2 culbertson hall -mail services · finish system expansion joint elevation electric(al) ... pnt...

Post on 22-Jul-2018

213 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

CULBERTSON HALL - MAIL SERVICESHVAC IMPROVEMENT & WINDOW REPLACEMENT

CONSTRUCTION DOCUMENTS JANUARY 24, 2016

ABA/CACTADD'LADDMADJAFFAHUAIBALTALUMANODAPPROXARCHAUTOA/VAVG

BDBOBLDGBLKGBRGBSMTBTWNBOWBUR

CABCBCCCDXCFCHCIPCIRCCJCLCLGCLRCMUCOCOLCONCCONSTCONTCONTRCOORDCPTCTCTRCTRDCW

DBLDEGDEMODEPTDFDIADIMDISPDLDNDRDSDTLDWG

EAEIFS

EJELEVELECTENCLEQEQUIP(E)/EXISTESTETREWCEXHEXPEXT

FBOFDFDN

Anchor BoltAir ConditioningAcoustical Ceiling TileAdditionalAddendumAdjacentAbove Finished FloorAir Handling UnitAir Infiltration BarrierAlternativeAluminumAnodizedApproximate(ly)Architect(ural)AutomaticAudio / VisualAverage

BoardBottom OfBuildingBlockingBearingBasementBetweenBottom of WallBuilt Up Roof

CabinetCatch BasinCenter to CenterExterior Grade PlywoodCubic FeetChannelCast In PlaceCircumferenceControl JointCenterlineCeilingClearConcrete Masonry UnitClean OutColumnConcreteConstructionContinuousContractorCoordinateCarpetCeramic TileCenterCenteredCold Water

DoubleDegreeDemolish, DemolitionDepartmentDrinking FountainDiameterDimensionDispenserDead LoadDownDoorDownspoutDetailDrawing

EachExterior InsulationFinish SystemExpansion JointElevationElectric(al)EnclosureEqualEquipmentExistingEstimateExisting to RemainElectric Water CoolerExhaustExpansionExterior

Furnished By OthersFloor DrainFoundation

FEFECFINFIXFLEXFLRFLUORFOFTFTGFV

GAGBGCGALVGLGLU LAMGWB

HBHCHD BDHDRHDRWHMHORIZHRHTHTGHTRHVAC

HW

IDININCINFOINSULINT

JSTJT

LLAVLBLFLLLTWTLVL

MAGMANUFMASMAT'LMAXMECHMEDMEMBMEZZMDFMINMIRMISCMOMTDMTL

N/ANIC#NOMNTS

OCODOHOPNGOPP

PART BDPERFPERIMPERPPKGP/L

Fire ExtinguisherFire Extinguisher CabinetFinish(ed)FixtureFlexibleFloor DrainFluorescentFace OfFoot (Feet)FootingField Verify

GaugeGrab BarGeneral ContractorGalvanizedGlassGlue Laminated BeamGypsum Wall Board

Hose BibbHollow CoreHard BoardHeaderHardwareHollow MetalHorizontalHourHeightHeatingHeaterHeating, Ventilating,Air ConditioningHot Water

Inside DiameterInchIncludeInformationInsulationInterior

JoistJoint

LengthLavatoryPoundLineal/Linear FeetLive LoadLightweightLaminated Veneer Lumber

MagneticManufacturerMasonryMaterialMaximumMechanicalMediumMembraneMezzanineMedium Density FiberboardMinimumMirror(ed)MiscellaneousMasonry OpeningMountedMetal

Not ApplicableNot In ContractNumberNominalNot to Scale

On CenterOutside DiameterOverheadOpeningOpposite

Particle BoardPerforatedPerimeterPerpendicularParkingProperty Line

PLPLAMPLWDPNLPNTPREFABPREFINPSFPSIPSLPTPTDPVCPVMT

QTY

RRADRCPRDRDWDRE:RECPTREFREFGREINFREQDRESREVRMRO

SANSCHEDSDSFSGSHTSHTGSHWRSIMSIPSNTSOGSPECSSSSDSTDSTLSTORSTRUCTSUB FLR

TT&GTBTELTHRUTJITOTOWTPTSTATTVTYP

UNFINUGUNO

VACVCTVERTVB

WW/WBWCWDWNDWW/OWPW/RWTWWF

YD

PlatePlastic LaminatePlywoodPanelPaintPrefabricatedPrefinishedPounds per Square FootPounds per Square InchParallel Strand LumberPointPaper Towel DispenserPolyvinyl ChloridePavement

