Albemarle County Public SchoolsAlbemarle County Public Schools
Design for Vehicle Maintenance Design for Vehicle Maintenance Facility ImprovementsFacility Improvements
September 10, 2009September 10, 2009
R A N C O R N W I L D M A N A r c h i t e c t s P R A N C O R N W I L D M A N A r c h i t e c t s P L CL C
Design for Vehicle Maintenance Design for Vehicle Maintenance Facility ImprovementsFacility Improvements
Design Committee MembersDesign Committee Members
Josh Davis Josh Davis Charmane White Charmane White Sherry Wilkerson Sherry Wilkerson Carolyn Savina Carolyn Savina Allen Pritchett Allen Pritchett
Joe Letteri Joe Letteri Lisa Glass Lisa Glass
Joe Werres Joe Werres
Project ScopeProject Scope Storage Addition and Renovations at the VMFStorage Addition and Renovations at the VMF
New Parking and Site Lighting for Staff & Shop New Parking and Site Lighting for Staff & Shop VehiclesVehicles
Semi-Automated Bus Wash System with Water Semi-Automated Bus Wash System with Water RecyclingRecycling
Repair and Re-pave existing “upper” Parking AreaRepair and Re-pave existing “upper” Parking Area
Provide Site Lighting for existing “upper” and “lower” Provide Site Lighting for existing “upper” and “lower” Parking AreasParking Areas
Storm Water Treatment ImprovementsStorm Water Treatment Improvements
Design for Vehicle Maintenance Design for Vehicle Maintenance Facility ImprovementsFacility Improvements
Thank youThank you
Aerial Photo of Existing Aerial Photo of Existing Vehicle Maintenance Facility ComplexVehicle Maintenance Facility Complex
VMF StorageAddition &
Renovations
New Parking with
Site Lighting
Pavement Repairs & Site
Lighting
Site Lighting
Semi - Automated Bus Wash With Water Recycling
Storm-WaterTreatment
Improvements
Storage Addition for the VMFStorage Addition for the VMF
1074 Square Foot Storage Addition with high windows 1074 Square Foot Storage Addition with high windows for natural lightfor natural light
Rack and Pallet Storage System on two walls for Rack and Pallet Storage System on two walls for forklift and rolling stair accessforklift and rolling stair access
Renovations to last bay at existing VMF to create one Renovations to last bay at existing VMF to create one additional drive-through vehicle maintenance bayadditional drive-through vehicle maintenance bay
Relocate existing tire balancing machineRelocate existing tire balancing machine
Design for Vehicle Maintenance Design for Vehicle Maintenance Facility ImprovementsFacility Improvements
Storage Addition to the VMF
Proposed Location Proposed Location for Storage Additionfor Storage Addition
to the VMFto the VMF
Proposed 1075 Sq Ft Proposed 1075 Sq Ft VMF Storage AdditionVMF Storage Addition
Proposed Rack andProposed Rack and Pallet Storage System: Pallet Storage System:
Four Pallets HighFour Pallets High
Proposed RenovationsProposed Renovations to Last Vehicle Bay:to Last Vehicle Bay:
Add 14’ High Door,Add 14’ High Door,Level Floor Slab Level Floor Slab
Proposed Exterior Proposed Exterior Elevations, with Elevations, with
Windows for Windows for Natural LightNatural Light
New Parking for the VMFNew Parking for the VMF 69 New Parking spaces for Staff and Shop 69 New Parking spaces for Staff and Shop
VehiclesVehicles
Site Lighting for New ParkingSite Lighting for New Parking
Second Access Route to Existing “Lower” Second Access Route to Existing “Lower” Parking Area CreatedParking Area Created
Design for Vehicle Maintenance Design for Vehicle Maintenance Facility ImprovementsFacility Improvements
69 New Parking Spaces for Staff & Shop Vehicles
Second Accessto Existing LowerParking Area
Bus Wash ImprovementsBus Wash Improvements Semi-Automated, Touch-Less Bus Wash Semi-Automated, Touch-Less Bus Wash
System installed in existing Bus Wash BuildingSystem installed in existing Bus Wash Building
Small Addition to Bus Wash Building for Small Addition to Bus Wash Building for pumps, equipment, electrical, etc.pumps, equipment, electrical, etc.
Water-Recycling System for wash waterWater-Recycling System for wash water
Pave existing gravel Parking AreaPave existing gravel Parking Area
Design for Vehicle Maintenance Design for Vehicle Maintenance Facility ImprovementsFacility Improvements
Bus Wash Improvements
Existing Bus Existing Bus Wash FacilityWash Facility
Location ofProposed Addition
ProposedAddition
Proposed “Touch-less”
Bus Wash System
Proposed Proposed Bus WashBus WashSystem System
Improvements to Improvements to Existing Parking AreasExisting Parking Areas
Repair and Re-surface existing “upper” Parking AreaRepair and Re-surface existing “upper” Parking Area
Site Lighting for existing “upper” Parking AreaSite Lighting for existing “upper” Parking Area
Site Lighting for existing “lower” Parking AreaSite Lighting for existing “lower” Parking Area
Site Lighting controlled by Energy Management Site Lighting controlled by Energy Management SystemSystem
Site Lighting on multiple circuits to facilitate Energy Site Lighting on multiple circuits to facilitate Energy ConservationConservation
Design for Vehicle Maintenance Design for Vehicle Maintenance Facility ImprovementsFacility Improvements
Pavement Repairs for Existing“Lower” Parking Area
Site Lighting for Existing “Upper” and “Lower” Parking Areas
Storm Water Treatment Storm Water Treatment ImprovementsImprovements
Existing storm water basin upgraded to include Existing storm water basin upgraded to include water quality treatment water quality treatment
Basin will provide storm water treatment and Basin will provide storm water treatment and detentiondetention
Basin upgraded to protect the Ivy Creek drinking Basin upgraded to protect the Ivy Creek drinking water supply water supply
Approximately 75% of the VMF complex run-off is Approximately 75% of the VMF complex run-off is routed through the basinrouted through the basin
Design for Vehicle Maintenance Design for Vehicle Maintenance Facility ImprovementsFacility Improvements
Storm Water Treatment Improvements
Project Budget and Schedule
Construction Budget: $1,376,000
Several Additive Alternates will be used
Project Schedule: Receive Bids Oct 2009
Construction Completion: June 2010
Design for Vehicle Maintenance Design for Vehicle Maintenance Facility ImprovementsFacility Improvements
Thank YouThank You