3d 2 = klasicno zidana

Post on 15-Aug-2016

30 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

DESCRIPTION

klasicno zidana

TRANSCRIPT

Detail Structure Analyse

General model data

Data: 3D 2 = klasicno zidana.twpDate of calculation: 15.11.2013

Calculation method: 3D model

X Theory of I order XModal analyse Stability

Theory of II order XSeismic calculation Phases of construction

Nonlinear

Size of modelNo. of joints: 10698

No. of FEM elements: 10248

No. of beam elements: 2958

No. of boundary elements: 14463

No. of basic load actions: 5

No. of load combinations: 23

Measure unitsLength: m [cm,mm]Force: kNTemperature: Celsius

Input data – Structure

3D rendered views of the structure from 3D model of the structure created by Program

Izometrija

Izometrija

Izometrija

Izometrija

2D views of the structure from 3D model of the structure created by Program

b/d=

20/5

0

b/d=20/50

b/d=20/50

b/d=20/50

b/d=

20/5

0

b/d=20/50

b/d=

20/5

0b/

d=20

/50

b/d=

20/5

0b/d=

20/5

0b/

d=20

/50

b/d=20/50b/d=20/50

b/d=

20/5

0b/

d=20

/40

b/d=20/50

b/d=20/50

0

5.00

1

5.40

2

5.20

2'

2.60

3

3.20

4

1.55 4'

3.85

5

3.40

6

3.20

7

2.20

8

5.20

11

F

1.7

7

1

2.3

8

2

1.2

5

E

4.1

7

D'

0.5

0 D

1

.22

C

1.4

0

7

1.0

0

B

4.8

0

A

2.9

0

10

4.2

0

11

5.90 5.40

2.60

2.40 11.30

2.20

3.20

3.40

3.20

7.80

5.40

5.40

8.80

5.80

5.40

4.807.10

Nivo: -3.40 - BASEMENT [0.00 m]

T 30/40

T 55

/40

b/d=20/50T 55/40

T 30/40

b/d=

20/5

0

b/d=

20/2

7

T 30/40T

55/2

7

b/d=

35/5

0

b/d=

35/5

0

b/d=

35/5

0

b/d=

35/5

0

T 55

/50

b/d=

20/5

0

b/d=

20/5

0

b/d=20/50

T 55/40

T 55

/27

T 55/27b/

d=40

/60

T 30

/40

T 55/40

T 55

/40

T 55

/40

T 55

/40

T 55

/40

T 55

/40

T 55/40T 55/40

b/d=

35/5

0b/

d=35

/50

b/d=

35/5

0

b/d=35/50

b/d=

35/5

0b/

d=35

/50

T 55

/50

T 55

/50

b/d=20/50

b/d=20/50

b/d=

35/5

0

b/d=35/50

b/d=

35/5

0

b/d=20/50

b/d=20/50

b/d=35/50

T 55/40

b/d=

35/5

0

b/d=35/50 b/d=35/50 b/d=35/50

b/d=

35/5

0

b/d=

20/5

0

b/d=20/50

T 30

/40

0

5.00

1

5.40

2

5.20

2'

2.60

3

3.20

4

1.55 4'

3.85

5

3.40

6

3.20

7

2.20

8

5.20

11

F

1.7

7

1

2.3

8

2

1.2

5

E

4.1

7

D'

0.5

0 D

1

.22

C

1.4

0

7

1.0

0

B

4.8

0

A

2.9

0

10

4.2

0

11

1.80

8.305.902.40

5.40

7.10 4.80

5.40

5.80

8.80

5.40

5.40

7.80

3.20

3.40

3.20

2.20

Nivo: 0.00 - GF [3.40 m]

T 30/40

b/d=

35/4

0b/

d=35

/40

T 55/40

b/d=

20/2

7

T 55

/27

b/d=20/50

b/d=

35/4

0

b/d=

35/4

0

b/d=35/40

T 55

/50

T 55/40

T 55/40

b/d=

35/4

0b/

d=35

/40

b/d=

20/2

7

T 55/27

T 55

/40

T 55

/27

T 55

/40

T 55/40

T 55

/40

b/d=

35/4

0

b/d=

35/4

0b/

d=35

/40

T 30/40 b/d=20/50

b/d=35/40

T 55

/40

T 55/40

b/d=

20/6

0

b/d=35/40T 55/40

T 55/40

T 30

/40

T 55/40

T 55/40

T 55

/40

T 30

/40

b/d=

35/4

0

T 55/40

T 55

/50

T 55

/50

b/d=

20/5

0

T 30

/60

b/d=

35/4

0

b/d=35/40

T 55/40

T 55/40

b/d=

35/4

0

b/d=35/40 b/d=35/40 b/d=35/40

b/d=

35/4

0

T 55

/40

T 55/40 T 30/40

T 30

/40

T 30

/40

b/d=35/50b/d=20/50

T 55/40 T 55/40

b/d=

20/5

0T

55/4

0

T 55

/27

T 55

/27

0

5.00

1

5.40

2

5.20

2'

