THE ARBORS @ BRIGHTON PARK
BLOOMFIELD,
CONNECTICUT
PROJECT MANUAL
ISSUE DATE: 02-06-2015
DD REVIEW SET
KL PROJECT NO. 5256
Kenneth Linehan, Architect
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
TABLE OF CONTENTS PAGE 1 OF 5
THE ARBORS @ BRIGHTON PARK
BLOOMFIELD, CONNECTICUT
PROJECT MANUAL
TABLE OF CONTENTS
INTRODUCTORY INFORMATION DATE BY
A. COVER PAGE 02/06/15 KL
B. TABLE OF CONTENTS 02/06/15 KL
DIVISION 00 - PROCUREMENT AND CONTRACT DOCUMENTS
003132 GEOTECHNICAL REPORT 04/21/14 PSI
007200 GENERAL CONDITIONS OF THE CONTRACT 02/06/15 KL
007300 SUPPLEMENTARY CONDITIONS 02/06/15 KL
SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
011000 SUMMARY 02/06/15 KL
012100 ALLOWANCES 02/06/15 KL
012500 SUBSTITUTION PROCEDURES 02/06/15 KL
012600 CONTRACT MODIFICATION PROCEDURES 02/06/15 KL
012900 PAYMENT PROCEDURES 02/06/15 KL
013100 PROJECT MANAGEMENT AND COORDINATION 02/06/15 KL
013200 CONSTRUCTION PROGRESS DOCUMENTATION 02/06/15 KL
013233 PHOTOGRAPHIC DOCUMENTATION 02/06/15 KL
013300 SUBMITTAL PROCEDURES 02/06/15 KL
014000 QUALITY REQUIREMENTS 02/06/15 KL
014200 REFERENCES 02/06/15 KL
015000 TEMPORARY FACILITIES AND CONTROLS 02/06/15 KL
016000 PRODUCT REQUIREMENTS 02/06/15 KL
017300 EXECUTION 02/06/15 KL
017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 02/06/15 KL
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
TABLE OF CONTENTS PAGE 2 OF 5
017700 CLOSEOUT PROCEDURES 02/06/15 KL
017823 OPERATION AND MAINTENANCE DATA 02/06/15 KL
017839 PROJECT RECORD DOCUMENTS 02/06/15 KL
017900 DEMONSTRATION AND TRAINING 02/06/15 KL
DIVISION 02 EXISTING CONDITIONS NOT USED
DIVISION 03 CONCRETE
033000 CAST-IN-PLACE CONCRETE 02/06/15 MSP
035216 LIGHTWEIGHT CONCRETE TOPPING 02/06/15 MSP
035413 GYPSUM CEMENT UNDERLAYMENT 02/06/15 KL
DIVISION 04 MASONRY
042000 UNIT MASONRY 02/06/15 MSP
047200 CAST STONE MASONRY 02/06/15 KL
DIVISION 05 METALS
055100 METAL STAIRS 02/06/15 KL
055213 PIPE AND TUBE RAILINGS 02/06/15 KL
DIVISION 06 WOOD, PLASTICS AND COMPOSITES
061000 ROUGH CARPENTRY 02/06/15 MSP
061600 SHEATHING 02/06/15 MSP
061753 SHOP FABRICATED WOOD TRUSSES 02/06/15 MSP
062013 EXTERIOR FINISH CARPENTRY 02/06/15 KL
064023 INTERIOR FINISH CARPENTRY 02/06/15 KL
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
071326 SELF-ADHERING SHEET WATERPROOFING 02/06/15 KL
072100 THERMAL INSULATION 02/06/15 KL
072500 WATER RESISTIVE BARRIER / AIR BARRIER 02/06/15 KL
073113 ASPHALT SHINGLES 02/06/15 KL
074633 VINYL SIDING, SOFFIT VENT STRIP AND SOFFIT 02/06/15 KL
076200 SHEET METAL FLASHING AND TRIM 02/06/15 KL
076500 MANUFACTURED FLASHING PANELS 02/06/15 KL
077200 ROOF SPECIALTIES 02/06/15 KL
078413 PENETRATION FIRESTOPPING 02/06/15 KL
078446 FIRE-RESISTIVE JOINT SYSTEMS 02/06/15 KL
079200 JOINT SEALANTS 02/06/15 KL
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
TABLE OF CONTENTS PAGE 3 OF 5
DIVISION 08 OPENINGS
081115 HOLLOW METAL DOORS AND WOOD FRAMES 02/06/15 KL
081416 INTERIOR WOOD DOORS 02/06/15 KL
081620 MIRRORED CLOSET DOORS 08/08/11 KL
083113 ACCESS DOORS AND FRAMES 02/06/15 KL
083613 SECTIONAL DOORS 02/06/15 KL
085313 VINYL WINDOWS 02/06/15 KL
087100 DOOR HARDWARE 02/06/15 KL
088000 GLAZING 02/06/15 KL
088300 MIRRORS 02/06/15 KL
DIVISION 09 FINISHES
092216 NON-STRUCTURAL METAL FRAMING 02/06/15 KL
092900 GYPSUM BOARD 02/06/15 KL
093000 TILING 02/06/15 KL
096513 RESILIENT BASE AND ACCESSORIES 02/06/15 KL
096519 RESILIENT TILE AND STRIP FLOORING 02/06/15 KL
096816 SHEET CARPETING 02/06/15 KL
099113 EXTERIOR PAINTING 02/06/15 KL
099123 INTERIOR PAINTING 07/17/11 KL
DIVISION 10 SPECIALTIES
101400 SIGNAGE 02/06/15 KL
102801 BATH ACCESSORIES 02/06/15 KL
104413 FIRE EXTINGUISHER CABINETS 02/06/15 KL
104416 FIRE-EXTINGUISHERS 02/06/15 KL
105500 POSTAL SPECIALTIES 02/06/15 KL
105610 CLOSET SPECIALTIES 02/06/15 KL
DIVISION 11 EQUIPMENT
113100 RESIDENTIAL APPLIANCES 02/06/15 KL
DIVISION 12 FURNISHINGS
122113 HORIZONTAL LOUVER BLINDS 02/06/15 KL
123530 RESIDENTIAL CASEWORK 02/06/15 KL
DIVISION 13 - SPECIAL CONSTRUCTION NOT APPLICABLE
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
TABLE OF CONTENTS PAGE 4 OF 5
DIVISION 14 - CONVEYING SYSTEMS NOT APPLICABLE
DIVISION 15 through 20 NOT USED
DIVISION 21 FIRE SUPPRESSION
210517 SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING 02-06-15 MGE
210518 ESCUTCHEONS FOR FIRE-SUPPRESSION PIPING 02-06-15 MGE
210553 IDENTIFICATION FOR FIRE-SUPPRESSION PIPING AND 02-06-15 MGE
EQUIPMENT
211100 FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING 02-06-15 MGE
211200 FIRE SUPPRESSION STANDPIPIES 02-06-15 MGE
211313 WET-PIPE SPRINKLER SYSTEMS 02-06-15 MGE
DIVISION 22 PLUMBING
220517 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 02-06-15 MGE
220518 ESCUTCHEONS FOR PLUMBING PIPING 02-06-15 MGE
220523 GENERAL DUTY VALVES FOR PLUMBING PIPING 02-06-15 MGE
220529 HANGERS & SUPPORTS FOR PLUMBING, PIPING, AND 02-06-15 MGE
EQUIPMENT
220719 PLUMBING PIPING INSULATION 02-06-15 MGE
221116 DOMESTIC WATER PIPING 02-06-15 MGE
221119 DOMESTIC WATER PIPING SPECIALTIES 02-06-15 MGE
221316 SANITARY WASTE AND VENT PIPING 02-06-15 MGE
221319 SANITARY WASTE PIPING SPECIALTIES 02-06-15 MGE
223430 DIRECT-VENT GAS, DOMESTIC WATER HEATERS NOT ISSUED
224100 RESIDENTIAL PLUMBING FIXTURES 02-06-15 MGE
DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING (HVAC)
230513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT 02-06-15 MGE
230517 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING 02-06-15 MGE
230518 ESCUTCHEONS FOR HVAC PIPING 02-06-15 MGE
230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUPMENT 02-06-15 MGE
230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC 02-06-15 MGE
230713 DUCT INSULATION 02-06-15 MGE
230719 HVAC PIPING INSULATION 02-06-15 MGE
232300 REFRIGERANT PIPING 02-06-15 MGE
233113 METAL DUCTS 02-06-15 MGE
233116 NONMETAL DUCTS 02-06-15 MGE
233300 AIR DUCT ACCESSORIES 02-06-15 MGE
233423 HVAC POWER VENTILATORS 02-06-15 MGE
233713 DIFFUSERS, REGISTERS, AND GRILLES 02-06-15 MGE
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
TABLE OF CONTENTS PAGE 5 OF 5
234100 PARTICULATE AIR FILTRATION 02-06-15 MGE
238126 SPLIT-SYSTEM AIR-CONDITIONERS 02-06-15 MGE
238239 UNIT HEATERS 02-06-15 MGE
DIVISIONS 24 and 25 NOT USED
DIVISION 26 - ELECTRICAL
260519 LOW-VOLTAGE ELECT. POWER CONDUCTORS & CABLES 02-06-15 MGE
260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 02-06-15 MGE
260533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 02-06-15 MGE
260923 LIGHTING CONTROL DEVICES 02-06-15 MGE
262416 PANELBOARDS 02-06-15 MGE
262713 ELECTRICITY METERING 02-06-15 MGE
262726 WIRING DEVICES 02-06-15 MGE
262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS 02-06-15 MGE
265100 INTERIOR LIGHTING 02-06-15 MGE
265600 EXTERIOR LIGHTING 02-06-15 MGE
270528 PATHWAYS FOR COMMUNICATIONS SYSTEMS 02-06-15 MGE
DIVISIONS 27 and 28 NOT USED
DIVISION 31 EARTHWORK
313116 WDO CONTROL 02-06-15 FK
DIVISIONS 32 through 49 NOT USED
END TABLE OF CONTENTS
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
GEOTECHNICAL REPORT 003132 - 1
SECTION 003132 GEOTECHNICAL REPORT
PART 1 - GENERAL
1.1 SUMMARY
A. A report of preliminary geotechnical engineering report dated November 26, 2014 has been
prepared for this Project by:
GZA Geoenvironmental, Inc.
