Siting, Real Estate and Interconnection Issues for
Wind Projects
Tim ConboyIPED Financing Windpower
May 8, 2008
2
Outline
• Introduction
• Development Process
• Siting
• Real Estate
• Interconnection
• Summary
3
Wind• Long-term developer, owner & operator• Manufacture AW-1500 1.5 MW wind turbine generator• #1 globally in project development (4,690 MW/175 projects)• Own/operate 3,465 MW of wind generation
Thermal & PV Solar – develop, own & operate projectsSmall Hydro – own & operate in SpainBiomass – 1st straw-fired plant in southern EuropeBiofuels – biodiesel and bioethanol production facilities
Acciona Energy
4
Development Process
Preliminary Investigation
Local Government Consultation
EnvironmentalImpact Studies
TransmissionInterconnection
Wind Resource Measurement
Land Access
Permitting
Project Financing
Preliminary Design & Engineering
Final Design & Engineering
Power Marketing
Critical Issues Analysis
5
Siting
• Wind resource• Compatible land• Nearby transmission• No undue environmental
impacts
• Power market• Local government &
community interest
6
Real Estate
Wind energy lease• Payment – calculation (gross
revenues)• Landowners without turbines• Assignment – consents• Actual location of facilities• Hunting rights
Transmission interconnection• Obtaining adequate ROW• Use of existing ROW
Land control - as a solution • Setbacks, noise• Mitigation efforts (wetlands, avian)
7
Interconnection
• Land Control• Competition• Curtailment• Equipment Selection• Interconnection
Agreement
8
Summary
• Development Process
• Siting
• Real Estate
• Interconnection