Quantity

RiserRadiusReflected Ceiling PlanRoof DrainRedwoodRegardingReceptacleReferenceRefrigeratorReinforce(d), (ing)RequiredResilientRevision, RevisedRoomRough Opening

SanitaryScheduleSoap DispenserSquare FeetSupply GrilleSheetSheathingShowerSimilarStructual Insulated PanelSealantSlab on GradeSpecificationsStainless SteelSee Structural DrawingsStandardSteelStorageStructuralSubfloor

TreadTongue and GrooveTest BoreTelephoneThroughTruss Joist IncorporatedTop OfTop of WallToilet Paper DispenserThermostatTelevisionTypical

UnfinishedUndergroundUnless Noted Otherwise

Vacuum OutletVinyl Composite TileVerticalVapor Barrier

WidthWithWhite BoardWater ClosetWoodWindowWithoutWaterproofWater ResistantWeightWelded Wire Fabric

Yard

ABBREVIATIONS

G0.0 COVER / GENERAL INFORMATION / SPECIFICATIONS

DRAWING INDEXGENERAL

ARCHITECTURALA1.1 PLANS, SECTION, DETAILSA1.2 WINDOWS & WINDOW DETAILS

MECHANICAL

ELECTRICAL

MD1.1 FIRST FLOOR PLAN - DEMOLITIONM2.0 BASEMENT PLAN - PIPINGM2.1 FIRST FLOOR PLAN - HVACM2.2 SECOND FLOOR / ROOF PLAN - PIPINGM3.1 MECHANICAL SCHEDULES & DETAILS

E1.0 BASEMENT PLAN - POWERE1.1 MAIN LEVEL PLAN - POWERE1.2 ROOF PLAN - POWERE1.3 ELECTRICAL SCHEDULES & DETAILS

CIVILNOT APPLICABLE

STRUCTURALNOT APPLICABLE

GENERAL NOTES1. Do not scale drawings. If critical dimensions do not appear on the drawings, notify the Architect.2. Contractor to field verify all dimensions and existing conditions prior to beginning work. Start of work indicates acceptance of existing

conditions.3. If discrepancies exist between drawings or between the drawings and the specifications, notify the Architect immediately for clarification.4. All dimensions are to face of framing, masonry or concrete wall, centerline of column, or finished floor, unless noted otherwise.5. Provide all components and accessories needed for a complete and finished installation. Coordinate with Owner on all "Owner-Provided"

equipment and furnishings. Coordinate all work with Subcontractors prior to beginning work.6. Provide blocking for all wall-mounted casework, millwork, grab bars, hardware, equipment, etc.7. Maintain a clean and safe work site at all times. No radios or music players allowed on site.8. All areas used for construction and staging shall be restored to their existing conditions upon project completion.9. All building entrances and stairwells are to remain open and unobstructed to allow access and egress at all times.10. Notify MSU Project Manager in writing of any expected disruptions in service or changes in construction schedule at least 72 hours in

advance.11. Do not block any roads, sidewalks or access to garbage dumpsters.12. Contractor is responsible for purchasing parking permits from MSU. Coordinate parking with MSU13. The specifications included are an integral part of these Construction Documents. It is the responsibility of the Contractor to review all

information.

Montana State UniversityP.O. Box 172760, Bozeman, MT 59717 Contact: Bill Mackin, 406.994.6377

PROJECT TEAMOWNER

ARCHITECT

MECHANICAL

Architecture 118, LLC115 East Oak Street, Bozeman, MT 59715Contact: Scott Hedglin, 406.599.7549

Consulting Design Solutions, Inc.7540 Churchill Road, Manhattan, MT 59741Contact: Curt Smit, 406.282.7082

ELECTRICALConsulting Design Solutions, Inc.7540 Churchill Road, Manhattan, MT 59741Contact: Scott Elders, 406.282.7082

HVAC Renovation and window replacement at southern end of first floor.