655 Winding Brook Drive
Suite 402
Glastonbury, Connecticut, 06033
B. A copy of the report is provided for reference with this Section.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 003132
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
GENERAL CONDITIONS OF THE CONTRACT 007200 - 1
SECTION 007200 - GENERAL CONDITIONS OF THE CONTRACT
PART 1 - GENERAL
1.1 Form
A. The American Institute of Architects Document A201 - GENERAL CONDITIONS OF
THE CONTRACT FOR CONSTRUCTION, 2007 Edition, contains the General
Conditions of the Contract. AIA Document A201 is amended by supplementary
conditions provided in Section 007300 - Supplementary Conditions herein.
B. The General Conditions of the Contract for Construction and the Supplementary
Conditions shall be taken together and constitute the Conditions of the Contract
referenced in the Agreement.
C. The General Conditions of the Contract for Construction and the Supplementary
Conditions are referred together in the Project Manual as the General Conditions,. No
contractual adjustments shall be due or become exigent as a result of failure on the part
of the Contractor to fully acquaint himself and all other parties to the Contract with the
General Conditions of the Contract for Construction and the Supplementary Conditions.
PART 2 - PRODUCTS
NOT USED.
PART 3 - EXECUTION
NOT USED.
END OF SECTION 007200
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUPPLEMENTARY CONDITIONS 007300 - 1
SECTION 007300 - SUPPLEMENTARY CONDITIONS
PART 1 - GENERAL
Document Includes
The following supplements modify, rescind, supplement, and take precedence over the General
Conditions of the Contract for Construction, AIA Document A201, 2007 edition, referenced in
Document 007200 - General Conditions of the Contract Documents. Where a portion of the
General Conditions is modified or deleted by these Supplementary Conditions, the unaltered
portions of the General Conditions shall remain in effect.
ARTICLE 1 - GENERAL PROVISIONS
Add Section 1.1.9 as follows:
1.1.9 MISCELLANEOUS DEFINITIONS
.1 Where the words "equal", "approved equal", "equivalent", "satisfactory",
"directed", "designated", "selected", "as required", and words of similar meanings
are used, the written review, comment, acceptance, selection, or similar action of
the Architect or Owner is required.
.2 Where words "required" and words of similar meaning are used, it shall mean "as
required to properly complete the Work and as required by the Architect or
Owner", unless stated otherwise.
.3 Where the words "provide" and "perform" are used, it is understood and intended
to mean that the Contractor, at his expense, shall furnish and install the Work,
complete in place and ready for use, including furnishing of necessary labor,
materials, tools, equipment and transportation. These definitions apply the same
to future, present and past tenses, except the word "provided" may mean
"contingent upon" where such is the context.
1.2 CORRELATION AND INTENT OF THE CONTRACT DOCUMENTS
Add the following Sections 1.2.4 through 1.2.8 inclusive as follow:
1.2.4 In the Specification Sections, Part 1 General, may include Related Documents,
Summary and Definitions information contained in the Specifications. The listings
are not intended to be inclusive. It shall be the responsibility of the Contractor to
determine the full extent of Work that will be required for proper completion of the
Project. No responsibility, either direct or implied, will be assumed by either the
Architect or the Owner for omissions or duplications by the Contractor due to the
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUPPLEMENTARY CONDITIONS 007300 - 2
arrangement of information in the Contract Documents. It shall be the Contractor's
responsibility to properly organize and coordinate such information to accomplish the
Work.
1.2.5 Specification Sections are written in modified brief style consistent with clarity. In
general, the words "the", "shall", "will", and "all" are not used. Where such words as
"perform", "provide", "install", "erect", "furnish", "connect", "test", or words of similar
meaning are used, it shall be understood that such words include the meaning of the
phrase "(The) Contractor shall". The requirements indicated and specified apply to all
Work of the same kind, class and type, even though the word "all" is not stated.
1.2.6 Drawings are intended to show general arrangement, design and extent of Work and are
partly diagrammatic. As such, they are not intended to be scaled for measurements or to
serve as shop drawings.
1.2.7 When reference is made in the Drawings or Specifications to industry standards, or
reference type specifications, or to another part of the Contract Documents, it shall have
the same force and effect as if the document, or portion referenced, is exactly repeated in
the place where reference is made. Refer to Section 014200 References in the
Specifications for additional requirements.
1.2.8 Whenever the Drawings or Specifications, a material, component or piece of equipment is
referred to in the singular, the reference shall be interpreted to apply to as many of such
articles, devices and equipment as are required to complete the Work.
1.5 OWNERSHIP AND USE OF DRAWINGS, SPECIFICATIONS AND OTHER
INSTRUMENTS OF SERVICE
Add Section 1.5.3 as follows:
1.5.3 The Contractor will be furnished free of charge one (1) copy of each set of Drawings and
Specifications as accepted for building permit issue by the permit authority having
jurisdiction for the purpose of construction of the Work. Additional copies may be
obtained by the Contractor from the Architect for the cost of reproduction, shipping and
handling.
ARTICLE 3 CONTRACTOR
3.2 REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS BY
CONTRACTOR
Add Section 3.2.5 as follows:
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUPPLEMENTARY CONDITIONS 007300 - 3
3.2.5 In order that any lack of clear definition of the Work, or conflicts in the Contract
Documents, be identified and resolved prior to the start of construction activities, the
Contractor shall submit a written report to the Architect and/or Owner within fifteen (15)
days after award of Contract by the Owner. This report shall include the following
statement:
"[INSERT Contractor's name] hereby certifies that the Drawings and Specifications for
the Project have been carefully examined and sufficient time has been provided to prepare
the Contract Sum. [INSERT Contractor's name] further warrants that to the extent that
any of the provided Contract Documents required clarification in any respect, such
clarification has been obtained from the Architect in writing and [INSERT Contractor's
name] is satisfied with such responses. It is understood that the Contract Documents
contemplate a finished Project of such character and quality as is described in or is
reasonable inferable from them. Recognizing the impossibility of producing Drawings
and Specifications with perfect accuracy, [INSERT Contractor's name] agrees that the
Contract Time and Sum for the Work includes sufficient time (including rain delays) and
cost allowances to make the Work complete and in compliance with good practice and
the design intent". Contractor claims for delay due to weather conditions will not be
considered or accepted.