2.60

3

3.20

4

1.55 4'

3.85

5

3.40

6

3.20

7

2.20

8

5.20

11

F

1.7

7

1

2.3

8

2

1.2

5

E

4.1

7

D'

0.5

0 D

1

.22

C

1.4

0

7

1.0

0

B

4.8

0

A

2.9

0

10

4.2

0

11

1.60

3.80

0.70

8.305.902.40

5.40

5.40

5.40

7.80

3.20

3.40

3.20

2.20

Nivo: 1. FLOOR [6.80 m]

T 55

/40

T 55/40 b/d=35/40

b/d=

20/5

0

b/d=

35/4

0

b/d=

35/4

0

T 55

/60

b/d=

20/2

7

T 55

/27

T 30/40

b/d=

35/4

0

b/d=

35/4

0

b/d=35/40

b/d=35/40

b/d=

35/4

0

b/d=

35/4

0

T 55

/27

b/d=

35/4

0

b/d=

35/4

0b/

d=35

/40

b/d=35/40 b/d=20/50T

55/4

0

T 55/40 b/d=35/40T 55/40

T 55/40

b/d=

35/4

0

T 55/40

T 55/40

T 55

/40

b/d=

35/4

0

b/d=

35/4

0

T 55/40

T 55

/50

b/d=

35/4

0

b/d=35/40

T 55/40

T 55/40

b/d=

35/4

0

b/d=35/40 b/d=35/40 b/d=35/40

b/d=

35/4

0

T 55/40 T 30/40

T 30

/40

T 30

/40

b/d=35/40b/d=20/50

b/d=

20/5

0T

55/4

0

0

5.00

1

5.40

2

5.20

2'

2.60

3

3.20

4

1.55 4'

3.85

5

3.40

6

3.20

7

2.20

8

5.20

11

F

1.7

7

1

2.3

8

2

1.2

5

E

4.1

7

D'

0.5

0 D

1

.22

C

1.4

0

7

1.0

0

B

4.8

0

A

2.9

0

10

4.2

0

11

5.40

5.92

8.305.902.40

5.40

5.40

5.40

7.80

3.20

3.40

3.20

2.20

Nivo: 2. FLOOR [10.20 m]

b/d=

35/4

0

T 30

/40

b/d=35/40

b/d=35/40

b/d=

35/4

0b/

d=35

/40

b/d=35/40

b/d=35/40 b/d=35/40

b/d=

35/4

0

0

5.00

1

5.40

2

5.20

2'

2.60

3

3.20

4

1.55 4'

3.85

5

3.40

6

3.20

7

2.20

8

5.20

11

F

1.7

7

1

2.3

8

2

1.2

5

E

4.1

7

D'

0.5

0 D

1

.22

C

1.4

0

7

1.0

0

B

4.8

0

A

2.9

0

10

4.2

0

11

Nivo: ROOF [13.60 m]

Modal analyse

Modal analyse calculate is used to calculate periods and frequencies of structure vibrations which are necessary for seismic analyse of the structure.

Calculation of Masses FactorNo Name Coefficient1 SELFWEIGHT + DEAD LOAD (g) 1.002 Gk - WALLS (DEAD LOAD) 1.003 Qk1 - Implied Load ( LIVE LOAD) 0.30

Distribution of Masses Along the HighNivo Z [m] X [m] Y [m] Masa [T] T/m2

ROOF 13.60 22.26 9.27 90.77 1.162. FLOOR 10.20 21.32 10.21 407.73 1.161. FLOOR 6.80 20.21 10.54 550.42 1.620.00 - GF 3.40 19.50 12.14 449.11 1.50-1,20 - FOOTINGS 2.20 21.16 15.11 158.81-3.40 - BASEMENT 0.00 20.45 14.17 100.68 5.33-4.60 - ELEV. PIT -1.20 19.80 8.35 21.03-6.70 - POOL TECH. -3.40 19.80 8.35 17.29 0.92Ukupno: 6.09 20.48 11.36 1795.85

Centre of Stiffness Placement Along the High of StructureNivo Z [m] X [m] Y [m]

ROOF 13.60 19.79 12.422. FLOOR 10.20 18.63 13.921. FLOOR 6.80 17.61 14.280.00 - GF 3.40 16.88 19.37-1,20 - FOOTINGS 2.20 16.85 19.73-3.40 - BASEMENT 0.00 16.89 19.52-4.60 - ELEV. PIT -1.20 19.80 8.35-6.70 - POOL TECH. -3.40 19.80 8.35