SUMMARY OF WORK

VICINITY MAP

PROJECT SITE

MSU - Culbertson Hall, Bozeman, MT

CODE INFORMATION

International Building Code (IBC) 2012International Existing Building Code 2012International Mechanical Code (IMC) 2012National Electrical Code (NEC) 2014Uniform Plumbing Code (UPC) 2012International Fire Code (IFC) 2012International Energy Conservation Code (IECC) 2012International Fuel Gas Code (IFGC) 2012ANSI A117.1

APPLICABLE CODES PROJECT INFORMATIONType of Project: HVAC Renovation &

Window ReplacementType of Construction: II-B (existing)Occupancy Group (Use): BAutomatic Sprinkler System: NoFire Alarm System: YesAffected Area: N/AOccupant Load: N/AExits Required: N/AExits Provided: No Change

Not ApplicablePARKING REQUIREMENTS

HAZARDOUS MATERIALSNOTICE:1. SOME AREAS OF JOHNSTONE COMPLEX HAVE BEEN TESTED FOR ASBESTOS. FULL REPORTS ARE AVAILABLE AT MSU WORK CONTROL / FACILITIES. SUMMARY:

A. FLOOR TILE & MASTIC - KNOWN ASBESTOS CONTENTB. CARPETING - BLACK MASTIC UNDER CARPET - KNOWN ASBESTOS CONTENTC. WINDOW GLAZING CAULK (WINDOW PUTTY) - KNOWN ASBESTOS CONTENTD. PIPE INSULATION - KNOWN ASBESTOS CONTENTE. PLASTER CEILING & WALLS - UNKNOWN

2. SPECIFIC MATERIALS WITHIN THE PROJECT LIMITS HAVE NOT BEEN TESTED FOR ASBESTOS. IF SUSPECT MATERIALS ARE ENCOUNTERED, DO NOT DISTURB AND NOTIFY MSU PROJECT MANAGER IMMEDIATELY .

SPECIFICATIONSDIVISION 00: SEE PROJECT MANUAL - BY MSUDIVISION 01: SEE PROJECT MANUALDIVISION 02: EXISTING CONDITIONS024100 SELECTIVE DEMOLITIONA. Items indicated to be removed and salvaged remain Owner's property. Carefully detach from existing construction, in a manner to

prevent damage, and deliver to Owner.B. Owner will occupy portions of building immediately adjacent to work area. Conduct work activities so Owner's operations will not be

disrupted. All work, material storage, and staging shall occur within Construction Limits shown (except incidental work in adjacent areas).

C. Protect walls, ceilings, floors, and other existing finish work that are to remain. Cover and protect, furniture, furnishings, and equipment that have not been removed.

D. Patch and repair existing surfaces as needed.E. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction

to remain or adjoining construction.F. Remove demolition waste materials from Project site.G. Clean construction area at conclusion of work. Return construction area to cleanliness existing before work began.H. Complete MSU standard form 097 "Project Close-out Checklist" prior to application for final payment.

DIVISION 06: WOOD, PLASTICS, AND COMPOSITES062000 FINISH CARPENTRYA. Material: Paint-grade softwood lumber. Kiln-dried.B. Profiles: Standard profiles that are substantially similar to profiles indicated on drawings.C. Install finish carpentry level, plumb, true, and aligned with adjacent materials. Scribe and cut to fit adjoining work. Refinish and seal

cuts.D. Install standing and running trim with minimum number of joints practical, using full-length pieces from maximum lengths of lumber

available. Do not use pieces less than 24 inches long except where necessary. Stagger joints in adjacent and related trim. Cope at returns and inside corners and miter at outside corners.

064023 INTERIOR ARCHITECTURAL WOODWORKA. Quality Standard: Architectural Woodwork Institute's "Architectural Woodwork Quality Standards."B. Materials: Custom grade, pine or poplar suitable for paint.C. Installation: Install to comply with referenced standard. Install level, plumb, true, and straight. Scribe to fit adjoining work.

