acd company profile eng -...
Post on 14-May-2018
224 Views
Preview:
TRANSCRIPT
COMPANY PROFILE
ACD
ACD Insaat Tes. Tar. Hay. San. Ve Tic. Ltd. Sti. Ceyhun Atuf Kansu Cad. No:137/4-5
Balgat – Cankaya / ANKARA-TURKEY Tel: +90 312 473 41 81/82 Fax: +90 312 473 41 83
http://www.acd-insaat.com
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 2 / 56
BRIEFLY ABOUT ACD
ACD is an international construction company established in 2002. The company
specialized in oil pipeline construction, gas pipeline construction, water pipeline
construction, pump station & compressor station construction, natural gas RMS station
construction, oil field development projects, process piping works, hot-tap and stopple
operations.
ACD successfully performed numerous projects for the last ten years. These projects
have been performed in four different countries and the list includes 17 pipeline
construction projects, 7 pump station & 2 compressor station construction projects, 3 oil
field development projects, 15 RMS-A station construction projects, 4 industrial & plant
piping, 2 power station piping projects and more than 50 hot-tap & stopple operations.
The company has a professional team of experts specialized in their fields and has its
own construction equipment to perform pipeline and piping works. The head office is
located in Ankara and the warehouse & equipment park is located in Haymana.
The purpose of ACD Construction Company is to complete the commitments it
undertakes, and further stand reliable and trustworthy in this competitive market. In
order to succeed these core values and missions, ACD Construction Company is
determined to become an indispensable organization by creating additional values for its
clients.
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 3 / 56
TOOLS & EQUIPMENT
Tools and Equipment Units Capacity / Model Brand
Pipelayer (Sideboom) 1 1983 / TD 25 CS
65 tons International
Pipelayer (Sideboom) 2 1992 / D7 45 tons
Caterpillar
Pipelayer (Sideboom) 5 1974 - 1986 / D6
30 – 36 tons Caterpillar
Pipelayer (Sideboom) 1 1987 / D65 A
20 tons Komatsu
Pipelayer (Sideboom) 1 1990 / D4 12 tons
Caterpillar
Hydraulic Pipe Bending Machine 1 22” – 36”
1998 CRC-Evans
Hydraulic Pipe Bending Machine 1 4” – 20”
1990 CRC-Evans
Pneumatic Internal Clamp 8 12”-14”-16”-24” 28”-30”-48”-80”
Vietz / CRC
Mobile Crane 1 1975 / LT1030
30 tons Liebherr
Boom truck (Hi-up) 1 25 Tons
2008 Hidrokon / BMC
Boom truck (Hi-up) 1 20 Tons
2005 Kocoglu / Man
Paywelder (4 welding sets) 2 2003 Vietz – Arcotrac 4
Paywelder (4 welding sets) 3 2008 2009
Volvo
Excavator 2 2012 / HMK300
30 tons Hidromek
Excavator 1 2005 / D 320L
20 tons Caterpillar
Excavator 1 2011
30 tons JCB
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 4 / 56
Tools and Equipment Units Capacity / Model Brand
Wheel Excavator 1 2012 /HMK200W
20 tons Hidromek
Bulldozer 1 D7R XR
2003 Caterpillar
Loader 1 938 H 2012
Caterpillar
Grader 1 140G 1988
Caterpillar
Dump Truck 1 2008 / 30 tons BMC
Fuel Tanker 1 2010 / 7 tons Iveco
Tractor 4x4 2 2008 Tümosan
Welding Machine (Redresor) 20 WTU 455
RKM 450 / 650 Fronius (Gedik)
Welding Machine (Redresor) 16 405 SA Lincoln
Diesel Generator 2 72 KVA Perkins (Genpower)
Diesel Generator 4 GVP 142 142 kVA
Volvo ABB (Genpower)
Hydrotest Filling Pump 1 12 bar
500 m3/h Tempo
Hydrotest Pressurizing Pump 1 160 bar 16 m3/h
HPP Italy
Total Station 2 2010 Leica