Eksc. Along the High of StructureNivo Z [m] eox [m] eoy [m]

ROOF 13.60 2.47 3.152. FLOOR 10.20 2.69 3.701. FLOOR 6.80 2.60 3.740.00 - GF 3.40 2.62 7.23-1,20 - FOOTINGS 2.20 4.31 4.62-3.40 - BASEMENT 0.00 3.56 5.35-4.60 - ELEV. PIT -1.20 0.00 0.00-6.70 - POOL TECH. -3.40 0.00 0.00

Vibration Periods of the StructureNo T [s] f [Hz]

1 0.2557 3.91162 0.1779 5.62263 0.1577 6.3411

Seismic Calculation

Used Code: EUROCODE

Ground Classification: D(Deposits of loose-to-mediumcohesionless soil (with or without some soft cohesive layers), or ofpredominantly soft-to-firm cohesivesoil.)

Importance Class (Factor): II (γ=1.2)ag/g: 0.05Behaviour Factor: 2Damping Correction Factor: 0.05S: 1.35Tb: 0.2Tc: 0.8Td: 2

Seismic Distribution Factor:Name Kx Ky Kz

Aex 1.000 0.000 0.000Aey 0.000 1.000 0.000

AexTon 1 Ton 2

Level Z [m] Px [kN] Py [kN] Pz [kN] Px [kN] Py [kN] Pz [kN]ROOF 13.60 -0.00 0.00 -0.00 7.00 14.38 -0.062. FLOOR 10.20 0.00 0.00 -0.00 23.75 62.34 4.201. FLOOR 6.80 0.00 0.00 -0.00 24.67 57.65 1.790.00 - GF 3.40 0.00 0.00 -0.00 3.67 10.20 0.75-1,20 - FOOTINGS 2.20 0.00 -0.00 -0.00 0.35 0.45 0.02-3.40 - BASEMENT 0.00 -0.00 -0.00 -0.00 0.05 0.04 -0.03-4.60 - ELEV. PIT -1.20 0.00 -0.00 -0.00 0.01 0.01 0.02-6.70 - POOL TECH. -3.40 0.00 -0.00 -0.00 0.00 0.00 0.00

Σ= 0.00 0.00 -0.00 59.50 145.08 6.68

Ton 3 Svi tonoviLevel Z [m] Px [kN] Py [kN] Pz [kN] Px [kN] Py [kN] Pz [kN]

ROOF 13.60 0.08 -0.11 0.01 7.08 14.27 -0.052. FLOOR 10.20 0.11 -0.86 2.82 23.86 61.48 7.021. FLOOR 6.80 0.20 -0.74 0.60 24.87 56.91 2.390.00 - GF 3.40 0.05 -0.19 0.02 3.72 10.01 0.78-1,20 - FOOTINGS 2.20 0.00 -0.01 0.00 0.35 0.45 0.02-3.40 - BASEMENT 0.00 0.00 -0.00 0.00 0.05 0.04 -0.03-4.60 - ELEV. PIT -1.20 -0.00 -0.00 0.00 0.01 0.01 0.02-6.70 - POOL TECH. -3.40 -0.00 0.00 0.00 0.00 0.00 0.00

Σ= 0.44 -1.91 3.45 59.94 143.17 10.14

AeyTon 1 Ton 2

Level Z [m] Px [kN] Py [kN] Pz [kN] Px [kN] Py [kN] Pz [kN]ROOF 13.60 0.08 -0.11 0.01 -0.00 0.00 -0.002. FLOOR 10.20 0.11 -0.86 2.82 0.00 0.00 -0.001. FLOOR 6.80 0.20 -0.74 0.60 0.00 0.00 -0.00

0.00 - GF 3.40 0.05 -0.19 0.02 0.00 0.00 -0.00-1,20 - FOOTINGS 2.20 0.00 -0.01 0.00 0.00 -0.00 -0.00-3.40 - BASEMENT 0.00 0.00 -0.00 0.00 -0.00 -0.00 -0.00-4.60 - ELEV. PIT -1.20 -0.00 -0.00 0.00 0.00 -0.00 -0.00-6.70 - POOL TECH. -3.40 -0.00 0.00 0.00 0.00 -0.00 -0.00

Σ= 0.44 -1.91 3.45 0.00 0.00 -0.00

Ton 3 Svi tonoviLevel Z [m] Px [kN] Py [kN] Pz [kN] Px [kN] Py [kN] Pz [kN]