DIVISION 07: THERMAL AND MOISTURE PROTECTION075000 MEMBRANE ROOFINGA. Patch roof assembly as needed matching existing materials.B. Existing roof warranty shall be maintained. Provide manufacturer’s written warranty upon completion of roof work.C. Contact for more information (provided by MSU): Bill Mackin, 406-994-6377.079200 JOINT SEALANTSA. Compatibility: Provide sealants, joint fillers, and other related materials that are compatible with one another and with joint substrates.B. Sealant for General Exterior Use: Single-component, neutral-curing silicone, ASTM C920, Type S, Grade NS, Class 25, for Use NT.

Sikaflex-1A; color:C. Sealant for General Interior Use: Single-component, mildew-resistant sealant, ASTM C920, Type S, Grade NS, Class 25, for Use NT.D. Comply with ASTM C1193. Sonolastic NP1; color:E. Do not proceed with installation when ambient and substrate temperatures are outside limits permitted by joint-sealant manufacturer or

are below 40 degrees F.

DIVISION 08: OPENINGS085113 ALUMINUM WINDOWSA. Submittals: Provide Product Data, and Shop Drawings.B. Product: All windows shall be Gerkin Windows & Doors (gerkin.com; 800-475-5061) or Prior Approved Equal similar to existing windows

at west facade of Culbertson Hall.a. Horizontal Sliders: 5045 Series. Sizes as indicated on drawings. Clear anodized aluminum finish (Class I), AAMA 611.b. Fixed: 5500 Series. Sizes as indicated on drawings. Clear anodized aluminum finish (Class I), AAMA 611.

C. Operable Panels: As indicated on drawings.D. Screen: Aluminum mech insect screen at operable panels. Tamper-proof fasteners.E. Glazing: Clear, insulated glass. 1 inch overall thickness. Low-E 366. Window Manufacturer's standard glazing.F. Set units level, plumb, and true to line. Provide proper support and anchor securely in place.G. Set sill members in bed of sealant to provide weathertight construction.H. Install windows and components to drain condensation, water that has penetrated any joints, and moisture migrating within the assembly

to the exterior.I. Adjust operable panels for smooth operation and weathertight closure. Lubricate hardware.J. Remove non-permanent labels and clean all surfaces including glazing.088000 GLAZINGA. Insulating-Glass Certification Program: Provide certification label of IGCC.B. Safety Glazing Labeling: Permanently mark glazing with certification label of the manufacturer. Label shall indicate type of glass,

thickness, and safety glazing standard with which glass complies.C. Warranty: Manufacturer's standard 10-year written warranty.D. Comply with the combined recommendations of manufacturers of glass, sealants, gaskets, and any other glazing materials, unless more

stringent requirements are contained in GANA's "Glazing Manual."E. Replace all glass that has been broken, chipped, cracked, or damaged during construction.F. Remove non-permanent labels and clean all surfaces.

DIVISION 09: FINISHES092900 GYPSUM BOARDA. Material: Interior Gypsum Board, ASTM C1396 / C1396M, Type XB. Thickness: 5/8 inch.C. Edges: Tapered.D. Trim Accessories: ASTM C 1047. Provide cornerbead at outside corners. Accessories as noted on drawings.E. Joints: Paper tape. Ready-mixed, all-purpose joint compound.F. Installation: ASTM C 840. Level 4 finish.095100 ACOUSTICAL CEILINGS - ADDITIVE ALTERNATE #1A. Ceiling Tile: Armstrong "Georgian" #763, or match existing tile in Room 100, or approved substitution.B. Color: White.C. Edge Detail: Square.D. Thickness: 5/8 inch.E. Modular Size: 24 by 48 inches.F. Suspension System: Armstrong "Prelude," 15/16 inch, white, direct hung, ASTM C635, heavy duty.099100 PAINTINGA. Materials: 2-coat PPG Speedhide Latex over compatible primer, or approved substitution.B. Colors: As selected by Architect from Manufacturer's standards.C. Finish: As selected by Architect from Manufacturer's standards.D. Comply with recommendations in MPI's "MPI Architectural Painting Specification Manual" applicable to substrates encountered.

