All Electronic Tolling System (AETS) Implementation Project
I-90 (Western Turnpike / Boston Extension) & Harbor Crossings
Stephen M. Collins – MassDOT Director of Statewide Tolling
Presented by:
Donald Bell P.E. - Traffic Technologies, Inc. Phil Miller P.E. - AECOM
Intro
• MassDOT Toll Facilities • Decision to Convert to AET • Procurement Approach • New Roadside (Design Build Procurement) and
BackOffice (Goods and Services Procurement)
• Massachusetts Turnpike Authority – 1952 • Principal Toll Facilities:
– Western Turnpike – Closed/Ticket System • 123 miles – 16 Interchanges
– MHS Extension – Barrier • 12 miles – 3 Toll Barriers
– Boston Harbor Crossings – Barrier • Ted Williams Tunnel • Sumner/Callahan Tunnel • Tobin Memorial Bridge
MassDOT – Tolled Facilities
MassDOT – Tolled Facilities
135 miles end to end
MassDOT – Tolled Facilities • Combined Traffic / Revenue
– 218 million annual transactions • 597K average daily transactions • Averages greater than 700K on weekdays
– $331 million annual revenue – 73% of transactions are paid for via ETC
Reasons to Consider AET
AET Feasibility Study • Evaluated “As-is”, ORT, and AET • Study determined AET:
– Simplifies Roadway Operations – Highest traffic and environmental benefits – Least disruptive to implement – Best long term value – Best customer service for toll-paying customers
All Electronic Tolling System Project Purpose
To eliminate delays associated with tolling; increase the efficiency of maintenance and operations associated with tolling; and improve safety at the point of toll collection.
Tobin Bridge – Ramp TC
Project Area
Boston – See Detail Graphic
Partial Interchange with no Toll PlazaFull Interchange with no Toll Plaza
Full Interchange with Toll Plaza
AET Toll Zone (Both Directions)
Mainline Toll Plaza – One DirectionMainline Toll Plaza – Both DirectionsComplex Interchange with Mainline and Ramp Toll Plazas
MassDOT All Electronic Toll System
Existing Toll Plazas
Future AET System
18 A
llsto
n/ B
right
on
14/ 1
5 - W
esto
n
17 -
New
ton
Cor
ner
16 –
Wes
t New
ton
13 -
Nat
ick
11A
- W
estb
orou
gh
11 -
Mill
bury
10 -
Aub
urn
9 - S
turb
ridge
8 - P
alm
er
7 - L
udlo
w
3 - W
estfi
eld
4 –
Wes
t Spr
ingf
ield
2 - L
ee
1 –
W. S
tock
brid
geN
ew Y
ork
Stat
e Li
ne
12 -
Fram
ingh
am
90
90
954958491
System Interchange
1
1A
90
93
93
93
Tobin Bridge
Sumner / Callahan Tunnels
Williams Tunnel
Prudential Plaza Tunnel
Zakim Bridge
BOSTON
Toll Gantry
Toll Gantry
Toll Gantry
Central Artery Tunnel
N
Mass. Ave.
Exit 22 Clarendon
Arlington
Exit 18 Mass. Ave.
Exit 18/ 20 Brighton
Cambridge
90
Connecting Roads
Toll Gantry
Project Area - Boston
Infrastructure • One Design/Build Contract for New System:
– New Toll Zones and data/power, – New AET Roadside System, – Traffic Control before and at Go Live.
• Follow-up Projects: – Future Demolition of Legacy Plazas – Interchange Reconstruction
MassDOT AET Program • Two methods of payment:
Implementation Timeline Project Phases: Tobin Demonstration – Summer 2014 (GO LIVE TODAY !)
•AETS – “Best Value” Design-Build Procurement* – AETS Construction & Implementation 2014-2016 – 10 year Operations and Maintenance
•Back Office/Customer Service Center – Generally concurrent with AETS Implementation – 10 year Operations – “Best Value” Procurement
•Demolition of legacy plazas – Under Design – Procured in 2016 – Demolition to follow AETS “Go-Live” in 2016
• Interchange Improvements – 2017+
Codependent Implementation
• Concurrent NTP • Concurrent Integration Testing • Concurrent Production Readiness Testing • Concurrent Go-Live • Co-dependent Incentives for early Go-Live • Co-dependent Disincentives for late Go-Live
Operational Performance
• 10 Year Operational Contracts • Both CSC and Roadside/Host Systems are
Performance Standard Driven • Automatic Monthly Invoice Adjustments
AETS Roadside and Host • Roadside & Host System o Toll Zones o Trip Building o Toll Calculation o ALPR/Fingerprinting o Image Review System o Traffic and Revenue System of Record
CSC • Performs Image Review on Host provided
System • Performs Transaction Correction on Host
provided System • All Typical Back Office Functions • E-ZPass Account Management • PAY BY PLATE MA Accounts Management • PAY BY PLATE MA Invoicing
MassDOT’s Tolling Future
All Electronic Tolling System (AETS) Implementation Project
THANK YOU
Presented by:
Phil Miller, P.E. - AECOM Donald Bell, P.E. – Traffic Technologies, Inc.