3.4 LABOR AND MATERIALS
Section 3.4.1: Add the following Subparagraphs to the Section:
.1 The Contractor shall provide a list showing the name of the manufacturer
proposed to be used for each of the manufacturers or products identified in the
Contract Documents and, where applicable or required, the name of the installing
subcontractor or supplier.
.2 The Owner will promptly reply in writing to the Contractor if there are any
reasonable objections to the manufacturer or products specified. If adequate data
on any proposed manufacturer or installer is not available, the Owner may state
that action will be deferred until the Contractor provides further data. Failure to
object to a manufacturer shall not constitute a waiver of any of the requirements
of the Contract Documents, and all products furnished by the listed manufacturer
must conform to such requirements.
Section 3.4.2: Add the following Subparagraphs to the Section:
.1 After the Contract has been executed, the Owner and Architect will consider requests for
the substitution of products for those specified only under the conditions provided by
Division 01 General Requirements.
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUPPLEMENTARY CONDITIONS 007300 - 4
.2 By making a request for substitutions, the Contractor:
.a represents that the Contractor has personally investigated the proposed substitute
product and determined that it is equal or superior in all respects to that specified;
.b represents that the Contractor will provide the same warranty for the substitution
that the Contractor would for that specified;
.c certifies that the cost data presented is complete and includes all related costs, and
waives all claims for additional costs related to the substitution which
subsequently become apparent; and
.d will coordinate the installation of the accepted substitute, making such changes as
may be required for the Work to be complete in all respects.
3.7 PERMITS, FEES, NOTICES AND COMPLIANCE WITH LAWS
Add the following Subparagraphs 3.7.1.1 through 3.7.1.5 to Section 3.7.1:
.1 The Owner will pay for building plan review fees, utility deposits, environmental
fees, and impact fees.
.2 The Contractor will pay for all other fees including but not limited to: Utility
connection fees, subcontractor permit fees, utility meter fees, etc.
.3 The Contractor shall include in Contract Sum all administrative costs involved in
obtaining various permits and processing other fees that are the responsibility of
the Contractor.
.4 The Contractor shall further secure and pay for all other licenses and inspections
necessary for execution of the Work.
.5 The Contractor shall obtain necessary information, apply for and deliver the
payments for all fees paid by the Owner.
3.10 CONTRACTORS CONSTRUCTION SCHEDULES
In Section 3.10.2, lines 2 and 3, change approval in one (1) location each to review.
3.11 DOCUMENTS AND SAMPLES AT THE SITE
In Section 3.11, line 3, change "approved in one (1) location to reviewed.
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUPPLEMENTARY CONDITIONS 007300 - 5
In Section 3.11 change the period at the end of the paragraph to a comma and add the following:
. . . . . . , except as otherwise modified by Division 01 General Requirements.
3.12 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
In Section 3.12.5, line 3, change approved in two (2) locations to accepted.
In Section 3.12.7, line 3, change approved in one (1) location to reviewed.
In Section 3.12.8, line 1, change approved in one (1) location to accepted.
In Section 3.12.8, lines 2 and 7, change approval in one (1) location in each referenced line to
review.
In Section 3.12.8, line 4, change approval to acceptance in one (1) location.
In Section 3.12.9, line 3, change approval in one (1) location to review.
In Section 3.12.10, line 16, change approve in one (1) location to indicate no exceptions
taken.
Add Section 3.12.11 as follows:
3.12.11 Procedures for submittals are further delineated in Division 01, General
Requirements.
3.15 CLEANING UP
Add Section 3.15.3 as follows:
3.15.3 The Contractor, as a minimum requirement, and as defined by the Contract
Documents, and including but not limited to, shall wash and polish all glass,
remove all stains, paint stops, fingerprints, soil and dirt from finished surfaces,
clean and polish hardware and fixtures, wash all unpainted concrete, masonry and
tile, and leave the building broom clean.
ARTICLE 4 ARCHITECT
4.1 GENERAL
In Subparagraph 4.1.3, delete the words, "as to whom the Contractor makes no unreasonable
objection and"
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUPPLEMENTARY CONDITIONS 007300 - 6
4.2 ADMINISTRATION OF THE CONTRACT
In Section 4.2.3, line 2, change known in one (1) location to observed.
4.2.4 COMMUNICATIONS FACILITATING CONTRACT ADMINISTRATION
In Section 4.2.5, line 2, change certify in one (1) location to comment on.
In Section 4.2.5, line 2, insert a period (.) after Contractor and delete the words and will issue
Certificates for Payment in such amounts.
In Section 4.2.7, line 1, change approve in one (1) location to comment.
In Section 4.2.7, line 4, change approved in two (2) locations to accepted.
In Section 4.2.7, line 10, change approval in one (1) location to acceptance or endorsement.
In Section 4.2.7, line 12, change approval in two (2) locations to acceptance.
In Section 4.2.8, line 1, delete the words Change Orders and in one (1) location.
In Section 4.2.8, line 2, change investigate in one (1) location to observe.
In Section 4.2.8, line 2, delete the words determinations and.
In Section 4.2.9, line 1, change inspections in one (1) location to observations.
In Section 4.2.9, line 4, change issue in one (1) location to review.
ARTICLE 5 SUBCONTRACTORS
5.2 AWARD OF SUBCONTRACTS AND OTHER CONTRACTS FOR PORTIONS
OF THE WORK
In Section 5.2.1, line 2, change through in one (1) location to and.
ARTICLE 6 - CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS
6.1 OWNERS RIGHT TO PERFORM CONSTRUCTION AND TO AWARD
SEPARATE CONTRACTS
Add Section 6.1.5 and subparagraphs as follows:
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUPPLEMENTARY CONDITIONS 007300 - 7
6.1.5 The Owner reserves the right to take possession and use any completed or partially
complete portion of the building prior to completion providing such possession or use
does not interfere with the Contractor's accomplishment of the Work. Such partial
occupancy or taking possession will be based on the following:
.1 Occupancy of any portion of the Work will not constitute an acceptance of the
Work not performed in accordance with Contract Documents or relieve the
Contractor of liability to perform Work required by the Contract, but not
completed at the time of occupancy.
.2 Immediately prior to any partial occupancy, the Contractor, Owner, and Architect
shall make a thorough joint observation of the portion of the Work affected and
mutually agree upon the conditions of occupancy and status of the Work. The
Architect's evaluation shall be final in determining responsibility at the time of
observations for the conditions resulting from said occupancy. Damage to the
building caused by the Owner, his representative or occupants before Final
Acceptance will be the responsibility of the Owner.
ARTICLE 7 - CHANGES IN THE WORK
7.1 GENERAL
Add the following Subparagraph to Section 7.1.1.
7.1.1.1 Procedures and administrative requirements for changes in the work are further specified
in Division 01 General Requirements.
7.2 CHANGE ORDERS
In Section 7.2.1, line 1, replace Architect in one (1) location with Contractor.
Add Section 7.2.2 as follows:
7.2.2 Reasonable allowances for overhead and profit shall be included at the rates as negotiated
and referenced in the Agreement.
7.3 CONSTRUCTION CHANGE DIRECTIVES
In Section 7.3.8, line 2, replace confirmed in one (1) location with substantiated by the
Contractor to the acceptance of the Owner and review.
In Section 7.3.9, line 3, replace certification in one (1) location with review of the
Contractors provided application.
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUPPLEMENTARY CONDITIONS 007300 - 8
In Section 7.3.9, line 4, replace certify in one (1) location with accept.
In Section 7.3.10, line 3, replace Architect in one (1) location with Contractor.
ARTICLE 8 TIME
8.2 PROGRESS AND COMPLETION
Add the following Section 8.2.4:
8.2.4 The Contractor will not be entitled to additional compensation for Work performed
outside of regular working hours, except as authorized in advance and in writing by the
Owner.
8.3 DELAYS AND EXTENSIONS OF TIME
Add the following to the end of Section 8.3.1:
Inclement weather shall not be cause to justify delay.
ARTICLE 9 - PAYMENTS AND COMPLETION
9.3 APPLICATIONS FOR PAYMENT
Add the following to the end of Section 9.3.1:
Requirements for the Application for Payment shall be as specified in Division 01 General
Requirements.
Add the following Subparagraph 9.3.1.3 to Section 9.3.1:
9.3.1.3 The first Application for Payment shall be accompanied, in writing, by the Contractor's
conditional partial waiver of lien, for the amount due. Each subsequent Application for
Payment shall be accompanied, in writing, by the Contractor's partial waiver of lien for
the current and unconditional waiver for previous payment amount due and by
unconditional partial waivers of lien from all subcontractors and supplies of materials,
equipment and services who are included in the preceding Application for Payment.