ADDITIVE ALTERNATE #1 (ADD ALT #1):PROVIDE COMPLETE MECHANICAL HEAT RECOVERY VENTILATION SYSTEM AND ALL ASSOCIATED WORK (INCLUDING BUT NOT LIMITED TO: CEILING, LIGHTING, WINDOW, WALL WORK, MECHANICAL EQUIPMENT & DUCTWORK, ELECTRICAL WORK) AS SHOWN (ROOM 100B). MODIFY CEILING AND LIGHTING AS SHOWN. PROVIDE WINDOW TYPE (W6).

ALTERNATE(S)

0"

1"

2"

SHEET

DRAWN BY

REVIEWED BY

1/24

/201

7 5:

48:2

0 PM G0.0

PPA # 15-0079

HV

AC

IM

PR

OV

EM

EN

T &

WIN

DO

WR

EP

LA

CE

ME

NT

JAN. 24, 2016

STH

STH

A118: 15-070

CU

LB

ER

TSO

N H

AL

L

REV DESCRIPTION DATE

f34w529
Stamp

DN

A1.2 1

A1.2

2

A1.23

A1.2

4

CLASSROOM101

BULKMAIL103

STORAGE103A

STORAGE101B

STORAGE101A

JANITOR113CU

BATHROOM115RR

OFFICE116

OFFICE114

BREAKROOM100B

MAILSERVICES

100

CLERKOFFICE100A

VESTIBULE199VE

HALLWAY199CO

HALLWAY198CO

STAIRWELL199S1

W5

W6

W7

W4

W3

W2 W1

3A1.1

ADD ALT #1: MODIFY CEILING FOR NEW HRV UNIT

REMOVE (E) WINDOWS & PREP OPENINGS FOR NEW WINDOWS- TYP

NOTES: 1. COORDINATE w/ OWNER ON REMOVAL OR

DISTURBANCE OF (E) VEGETATION.2. REPAIR LANDSCAPING AS NEEDED.

ADD ALT #1: ALIGN FACE OF (N) GWB SOFFIT w/ RETURN @ WINDOW

(E) PLASTER CEILING TO REMAIN (+/- 8'-6" A.F.F.)

ADD ALT #1: PATCH (E) CEILING AS NEEDED

(N) 2x4 ACT (+/- 7'-6" A.F.F.)

ADD ALT #1: (N) GWB (3-5/8" METAL FRAMING) HEADER (+/- 7'-5" A.F.F.)

CONCEAL PIPING IN WALL CAVITY-DEMO/PATCH/REPAIR WALL AS NEEDED

ADD ALT #1: PROVIDE CLOSURE- re: DETAIL

NOTE:COORDINATE ALL WORK OCCURING IN ROOM 103 DURING MONTH OF JULY w/ OCCUPANT-RESTRICTIONS MAY APPLY

7'-4"

F.V

.

CONCEAL PIPING IN WALL CAVITY-DEMO/PATCH/REPAIR WALL AS NEEDED

CONCEAL PIPING & WIRING IN WALL CAVITY-COORDINATE LOCATION w/ (E) ELECTRICAL, (E) PIPE, (E) BASEBOARD HEATER, AND TUNNEL BELOW- DEMO WALL AS NEEDED- PROVIDE FULL HEIGHT PLYWOOD COVER PANEL w/ BEVELED EDGES & DECORATIVE FASTENERS FOR FUTURE ACCESS- PAINT

APPROX LINE OF TUNNEL BELOW

ADD ALT #1: COORDINATE PENETRATIONS THRU WALL w/ HVAC- re: MECH

REMOVE (E) WINDOWS & PREP OPENINGS FOR NEW WINDOWS- TYP

REMOVE (E) WINDOWS & PREP OPENINGS FOR NEW WINDOWS- TYP

REMOVE (E) WINDOWS & PREP OPENINGS FOR NEW WINDOWS-TYP

ADDITIVE ALTERNATE #1:PROVIDE COMPLETE MECHANICAL HEAT RECOVERY VENTILATION SYSTEM AND ALL ASSOCIATED WORK (INCLUDING BUT NOT LIMITED TO: CEILING, LIGHTING, WINDOW, WALL WORK, MECHANICAL EQUIPMENT & DUCTWORK, ELECTRICAL WORK) AS SHOWN (ROOM 100B). MODIFY CEILING AS SHOWN. PROVIDE FIXED WINDOW UNIT (W6).