ROOF 13.60 17.07 35.07 -0.14 17.15 34.96 -0.142. FLOOR 10.20 57.92 152.01 10.24 58.03 151.15 13.061. FLOOR 6.80 60.14 140.58 4.36 60.35 139.84 4.960.00 - GF 3.40 8.96 24.87 1.83 9.01 24.68 1.86-1,20 - FOOTINGS 2.20 0.85 1.11 0.05 0.86 1.10 0.05-3.40 - BASEMENT 0.00 0.12 0.10 -0.07 0.12 0.10 -0.07-4.60 - ELEV. PIT -1.20 0.01 0.02 0.04 0.01 0.02 0.04-6.70 - POOL TECH. -3.40 0.00 0.00 0.00 0.00 0.00 0.00

Σ= 145.08 353.77 16.30 145.52 351.86 19.75

Factors of participationsTon \ Name 1. Aex 2. Aey

1 0.0002 0.993 0.0003 0.007 1.005

Factors of participations - involved massesTon UX (%) UY (%) UZ (%) ΣUX

(%)ΣUY (%)

ΣUZ (%)

1 0.00 0.00 0.28 0.00 0.00 0.282 3.52 20.92 0.04 3.52 20.92 0.333 0.03 0.51 1.67 3.55 21.43 2.00

Calculations of the Structural Forces and Displacements under the Vertical and Lateral (Seismic) Forces

Opt. 4: Aex

Deformisani model IzometrijaDeformed 3D model under the seismic load Aex

Opt. 4: Aex

Deformisani model Ram: H_5

Opt. 4: Aex

Deformisani model Ram: H_2

Opt. 5: Aey

Deformisani model Izometrija

Opt. 5: Aey

Deformisani model Ram: V_4

Opt. 5: Aey

Deformisani model Ram: V_5

Opt. 5: Aey

Deformisani model Izometrija (Top)

-160.49

112.92

-102.42

-37.10

38.51

-107.46

0.84

-0.5

2 2.

84 -

0.26

1.

78 -0

.98

6.14

-11.

53

-12.

66

5.57

-1.4

1 5.

02 -0

.37

1.04

-2.7

1 3.

60

5.15

-31.02

0.65

-0.9

7 0.

26 -0

.90

0.05

-1.2

2

0.30

-0.8

9 0.

10 -0

.58

0.44

-0.7

0

-7.6

8 3.

77 -1

.33

-0.7

8 0.

26 -0

.95

1.48

-0.3

5 1.

01 -1

.10

2.22

-2.2

9 2.

55 -5

.95

-2.49 0.41

-1.47 0.70 0.37

-0.53

0.80 -1.20 0.33 -1.28 -7

.76

1.95

-3.2

0

-4.6

7

5.65

-44.

19

-28.

70

18.5

9

-0.2

5

-59.58

36.57

-11.46

-0.29 0.36 -0.32 4.69

-36.18

-26.

12

4.42

-6.8

1

-347

.25

198.

67

-121

.08

-14.31

12.58

9.79

-69.

26

-35.

50

29.0

3

-56.

30

-42.

33

38.3

0

-45.

37

-21.60

14.00 -0.73

-7.97 13.90

0.99

-18.69

-14.

01

4.54

-1.1

8 5.

56 -0

.02

10.3

2

-24.11

12.06

-13.05

-4.67

3.31

-8.23

-4.71

4.54

-5.65

-6.67

2.70

-7.37 -13.

88

7.37

-15.

13

-10.

41

5.75

-8.8

9

5.50

-2.0

9 0.

35 -0

.68

0.31

-0.2

5 0.

39 -0

.91

0.83

-1.

38

-0.03

6.61 -0.59

-6.5

8 3.

01 -8

.43

4.85

-8.1

8

-27.

27

7.61

-13.

83

-21.12

22.49

-15.77

-18.25

34.73

-43.46

8.38

-10.

56

-17.77

21.70

-24.47

-5.0

9

22.3

1

-4.4

0

-63.

03

66.7

7

-74.

33

0.20 -0.52

0.14 -0.04

-72.

73

104.

56

-74.

18

-45.

76

64.3

6

-48.

48

11.26 -28.31

23.10

-7.30

-16.

25

8.02

-21.

09

11.6

7

12.03

-0.74

-15.

67

8.56

8.77

-21.

56

-45.

37

20.1

1

-27.

22

1.76 -38.47

3.96

Opt. 6: 1.35xI+1.35xII+1.5xIII

Uticaji u gredi: max M3= 198.67 / min M3= -347.25 kNm Nivo: 0.00 - GF [3.40 m]

-110.10

93.69

-58.98

91.09

-2.0

9

18.1

4

-22.