Holiday Detector 4 20 KVA SPY
External Clamp 12 Multiple sizes -
Jeep 4x4 3 2012 2009 2011
Mitsubishi Nissan Jeep
Pick-Up 4x4 6 2012 2010 2003
Mitsubishi Nissan Ford
Car 5 2012 Hyundai
Minibus 2 2005 Ford
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 5 / 56
TOOLS & EQUIPMENT
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 6 / 56
TOOLS & EQUIPMENT
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 7 / 56
REFERENCES
No Project Description
1
Tuzgölü Fresh Water Pipeline & Natural Gas Pipeline Construction Project / Turkey 24” – 28” - 30” – 36” Total 150 km Pipeline Construction, Line Valve, Drain Valve and Relief Valve Chambers Construction (total 267 each)
2
Erbil - Kalak - Dohuk Natural Gas Pipeline Construction Project / Iraq 24” and 36” Total 60 km Pipeline Construction
3 Kırsehir / Mucur Compressor Station Construction Project / Turkey
4
Batı Raman & Raman Oil Field Development Project / Turkey 90 km Flowline (Steel, PE & Stainless) Construction, 12 each Manifold Construction
5 Pendik Pig Station 30” Valve Replacement Project / Turkey 30” Hottap / Stopple and Valve Replacement
6
Yeni Elektrik 850 MWe CCGT Natural Gas Feed Line Construction / Turkey 24” x 20” Hottap and Take-Off Valve Group Construction
7
Extending Water Pipeline form Sherkozh Storage to Suli Quarter / Iraq 48” – 17 km, 24” – 3 km Pipeline & 3 each Pump Station Construction
8
Oguz - Gabala - Baku Water Pipeline Project / Azerbaijan 80” - 47 km Pipeline Construction, 3 each Flow and Pressure Control Chamber Construction
9
Sayda Province Natural Gas Pipeline Project / Algeria 8” - 25 km Pipeline Construction
10
Kesikkopru Dam to Ankara Ivedik Treatment Plant Pipeline Project / Turkey 64” - 30 km Pipeline Construction, Pump Station Construction
11
Baku – Tbilisi – Ceyhan (BTC) Crude Oil Pipe Line / Azerbaijan 42” - 430 km Pipeline Construction, 19 Block Valve Station, 2 Pumping Station, 1 Pigging Station, 2 Check Valve Station Construction
12
Cankırı – Gerede Natural Gas Pipeline Project / Turkey 24” - 33 km Pipeline Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 8 / 56
No Project Description
13
Ankara - Kazan Water Pipeline Project / Turkey 28” – 36” - 28 km Pipeline Construction
14
Ingaz High Pressure Natural Gas Pipeline / Turkey 8” – 2,5 km Pipeline Construction
15 Teksem Factory Natural Gas Conversion Works / Turkey
16
Turkey – Greece Natural Gas Pipeline Project / Turkey/Greece 36” – Pipeline Critical Welding Works and Hot-taps
17
Aliaga Pigging Station - RMS Station Natural Gas Pipeline / Turkey 20” - 8 km Pipeline Construction
18
Yozgat Sugar Factory RMS Station / Turkey 20.000 Nm3/h Natural Gas RMS-A Station Construction
19
PETKIM - 40 MW Gas Turbines and 14” Natural Gas Pipeline Construction Project
20
Yumurtatepe - Seckoy Natural Gas Pipeline Project / Turkey 24” - 13 km Pipeline Construction
21 CS-5 Eskisehir Natural Gas Compressor Station Cyclone Filter Installation
22
Iran Natural Gas Pipeline Project / Turkey/Iran Gas Distribution to Ardahan City and 48”x12” Hot -Tap Works
23
Bursa Natural Gas Pipeline Project / Turkey Botas Displacement Works for 36” - 250 m
24
Botas Karacabey RMS Station Project / Turkey 50.000 Nm3/h Natural Gas RMS-A Station Construction
25
Botas M.K. Pasa RMS Station Project / Turkey 60.000 Nm3/h Natural Gas RMS-A Station Construction
26
Botas Malatya OIZ RMS Station Project / Turkey 15.000 Nm3/h Natural Gas RMS-A Station Construction