Application for Final Payment shall be accompanied by the Contractor's full waiver of
lien for the amount due and by full waivers of lien from subcontractors and suppliers of
materials, equipment and services who have not previously furnished such full waivers.
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUPPLEMENTARY CONDITIONS 007300 - 9
Add the following Subparagraph 9.3.1.4 to Section 9.3.1.
9.3.1.4 Until Substantial Completion, the Owner shall pay no more than ninety (90) percent of
the amount due the Contractor on account of progress payments.
Add the following Subparagraph 9.3.1.5 to Section 9.3.1.
9.3.1.5 After the Work is substantially complete and the Architect has determined that the
Contractor's list of items to be completed or corrected is acceptable, retainage shall be
adjusted to be in proportion to the value of Work on the list, plus unsettled claims.
9.4 CERTIFICATES FOR PAYMENT
In Section 9.4, delete CERTIFICATES FOR PAYMENT and replace with REVIEW OF
CONTRACTORS APPLICATION FOR PAYMENT.
In Section 9.4.1, line 2, change a Certificate for Payment in one (1) location to an acceptance
of the Contractors Application for Payment.
In Section 9.4.1, line 4, change certification in one (1) location to acceptance.
In Section 9.4.2, line 1, change a Certificate for Payment in one (1) location to an acceptance
of the Contractors Application for Payment.
In Section 9.4.2, line 7, change a Certificate for Payment in one (1) location to an acceptance
of the Contractors Application for Payment.
In Section 9.4.2, line 8, change certified in one (1) location to accepted.
In Section 9.4.2, line 9, change a Certificate for Payment in one (1) location to an acceptance
of the Contractors Application for Payment.
In Section 9.4.2, line 10, change inspections in one (1) location to observations.
In Section 9.4.2, line 12, change made examination in one (1) location to reviewed.
9.5 DECISIONS TO WITHOLD CERTIFICATION
In Section 9.5, delete CERTIFICATION in one (1) location and replace with
ACCEPTANCE.
In Section 9.5.1, line 1, change a Certificate for Payment in one (1) location to an acceptance
of the Contractors Application for Payment.
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUPPLEMENTARY CONDITIONS 007300 - 10
In Section 9.5.1, line 3, change certify in one (1) location to accept.
In Section 9.5.1, line 5, change a Certificate for Payment in one (1) location to an acceptance
of the Contractors Application for Payment.
In Section 9.5.1, line 6, change a Certificate for Payment in one (1) location to an acceptance
of the Contractors Application for Payment.
In Section 9.5.1, line 7, change a Certificate for Payment in one (1) location to an acceptance
of the Contractors Application for Payment.
In Section 9.5.2, line 1, change certification in two (2) locations to acceptance.
In Section 9.5.3, line 1, change certification in one (1) location to acceptance.
In Section 9.5.3, line 5, change Certificate for Payment in one (1) location to review of the
submitted Contractors Application for Payment.
9.6 PROGRESS PAYMENTS
In Section 9.6.1, line 1, change issued a Certificate for Payment in one (1) location to
accepted the Contractors Application for Payment.
In Section 9.6.6, line 1, change a Certificate for Payment in one (1) location to An acceptance
of the Contractors Application for Payment.
9.7 FAILURE OF PAYMENT
In Section 9.7, line 1, change a Certificate for Payment in one (1) location to An acceptance
of the Contractors Application for Payment.
In Section 9.7, line 3, change certified in one (1) location to accepted.
9.8 SUBSTANTIAL COMPLETION
In Section 9.8.3, line 1, replace make an inspection with visit the Project to observe and
In Section 9.8.3, line 2, replace inspection in one (1) location with observations.
In Section 9.8.3, line 6, replace inspection in one (1) location with site visit and observation.
In Section 9.8.4, lines 5 and 6, revise the following:
Delete the following sentence:
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUPPLEMENTARY CONDITIONS 007300 - 11
Warranties required by the Contract Documents shall commence on the date of substantial
completion of the work or designated portion thereof unless otherwise provided in the Certificate
of Substantial Completion.
Replace with the following sentence:
The Contractors comprehensive 1 yr. warranty and all other warranties required or
provided by the Contract Documents shall commence on the date of the Owners written
acceptance of the work or portion thereof, unless otherwise agreed upon in writing.
9.9 PARTIAL OCCUPANCY OR USE
In Section 9.9.2, line 1, replace inspect in one (1) location with observe.
9.10 FINAL COMPLETION AND FINAL PAYMENT
In Section 9.10.1, lines 1, 2, replace inspection in one (1) location, each line, with
observation.
In Section 9.10.1, line 4, replace issue a Final Certificate for Payment in one (1) location with
review the Contractors final Application for Payment.
In Section 9.10.1, line 4, replace issue a Final Certificate for Payment stating that to the best of
the Architects knowledge with review the Contractors Final Application for Payment
considering that to the extent of the Architects knowledge, available.
In Section 9.10.1, line 5, replace inspections in one (1) location with observations.
In Section 9.10.1, line 7, replace Certificate in one (1) location with Application for
Payment.
In Section 9.10.1, line 7, replace Final Certificate for Payment in one (1) location with
acceptance of the Contractors Final Application for Payment.
Add the following sentence to Section 9.10.1:
The payment amount conveyed by the accepted Contractors final Application for Payment shall
be sufficient to increase the total payments to 100 percent of the Contract Sum, less such
amounts as the Architect shall determine for incomplete Work and unsettled claims.
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUPPLEMENTARY CONDITIONS 007300 - 12
Add the following Subparagraph 9.10.2.1 to Section 9.10.2:
9.10.2.1 In addition to the above, the following requirements shall be fulfilled before
application for final payment or payment of the retained percentages is accepted and
paid: The Contractor shall deliver to the Architect (for delivery to the Owner), in a
single package, properly labeled item by item, to indicate all materials, equipment and
documents contained therein the following;
(1) Notice by the Contractor of satisfactory completion of Work including corrections
of defective Work and acceptance of same by the Architect,
(2) Contractor's Affidavit of Payment of Debtors and Claims; AIA Document G706
and Contractor's Affidavit of Release of Liens, AIA Document G706A, or other
forms as directed or accepted by the Owner.
(3) Submission to the Owner of required Project Record Documents as defined in
Division 01 - General Requirements.
(4) Completion of any required instructions and training to the Owner on operation
and maintenance of all equipment and systems.
(5) Submission of all tools which are a permanent part of equipment installed in the
work.
(6) Submission of all keys, construction and permanent, properly identified.
In Section 9.10.3, lines 3 and 8, replace certification in one (1) location, in each referenced
line, with review".
Add Section 9.10.6 as follows:
9.10.6 Following the issuance of final payment the Owner will record a Notice of Completion
with the governmental authorities having jurisdiction within ten (10) days following
completion and acceptance by the Owner of all work in accordance with the Contract
Documents. The Notice of Completion replaces any Certificate(s) of Substantial
Completion.
Add Section 9.11 as follows:
9.11 LIQUIDATED DAMAGES
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUPPLEMENTARY CONDITIONS 007300 - 13
9.11.1 The Contractor and Contractor's surety, if any, shall be liable for and shall pay the Owner
the sums stipulated in the Agreement as liquidated damages, in lieu of actual damages,
for each calendar day of delay until Substantial Completion.
ARTICLE 10 - PROTECTION OF PERSONS AND PROPERTY
10.2 SAFETY OF PERSONS AND PROPERTY
Add the following to the end of Section 10.2.1:
. . . . .This requirement shall apply continuously and not be limited to normal working
hours.
Add the following Section 10.2.2.1 to Section 10.2.2:
10.2.2.1 The Contractor, its agents, employees, materialmen and subcontractors will perform
all work on the project in a safe and responsible manner. The Contractor shall, at its
own expense, conform to the safety policies and regulations established by the
Contractor and shall comply with all specific safety requirements promulgated by all
government authorities including without limitation the requirements of the
Occupational Safety and Health Act, and the Construction Safety Act, in effect on the
date of the Agreement and all standard and regulations which have been or shall be
promulgated by the parties or agencies which administer the Acts. The Contractor
shall comply with said requirements, standards and regulations, and require and be
directly responsible for compliance therewith on the part of its said agents,
employees, materialmen, and subcontractors; and shall directly receive, respond to,
defend, and be responsible for all citations, assessments, fines or penalties which may
be incurred by reason of its failure on the part of its agents, employees, materialmen
or subcontractors to so comply.