47 2.

10

-1.6

3 2.

15

23.73

3.27

-0

.27

2.92

-0.9

7 2.

81

-1.6

3 2.

15

-0.2

1 2.

75

-13.

62 4.

01

-2.8

0

6.51

-2.6

2 0.

19

-4.6

5

10.5

6

-4.39

0.17 -1.05

2.18 -1.46

1.77 -1.51

3.73

-9.1

3

6.11

-20.

37

28.6

0

-44.

79

26.8

3

112.47 -62.62

43.85

-2.09 0.48 -2.80

27.93

-31.

80

19.6

3

-226

.03

158.

58

-32.21

21.20

23.7

5

-49.

82

49.2

7

-60.

69

61.8

2

-35.37

1.06 -4.60

0.72 -4.98

19.03

-55.87

6.24 -1.44

4.46 -1.61

33.41

15.29

-24.

34 1.

92

-6.7

2

11.5

3

-34.08

7.32 -2.60

28.20

-9.72

11.69

-7.90

8.30

-7.95

8.25

-25.

54

28.9

8

-18.

49

16.3

4

-5.3

9

22.6

2

-3.8

0

0.75

-1

.08

1.68

-1

.39

4.55

-6.73

2.13 -3.85

1.82 -3.95

10.34

-14.

89 5.

76

-15.

53 14

.71

-43.

55

24.6

9

-18.75

29.25

-40.22

57.62 -12.

35

24.3

9

-35.61

26.75

-32.

63

32.2

3

-54.

21

65.4

8

-0.40 2.07 -1.44

-74.

66

70.3

5

-51.

55

49.2

3

29.58 -23.34

23.39

-28.

55

36.7

6

-11.

15

25.2

8

-15.05

5.36 -0.63 4.54 -5.10

13.90

-25.

52

8.68

-42.

97

36.2

8

-54.

55

41.2

5

13.15 -40.45

4.85

Opt. 6: 1.35xI+1.35xII+1.5xIII

Uticaji u gredi: max T2= 158.58 / min T2= -226.03 kN Nivo: 0.00 - GF [3.40 m]

7.62

-247

.47

30.3

9 -62.75

0.14 -0.13 0.57 -0.63 0.60

-1.17 0.53 -1.03

-1.4

5

-0.4

9 0.

07 -0

.58

82.2

0

-22.

69

27.3

6

-62.

53

28.00

22.81

-6.3

5

15.3

0

-5.9

4

-4.0

1

10.3

1

-3.1

4

-7.74

39.10

-42.18

-0.5

8

-16.93

-0.20 0.02 -0.98

3.83

-4.2

6 1.

87 -5

.12

3.26

-5.4

3 11

.37

-27.67

-29.

07

65.2

4

-22.

58

-0.55 0.23 -0.05 0.33 -0.23 0.14 -0.41

0.39 -1.10

0.64 -1.73

0.03 -0.71

-1.32 0.71 -1.78

0.45 -1.23

0.41 -0.35

0.93 -1.40

0.21 -0.88

4.00 -0

.71

0.62

-2.9

1 0.

36 -1

.35

1.02

-1.5

9 0.

32 -4

.23

0.88

2.32

-30.81 0.06 -1.21

2.16 -0.79

0.22

-6.17

32.31

-12.97

0.25

-0.2

8 0.

10 -

0.02

0.

21 -0

.57

0.15

-0.5

6

0.75

-0.5

8

-0.1

9 0.

33 -0

.87

0.22

-1.4

1 0.

60 -0

.86

0.35

-1.1

1 0.

37

-17.

44

44.6

5

-53.

65

47.9

7

-45.

28

6.67

-3.9

9

0.74

-0.27 0.20 -0.29

0.29 -0.79

0.50 -1.15

0.78 -0.31

1.19 -2.74

0.34

-86.38

-0.4

4 0.

16 -0

.53

0.20

-0.3

5 0.

22 -0

.51

0.22

-0.4

4 0.

36 -0

.19

1.43

-1.8

7 0.

18 -1

.34

0.15

-0.7

5 0.

08 -0

.30

65.4

3 -39.76

58.64

-95.56

-54.77

50.95

-96.53

-120

.42

84.4

1

-101

.63

-0.2

6 0.

22 -0

.96

0.17

-0.8

7 0.

05 -0

.87

1.07

-3.56 0.17 -0.41

1.08 -0.90

1.30 -1.60

0.59

0.18

-1.3

7 3.

27 -8

.88

0.12

-0.

14

-42.

69

20.4

0 -9

.69

11.3

4

-61.

69

30.4

1

-17.

69

10.8

9

-1.2

7 3.

39 -1

.64

1.51

-1.0

3 1.

