges 08/09 budget of 14 Billion08/09 budget of 14 Billion 36,000,000 +/- People in California36,000,000 +/- People in California
33
Districts and RegionsDistricts and Regions 12 Districts12 Districts 2 Regions2 Regions
44
Earth QuakesEarth Quakes
55
66
77
MG History in CaltransMG History in Caltrans 2001 Vendor Presentations2001 Vendor Presentations 2001 Contractor Requests2001 Contractor Requests
– Can we have your design model?Can we have your design model? 2003 Machine Guidance Committee2003 Machine Guidance Committee 2005 Interim Guidance2005 Interim Guidance 2006 California Industry Capacity 2006 California Industry Capacity
ExpansionExpansion 2007 Pilot Projects2007 Pilot Projects 20?? Road Design Software Change20?? Road Design Software Change 20?? Create Policy\Implement workflow 20?? Create Policy\Implement workflow
changeschanges 20?? Full Adoption20?? Full Adoption
88
Machine Guidance Machine Guidance CommitteeCommittee
Organizational IssuesOrganizational Issues– Change Change
Design software limitationsDesign software limitations Reluctance to provide Reluctance to provide
electronic fileselectronic filesAdditional LiabilityAdditional LiabilityTranslation issuesTranslation issues
99
MG Committee Cont.MG Committee Cont.
No data to positively show No data to positively show that MG will save money on a that MG will save money on a Caltrans projectCaltrans project
Technological Overload Technological Overload Information OverloadInformation Overload
1010
Design Product is a Design Product is a Set of 2D Paper PlansSet of 2D Paper Plans Paper plans are the legal documentPaper plans are the legal document 3D design files are an intermediate 3D design files are an intermediate
product- product- not a final productnot a final product Our current software (CAiCE) is not Our current software (CAiCE) is not
model based it is cross-section model based it is cross-section basedbased
Additional work is required to create Additional work is required to create a 3D modela 3D model
Model/files not required at bid dateModel/files not required at bid date
1111
Early ProjectEarly Project8-SB-15 8-SB-15
15 miles each side of existing 15 miles each side of existing HighwayHighway
1212
1313
Brawley Bypass Stage Brawley Bypass Stage 11
1414
Interim GuidelinesInterim Guidelines
Contract is already awardedContract is already awarded Existing files- Existing files- No model availableNo model available Divisions of Construction/Design Divisions of Construction/Design
determine level of Caltrans determine level of Caltrans participationparticipation
Participation is not mandatoryParticipation is not mandatory
1515
Suitable MG project?Suitable MG project?
Design base on a DTMDesign base on a DTM Large amounts of earthworkLarge amounts of earthwork Good GPS environmentGood GPS environment Electronic files availableElectronic files available
1616
Not Every Project is Not Every Project is Suitable for MGSuitable for MG GPS issuesGPS issues
– Narrow canyonsNarrow canyons– Tree canopyTree canopy– Tall buildingsTall buildings
Design not based on a full DTMDesign not based on a full DTM– Pavement overlayPavement overlay
Design difficultiesDesign difficulties
1717
Files Needed to Create Files Needed to Create ModelModel Original ground DTMOriginal ground DTM Alignments and profilesAlignments and profiles Cross-sectionsCross-sections Contour grading areasContour grading areas 2D Microstation Cadd files2D Microstation Cadd files
1818
Translation IssuesTranslation Issues
No single data formatNo single data format Different triangulation algorithmsDifferent triangulation algorithms Data goes through two or three Data goes through two or three
translationstranslations Is there distortion? Is there distortion?
1919
Tested Vendor SoftwareTested Vendor Software
Data after vertical line was Data after vertical line was deleteddeleted– XML parser problemXML parser problem
2020
Legal IssuesLegal Issues
Added liabilityAdded liability Foolproof waiver of liability?Foolproof waiver of liability? Electronic file securityElectronic file security Copyright issuesCopyright issues Homeland securityHomeland security Electronic file vs. paper plansElectronic file vs. paper plans
2121
Stakes for InspectorStakes for Inspector
Will stake projects as normalWill stake projects as normal Construction has to match stakesConstruction has to match stakes Surveys staking QASurveys staking QA
2222
Results From MG Results From MG ProjectsProjects Contractor wiped out inspectors stakesContractor wiped out inspectors stakes Increased speed of earth movingIncreased speed of earth moving Caltrans Construction RE valued having Caltrans Construction RE valued having
3D model for problem solving3D model for problem solving Reluctance to give our electronic Reluctance to give our electronic
informationinformation Most contractors are now requesting Most contractors are now requesting
filesfiles Spotty documentation of resultsSpotty documentation of results
2323
Brawley\Tudor Bypass Brawley\Tudor Bypass Pilot ProjectsPilot Projects
Tudor
Brawley
2424
TudorTudor Brawley Brawley
2525
Expectations of Pilot Expectations of Pilot ProjectsProjects Effect of MG on projectEffect of MG on project
– TimeTime– MoneyMoney– ReworkRework– ??
Suggestions for MG workflow Suggestions for MG workflow Document resultsDocument results
2626
Full ImplementationFull Implementation
Management/Organization Management/Organization commitment commitment
Build a 3D model for every projectBuild a 3D model for every project Model included in bid packageModel included in bid package Change workflow during Design, Change workflow during Design,
Bidding, & ConstructionBidding, & Construction Early identification of projects Early identification of projects
that should not use MG that should not use MG
2727
New Road Design New Road Design Software-Wish ListSoftware-Wish List Design products that are Design products that are
interactive interactive – 3D model3D model– 2D Cad files2D Cad files– Slope Stake notesSlope Stake notes
Export to major formatsExport to major formats Translation issues identified and Translation issues identified and
resolvedresolved
2828
3D Models in Bid 3D Models in Bid PackagePackage Electronic securityElectronic security Liability waiversLiability waivers Copyright protectionCopyright protection Assigned responsibility to manage Assigned responsibility to manage
filesfiles– Updates/Changes/Etc…Updates/Changes/Etc…
2929
Project ControlProject Control
Last through life of projectLast through life of project Agree on control to be usedAgree on control to be used Mutual GPS calibration at the Mutual GPS calibration at the
start of the projectstart of the project
3030
Questions?Questions?
Contact InformationContact Information
Kevin AkinKevin Akin
916-227-7650916-227-7650
kakin@dot.ca.govkakin@dot.ca.gov
1727 301727 30thth St. MS 35 St. MS 35
Sacramento, Ca. 95816Sacramento, Ca. 95816
top related