AIA Survey –Preparation and Experiences
Jürgen HENRICHSMEYER
Systems
AIA Survey – Preparation and Experiences
Structure:
I. History of TÜV Nord Systems in the ASME Business
II. TÜV Nord Systems Accreditation
III. Application / Scope
IV. Development of the ASME Business
V. Initial Position: Administration
VI. Optimization of the System and Survey Preparation
VII. The Survey
VII.1 – Course of Action
VII.2 – Experiences
VII.3 – Results
VIII. Conclusion
Systems
AIA Survey – Preparation and Experiences
I. History of TÜV Nord Systems
1984 FM/TÜV
1997 FM/TÜV/BV
2003 One/TÜV/BV
2012 TÜV NORD Systems
Systems
AIA Survey – Preparation and Experiences
II. TÜV Nord Systems Accreditation
2012
ASME NB-360 NB-369(for repairs and alterations)
Initial;
Section I, IV, V, X
2013
2014
2015
Added:
Section III, Div. 1 & 3;
Section XII
Implementation in the
real business
initial initial
Implementation in the
real business
Implementation in the
real business
renewal renewal renewal
Systems
AIA Survey – Preparation and Experiences
III. Application / Scope
Scope: ASME NB-360 NB-369
√ √ ?Question: It is necessary to be accredited according to NB-369 for repairs
and alterations?
• June 2014: Answer National Board:
„No. The respective Inspector just needs an AR or IS Endorsement.“
• May 2015: Question by NB:
„Should the AIA audit in June 2015 include both, the audit for ASME and NB-369?“
Yes, but only if NB is required for repairs and alterations
official statement requested Answer: „Yes, NB-369 is required.“
Systems
AIA Survey – Preparation and Experiences
IV. Development:
Significant growth of personnel and shops
2012:
- 1 AI and 1 AIS (in India)
2013:
- added: 1 ANI and 1 ANIS
2015:
- more than 50 Inspectors/Supervisors
- more than 200 Shops
Systems
No. of Countries
serviced worldwide by
TÜV NORD SYSTEMS:
25
AIA Survey – Preparation and Experiences
Area Coverage and Shops
Systems
AIA Survey – Preparation and Experiences
V. Initial Position: Administration
• 1 control tool: Shop list
Containing information related to: Shops
Inspectors/Supervisors
Audits
• Data Base
Transparency had to be
improved!!!!
Systems
AIA Survey – Preparation and Experiences
VI. Optimization of the System and Survey Preparation
- Continuous Process since January 2014
- Processes and Structure had to be questioned and optimized:
new tools to be introduced
(Shoplist, Inspectors Supervisor List, Audit Schedules)
Improvement of AI Homepage
(QA Manual Distribution, procedures, forms, news,…)
Revision and Improvement of QAM and Procedures
(QAM Revision 4 issued)
about 1000 h preparation work
Systems
AIA Survey – Preparation and Experiences
Systems
AIA Survey – Preparation and Experiences
Systems
Date: June 15th – 17th, 2015
Location: TÜV Nord, Essen
Participants:
ASME/NB Team: 3 Persons including one Trainee
TÜV Nord Systems COO
Internal Auditor
Head of CC ASME
Responsible ANIS
Responsible AIS
4 Team Assistants
AIA Survey – Preparation and Experiences
VII. The Survey
Systems
Day 1: Review of QA Manual and Procedures by the ASME / NB Team
Day 2+3: Opening Meeting and Implementation
Team 1: Team Leader, Internal Auditor, Responsible AIS
- Review and Revision of the QAM and Procedures
Team 2: Team Member, Trainee, Head of CC ASME, responsible ANIS, Team
Assistant
- review of Implementation containing:
10 personnel files (qualification, designation, etc.)
all ANIS and Lead Auditor Files
10 Shop Files (monitoring, ISA, notification ASME/NB,…)
Data Base and new Forms (4.1/4.2)
internal audit program
Training evidence (Quiz / internal training / NB-Training)
check of Inspector‘s Diary (3 examples)
check of personnel files related to terminated AI
AIA Survey – Preparation and Experiences
VII.1. Course of Action
Systems
AIA Survey – Preparation and Experiences
VII.2. Experiences during the AIA Survey
professional Audit Team
well structured Audit Plan
audited the complete QA-System
open atmosphere
helpful discussions with the Survey Team
fair feedback
Systems
QAM:
- just one significant change
Head of CC ASME is responsible for Designation of Inspectors and
Supervisors
Direct line from Head of CC ASME to COO
QAM Revision 5 issued during the Survey and
accepted by ASME and approved by NB
Implementation:
- no deficiencies!
VII.3. Results
AIA Survey – Preparation and Experiences
Systems
The Audit Team
Systems
AIA Survey – Preparation and Experiences
Systems
AIA Survey – Preparation and Experiences
VIII. Conclusion
Transparency of the System
will lead to Efficiency
of the Business!
Stay close to the Business!
Systems
Thank you very much for the
attention!