01

-44.79

38.30

-6.99

0.79

-0.5

8 1.

44 -1

.58

2.36

-2.7

1 2.

00 -3

.19

3.06

-3.3

4

1.24

-2.0

2

0.45

-0.

33

0.41

-0.9

1 0.

06 -0

.81

0.61

0.19

-0.

16

0.18

-0.5

3 0.

26 -0

.57

0.25

-0.7

6

-31.85

-0.6

6 0.

36 -0

.57

0.34

-0.4

2 0.

12 -0

.69

0.23

-4.16

0.61 -0

.56

0.70

-2.2

8

0.21

-1.4

9 0.

24 -1

.34

0.19

-1.5

2 0.

53 -0

.82

-76.07

43.34

-13.26 3.55 -0.87

1.05 -2.20

0.69 -2.44

0.38

-8.00

-1.10

0.23 -0.85

0.06 -1.07

0.09 -1.33

1.10

11.0

5

-0.38

31.07

-27.97

-68.49

-24.65

6.37

-108

.26

46.6

5

-98.

84

-183.40

93.07

-96.24

21.3

1

-5.3

6 0.

74

-0.12 0.01 -0.56

-2.2

0

0.06

-1.1

9 0.

49 -0

.53

1.08

Opt. 6: 1.35xI+1.35xII+1.5xIII

Uticaji u gredi: max M3= 93.07 / min M3= -247.47 kNm Nivo: 1. FLOOR [6.80 m]

52.1

6 -1

47.4

0

63.70 -9.15

1.81 -0.62 3.81 -0.36

4.59

-2.3

3

0.50

-0

.93

1.01

-15.

66

3.40

-4

7.96

58.7

8

-27.

24

62.3

1

-30.19

37.04

-25.69

25.69

-26.

64

26.4

2

-19.

91

4.83

-5

.13

19.4

8

-35.82

22.35

-44.27

58.09

-0.3

8 1.

84

-1.1

8 1.

05

-15.06

1.91 -1.12

2.46

-4.5

6

3.06

-21.

44

-25.57

19.61 -36.11

-65.

44

63.5

2

-2.71 1.55

-1.95 2.30

-1.92 2.34

-0.47

4.76 -1.60

2.65

-4.61

1.53 -4.00

0.73 -2.97

4.69 -1.27

3.22

-3.59 2.08

-2.41 3.26

-7.7

3 8.

61

-11.

58 4.

76

-10.

20

9.20

-9

.28

10.1

2 -7

.75

11.6

5 -1

4.54

4.

87

24.97 -0.72 2.73

-2.04 1.40

-2.40 1.11

-28.35

30.59

-0.9

5 1.

86

-1.3

9 0.

89

-1.0

8 2.

27

-0.9

5 2.

16

-2.1

9

2.98

-2.2

8 2.

92

-3.2

1 1.

99

-4.4

0 0.

56

-3.3

7 1.

71

-3.7

6 1.

32

-39.

40

59.8

2

-30.

50

25.9

0

-27.

72

21.2

0

-1.97 2.57

-2.25 2.29

-1.33 3.20

-0.55 3.98

-1.33 3.21

5.47 -2.77

9.24

-71.16

-2.5

1 2.

56

-2.7

1 2.

37

-2.2

6 2.

70

-2.6

2 2.

58

-2.8

3 2.

37

6.61

-1

.14

3.82

-1

.09

2.93

-2

.01

2.01

-41.

85

37.1

2

-65.48

102.00 -57.62

-68.23

98.30 -76.91

-98.

31

93.6

4

-1.8

1 1.

06

-2.7

7 0.

10

-2.5

1 0.

35

-3.7

2

-0.10 5.80

-1.27 2.33 -1.14 2.46 -0.51

5.25 -2.66

2.49

-1.3

5

13.6

4 -4

.75

0.21

-2

.86

2.22

-3

.52

1.56

-2

1.09

34.6

1 -4

0.14

1.03

38.3

7

-2.7

6 3.

20

-21.

71

-70.

42

52.7

4

-21.

78

0.96

-47.62

33.66

-1.5

0

9.89

-2.2

5 9.

59

-5.7

3 6.

11

-7.1

6 4.

68

-0.8

1 2.

98

-1.3

9 2.

39

-2.2

4 0.

72

-1.1

0 1.

54

-1.4

5 2.

17

-0.8

6 2.

35

-0.5

8 2.

62

-13.27

19.87

-2.6

3 0.

24

-2.5

1 0.

36

-1.9

1 0.

96

-2.5

2 0.

35

-5.29

0.80

-5.9

6 9.

08

-7.9

1 7.

13

-6.7

6 6.