ARTICLE 11 - INSURANCE AND BONDS
11.1 CONTRACTORS LIABILITY INSURANCE
Add the following Section 11.1.2.1 to Section 11.1.2:
11.1.2.1 The Contractor shall obtain and maintain, for the full period of the Contract, the
following minimum coverage and limits, or coverage and limits that are required by
the Owner or by law, whichever is greater:
.1 WORKER'S COMPENSATION including Occupational Disease insurance
meeting the statutory requirements of the jurisdiction of the Project together with
a Broad Form All States Endorsement and containing Employers' Liability
insurance in an amount of at least $1,000,000.
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUPPLEMENTARY CONDITIONS 007300 - 14
.2 COMPREHENSIVE GENERAL LIABILITY AND/OR UMBRELLA
LIABILITY insurance on an occurrence basis provided limits for Bodily Injury
with Personal Injury including its employees of in the amounts of at least
$1,000,000 each occurrence and $1,000,000 aggregate; Property Damage
$1,000,000 each occurrence, $1,000,000 aggregate. The policy must include the
Owner, Architect and other Project Consultants as listed in the Project Directory,
as ADDITIONAL INSUREDS and must provide Premises-Operations,
Independent Contractors, Broad Form Property Damage, Contractual Liability,
Products and Completed Operations coverages (which shall be maintained in
force for a period of two years after substantial completion of the project or for
such longer period of time as is described in the Contract Documents) and
PRIMARY to any insurance of the ADDITIONAL INSUREDS. XCU Exclusions
must be deleted when applicable to operations performed by the Contractor. A
waiver of Subrogation in favor of the Owner shall also be included. Evidence of
Insurance coverage naming the additional insureds shall be provided to the Owner
and Architect prior to proceeding with the work.
.3 COMPREHENSIVE AUTOMOBILE LIABILITY on an occurrence basis
covering all Owned, Non-Owned and Hired Vehicles for limits of liability equal
to those in (.2) above.
.4 A Certificate of Insurance on an approved form must be delivered to the Owner
and Architect and must state coverage will not be altered, canceled or allowed to
expire without thirty (30) days written notice by registered mail to the Owner.
.5 Insurance coverage of $1,000,000.00 minimum limit must be obtained from each
subcontractor and, or, supplier, if any, before permitting them on the site of the
project. Otherwise, this required protection must be included within the
Contractors insurance policies.
.6 It is understood and agreed that the insurance coverages and limits required above
shall not limit the extent of the Contractor's responsibilities and liabilities
specified within the Contract Documents or by law.
.7 It is understood and agreed authorization is hereby granted to Owner to withhold
payments to the Contractor until properly executed Certificate(s) of Insurance
evidencing insurance required herein are received by the Owner.
.8 Certificates of Insurance shall be submitted as specified in Division 00
Procurement and Contracting Requirements and Division 01 - General
Requirements.
11.3 PROPERTY INSURANCE
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUPPLEMENTARY CONDITIONS 007300 - 15
Add the following to the end of Section 11.3.1.1
The Contractor shall be responsible for any damage or loss not covered under the Owner's
policy to any and all materials, supplies or equipment after delivery to the site by the Contractor
or his suppliers, whether paid for by the Owner or not, whether prior to or after installation into
the building structure. (Examples: theft, damage while handling, etc..)
11.4 PERFORMANCE BOND AND PAYMENT BOND
Add Section 11.4.3 as follows:
11.4.3 The Contractor shall deliver the required bonds to the Owner not later than three days
following the date the Agreement is entered into, or if the Work is to be commenced prior
thereto in response to a letter of intent, the Contractor shall, prior to the commencement
of the Work, submit evidence satisfactory to the Owner that such bonds will be furnished.
Add Section 11.4.4 as follows:
11.4.4 The Contractor shall require the attorney-in-fact who executes the required bonds on
behalf of the surety to affix thereto a certified and current copy of the power of attorney.
ARTICLE 12 UNCOVERING AND CORRECTION OF WORK
12.1 UNCOVERING OF WORK
In Section 12.1.1, line 3, change examination in one (1) location to observation.
In Section 12.1.2, line 1, change examine in one (1) location to observe it.
In Section 12.2.1, line 1, change rejected in one (1) location to not accepted.
ARTICLE 13 - MISCELLANEOUS PROVISIONS
13.6 INTEREST
In Section 13.6, line 1, following unpaid insert after 30 days.
ARTICLE 14 - TERMINATION OR SUSPENSION OF THE CONTRACT
14.1 TERMINATION BY CONTRACTOR
In Section 14.1.1.3, line 1, change issued a Certificate for Payment in one (1) location to
accepted the Contractors Final Application for Payment.
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUPPLEMENTARY CONDITIONS 007300 - 16
In Section 14.1.1.3, line 2, change certification in one (1) location to acceptance.
In Section 14.1.1.3, line 3, change or in one (1) location to or the Contractor has not provided
required or requested supporting documents including satisfaction of requirements of the Owner
related to the Owners financing resource or Lender for the Project.
14.2 TERMINATION BY THE OWNER FOR CAUSE
In Section 14.2.2, line 1, change certification in one (1) location to acceptance.
In Section 14.2.4, line 5, change certified in one (1) location to accepted.
ARTICLE 15 CLAIMS AND DISPUTES
15.1 CLAIMS
15.1.3 CONTINUING CONTRACT PERFORMANCE
In Section 15.1.3, line 3, change prepare in one (1) location to review.
In Section 15.1.3, line 3, change issue in one (1) location to review.
In Section 15.1.3, line 4, change Certificates for Payment in one (1) location to the
Contractors Application for Payment.
15.2 INITIAL DECISION
In Section 15.2.2, line 3, change reject in one (1) location to not accept.
In Section 15.2.2, line 3, change approve in one (1) location to accept.
In Section 15.2.4, line 5, change reject or approve in one (1) location to accept or not accept.
In Section 15.2.5, line 1, change approving or rejecting in one (1) location to accepting or not
accepting.
END OF SECTION 007300
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUMMARY 011000 - 1
SECTION 011000 - SUMMARY
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes:
1. Project information.
2. Work covered by Contract Documents.
3. Access to site.
4. Specification and drawing conventions.
B. Related Section:
1. Division 01 Section "Temporary Facilities and Controls" for limitations and procedures
governing temporary use of Owner's facilities.
1.3 PROJECT INFORMATION
A. Project Identification: The Arbors at Brighton Park
1. Project Location: On Woodland Avenue between the intersections of Old Road and
Castlewood Drive in Bloomfield, CT.
B. Owner: Brighton Park Apartments, LLC or assigns
c/o Rohdie Group, LLC
52 Vanderbilt Avenue, Suite 2007
New York, NY 10017
1. Owner's Representative: Marc Weil
C. Architect: Kenneth Linehan, Architect
c/o Fugleberg Koch, PLLC.
2555 Temple Trail
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUMMARY 011000 - 2
Winter Park, FL. 32789
(407) 629-0595 phone
1. Architects Representative: Kenneth Linehan, Architect.
D. Other Owner Consultants: The Owner has retained the following design professionals who
have prepared designated portions of the Contract Documents:
1. Civil Engineering and Site Improvements
F. A. Hesketh & Associates, Inc.
6 Creamery Brook
East Granby, CT 06026
Contact: Guy Hesketh, PE
E. Contractor: TBD
1.4 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of the Project is defined by the Construction Documents and consists of the
following:
New construction of one hundred thirty (130) rental apartment units of several types dis-
tributed among four (4) residential buildings of three (3) types. One (1) of the residential
building types will be of a two (2) floor configuration.. The other two (2) residential
building types will be of a three (3) story configuration as established by the Owners pro-
gram and including a Clubhouse amenity building, a Mail Kiosk and a Trash Compactor
Enclosure. The Clubhouse amenity building will include two (2) dwelling units. The Pro-
ject site is comprised of approximately 14 (14) acres located on Woodland Avenue be-
tween the intersections of Old Road and Castlewood Drive in Bloomfield, Connecticut.
B. Type of Contract
1. Project will be constructed as defined by the Construction Documents issued separately.
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUMMARY 011000 - 3
1.5 ACCESS TO SITE
A. General: Contractor shall have limited use of Project site for construction operations as
indicated on Drawings by the Contract limits and as indicated by requirements of this Section.