3A1.1

BUILDING MOVEMENT JOINT

NEW MECH EQUIP on NEW ROOF CURB- re: MECH- PATCH & REPAIR ROOF MEMBRANE

(E) 60-MIL, FULLY-ADHERED EPDM ROOF

LINE OF WALL BELOW

LINE

OF S

TRUC

TURE

BEL

OW

10'-8

" (10

'-0" M

IN)

5'-4"

(E) EXHAUST FAN TO REMAIN

FUTURE MECH. UNITS (APPROX).

LINE

OF S

TRUC

TURE

BEL

OW

PROVIDE (5) 30"x30" WALKWAY PADS-COMPATIBLE w/ (E) ROOF MEMBRANE-COORDINATE FINAL LOCATION w/ ARCHITECT/ENGINEER

ENTRY FLOOR100'-0"

1ST FLOOR101'-9"

BASEMENT93'-9"

STEAM ROOM91'-0"

2ND FLOOR110'-7"

2'-9"

6'-3"

1'-9"

8'-10

"8'-

10"

11'-5

"

3RD FLOOR119'-5"

DIRT FLOOR AREA

BSMT AREA TUNNEL AREA

BUILDING MOVEMENT JOINT

NEW MECH EQUIP on NEW ROOF CURB AREA

CONCEAL PIPING & WIRING IN (E) WALL

CONCEPTUAL ROUTING OF PIPING

9'-10

"

HALLWAY199CO

MAILSERVICES

100

CLASSROOM101

CONCEPTUAL ROUTING OF PIPING

1"5"

COOR

D. w

/ HVA

C

1'-11

"

(E) STRUCTURE

(N) A.C.T. SYSTEM

(N) HEADER-5/8" TYPE 'X' GWB on3-5/8" METAL FRAMING

(E) SUSPENDED PLASTER CEILING TO REMAIN

WD TRIM- PAINT

ALUMINUM WINDOW SYSTEM w/ SUBFRAME & 1" INSUL ALUM PANEL-

CAULK PERIMETER- TYP

(E) STRUCTURE

(E) PLASTER WALL ASSEMBLY

SEALANT

HVAC DUCT & LOUVER- re: MECH

REMOVE (E) METAL SILL

(N) A.C.T. CEILING- COORDINATE HEIGHT w/ HVAC DUCT ROUTING

INFILL w/ GWB on METAL FRAMING

(E) STONE MASONRY- DO NOT DISTURB

REMOVE (E) PLASTER CEILIING- re: FLOOR PLAN

(E) STEEL LINTEL- DO NOT DISTURB

NOTES:1. REVIEW CONDITIONS w/ ARCHITECT AT COMPLETION OF

DEMOLITION2. SEE WINDOW DETAILS FOR ADDITIONAL INFORMATION

SEALANT w/ BACKER ROD

ALUMINUM WINDOW SYSTEM w/ SUBFRAME-CAULK PERIMETER, BOTH SIDES- TYP

(E) INTERIOR WALL

INFILL w/ GWB on METAL FRAMING

ROOM 100B

ROOM 100

SEALANT- ALL EDGES

STONE MASONRY BELOW

NOTES:1. REVIEW CONDITIONS w/ ARCHITECT AT COMPLETION OF

DEMOLITION2. SEE WINDOW DETAILS FOR ADDITIONAL INFORMATION

1" INSUL METAL PANEL

LINE OF (E) CONDITIONS TO BE REMOVED (HEAD & SILL)

0"

1"

2"

SHEET

DRAWN BY

REVIEWED BY

1/24

/201

7 5:

48:1

8 PM A1.1

PPA # 15-0079

HV

AC

IM

PR

OV

EM

EN

T &

WIN

DO

WR

EP

LA

CE

ME

NT

JAN. 24, 2016

STH

STH

A118: 15-070

CU

LB

ER

TSO

N H

AL

L

1/8" = 1'-0"1 1ST FLOOR

1/8" = 1'-0"2 ROOF PLAN

1/8" = 1'-0"3 CONCEPTUAL BUILDING SECTION

N

1 1/2" = 1'-0"4 ADD ALT #1 - HEADER & SOFFIT 1 1/2" = 1'-0"5 ADD ALT #1 - HVAC & WINDOW AT STONE

1 1/2" = 1'-0"6 ADD ALT #1 - PLAN DETAIL @ (E) WALL / WINDOW INTERFACE

REV DESCRIPTION DATE

22'-3" F.V.