39

-6.8

3 7.

10

-7.6

5 6.

28

-74.07

47.04 -6.17 13.44

-8.01 11.60

-8.19 11.42

-7.60 12.01

-4.28 15.33

-2.12 1.93

-2.07 0.46 -2.59

0.67 -2.81

1.00 -4.06

-15.

14

4.18

-8

.64

10.6

8 -6

.46

12.8

6

-24.18

34.77 -1.62

41.31

-34.14

4.67 -0.66

3.60 -1.94

8.84

-78.

23

75.8

2

-160.83

135.92

-25.

85

3.09

-7

.04

10.1

5 -4

.03

15.8

8 -2

.31

21.3

4

11.7

7

-0.95 1.96

-1.39

-0.5

9 4.

23

-2.8

1 2.

00

-3.7

4 0.

81

-4.0

2 1.

17

-3.9

2 1.

28

Opt. 6: 1.35xI+1.35xII+1.5xIII

Uticaji u gredi: max T2= 135.92 / min T2= -160.83 kN Nivo: 1. FLOOR [6.80 m]

-8.1

8

1.68

-39.

56

-23.48 -4

2.88

28.7

0

1.98

-30.15

30.96

-28.05

2.48 -0.31

0.65 -1.14

0.45 -1.35

0.46 -1.23

1.37

0.76

-1.4

1 0.

21 -1

.27

0.22

-1.0

2 0.

13 -0

.50

-87.

95

143.

67

-130

.34

-2.7

6 2.

79

-158

.24

82.3

1

-9.8

2

-40.90

36.74

-1.64

-0.1

9 0.

64 -0

.45

0.61

-0.7

2 0.

99 -

0.48

0.

91 -

0.76

0.

74 -1

.73

0.55

-1.5

8

-3.5

2 1.

41

-0.9

2

2.08

9.

17

0.66 -0.54

2.79

-4.42

-24.

07

74.8

7

0.58

-1.1

2 0.

31 -2

.74

0.26

0.89 -1.03

0.16 -0.68 0.35 -0.64 0.66

-1.21 0.93

-1.46 2.04

27.72

-62.89

-51.54

36.04

-53.20

0.32

-0.7

7

0.24

-0.3

5

0.22

-0.5

1 0.

14 -0

.37

0.15

-0.3

5 0.

40

2.73

-43.93

-2.03

0.29

19.2

9

-21.

33

30.97

-33.33 1.85

-44.02

-22.78

0.55 -1.18 0.68

-0.65 0.65

-1.81 0.11

-1.04

0.30

-1.4

1 2.

81

-0.40 0.05 -0.61

0.16 -0.29

-56.46

0.11 -0.84

0.27 -0.92

-69.

04

13.8

1

-3.5

5 -1

.46

-108

.75

83.4

6

-157

.48

-101.03

62.46

-1.53

-19.40 3.09

-9.56

-4.7

7

29.9

2

-61.

86

0.78 -1.15

0.02

-0.96 0.03

-1.34 1.56

-55.45

32.23

-0.75

0.76

-2.1

2 0.

23 -1

.89

0.81

-0.4

1 0.

32 -0

.94

0.40

-0.7

4 0.

51 -0

.93

0.69

-0.5

7 1.

01

-3.7

0

9.73

-31.

28

-5.9

0

38.4

1

-11.

05

-0.20 0.24 -0.79

0.16 -0.59

0.23 -0.61

0.20 -0.70

0.05

-0.97 0.55

-0.59 0.55 -0.82

0.50 -0.73

0.49 -0.56

0.41 -0.34 0.32

-0.74 0.37 -0.14

-0.69 0.65

-1.86 0.49 -0.03

-0.1

8 0.

66 -1

.07

0.27

-1.5

1 0.

33 -0

.76

0.32

-1.2

5 0.

43

-10.

98

15.0

7

-41.

49

-8.9

7

35.5

2

-14.

06

Opt. 6: 1.35xI+1.35xII+1.5xIII

Uticaji u gredi: max M3= 143.67 / min M3= -158.24 kNm Nivo: 2. FLOOR [10.20 m]

-12.

50

30.4

9

-16.44

16.19

-39.

70

23.7

5

23.87

-22.27

34.50

-0.50 6.31

-1.75 5.05

-1.72 5.09

-1.89 4.91

-3.80 3.01

-0.2

5 5.

55

-1.6

4 4.

60

-1.8

1 4.

21

-2.9

1 3.

12

-98.

79

106.

62

-2.0

3 1.

79

-6.8

1

-130

.50

67.2

0

-43.98

29.75

-3.5

8 4.