27
Botas Kahramanmaras OIZ RMS Station Project / Turkey 75.000 Nm3/h Natural Gas RMS-A Station Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 9 / 56
No Project Description
28
Botas Payas OIZ RMS Station Project / Turkey 20.000 Nm3/h Natural Gas RMS-A Station Construction
29
Botas Iskenderun OIZ RMS Station Project / Turkey 20.000 Nm3/h Natural Gas RMS-A Station Construction
30
Natural Gas Utility Pipeline Infrastructure Works for Kocaeli – Gebze IVth
Istanbul Machinery and Manufacturing Organized Industrial Zone
31
Izmit - Kosekoy Bogging Area Displacement Works / Turkey Botas Displacement Works 16” - 1250 m
32
Botas Mersin OIZ RMS Station Project / Turkey 20.000 Nm3/h Natural Gas RMS-A Station Construction
33
Botas Adana OIZ RMS Station Project / Turkey 75.000 Nm3/h Natural Gas RMS-A Station Construction
34 Botas Baser Kimya OIZ RMS Station Project / Turkey 2.000 Nm3/h Natural Gas RMS-A Station Construction
35
Botas Gaziantep OIZ RMS Station Project / Turkey 150.000 Nm3/h Natural Gas RMS-A Station Construction
36
Botas Adana West RMS Station Project / Turkey 50.000 Nm3/h Natural Gas RMS-A Station Construction
37
Botas Adana East RMS Station Project / Turkey 40.000 Nm3/h Natural Gas RMS-A Station Construction
38
Botas Mersin City OIZ RMS Station Project / Turkey 150.000 Nm3/h Natural Gas RMS-A Station Construction
39
Ingaz Inegol RMS Station Project / Turkey 50.000 Nm3/h Natural Gas RMS-A Station Construction
40
EGO Revision Works / Turkey Revision of 18 each Natural Gas RMS-A Station and Integration of Scada System
41 Turkuaz Ceramic Factory Natural Gas Conversion Project / Turkey
42 Blue Stream Pipeline Project (EGO – Ankara) / Turkey 48” x 36” Hot-Tap Works
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 10 / 56
No Project Description
43 Aksaray - Mercedes Truck Factory Natural Gas Conversion Project / Turkey
44 Anadolu Textile Factory Natural Gas Conversion Project / Turkey
45
TPIC (Turkish Petroleum Company) / Emity Oil - Natural Gas Distribution System / Turkey Construction of Pipelines from Natural Gas Wells to the Factories at Corlu and Cerkezkoy Area, 4’’-6’’-8’’-10’’, 40 km Pipeline Construction
46
EGO Natural Gas Distribution System, Ankara / Turkey 36”-24”-18’’, 36 km Pipeline Construction, Compressor Station Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 11 / 56
ACD Hot-Tap & Line Stop Works Reference List / 2009 - 2012
No Work Description Owner Client Operator Company Date Location
1
40"x36"x36"x40" Line Stop / Replacement 36" By-pass line (120 meters) BOTAŞ Türkerler İnşaat TDW
October 2012 Kırşehir
2 40"x36"x36"x40" Split Body Tee / Hot-Tapping BOTAŞ Türkerler İnşaat TDW
October 2012 Kırşehir
3 16"x16"x16"x16" Split Body Tee / Hot-Tapping İZMİRGAZ Kolin İnşaat Furmanite/Ipsco July 2012 İzmir
4 30"x30"x30" Hot-tap Tee / Line Stop BOTAŞ
BOTAŞ İstanbul İşletme
Müdürlüğü Furmanite/Ipsco May 2012 İstanbul
5 22"x22"x22"x22" Split Body Tee / Line Stop ESGAZ Ulusoy İnşaat Furmanite/Ipsco April 2012 Eskişehir
6 16"x16"x16" Hot-Tap Tee / Line Stop ARMAGAZ Mekaser Tecpesa
August 2011 Yalova
7 24"x20"x20"x24" Split Body Tee / Hot-Tapping BOTAŞ
Ekon / Ansaldo Energia Furmanite/Ipsco
October 2011 Kocaeli
8 48"x24"x24"x48" Split Body Tee / Hot-Tapping BOTAŞ Fernas / OMV TDW
November 2011 Samsun
9 16"x10"x10"x16" Split Body Tee / Hot-Tapping İZMİRGAZ Kolin İnşaat Furmanite/Ipsco July 2011 İzmir