EQ EQ EQ EQ EQ EQ EQ

1'-6"

F.V

.

W2ALUM

W5ALUM

W4ALUM

9'-2" F.V.

EQ EQ EQ EQ EQ

1'-6"

F.V

.

W6ALUM

6'-3"

F.V

.

1'-6"

4'-9"

EQ EQ EQ EQ EQ4'-1" F.V.

W1ALUM

6'-3"

F.V

.

1'-6"

4'-9"

13'-0" F.V. 9'-2" F.V.

EQ EQ EQ EQ EQ

1'-6"

F.V

.

W7ALUM

ADD ALT #1: 1" INSUL ALUM PANEL (MAPES or SIM, MATCH WINDOW FINISH)- COORDINATE w/ MECH LOUVER

FIXED FIXED SLIDER

FIXED FIXED FIXED FIXED FIXED

SLIDER SLIDER SLIDER SLIDER SLIDERSLIDER

SLIDER FIXED SLIDER

FIXED

SLIDER FIXED SLIDER

W3ALUM

2'-0" F.V.

3'-4"

F.V

.

FIXE

D

2'-0" F.V.

4'-8"

F.V

.

FIXE

D

BASE BID: MATCH WINDOW TYPE W7

W3 W4NIC NIC NIC NIC NIC NIC NICNIC

REUSE (E) LOUVER PENETRATION- SEE MECH

REMOVE (E) EXHAUST FAN

NICNIC

STONE VENEER WALL

W5

STONE VENEER WALL

W6 W7W1 W2

(E) DOOR TO REMAIN

ALUMINUM WINDOW SYSTEM w/ SUBFRAME- CAULK PERIMETER, BOTH SIDES- TYP

(E) FINISH TO REMAIN

(E) STRUCTURE(E) PLASTER WALL ASSEMBLY

SHIMS & LOW-PRESSURE EXPANDING FOAM INSULATION

LINE OF (E) CONDITIONS TO BE REMOVED- NEW SYSTEM TO CONCEAL JOINT LINE

SEALANT w/ BACKER ROD

PATCH/REPAIR/INFILL AS NEEDED-MATCH (E) ADJACENT SURFACE1/8"x3/4" ALUM PLATE TRIM

1/2"

ALIG

N

(E) STEEL LINTEL- DO NOT DISTURB

(E) PLASTER CEILING TO REMAIN

(E) STRUCTURE

SHIMS & LOW-PRESSURE EXPANDING FOAM INSULATION

SEALANT w/ BACKER RODPATCH/REPAIR/INFILL AS NEEDED-MATCH (E) ADJACENT SURFACE1/8"x3/4" ALUM PLATE TRIM

1/2"

ALUMINUM WINDOW SYSTEM w/ SUBFRAME- CAULK PERIMETER, BOTH SIDES- TYP

LINE OF (E) CONDITIONS TO BE REMOVED- NEW SYSTEM TO CONCEAL JOINT LINE

(E) STONE MASONRY-DO NOT DISTURB

ALIG

N

ALUMINUM WINDOW SYSTEM w/ SUBFRAME- CAULK PERIMETER, BOTH SIDES- TYP

(E) FINISH TO REMAIN

(E) STRUCTURE(E) PLASTER WALL ASSEMBLY

SHIMS & LOW-PRESSURE EXPANDING FOAM INSULATION

LINE OF (E) CONDITIONS TO BE REMOVED- NEW SYSTEM TO CONCEAL JOINT LINE

SEALANT w/ BACKER ROD

PATCH/REPAIR/INFILL AS NEEDED-MATCH (E) ADJACENT SURFACE1/8"x3/4" ALUM PLATE TRIM

1/2"