B. Use of Site: Limit use of Project site to within the Contract limits indicated. Do not disturb
portions of Project site beyond areas in which the Work is indicated.
1. Limits: Confine construction operations to Contract limits defined by Owner.
1.6 COORDINATION WITH OCCUPANTS
A. Owner Limited Occupancy of Completed Areas of Construction: Owner reserves the right to
occupy completed building and related site improvement areas following the issuance of a
Certificate of Occupancy by the authorities having jurisdiction, and prior to Final Completion of
the Work, provided such occupancy does not interfere with completion of the Work. Such
occupancy shall not constitute final acceptance of the total Work.
1. Obtain a Certificate of Occupancy from authorities having jurisdiction before limited
Owner occupancy.
2. Before limited Owner occupancy, mechanical and electrical systems shall be fully
operational, and required tests and inspections shall be successfully completed. On
occupancy, Owner will operate and maintain mechanical and electrical systems serving
occupied portions of Work.
3. On occupancy, Owner will assume responsibility for maintenance and custodial service
for occupied portions of Work.
1.7 WORK RESTRICTIONS
A. Work Restrictions, General: Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets and other requirements of authorities
having jurisdiction.
B. On-Site Work Hours: Limit work in the existing building to normal business working hours of
8:00 a.m. to 5:00 p.m., Monday through Friday, except as otherwise indicated or to hours
stipulated by Owner Contractor Agreement and as acceptable to the authorities having
jurisdiction.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or
others unless permitted under the following conditions and then only after providing temporary
utility services according to requirements indicated:
1. Notify Owner not less than two (2) days in advance of proposed utility interruptions.
2. Obtain Owner's written permission before proceeding with utility interruptions.
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUMMARY 011000 - 4
D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and
vibration, odors, or other disruption to Owner occupancy with Owner.
1. Notify Owner not less than two (2) days in advance of proposed disruptive operations.
2. Obtain Owner's written permission before proceeding with disruptive operations.
E. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet (8 m) of
entrances, operable windows, or outdoor air intakes.
F. Controlled Substances: Use of controlled substances on the Project site is not permitted.
1.8 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of language and
the intended meaning of certain terms, words, and phrases when used in particular situations.
These conventions are as follows:
1. Imperative mood and streamlined language are generally used in the Specifications. The
words "shall," "shall be," or "shall comply with," depending on the context, are implied
where a colon (:) is used within a sentence or phrase.
2. Specification requirements are to be performed by Contractor unless specifically stated
otherwise.
B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work
of all Sections in the Specifications.
C. Drawing Coordination: Requirements for materials and products identified on the Drawings are
described in detail in the Specifications. One or more of the following are used on the
Drawings to identify materials and products:
1. Terminology: Materials and products are identified by the typical generic terms used in
the individual Specifications Sections.
2. Abbreviations: Materials and products are identified by abbreviations scheduled on
Drawings.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 011000
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
ALLOWANCES 012100 - 1
SECTION 012100 - ALLOWANCES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements governing allowances.
1. Certain items may be specified in the Contract Documents by allowances. Allowances
have been established in lieu of additional requirements and to defer selection of actual
materials and equipment to a later date when direction will be provided to the Contractor.
If necessary, additional requirements will be issued by Change Order.
B. Types of allowances include the following:
1. Lump-sum allowances.
2. Quantity allowances.
3. Contingency allowances.
4. Testing and inspecting allowances.
C. Related Sections:
1. Division 01 Section "Quality Requirements" for procedures governing the use of
allowances for testing and inspecting.
2. Divisions 02 through 49 Sections for items of Work covered by allowances.
1.3 SELECTION AND PURCHASE
A. At the earliest practical date after award of the Contract, advise Architect of the date when final
selection and purchase of each product or system described by an allowance must be completed
to avoid delaying the Work.
B. At Architect's or Owners request, obtain proposals for each allowance for use in making final
selections. Include recommendations that are relevant to performing the Work.
C. Purchase products and systems selected by Architect or Owner from the designated supplier.
1.4 SUBMITTALS
A. Submit proposals for purchase of products or systems included in allowances, in the form
specified for Change Orders.
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
ALLOWANCES 012100 - 2
B. Submit invoices or delivery slips to show actual quantities of materials delivered to the site for
use in fulfillment of each allowance.
C. Submit time sheets and other documentation to show labor time and cost for installation of
allowance items that include installation as part of the allowance.
D. Coordinate and process submittals for allowance items in same manner as for other portions of
the Work.
1.5 COORDINATION
A. Coordinate allowance items with other portions of the Work. Furnish templates as required to
coordinate installation.
1.6 LUMP-SUM ALLOWANCES
A. Allowance shall include cost to Contractor of specific products and materials selected by
Architect, or Owner, under allowance and shall include taxes, freight, and delivery to Project
site.
B. Unless otherwise indicated, Contractor's costs for receiving and handling at Project site, labor,
installation, overhead and profit, and similar costs related to products and materials selected by
Architect, or Owner, under allowance shall be included as part of the Contract Sum and not part
of the allowance.
C. Unused Materials: Return unused materials purchased under an allowance to manufacturer or
supplier for credit to Owner, after installation has been completed and accepted.
1. If requested by Architect, or Owner, retain and prepare unused material for storage by
Owner. Deliver unused material to Owner's storage space as directed.
1.7 ADJUSTMENT OF ALLOWANCES
A. Allowance Adjustment: To adjust allowance amounts, prepare a Change Order proposal based
on the difference between purchase amount and the allowance, multiplied by final measurement
of work-in-place where applicable. If applicable, include reasonable allowances for cutting
losses, tolerances, mixing wastes, normal product imperfections, and similar margins.
1. Include installation costs in purchase amount only where indicated as part of the
allowance.
2. If requested, prepare explanation and documentation to substantiate distribution of
overhead costs and other margins claimed.
B. Submit claims for increased costs because of a change in scope or nature of the allowance
described in the Contract Documents, whether for the purchase order amount or Contractor's
handling, labor, installation, overhead, and profit.
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
ALLOWANCES 012100 - 3
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine products covered by an allowance promptly on delivery for damage or defects. Return
damaged or defective products to manufacturer for replacement.
3.2 PREPARATION
A. Coordinate materials and their installation for each allowance with related materials and
installations to ensure that each allowance item is completely integrated and interfaced with
related work.
3.3 SCHEDULE OF ALLOWANCES
A. Allowances are applicable as listed by a Schedule of Allowances provided within the
Owner/Contractor Agreement in the absence of a Schedule of Allowances provided within the
Project Manual, Division 01 of the Contract Documents.
END OF SECTION 012100
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUBSTITUTION PROCEDURES 012500 - 1
SECTION 012500 - SUBSTITUTION PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for substitutions.
B. Related Sections:
1. Division 01 Section "Product Requirements" for requirements for submitting comparable
product submittals for products by listed manufacturers.
2. Divisions 02 through 49 Sections for specific requirements and limitations for
substitutions.
1.3 DEFINITIONS
A. Substitutions: Changes in products, materials, equipment, and methods of construction from
those required by the Contract Documents and proposed by Contractor.
1. Substitutions for Cause: Changes proposed by Contractor that are required due to
changed Project conditions, such as unavailability of product, regulatory changes, or
unavailability of required warranty terms.
2. Substitutions for Convenience: Changes for convenience are not allowed.
1.4 SUBMITTALS
A. Substitution Requests: Submit three copies of each request for consideration. Identify product
or fabrication or installation method to be replaced. Include Specification Section number and
title and Drawing numbers and titles.
1. Substitution Request Form: Use form acceptable to Architect.
2. Documentation: Show compliance with requirements for substitutions and the following,
as applicable:
a. Statement indicating why specified product or fabrication or installation cannot be
provided.
b. Coordination information, including a list of changes or modifications needed to
other parts of the Work and to construction performed by Owner and separate
contractors, that will be necessary to accommodate proposed substitution.
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUBSTITUTION PROCEDURES 012500 - 2
c. Detailed comparison of significant qualities of proposed substitution with those of
the Work specified. Include annotated copy of applicable specification section.