10 36"x24"x20"x36" Split Body Tee / Hot-Tapping BURSAGAZ Arsan İnşaat Tecpesa
February 2011 Bursa
11 16"x16"x16"x16" Split Body Tee / Hot-Tapping BOTAŞ Aksa Gaz Furmanite/Ipsco
December 2010 Antalya
12 12"x12"x12"x12" Split Body Tee / Hot-Tapping BOTAŞ Aksa Gaz Furmanite/Ipsco
September 2009 Adana
13 18"x18"x18"x18" Split Body Tee / Hot-Tapping BOTAŞ Aksa Gaz Furmanite/Ipsco
September 2009 Adana
14 24"x16"x16"x24" Split Body Tee / Hot-Tapping BOTAŞ Aksa Gaz Furmanite/Ipsco
September 2009 Osmaniye
15 40"x16"x16"x40" Split Body Tee / Hot-Tapping BOTAŞ Aksa Gaz Furmanite/Ipsco
September 2009 Ceyhan
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 12 / 56
CONTACT INFORMATION
Contact Person:
Enver Selim BOLUKBASI, Business Development Manager
Address and Contact Information: Head Office Address : Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – ANKARA / TURKEY Tel : +90 312 473 41 81 Mobile : +90 533 688 55 71 Fax : +90 312 473 41 83 E-mail : s.bolukbasi@acd-insaat.com Web Address : http://www.acd-insaat.com
Warehouse & Equipment Yard Address : Bumsuz Beldesi Girişi 2. km Haymana – ANKARA / TURKEY
ANNEXES
ISO 9001, ISO 14001, OHSAS 18001, EMRA – Energy Market Regulatory Authority Construction and Service Certificate
Detailed Project Description Sheets
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 13 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 14 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 15 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 16 / 56
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 17 / 56
DETAILED PROJECT DESCRIPTION Project Name: Tuzgölü Fresh Water Pipeline & Natural Gas Pipeline Construction Project
Project Location: Aksaray - Konya / Turkey
Client: BOTAS / TCC China Tianchen Engineering Corporation
Project Start Date (month/year): 05/2012
Completion Date (month/year): On going
Project Scope: 24” – 28” - 30” – 36” Total 150 km Pipeline Construction, Line Valve, Drain Valve and Relief Valve Chambers Construction (total 225 each)
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 18 / 56
DETAILED PROJECT DESCRIPTION Project Name: Erbil - Kalak - Dohuk Natural Gas Pipeline Construction Project Project Location: Erbil / Iraq Client: KAR Group / 77 Construction - Pikaron Joint Venture Project Start Date (month/year): 06/2012
Completion Date (month/year): 12/2012
Project Scope: 24” and 36” Total 60 km Pipeline Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 19 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Kırsehir / Mucur Compressor Station Construction Project Project Location: Kırsehir / Turkey Client: BOTAS / Turkerler Insaat A.S. Project Start Date (month/year): 08/2011
Completion Date (month/year): On Going
Project Scope: Construction of Compressor Station with 2 Turbocompressor / Turbine Sets
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 20 / 56
DETAILED PROJECT DESCRIPTION Project Name: Batı Raman & Raman Oil Field Development Project Project Location: Batman / Turkey Client: Turkish Petroleum Corporation (TPAO) Project Start Date (month/year): 09/2011
Completion Date (month/year): 10/2012
Project Scope: 90 km Flowline (Steel, PE & Stainless) Construction, 12 each Manifold Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 21 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Extending Water Pipeline from Sherkozh Storage to Suli Quarter Project Location: Suleymaniah / Iraq Client: Pikaron - Zozik Joint Venture Project Start Date (month/year): 03/2010