ALIG

N

ALUMINUM WINDOW SYSTEM w/ SUBFRAME- CAULK PERIMETER, BOTH SIDES- TYP

(E) METAL SILL TO REMAIN

(E) STRUCTURE(E) PLASTER WALL ASSEMBLY

SHIMS (SET IN SEALANT) & LOW-PRESSURE EXPANDING FOAM INSULATION

LINE OF (E) CONDITIONS TO BE REMOVED- NEW SYSTEM TO CONCEAL JOINT LINE

ALUM 'Z' FLASHING- MATCH WINDOW ASSEMBLY

1/8"x3/4" ALUM PLATE TRIMSEALANT

(E) STONE MASONRY-DO NOT DISTURB

ALUMINUM WINDOW SYSTEM w/ SUBFRAME- CAULK PERIMETER-TYP

(E) METAL SILL TO REMAIN

(E) STRUCTURE(E) PLASTER WALL ASSEMBLY

SHIMS (SET IN SEALANT) & LOW-PRESSURE EXPANDING FOAM INSULATION

LINE OF (E) CONDITIONS TO BE REMOVED- NEW SYSTEM TO CONCEAL JOINT LINE

1/8"x3/4" ALUM PLATE TRIM

ALUMINUM WINDOW SYSTEM w/ SUBFRAME- CAULK PERIMETER, BOTH SIDES- TYP

(E) FINISH TO REMAIN

(E) STRUCTURE(E) PLASTER WALL ASSEMBLY

SHIMS & LOW-PRESSURE EXPANDING FOAM INSULATION

LINE OF (E) CONDITIONS TO BE REMOVED- NEW SYSTEM TO CONCEAL JOINT LINE

SEALANT w/ BACKER RODPATCH/REPAIR/INFILL AS NEEDED-MATCH (E) ADJACENT SURFACE1/8"x3/4" ALUM PLATE TRIM

(E) STONE MASONRY-DO NOT DISTURB

ALIG

N

1/2"

0"

1"

2"

SHEET

DRAWN BY

REVIEWED BY

1/24

/201

7 5:

48:1

9 PM A1.2

PPA # 15-0079

HV

AC

IM

PR

OV

EM

EN

T &

WIN

DO

WR

EP

LA

CE

ME

NT

JAN. 24, 2016

EML

STH

A118: 15-070

CU

LB

ER

TSO

N H

AL

L

1/4" = 1'-0"5 WINDOW TYPES

1/8" = 1'-0"1 WEST

1/8" = 1'-0"2 SOUTH 1/8" = 1'-0"3 EAST

1/8" = 1'-0"4 NORTH

3" = 1'-0"6 HEAD - TYP 3" = 1'-0"9 HEAD @ STONE

3" = 1'-0"7 JAMB - TYP

3" = 1'-0"8 SILL - TYP 3" = 1'-0"11 SILL @ STONE

3" = 1'-0"10 JAMB @ STONE

REV DESCRIPTION DATE

225

DESCRIPTION DESCRIPTION

AMPS POLES WATTS # A B C # WATTS AMPS POLES20 1 (E) DOCK HOIST 1 0 2

20 1 (E) RM 103 N OUTLETS 3 0 4

20 1 HRV1-1 (ALTERNATE BID) 252 5 252 6

20 1 EDH1-1 (ALTERNATE BIT) 1512 7 1512 8

20 2 FCU1-1, FCU1-2, FCU 1-3, FCU1-4, FCU1-7, BS1-2 300 9 300 10

- - ---- 300 11 300 12

20 2 FCU1-5, FCU1-6, BS1-1 250 13 250 14

- - ---- 250 15 250 16

45 3 CU1-1 2516 17 2516 18

- - ---- 2516 19 2516 20

- - ---- 2516 21 2516 22

20 1 RCPT: ROOF SERVICE 180 23 180 24

25 0 26

27 0 28

29 0 30

31 0 32

33 0 34

35 0 36

37 0 38

39 0 40

41 0 42

4278 3066 3248

TOTAL LOADS: 10592 WATTS

DEMAND:

29 AMPS

(EXISTING) PANEL '00' AMPS MLO 208Y/120V VOLT 3 PHASE 4 WIRE FLUSH MOUNTING

BREAKER CIRCUIT PHASE LOADS CIRCUIT BREAKER

top related