Significant qualities may include attributes such as performance, weight, size,
durability, visual effect, sustainable design characteristics, warranties, and specific
features and requirements indicated. Indicate deviations, if any, from the Work
specified.
d. Product Data, including drawings and descriptions of products and fabrication and
installation procedures.
e. Samples, where applicable or requested.
f. Certificates and qualification data, where applicable or requested.
g. List of similar installations for completed projects with project names and
addresses and names and addresses of architects and owners.
h. Material test reports from a qualified testing agency indicating and interpreting test
results for compliance with requirements indicated.
i. Research reports evidencing compliance with building code and regulations in
effect for Project, from an evaluation organization acceptable to the authorities
having jurisdiction.
j. Detailed comparison of Contractor's construction schedule using proposed
substitution with products specified for the Work, including effect on the overall
Contract Time. If specified product or method of construction cannot be provided
within the Contract Time, include letter from manufacturer, on manufacturer's
letterhead, stating date of receipt of purchase order, lack of availability, or delays
in delivery. Identify use of available float, if any, in schedule comparison.
k. Cost information, including a proposal of change, if any, in the Contract Sum.
l. Documentation of Owner acceptance of the proposed substitution.
m. Contractor's certification that proposed substitution complies with requirements in
the Contract Documents except as indicated in substitution request, is compatible
with related materials, and is appropriate for applications indicated.
n. Contractor's waiver of rights to additional payment or time that may subsequently
become necessary because of failure of proposed substitution to produce indicated
results.
3. Architect's Action: If necessary, Architect will request additional information or
documentation for evaluation within seven (7) days of receipt of a request for
substitution. Architect will notify Contractor of acceptance or rejection of proposed
substitution within fourteen (14) days of receipt of request, or seven (7) days of receipt of
additional information or documentation, whichever is later, unless Architect is unable to
accept the substitution as presented.
a. Forms of Acceptance: Construction Change Directive, or Architect's
Supplemental Instructions for minor changes in the Work.
b. Use product specified if Architect does not issue a decision on use of a proposed
substitution within time allocated.
1.5 QUALITY ASSURANCE
A. Compatibility of Substitutions: Investigate and document compatibility of proposed
substitution with related products and materials. Engage qualified testing agency to perform
compatibility tests recommended by manufacturers.
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
SUBSTITUTION PROCEDURES 012500 - 3
1.6 PROCEDURES
A. Coordination: Modify or adjust affected work as necessary to integrate work of the accepted
substitutions.
PART 2 - PRODUCTS
2.1 SUBSTITUTIONS
A. Substitutions for Cause: Submit requests for substitution immediately upon discovery of need
for change, but not later than ten (10) days prior to time required for preparation and review of
related submittals.
1. Conditions: Architect will consider Contractor's request for substitution when the
following conditions are satisfied. If the following conditions are not satisfied, Architect
will return requests without action, except to record noncompliance with these
requirements:
a. Requested substitution is consistent with the Contract Documents and will produce
indicated results.
b. Substitution request is fully documented and properly submitted.
c. Requested substitution will not adversely affect Contractor's construction schedule.
d. Requested substitution has received necessary approvals of authorities having
jurisdiction.
e. Requested substitution is compatible with other portions of the Work.
f. Requested substitution has been coordinated with other portions of the Work.
g. Requested substitution provides specified warranty.
h. If requested substitution involves more than one contractor, requested substitution
has been coordinated with other portions of the Work, is uniform and consistent, is
compatible with other products, and is acceptable to all contractors involved.
i. Owner has directed Architect to review Contractors request for substitution.
PART 3 - EXECUTION (Not Used)
END OF SECTION 012500
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
CONTRACT MODIFICATION PROCEDURES 012600 - 1
SECTION 012600 - CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for handling and processing
Contract modifications.
B. Related Sections:
1. Division 01 Section "Product Requirements" for administrative procedures for handling
requests for substitutions made after Contract award.
1.3 MINOR CHANGES IN THE WORK
A. Architect will issue supplemental instructions authorizing minor changes in the Work, not
involving adjustment to the Contract Sum or the Contract Time, on AIA Document G710,
"Architect's Supplemental Instructions" or on an alternate form accepted by Architect or
directed by Owner.
1.4 PROPOSAL REQUESTS
A. Owner-Initiated Proposal Requests: Architect will issue a detailed description of proposed
changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If
necessary, the description will include supplemental or revised Drawings and Specifications.
1. Proposal Requests issued by Architect are not instructions either to stop work in progress
or to execute the proposed change.
2. Within time specified in Proposal Request or fourteen (14) days, when not otherwise
specified, after receipt of Proposal Request, submit a quotation estimating cost
adjustments to the Contract Sum and the Contract Time necessary to execute the change.
a. Include a list of quantities of products required or eliminated and unit costs, with
total amount of purchases and credits to be made. If requested, furnish survey data
to substantiate quantities.
b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade
discounts.
c. Include costs of labor and supervision directly attributable to the change.
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
CONTRACT MODIFICATION PROCEDURES 012600 - 2
d. Include an updated Contractor's construction schedule that indicates the effect of
the change, including, but not limited to, changes in activity duration, start and
finish times, and activity relationship. Use available total float before requesting
an extension of the Contract Time.
e. Quotation Form: Use form acceptable to Architect and Owner.
B. Contractor-Initiated Proposals: If latent or changed conditions require modifications to the
Contract, Contractor may initiate a claim by submitting a request for a change to Architect and
Owner concurrently.
1. Include a statement outlining reasons for the change and the effect of the change on the
Work. Provide a complete description of the proposed change. Indicate the effect of the
proposed change on the Contract Sum and the Contract Time.
2. Include a list of quantities of products required or eliminated and unit costs, with total
amount of purchases and credits to be made. If requested, furnish survey data to
substantiate quantities.
3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade
discounts.
4. Include costs of labor and supervision directly attributable to the change.
5. Include an updated Contractor's construction schedule that indicates the effect of the
change, including, but not limited to, changes in activity duration, start and finish times,
and activity relationship. Use available total float before requesting an extension of the
Contract Time. Clearly indicate amount of available float used.
6. Comply with requirements in Division 01 Section "Substitution Procedures" if the
proposed change requires substitution of one product or system for product or system
specified.
7. Proposal Request Form: Use form acceptable to Architect and Owner.
1.5 ADMINISTRATIVE CHANGE ORDERS
A. Alternate Adjustment: Refer to Division 01 Section "Alternates" for administrative procedures
for preparation of Change Order Proposal for adjusting the Contract Sum and schedule to reflect
alternates accepted after the establishment of the Contract Sum and Schedule.
1.6 CHANGE ORDER PROCEDURES
A. On Owner's approval of a Proposal Request, Contractor will issue a Change Order for review
and signature by Owner and Architect on AIA Document G 701.
1.7 CONSTRUCTION CHANGE DIRECTIVE
A. Construction Change Directive: Architect may issue a Construction Change Directive on
AIA Document G714. Construction Change Directive instructs Contractor to proceed with a
change in the Work.
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
CONTRACT MODIFICATION PROCEDURES 012600 - 3
1. Construction Change Directive contains a complete description of change in the Work. It
also designates method to be followed to determine change in the Contract Sum or the
Contract Time and implementation prerequisite requirements as may be applicable.
B. Documentation: Maintain detailed records on a time and material basis of work required by the
Construction Change Directive.
1. After completion of change, submit an itemized account and supporting data necessary to
substantiate cost and time adjustments to the Contract as directed by the Construction
Change Directive requirements in the format of a Proposed Change Order.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 012600
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
PAYMENT PROCEDURES 012900 - 1
SECTION 012900 - PAYMENT PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section specifies administrative and procedural requirements necessary to prepare and
process Applications for Payment.
B. Related Sections:
1. Division 01 Section "Allowances" for procedural requirements governing the handling
and processing of allowances.
2. Division 01 Section "Contract Modification Procedures" for administrative procedures
for handling changes to the Contract.
3. Division 01 Section "Construction Progress Documentation" for administrative
requirements governing the preparation and submittal of the Contractor's construction
schedule.
4. Division 01 Section "Submittal Procedures" for administrative requirements governing
the preparation and submittal of the submittal schedule.
1.3 DEFINITIONS
A. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract
Sum to various portions of the Work and used as the basis for reviewing Contractor's
Applications for Payment.
1.4 SCHEDULE OF VALUES
A. Coordination: Coordinate preparation of the schedule of values with preparation of Contractor's
construction schedule.
1. Correlate line items in the schedule of values with other required administrative forms
and schedules, including the following:
a. Application for Payment forms with continuation sheets.
b. Submittal schedule.
c. Contractor's Construction Schedule.