Completion Date (month/year): 02/2011
Project Scope: 48” - 17 km , 24” – 3 km Pipeline Construction 3 each Pump Station Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 22 / 56
DETAILED PROJECT DESCRIPTION Project Name: Oguz – Gabala – Baku Water Pipeline Project Project Location: Oguz – Gabala – Baku / Azerbaijan Client: Azersu (Project Owner) / HTG JV (Turan Haznedaroglu – Tekser – Gence Korpu Joint Venture) Project Start Date (month/year): 03/2008
Completion Date (month/year): 06/2010
Project Scope: 80” - 47 km Pipeline Construction Flow Control Chamber, Pressure Control Chamber & Pressure Break Chamber Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 23 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Sayda Province Natural Gas Pipeline Project Project Location: Sayda City / Algeria Client: Sarl Nafco – Sonelgaz Project Start Date (month/year): 04/2008
Completion Date (month/year): 08/2008
Project Scope:
8” - 25 km Pipeline Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 24 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Kesikkopru Dam to Ankara Ivedik Treatment Plant Pipeline Project Project Location: Ivedik - Ankara / Turkey Client: ASKİ (Ankara Water and Sewage Administration) Project Project Start Date (month/year): 05/2007
Completion Date (month/year): 04/2008
Project Scope:
64” - 30 km Pipeline Construction, Pump Station Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 25 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Baku – Tbilisi – Ceyhan (BTC) Crude Oil Pipeline Project Project Location: Baku - Azerbaijan Client: BP – BOTAS Consortium Project Project Start Date (month/year): 05/2004
Completion Date (month/year): 08/2005
Project Scope:
42” - 430 km Pipeline Construction, 19 Block Valve Station, 2 Pumping Station, 1 Pigging Station, 2 Check Valve Station Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 26 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Cankırı – Gerede Natural Gas Pipeline Project Project Location: Gerede - Bolu / Turkey Client: BOTAS Project Project Start Date (month/year): 08/2007
Completion Date (month/year): 12/2007
Project Scope:
24” - 33 km Pipeline Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 27 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Ankara - Kazan Water Pipeline Project Project Location: Kazan – Ankara / Turkey Client: ASKI (Ankara Water and Sewage Administration) Project Project Start Date (month/year): 03/2007
Completion Date (month/year): 12/2007
Project Scope: 28” – 36” - 28 km Pipeline Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 28 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Ingaz High Pressure Natural Gas Pipeline Project Location: Inegol - Bursa / Turkey Client: Ingaz Inc. Project Start Date (month/year): 01/2007
Completion Date (month/year): 03/2007
Project Scope: 8” – 2,5 km Pipeline Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 29 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Teksem Factory Natural Gas Conversion Works Project Location: Cerkezkoy - Corlu / Turkey Client: TEKSEM Inc. Project Start Date (month/year): 01/2007
Completion Date (month/year): 03/2007
Project Scope: Teksem Factory all natural gas conversion works.
