Experience in Commissioning of a 1MWe Solar Thermal Power Plant in Gurgaon

N.G.R. Kartheek1*, Deepak Yadav 1, Rangan Banerjee1, J.K. Nayak1, Santanu Bandyopadhyay1 Shireesh B.

Kedare1 

1 Department of energy science and engineering,

IIT BombayFunded by

Ministry of New and Renewable EnergyCorresponding Author. Tel: +91 22 25764794, E-mail: solarthermaliitb@gmail.com

Schematic of process flow for the solar thermal power plant

Process flow diagram

Unique features of the project

Demonstration of solar thermal technology for power generation

Combination of different collector technologies

Direct and indirect steam generation to be demonstrated

Simulation package for scale-up

Test facility for solar thermal applications to facilitate the development of indigenous technology

Consortium based approach involving government and industry

Project Landmarks

January 2010

January 2011

July 2013

Parabolic Trough Solar Field

Linear Fresnel Reflector

Commissioning Experience

Classification of commissioning experience

Operational Problems

Linear Fresnel Reflector

Receiver tube leakage of the LFR system

Receiver Tube leakage

• Operating Pressure: 40 kg/cm2 (g) saturated steam pressure • Hydro test Pressure: 120 kg/cm2 (g) • Leakages were found in 12 welding joints during hot commissioning

Leakage in the receiver tube

Equipment Problems

Leakages in instrument stub connections on heat exchanger

Temperature Transmitters showing Leakages

Leakage from Screwed connection

Temperature Transmitters with sealant

• Vapor pressure of Therminol VP 1 at 257°C is 1 bar (a) • Ignition temperature of Therminol VP 1 is 621°C• No screw joints and minimum flanged connections

System Problems

HTF Freezing

0:00

:00

0:10

:00

0:20

:00

0:30

:00

0:40

:00

0:50

:00

1:00

:00

1:10

:00

1:20

:00

1:30

:00

1:40

:00

1:50

:00

2:00

:00

2:10

:00

2:20

:00

2:30

:00

2:40

:00

2:50

:00

3:00

:00

3:10

:00

3:20

:00

3:30

:00

3:40

:00

3:50

:00

4:00

:00

4:10

:00

4:20

:00

4:30

:00

4:40

:00

4:50

:00

5:00

:00

5:10

:00

5:20

:00

5:30

:00

5:40

:00

5:50

:00

6:00

:00

6:10

:00

6:20

:00

6:30

:00

6:40

:00

6:50

:00

7:00

:00

7:10

:00

7:20

:00

7:30

:00

7:40

:00

7:50

:00

8:00

:00

8:10

:00

8:20

:00

8:30

:00

9

10

11

12

13

14

15

Time (hr: min)

Am

bien

t Tem

pera

ture

(oC

)

Ambient temperature profile at the project site on February 24th, 2013

• Crystallization temperature of HTF Therminol VP1 is 12°C

HTF Freezing Manual Operation Temperature gauge readings at Main HTF Pump discharge and outlet of solar fieldTemperature of HTF ~350C Pump at minimum flow rate

Schematic of Oil System

HTF Freezing

Schematic of Oil System

TG

TG

Pump Seal Failure: February, 2013

Dirt/Oil particles collected from the drain point near heat exchanger (March 17, 2013)

Summary and Lesson Learnt• Operational Problem – Time consuming, delay in commissioning

Leakages in superheater: Torque spanner Receiver tube and window glass: Spot Welding, Continuous power Water Entry in IA line: NRV Dry run of the BFP: Level Switches

• Equipment problems – Good engineering practise NRV Selection: Horizontal & Vertical line Instrument Stub: No threaded parts Compressed air line: No threaded joints Communication failure: Preconsidered Steam Valves: Control, Manual handle, Station

Summary and Lesson Learnt

• System Problem HTF Freezing: Unfreezes only in summer.UPS and Tracker failure: Continuous Power

supply

Commissioning problems in chronological order

THANK YOU

Project Objectives• 1MWe Solar Thermal Power Plant

Design & Development of a 1 MW plant. Generation of Electricity for supply to the grid.

•  National Test Facility Development of facility for component testing and

characterization.

•  Development of Simulation Package Simulation software for solar thermal power plant scale-up Compatibility for various solar applications.

receiver glass window breakage the LFR system

Breakage of the receiver window glass

Receiver Window Glass Breakage

Interruption in power supply to the tracking motors, focus shifted partially

Leakages in the superheater – 10/03/2013

Steam Leakage

Water entry in instrumentation air line

•Compressed air required in the Demineralisation plant (DM) in mixed bed unit• No NRV in IA line• DM water entered into the airline•4 control valve damaged

Dry run of the boiler feed pump

• Malfunction of Level transmitter on the Deaerator led to dry of pump

NRV at BFP exit Failure

Process flow from Deaerator to Steam generator

Leakages in compressed air piping

Schematic sketch of compressed air flow

Communication problem between level I and level II

Control System Hierarchy for the solar thermal power plant

Steam System valves

•Problem in complete closing of the valve• Manual closing of Valve – Not possible• Control Valve in the Steam Line – Regulate pressure

Control Valve with HandleControl Valve without Handle

Mechanical Seal-Frozen Oil Particles (March 17, 2013)

Dirt/Oil particles collected from the basket filter at suction of Main HTF Pumps (March 17, 2013)