07

-3.2

6

4.92

-1

.68

5.98

-2

.14

5.52

-8.5

2

20.2

3

-0.1

1 1.

83

-2.2

5

2.93

-11.

29

8.03

-1

0.31

9.

02

-6.7

5 12

.57

-2.69 3.59

-1.78 4.49

-6.81

-51.

72

46.0

2 -2

.88

4.92

-1

.12

6.68

-4

.03

3.41

-3

.02

2.06

-4

.52

0.56

-3.60 5.26

-1.95 3.45 -1.65 3.75 -2.15

5.15 -1.38

5.92 -2.35

5.38 -33.94

68.61 -48.51

-63.54

71.80 -48.53

2.69

-1

.25

2.26

-1

.76

1.75

-0.8

4 1.

98

-1.6

4 0.

64

-1.1

4 2.

20

-1.2

6 1.

85

-1.2

7 1.

84

-1.7

9 1.

32

-38.41

45.75

-3.12 0.82

-2.72 1.23

29.8

9

-21.15

36.25

37.57

-18.19

1.16 -2.12

4.26 -0.46

5.92 -2.34

4.04

-0.7

1 2.

16

-2.0

4 0.

82

-2.4

4 0.

43

-6.4

0

-2.33

57.94 -5.51

0.16 -1.67 1.18 -1.78

2.45 -3.43

3.54 -37.

35

24.7

8 -2

.11

0.12

-1

.61

0.61

-77.

36

95.8

5

-92.04

63.72 -0.91 2.61

-1.81

-30.78

21.82

-25.

13

48.3

1

-0.42 3.63

-1.64 0.89 -1.49 1.05 -2.00

1.18 -2.58

1.23 -4.47

-50.68

28.08

-2.2

0 4.

18

-5.7

8 2.

37

-6.2

4 1.

91

-3.3

2 4.

30

-4.1

4 3.

48

-4.2

8 3.

17

-4.8

0 3.

00

-4.7

5 3.

04

-18.

34

0.98

-1

3.22

6.

10

-4.2

7

45.2

5

-30.

94

32.8

1

-2.54 3.84

-2.99 3.39

-2.86 3.52

-2.76 3.62

-2.94 3.44

-4.66 1.72

-4.08 3.00

-4.34 2.75

-4.19 2.89

-3.82 3.27

-3.18 3.55

-4.00 2.74

-4.51 3.99

-5.78 2.72

-3.5

7 4.

23

-4.4

2 3.

38

-5.1

1 2.

33

-3.1

9 1.

89

-4.0

4 1.

04

-18.

23

32.5

7

-10.

32

8.70

-2

4.63

43.0

5 Opt. 6: 1.35xI+1.35xII+1.5xIII

Uticaji u gredi: max T2= 106.62 / min T2= -130.50 kN Nivo: 2. FLOOR [10.20 m]

27.0

6

-2.4

8

1.05

-1.0

8 0.

22

-66.

27

36.3

3

-0.74

0.50

-0.51

0.42

-0.59

0.35

-1.47

0.46

-1.07

0.42 -1.15

0.45 -0.53

19.1

1

-18.

56

12.0

3

-36.54

0.29

-0.80

0.09

-16.59

11.80

-0.15 0.79

-0.73

0.55

-1.00

16.51

-0.2

6 0.

17 -0

.39

0.18

-0.3

9 0.

24 -0

.69

0.22

-0.8

3

0.16

-0.7

6

1.21

-0.5

8

0.39

-0.8

8

0.34

-0.5

3

1.07

-43.24

26.41

-24.62

Opt. 6: 1.35xI+1.35xII+1.5xIII

Uticaji u gredi: max M3= 36.33 / min M3= -66.27 kNm Nivo: ROOF [13.60 m]

-16.

94

23.5

1

-2.0

5

5.51

-1

.20

13.5

1 -5

5.38

27.5

0

-4.19

2.24 -3.69

2.73 -3.70

2.73 -5.43

4.87 -3.30

0.24 -4.84

3.84

-13.

95

24.3

5

-16.

99

7.55

33.66 -5.34

0.55 -1.82

2.47 -2.98

3.89 -0.26

2.10 -0.99

4.80 -26.49

4.62 -3.77

4.73 -3.74

4.77

-14.93

38.26

-2.5

8

2.91

-2

.56

2.94

-3

.10

3.72

-2

.91

3.91

-3

.12

3.70

-4

.83

1.99

-3.9

0

3.66

-4

.24

3.32

-4

.76

2.80

-45.27

39.24 -23.81

Opt. 6: 1.35xI+1.35xII+1.5xIII

Uticaji u gredi: max T2= 39.24 / min T2= -55.38 kN Nivo: ROOF [13.60 m]

top related