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 30 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Turkey – Greece Natural Gas Pipeline Project Project Location: Kesan / Turkey Client: BOTAS - Atilla Dogan Inc. Project Start Date (month/year): 12/2006
Completion Date (month/year): 02/2007
Project Scope: 36” – Pipeline Critical Welding Works and Hot-taps
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 31 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Aliaga Pigging Station - RMS Station Natural Gas Pipeline Project Location: Aliaga -Izmir / Turkey Client: BOTAS – Atilla Dogan Inc. Project Start Date (month/year): 09/2006
Completion Date (month/year): 01/2007
Project Scope: 20” - 8 km Pipeline Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 32 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Yozgat Sugar Factory RMS Station Project Location: Bogazlıyan - Yozgat / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 09/2006
Completion Date (month/year): 10/2006
Project Scope: 20.000 Nm3/h Natural Gas RMS-A Station Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 33 / 56
DETAILED PROJECT DESCRIPTION
Project Name: PETKIM - 40 MW Gas Turbines and 14” Natural Gas Pipeline Construction Project Project Location: Aliaga - Izmir / Turkey Client: Petkim – Tokar Inc. Project Start Date (month/year): 08/2006
Completion Date (month/year): 12/2006
Project Scope: Construction works for conversion of solid fuel to natural gas with turbine piping works.
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 34 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Yumurtatepe - Seckoy Natural Gas Pipeline Project Project Location: Yumurtatepe - Seckoy – Bursa / Turkey Client: BOTAS – Atilla Dogan Inc. Project Start Date (month/year): 07/2006
Completion Date (month/year): 12/2006
Project Scope: 24” - 13 km Pipeline Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 35 / 56
DETAILED PROJECT DESCRIPTION
Project Name: CS-5 Eskisehir Natural Gas Compressor Station Cyclone Filter Installation Project Location: Eskisehir / Turkey Client: BOTAS Project Start Date (month/year): 07/2006
Completion Date (month/year): 09/2006
Project Scope: Revision of 16“ – 36” natural gas pipeline filters, additional cyclone filtering installation and commissioning works.
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 36 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Iran Natural Gas Pipeline Project
Project Location: Ardahan / Turkey
Client: BOTAS
Project Start Date (month/year): 03/2006
Completion Date (month/year): 05/2006
Project Scope: Gas Distribution to Ardahan City and 48”x12” Hot -Tap Works
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 37 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Botas Karacabey RMS Station Project Project Location: Karacabey – Bursa / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 04/2006
Completion Date (month/year): 05/2006
Project Scope: 50.000 Nm3/h Natural Gas RMS-A Station Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 38 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Botas M.K. Pasa RMS Station Project Project Location: M. K. Paşa – Bursa / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 04/2006
Completion Date (month/year): 05/2006
Project Scope: 60.000 Nm3/h Natural Gas RMS-A Station Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 39 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Botas Malatya OIZ RMS Station Project Project Location: Malatya / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 04/2006
Completion Date (month/year): 05/2006
Project Scope: 15.000 Nm3/h Natural Gas RMS-A Station Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 40 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Botas Kahramanmaras OIZ RMS Station Project Project Location: Kahramanmaras / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 02/2006
Completion Date (month/year): 03/2006
Project Scope: 75.000 Nm3/h Natural Gas RMS-A Station Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 41 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Botas Payas OIZ RMS Station Project Project Location: Payas – Iskenderun / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 02/2006
Completion Date (month/year): 03/2006
Project Scope: 20.000 Nm3/h Natural Gas RMS-A Station Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 42 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Botas Iskenderun OIZ RMS Station Project Project Location: Iskenderun / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 01/2006
Completion Date (month/year): 02/2006
Project Scope: 20.000 Nm3/h Natural Gas RMS-A Station Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 43 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Natural Gas Utility Pipeline Infrastructure Works for Kocaeli – Gebze IVth Istanbul Machinery and Manufacturing Organized Industrial Zone
Project Location: Gebze – Kocaeli / Turkey Client: Palgaz Inc. Project Start Date (month/year): 01/2006
Completion Date (month/year): 12/2006
Project Scope: Natural gas utility piping works.
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 44 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Botas Mersin OIZ RMS Station Project
Project Location: Mersin / Turkey
Client: BOTAS, Kale Kalıp Inc.
Project Start Date (month/year): 10/2005
Completion Date (month/year): 11/2005
Project Scope: 20.000 Nm3/h Natural Gas RMS-A Station Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 45 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Botas Adana OIZ RMS Station Project Project Location: Adana / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 10/2005
Completion Date (month/year): 11/2005
Project Scope: 75.000 Nm3/h Natural Gas RMS-A Station Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 46 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Botas Baser Kimya OIZ RMS Station Project
Project Location: Osmaniye / Turkey
Client: BOTAS, Kale Kalıp Inc.
Project Start Date (month/year): 09/2005
Completion Date (month/year): 10/2005
Project Scope: 2.000 Nm3/h Natural Gas RMS-A Station Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 47 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Botas Gaziantep OIZ RMS Station Project
Project Location: Gaziantep / Turkey
Client: BOTAS, Kale Kalıp Inc.
Project Start Date (month/year): 08/2005
Completion Date (month/year): 10/2005
Project Scope: 150.000 Nm3/h Natural Gas RMS-A Station Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 48 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Botas Adana West RMS Station Project Project Location: Adana / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 07/2005
Completion Date (month/year): 08/2005
Project Scope: 50.000 Nm3/h Natural Gas RMS-A Station Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 49 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Botas Adana East RMS Station Project Project Location: Adana / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 07/2005
Completion Date (month/year): 08/2005
Project Scope: 40.000 Nm3/h Natural Gas RMS-A Station Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 50 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Botas Mersin City OIZ RMS Station Project Project Location: Mersin / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 06/2005
Completion Date (month/year): 08/2005
Project Scope: 150.000 Nm3/h Natural Gas RMS-A Station Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 51 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Ingaz Inegol RMS Station Project Project Location: Inegol - Bursa / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 05/2006
Completion Date (month/year): 06/2006
Project Scope: 50.000 Nm3/h Natural Gas RMS-A Station Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 52 / 56
DETAILED PROJECT DESCRIPTION
Project Name: EGO Revision Works Project Location: Ankara / Turkey Client: EGO Project Start Date (month/year): 01/2005
Completion Date (month/year): 01/2006
Project Scope: Revision of 18 each Natural Gas RMS-A Station and Integration of Scada System
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 53 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Blue Stream Pipeline Project (EGO – Ankara) Project Location: Ankara / Turkey Client: EGO Project Start Date (month/year): 12/2003
Completion Date (month/year): 01/2004
Project Scope: 48” x 36” Hot-Tap Works and equipment installation
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 54 / 56
DETAILED PROJECT DESCRIPTION
Project Name: Aksaray - Mercedes Truck Factory Natural Gas Conversion Project Project Location: Aksaray / Turkey Client: Troya Limited Company Project Start Date (month/year): 03/2004
Completion Date (month/year): 05/2004
Project Scope: Mercedes Truck Factory all natural gas conversion works construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 55 / 56
DETAILED PROJECT DESCRIPTION
Project Name: TPIC (Turkish Petroleum Company) / Emity Oil - Natural Gas Distribution System Project Location: Corlu / Turkey Client: Troya Limited Company Project Start Date (month/year): 06/2004
Completion Date (month/year): 06/2005
Project Scope: Construction of Pipelines from Natural Gas Wells to the Factories at Corlu and Cerkezkoy Area, 4’’-6’’-8’’-10’’, 40 km Pipeline Construction
ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520
Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82
Fax: +90 312 473 41 83 http://www.acd-insaat.com
Company Profile 56 / 56
DETAILED PROJECT DESCRIPTION
Project Name: EGO Natural Gas Distribution System Project Location: Ankara / Turkey Client: EGO Project Start Date (month/year): 07/2002
Completion Date (month/year): 12/2003
Project Scope: 36”-24”-18’’, 36 km Pipeline Construction, Compressor Station Construction
top related