2010 long-term surveillance and maintenance conference lessons learned for institutional controls at...

Post on 15-Jan-2016

213 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

Lessons Learned for Institutional Controls at the Weldon Spring

Site

22

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

33

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

44

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

55

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

66

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

77

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

88

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

Institutional Control Mechanisms Institutional control mechanisms are designed to Appropriately limit access to or uses of land, facilities,

and other real and personal property; Protect cultural and natural resources; Maintain physical security of DOE facilities; and Prevent or limit inadvertent human and environmental

exposure to residual contaminants.

99

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

Institutional controls include methods to preserve knowledge and to inform current and future generations of hazards and risks.

1010

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

Institutional Controls

Institutional controls in place prior to issuance of long-term surveillance and maintenance plan Federal ownership Interpretive Center Notation of land ownership Historical markers Real estate licenses Memorandum of Understanding with the U.S. Army Federal Facility Agreement

1111

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

Historical Marker

1212

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

Interpretive Center

1313

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

Interpretive Center Interpretive Center (continued)(continued)

1414

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

Long-Term Surveillance and Maintenance Plan Process to obtain additional institutional

controls included Special-use area (Special Use Area Well Drillers Rule); Easements with surrounding property owners; and Updated Memorandum of Understanding (MOU)

with the U.S. Army.

1515

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

Special Use Area

Special Use Area Well Drillers Rule was finalized in July 2007 for DOE and Army sites

Designated the DOE and Army’s groundwater-restricted areas as special areas in the Missouri Code of State Regulations

Requires additional drilling protocols and construction specifications to be imposed by Missouri Department of Natural Resources (MDNR) on any future domestic wells installed in these areas

1616

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

Special Area 4

1717

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

Easements with Surrounding Non-Federal Property Owners MDNR – Division of State Parks Missouri Department of Conservation (DCD) Missouri Department of Transportation (MDOT)

1818

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

Institutional Control Areas

1919

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

Institutional Control Areas (continued)

2020

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

Easements

Seeking easements for the purpose of restricting the use of groundwater

Restrict land use in the Southeast Drainage and Quarry Reduction Zone

2121

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

Easements (continued)

Long and unknown process The planned easements are another layer for long-term

control in the future Currently have controls over the groundwater-restricted

areas with State and Federal ownership of properties Special use area regulation Annual inspection

2222

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

DOE Steps Toward Acquiring Easements Obtained legal descriptions and surveyed the

affected properties Conducted a title search for the affected parties Obtained preliminary title commitment Obtained appraisal of affected areas Issued letters to property owners to initiate discussion

regarding proposed easements Included a letter with a draft easement and

offer letter Issued periodic reminder letters

2323

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

Easements

DOE and MDNR-Parks finalized and signed the easement in September 2009

DOE continues to work closely with MDC and MDOT

2424

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

Updated MOU with Army

The MOU with the Army was finalized and signed by both parties in October 2009

2525

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

Annual Inspection ProcessIncludes Inspection of Current and Planned Institutional Control Areas

2626

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

BergermeisterBergermeister SpringSpring

2727

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

Southeast DrainageSoutheast Drainage

2828

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

20

10

Lon

g-T

erm

Su

rveilla

nce a

nd

Main

ten

an

ce

Con

fere

nce

Con

fere

nce

Lessons Learned for Institutional Controls Institutional controls take time to develop and patience

and persistence to obtain The process is best started well in advance It is a good practice to layer the institutional controls The Weldon Spring site has made good progress in

obtaining necessary institutional controls