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
PAYMENT PROCEDURES 012900 - 2
2. Submit the schedule of values to Architect at earliest possible date but no later than thirty
(30) days before the date scheduled for submittal of initial Applications for Payment.
3. Subschedules for Phased Work: Where the Work is separated into phases requiring
separately phased payments, provide subschedules showing values correlated with each
phase of payment.
4. Subschedules for Separate Elements of Work: Where the Contractor's construction
schedule defines separate elements of the Work, provide subschedules showing values
correlated with each element.
B. Format and Content: Use the Project Manual table of contents as a guide to establish line items
for the schedule of values. Provide at least one line item for each Specification Section.
1. Identification: Include the following Project identification on the schedule of values:
a. Project name and location.
b. Name of Architect.
c. Architect's project number.
d. Contractor's name and address.
e. Date of submittal.
2. Arrange schedule of values consistent with format of AIA Document G703.
3. Arrange the schedule of values in tabular form with separate columns to indicate the
following for each item listed:
a. Related Specification Section or Division.
b. Description of the Work.
c. Name of subcontractor.
d. Name of manufacturer or fabricator.
e. Name of supplier.
f. Change Orders (numbers) that affect value.
g. Dollar value and Percentage of the Contract Sum to nearest one-hundredth percent,
adjusted to total 100 percent.
4. Provide a breakdown of the Contract Sum in enough detail to facilitate continued
evaluation of Applications for Payment and progress reports. Coordinate with the Project
Manual table of contents. Provide multiple line items for principal subcontract amounts
as appropriate.
5. Round amounts to nearest whole dollar; total shall equal the Contract Sum.
6. Provide a separate line item in the schedule of values for each part of the Work where
Applications for Payment may include materials or equipment purchased or fabricated
and stored, but not yet installed and only in the event that stored materials are eligible for
payment by the Owner/Contractor Agreement.
a. Differentiate between items stored on-site and items stored off-site. For items
stored off-site, include evidence of insurance, bill of sale and contractor/supplier
affidavit in form acceptable to Architect.
7. Provide separate line items in the schedule of values for initial cost of materials, for each
subsequent stage of completion, and for total installed value of that part of the Work.
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
PAYMENT PROCEDURES 012900 - 3
8. Allowances: Provide a separate line item in the schedule of values for each allowance.
Show line-item value of unit-cost allowances, as a product of the unit cost, multiplied by
measured quantity. Use information indicated in the Contract Documents to determine
quantities.
9. Each item in the schedule of values and Applications for Payment shall be complete.
Include total cost and proportionate share of general overhead and profit for each item.
a. Temporary facilities and other major cost items that are not direct cost of actual
work-in-place may be shown either as separate line items in the schedule of values
or distributed as general overhead expense, at Contractor's option.
10. Schedule Updating: Update and resubmit the schedule of values before the next
Application for Payment when Change Orders or Construction Change Directives result
in a change in the Contract Sum.
1.5 APPLICATIONS FOR PAYMENT
A. Each Application for Payment shall be consistent with previous applications and payments as
certified by Architect and paid for by Owner.
1. Initial Application for Payment, Application for Payment at time of Substantial
Completion, and final Application for Payment involve additional requirements.
B. Payment Application Times: The date for each progress payment is indicated in the Agreement
between Owner and Contractor. The period of construction work covered by each Application
for Payment is the period indicated in the Agreement.
1. Submit draft copy of Application for Payment seven (7) days prior to due date for review
by Architect.
C. Application for Payment Forms: Use AIA Document G702 and AIA Document G703 as form
for Applications for Payment.
1. Architects Certificate for Payment: The Architects Certificate for Payment section of
AIA Document G702 is deleted and replaced with the following:
ARCHITECTS REVIEW OF APPLICATION FOR PAYMENT
In accordance with the Contract Documents, based on on-site observations and data
comprising this application, the Architect confirms to the Owner that to the best of the
Architects knowledge, information and belief the work has progressed as indicated and
the Contractor is entitled to payment of the amount requested.
Amount: $__________________
Architect:
By: Date:
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
PAYMENT PROCEDURES 012900 - 4
The AMOUNT noted above is payable only to the Contractor named herein. Issuance,
payment and acceptance are without prejudice to any rights of the Owner or Contractor
under this Contract.
Owner:
By: Date:
2. Signature of acceptance by Owner is required to accept and authorize payment to
Contractor.
D. Application Preparation: Complete every entry on form. Notarize and execute by a person
authorized to sign legal documents on behalf of Contractor. Architect will return incomplete
applications without action.
1. Entries shall match data on the schedule of values and Contractor's construction schedule.
Provide updated schedules if revisions were made.
2. Include amounts for work completed following previous Application for Payment,
whether or not payment has been received. Include only amounts for work completed at
time of Application for Payment.
3. Include amounts of Change Orders and Construction Change Directives issued before last
day of construction period covered by application.
E. Transmittal: Submit three (3) signed and notarized original copies of each Application for
Payment to Architect by a method ensuring receipt. One copy shall include waivers of lien and
similar attachments if required.
1. Transmit each copy with a transmittal form listing attachments and recording appropriate
information about application.
F. Waivers of Mechanic's Lien: With each Application for Payment, submit waivers of mechanic's
lien from entities lawfully entitled to file a mechanic's lien arising out of the Contract and
related to the Work covered by the payment.
1. Submit partial waivers on each item for amount requested in previous application, after
deduction for retainage, on each item.
2. When an application shows completion of an item, submit conditional final or full and
final waivers.
3. Owner reserves the right to designate which entities involved in the Work must submit
waivers.
4. Waiver Forms: Submit waivers of lien on forms, executed in a manner acceptable to
Owner.
G. Initial Application for Payment: Administrative actions and submittals that must precede or
coincide with submittal of first Application for Payment include the following:
1. List of subcontractors.
2. Schedule of values.
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
PAYMENT PROCEDURES 012900 - 5
3. Contractor's construction schedule (preliminary if not final).
4. Products list (preliminary if not final).
5. Submittal schedule (preliminary if not final).
6. List of Contractor's staff assignments.
7. List of Contractor's principal consultants.
8. Copies of building permits.
9. Copies of authorizations and licenses from authorities having jurisdiction for
performance of the Work.
10. Initial progress report.
11. Report of preconstruction conference.
12. Certificates of insurance and insurance policies.
13. Performance and payment bonds.
14. Data needed to acquire Owner's insurance.
H. Application for Payment at Substantial Completion: After issuance of Certificate of Substantial
Completion, submit a Contractors Application for Payment showing 100 percent completion
for portion of the Work claimed as substantially complete.
1. Include documentation supporting claim that the Work is substantially complete and a
statement showing an accounting of changes to the Contract Sum.
2. This application shall reflect Certificates of Partial Substantial Completion issued
previously for Owner occupancy of designated portions of the Work.
3. Include documentation supporting Contractors request for any reduction in retainage
amounts.
I. Final Payment Application: Submit final Application for Payment with releases and supporting
documentation not previously submitted and accepted, including, but not limited, to the
following:
1. Evidence of completion of Project closeout requirements.
2. Insurance certificates for products and completed operations where required and proof
that taxes, fees, and similar obligations were paid.
3. Updated final statement, accounting for final changes to the Contract Sum.
4. AIA Document G706, "Contractor's Affidavit of Payment of Debts and Claims."
5. AIA Document G706A, "Contractor's Affidavit of Release of Liens."
6. AIA Document G707, "Consent of Surety to Final Payment."
7. AIA Document G707A, Consent of Surety to Reduction in or Partial Release of
Retainage.
8. Evidence that all claims have been settled.
9. Final meter readings for utilities, a measured record of stored fuel, and similar data as of
date of Substantial Completion or when Owner took possession of and assumed
responsibility for corresponding elements of the Work.
10. Final liquidated damages settlement statement.
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
PAYMENT PROCEDURES 012900 - 6
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 012900
-
THE ARBORS @ BRIGHTON PARK ISSUE DATE: FEBRUARY 6, 2015
BLOOMFIELD, CT DD REVIEW SET
KL PROJECT No. 5256
PROJECT MANAGEMENT AND COORDINATION 013100 - 1
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative provisions for coordinating construction operations on Project
including, but not limited to, the following:
1. General project coordination procedures.
2. Administrative and supervisory personnel.
3. Coordination drawings.
4. Requests for Information (RFIs).
5. Project Web site.
6. Project meetings.
B. Related Sections: