APPENDIX-B5 CV 04- Sr Quantity Surveyor
Authoritys Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
APPENDIX B-5: CURRICULUM VITAE (CV)
Proposed Position : Senior Quantity Surveyor
Name of Firm : Redecon (India) Pvt Ltd
Name of Staff : Avijit Saha
Profession : Civil Engineering
Date of Birth : 04th June, 1978 (Proof of age enclosed)
Years with Firm/Entity : Consent given to join Nationality : Indian
Membership of Professional Societies: -
Detailed Task Assigned :
He will be reporting to the Team Leader and give input as and when required during the work. He will provide necessary guidance to the Quantity Surveyor, and shall issue directions/procedures/formats of reporting to the Quantity Surveyor. He will act as a contract specialist also for the construction package, even though the thrust of his responsibilities will be in the areas of quantity surveying/processing of the invoices etc. He will be responsible for taking all measures required to control the project cost and time over-runs. He will examine the claims of the contractor, variation orders, if any, and will approved the progress reports as per the project requirements. He will approve the measurement of all items of works executed in different stages for payment purpose prepared by Quantity Surveyor. S. No
Name of Employer
Post Held Project Name Period Assignment in the Project
Client of the Project
Remark
From To
1 URS Scott Wilson Pvt. Ltd. [Supervision Consultant]
Sr. Quantity Surveyor
Four Laning of Dankuni to Mogra from CH: 0+000 to CH: 36+354 and widening of two lane Mogra to Kalyani from 0+000 to 6+640 Link Road (Excluding Iswargupta Setu), Total Project Length 42 KM
May 2014
till date
Preparation or Checking of IPC, Reports, Quantity calculation Design of drain invert levels, Bar Bending level etc. Horizontal Curve design and elevation calculation, and other drawings etc.
West Bengal Highway Development Corporation Ltd.
2 SKES/Consulting Engineers Pvt. Ltd.(CEG) [Project Management Consultant]
Sr. Quantity Surveyor
Six Laning of Kolaghat to Kharagpur from CH: 72+000 to CH: 129+000 (Excluding 1KM. Roopnarayan Bridge), Total Project Length 56 KM. NH-6, in the state of West Bengal under NHDP Phase-V on DBFOT Toll Basis
Dec 2011
30th April 2014
Preparation or Checking of IPC, Reports, Quantity calculation Design of drain invert levels, Bar Bending level etc. Horizontal Curve design and elevation calculation, and other drawings etc.
NHAI
3 GKC PROJECT Ltd.
Sr. Quantity Surveyor
Construction of 6 - Laning of Ranchi Ring Road in State of Jharkhand, Total 51KM Length.
Apr 2010
Dec 2011
Preparation or Checking of IPC, Reports, Quantity calculation Design of drain
Govt. of Jharkhand
-
APPENDIX-B5 CV 04- Sr Quantity Surveyor
Authoritys Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
S. No
Name of Employer
Post Held Project Name Period Assignment in the Project
Client of the Project
Remark
From To
invert levels, Bar Bending level etc. Horizontal Curve design and elevation calculation, and other drawings etc.
4 GAYATRI PROJECT Ltd.
Sr. Quantity Surveyor
Widening to 4/6 - lanes and Strengthening of Existing 2 lane carriageway of NH-25 in the State of Uttar Pradesh
May 2008
Mar 2010
Preparation or Checking of IPC, Reports, Quantity calculation Design of drain invert levels, Bar Bending level etc. Horizontal Curve design and elevation calculation, and other drawings etc.
NHAI
5 D.S. CONSTRUCTIONS Ltd.
Quantity Surveyor
Widening to 4/6 - lanes and Strengthening of Existing 2 lane carriageway of NH-75 in the State of Madhya Pradesh and Uttar Pradesh from KM: 16.000 to KM: 56.150 and KM: 54.000 to KM: 97.130 (Gwalior - Jhansi) BOT
Apr 2007
May 2008
Preparation or Checking of IPC, Reports, Quantity calculation Design of drain invert levels, Bar Bending level etc. Horizontal Curve design and elevation calculation, and other drawings etc.
NHAI
6 ORIENTAL STRUCTURAL ENGINEERS Pvt. Ltd
Quantity Surveyor
TNRSP-01 (Tamil Nadu Road Sector Project 01) Upgrading of Roads of 2-Lanes
Feb 2006
Mar 2007
Preparation or Checking of IPC, Reports, Quantity calculation Design of drain invert levels, Bar Bending level etc. Horizontal Curve design and elevation calculation, and other drawings etc.
Tamil Nadu Road Sector Dev.Corporation
7 M/s. RBM-PATI Malaysian (Joint Venture)
Q.S. Cum CAD Engineer
Widening to 4/6 lanes and Strengthening of Existing 2 lane carriageway of NH-6 in the State of West Bengal from KM 17.60 to KM 72.00 (DankuniKolaghat)
August 2002
February 2006
Preparation of Quantity Estimation, Analysis of Rates, source of materials, preparation of IPCs, checking of measurements, etc.
NHAI
8 M/s. RBM- Ast. Widening of 2-Lanes Apr Aug Preparation of Govt.of
-
APPENDIX-B5 CV 04- Sr Quantity Surveyor
Authoritys Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
S. No
Name of Employer
Post Held Project Name Period Assignment in the Project
Client of the Project
Remark
From To
TANTIA (JV) Q.S./CAD Engineer
or Bypass New Alignment at State of Mizoram,
1999 2002 Quantity Estimation, Analysis of Rates, source of materials, preparation of IPCs, checking of measurements, etc.
Mizoram
Education: (Proof of qualification enclosed)
Bachelor of Technology (Civil Engineering) from Bundelkhand Engineering College in 1999 Board of
Uttar Pradesh Technical University (UPTU).
Computer Exposure:
AutoCAD R-13 to R-2010
Auto Plotter (Road Estimator) in Previous
Land Development Desktop (LDD)
Soft Desk (With R-14)
3D Max 2009 or 2010
Microsoft Office
MS Project 2003 or 2007
Programming Language
Visual Lisp (Auto Lisp)
Visual Basic Application for Auto Cad.
Visual Basic Application for Microsoft Excel.
Visual Basic 6.0
Key Qualifications:
Er. Avijit Saha is B.Tech ( in Civil Engineering) with experience of 15 years in construction & Construction
supervision of Highways and Bridge projects. He has worked as Senior Quantity Surveyor/QS, Surveyor and
has experience in preparation, and or checking of IPC ,Progress Reports, inspection reports etc., preparation of Rate
Analysis, BOQ, preparation of bills & Claims, maintaining & monitoring the Project targets and progress for timely
completion, Contract Management, Cost Estimation & Cost Control, survey measurements, setting of Horizontal
Alignment, setting out of Road work i.e. GSB, Earth work, WMM and DBM, BC, checking of levels, L-Sections &
Cross-Sections, design and calculations.
He is conversant with MORTH specification and IRC codes, FIDIC Condition of contract etc and possess computer
skills, as listed above.
Employment Record:
From: May 2014 to till date
Employer: URS Scott Wilson Pvt. Ltd. [Supervision Consultant]
Designation: Sr. Quantity Surveyor
Project Name: Four Laning of Dankuni to Mogra from CH: 0+000 to CH: 36+354 and widening of two lane
Mogra to Kalyani from 0+000 to 6+640 Link Road (Excluding Iswargupta Setu), Total
Project Length 42 KM. SH-13, in the state of West Bengal. Project Cost Rs.320 Cr.
Location: West Bengal
Client: West Bengal Highway Development Corporation Ltd. (WBHDCL)
Contractor: Dinesh Chandra R. Agarwal Pvt. Ltd.
Duties performed:
Preparation or Checking of IPC (Interim Payment Certificate).
-
APPENDIX-B5 CV 04- Sr Quantity Surveyor
Authoritys Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
Preparation of Daily Progress Report and Monthly Progress Report.
Preparation of Presentation in MS Power Point showing with salient features, scope of work, Mobilization of Machinery and Manpower, Organization chart, Status of Design & Drawings, Target Vs Achievement, Physical and Linear Progress, Quality Control and Safety.
Reconciliation of Material by site work report and Store or Plant Report.
Find out the working rates of every item (Concrete and Highway Material).
Quantity calculation by Visual Lisp Program for Earth works, GSB, WMM Fly Ash, Fascia area of RE Wall and BT works of Highway for IPC.
Concrete, Shuttering and Steel (BBS) Quantity calculation for Culverts, Bridges, Grade Separator, Under Pass, ROB, RUB, Cattle Crossing and Retaining Wall, RE Wall, Crash barrier and Drains.
Design of Drain Invert Level, Height and Bar Bending Schedule in every 10mts. Interval.
Designing F.R.Ls (Finished Road Levels) in every 10mts, as well as cross sectional levels with super elevation. (Vertical Curve design as per IRC-23).
Horizontal Curve design and elevation calculation by using LDD (Land Development Desktop Package). (Horizontal Curve Design as per IRC-38).
Preparation of any type of Cross Sections by using Own made software and Visual LISP Programming.
Preparation of all drawings and layout plan of Culverts, Underpass, Retaining Wall, Drain and necessary maps for approvals.
Calculation of Co-Ordinate by Layout of Culverts, Bridges (Pile to Bearing or Slab Points), Underpass, ROB, RUB, Flyover and others as per surveyor requirement for site works.
Preparation of Junctions Drawing as per site topography (By Typical Junction Drawing) and find out the Co-Ordinates of Proposed Junctions Plan.
Preparation of Plan & Profile with detail of vertical and horizontal curve (Super Elevation & Camber%)
Preparation of Level Sheets for every layers of Highway in every 5Mts or 10Mts Interval.
Preparation of Bar Chart for Culvert or Highways in Excel with Formula and Pictorial View of Major Structure for showing status of Project.
From: Dec 2011 30th April 2014
Employer: SKES/Consulting Engineers Pvt. Ltd.(CEG) [Project Management Consultant]
Designation: Sr. Quantity Surveyor
Project Name: Six Laning of Kolaghat to Kharagpur from CH: 72+000 to CH: 129+000 (Excluding 1KM.
Roopnarayan Bridge), Total Project Length 56 KM. NH-6, in the state of West Bengal under
NHDP Phase-V on DBFOT Toll Basis. Project Cost Rs. 385 Cr. (56 KM 6-Lane Widening)
I.E. : Aarvee Associates.
Concessionaire: Ashoka Buildcon Ltd.
Contractor: Dinesh Chandra R. Agarwal Pvt. Ltd.
Location: West Bengal
Client: NHAI
Duties performed:
Preparation or Checking of IPC (Interim Payment Certificate).
Preparation of Daily Progress Report and Monthly Progress Report.
Preparation of Presentation in MS Power Point showing with salient features, scope of work, Mobilization of Machinery and Manpower, Organization chart, Status of Design & Drawings, Target Vs Achievement, Physical and Linear Progress, Quality Control and Safety.
Reconciliation of Material by site work report and Store or Plant Report.
Find out the working rates of every item (Concrete and Highway Material).
Quantity calculation by Visual Lisp Program for Earth works, GSB, WMM Fly Ash, Fascia area of RE Wall and BT works of Highway for IPC.
-
APPENDIX-B5 CV 04- Sr Quantity Surveyor
Authoritys Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
Concrete, Shuttering and Steel (BBS) Quantity calculation for Culverts, Bridges, Grade Separator, Under Pass, ROB, RUB, Cattle Crossing and Retaining Wall, RE Wall, Crash barrier and Drains.
Design of Drain Invert Level, Height and Bar Bending Schedule in every 10mts. Interval.
Designing F.R.Ls (Finished Road Levels) in every 10mts, as well as cross sectional levels with super elevation. (Vertical Curve design as per IRC-23).
Horizontal Curve design and elevation calculation by using LDD (Land Development Desktop Package). (Horizontal Curve Design as per IRC-38).
Preparation of any type of Cross Sections by using Own made software and Visual LISP Programming.
Preparation of all drawings and layout plan of Culverts, Underpass, Retaining Wall, Drain and necessary maps for approvals.
Calculation of Co-Ordinate by Layout of Culverts, Bridges (Pile to Bearing or Slab Points), Underpass, ROB, RUB, Flyover and others as per surveyor requirement for site works.
Preparation of Junctions Drawing as per site topography (By Typical Junction Drawing) and find out the Co-Ordinates of Proposed Junctions Plan.
Preparation of Plan & Profile with detail of vertical and horizontal curve (Super Elevation & Camber%)
Preparation of Level Sheets for every layers of Highway in every 5Mts or 10Mts Interval.
Preparation of Bar Chart for Culvert or Highways in Excel with Formula and Pictorial View of Major Structure for showing status of Project.
From: Apr 2010 Dec 2011
Employer: GKC PROJECT Ltd.
Designation: Sr. Quantity Surveyor
Project Name: Construction of 6 - Laning of Ranchi Ring Road in State of Jharkhand, Total 51KM Length.
Project Cost Rs. 397 Cr Concessionaire: IL & FS, Consultant: MSV International
Location: Jharkhand
Client: Govt. of Jharkhand
Duties performed:
Preparation or Checking of IPC (Interim Payment Certificate).
Preparation of Daily Progress Report and Monthly Progress Report.
Preparation of Presentation in MS Power Point showing with salient features, scope of work, Mobilization of Machinery and Manpower, Organization chart, Status of Design & Drawings, Target Vs Achievement, Physical and Linear Progress, Quality Control and Safety.
Reconciliation of Material by site work report and Store or Plant Report.
Find out the working rates of every item (Concrete and Highway Material).
Quantity calculation by Visual Lisp Program for Earth works, GSB, WMM Fly Ash, Fascia area of RE Wall and BT works of Highway for IPC.
Concrete, Shuttering and Steel (BBS) Quantity calculation for Culverts, Bridges, Grade Separator, Under Pass, ROB, RUB, Cattle Crossing and Retaining Wall, RE Wall, Crash barrier and Drains.
Design of Drain Invert Level, Height and Bar Bending Schedule in every 10mts. Interval.
Designing F.R.Ls (Finished Road Levels) in every 10mts, as well as cross sectional levels with super elevation. (Vertical Curve design as per IRC-23).
Horizontal Curve design and elevation calculation by using LDD (Land Development Desktop Package). (Horizontal Curve Design as per IRC-38).
Preparation of any type of Cross Sections by using Own made software and Visual LISP Programming.
Preparation of all drawings and layout plan of Culverts, Underpass, Retaining Wall, Drain and necessary maps for approvals.
Calculation of Co-Ordinate by Layout of Culverts, Bridges (Pile to Bearing or Slab Points), Underpass, ROB, RUB, Flyover and others as per surveyor requirement for site works.
Preparation of Junctions Drawing as per site topography (By Typical Junction Drawing) and find out the Co-Ordinates of Proposed Junctions Plan.
Preparation of Plan & Profile with detail of vertical and horizontal curve (Super Elevation & Camber%)
-
APPENDIX-B5 CV 04- Sr Quantity Surveyor
Authoritys Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
Preparation of Level Sheets for every layers of Highway in every 5Mts or 10Mts Interval.
Preparation of Bar Chart for Culvert or Highways in Excel with Formula and Pictorial View of Major Structure for showing status of Project.
From: May 2008 Mar 2010
Employer: GAYATRI PROJECT Ltd.
Designation: Sr. Quantity Surveyor
Project Name: Widening to 4/6 - lanes and Strengthening of Existing 2 lane carriageway of NH-25 in the
State of Uttar Pradesh from KM: 104.100 to KM: 172.362 (Jhanshi-Bhagnipur) ,Project Cost
Rs. 414 Cr. Consultant RENARDET S.A.
Location: Uttar Pradesh
Client: NHAI
Duties performed:
Preparation /Checking of IPC (Interim Payment Certificate).
Preparation of Daily Progress Report and Monthly Progress Report.
Preparation of Presentation in MS Power Point showing with salient features, scope of work, Mobilization of Machinery and Manpower, Organization chart, Status of Design & Drawings, Target Vs Achievement, Physical and Linear Progress, Quality Control and Safety.
Reconciliation of Material by site work report and Store or Plant Report.
Find out the working rates of every item (Concrete and Highway Material).
Quantity calculation by Visual Lisp Program for Earth works, GSB, WMM Fly Ash, Fascia area of RE Wall and BT works of Highway for IPC.
Concrete, Shuttering and Steel (BBS) Quantity calculation for Culverts, Bridges, Grade Separator, Under Pass, ROB, RUB, Cattle Crossing and Retaining Wall, RE Wall, Crash barrier and Drains.
Design of Drain Invert Level, Height and Bar Bending Schedule in every 10mts. Interval.
Designing F.R.Ls (Finished Road Levels) in every 10mts, as well as cross sectional levels with super elevation. (Vertical Curve design as per IRC-23).
Horizontal Curve design and elevation calculation by using LDD (Land Development Desktop Package). (Horizontal Curve Design as per IRC-38).
Preparation of any type of Cross Sections by using Own made software and Visual LISP Programming.
Preparation of all drawings and layout plan of Culverts, Underpass, Retaining Wall, Drain and necessary maps for approvals.
Calculation of Co-Ordinate by Layout of Culverts, Bridges (Pile to Bearing or Slab Points), Underpass, ROB, RUB, Flyover and others as per surveyor requirement for site works.
Preparation of Junctions Drawing as per site topography (By Typical Junction Drawing) and find out the Co-Ordinates of Proposed Junctions Plan.
Preparation of Plan & Profile with detail of vertical and horizontal curve (Super Elevation & Camber%)
Preparation of Level Sheets for every layers of Highway in every 5Mts or 10Mts Interval.
Preparation of Bar Chart for Culvert or Highways in Excel with Formula and Pictorial View of Major Structure for showing status of Project.
From: Apr 2007 May 2008
Employer: D.S. CONSTRUCTIONS Ltd.
Designation: Quantity Surveyor
Project Name: Widening to 4/6 - lanes and Strengthening of Existing 2 lane carriageway of NH-75 in the
State of Madhya Pradesh and Uttar Pradesh from KM: 16.000 to KM: 56.150 and KM:
54.000 to KM: 97.130 (Gwalior - Jhansi) BOT (Annuity) Concession Period 20 Years.
Consultant: Grontmij Carl Bro A/S and EMA Unihorn (India) Pvt. Ltd. JV Project Cost
Rs. 721 Cr
Location: Uttar Pradesh
Client: NHAI
-
APPENDIX-B5 CV 04- Sr Quantity Surveyor
Authoritys Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
Duties performed:
Preparation or Checking of IPC (Interim Payment Certificate).
Preparation of Daily Progress Report and Monthly Progress Report.
Preparation of Presentation in MS Power Point showing with salient features, scope of work, Mobilization of Machinery and Manpower, Organization chart, Status of Design & Drawings, Target Vs Achievement, Physical and Linear Progress, Quality Control and Safety.
Reconciliation of Material by site work report and Store or Plant Report.
Find out the working rates of every item (Concrete and Highway Material).
Quantity calculation by Visual Lisp Program for Earth works, GSB, WMM Fly Ash, Fascia area of RE Wall and BT works of Highway for IPC.
Concrete, Shuttering and Steel (BBS) Quantity calculation for Culverts, Bridges, Grade Separator, Under Pass, ROB, RUB, Cattle Crossing and Retaining Wall, RE Wall, Crash barrier and Drains.
Design of Drain Invert Level, Height and Bar Bending Schedule in every 10mts. Interval.
Designing F.R.Ls (Finished Road Levels) in every 10mts, as well as cross sectional levels with super elevation. (Vertical Curve design as per IRC-23).
Horizontal Curve design and elevation calculation by using LDD (Land Development Desktop Package). (Horizontal Curve Design as per IRC-38).
Preparation of any type of Cross Sections by using Own made software and Visual LISP Programming.
Preparation of all drawings and layout plan of Culverts, Underpass, Retaining Wall, Drain and necessary maps for approvals.
Calculation of Co-Ordinate by Layout of Culverts, Bridges (Pile to Bearing or Slab Points), Underpass, ROB, RUB, Flyover and others as per surveyor requirement for site works.
Preparation of Junctions Drawing as per site topography (By Typical Junction Drawing) and find out the Co-Ordinates of Proposed Junctions Plan.
Preparation of Plan & Profile with detail of vertical and horizontal curve (Super Elevation & Camber%)
Preparation of Level Sheets for every layers of Highway in every 5Mts or 10Mts Interval.
Preparation of Bar Chart for Culvert or Highways in Excel with Formula and Pictorial View of Major Structure for showing status of Project.
From: Feb 2006 Mar 2007
Employer: ORIENTAL STRUCTURAL ENGINEERS Pvt. Ltd.
Designation: Quantity Surveyor
Project Name: TNRSP-01 (Tamil Nadu Road Sector Project 01) Upgrading of Roads of 2-Lanes from
Arcot to Ulundurpettai (Elavanasur) Length 32 KM, Polur to Chengam Length 47 KM,
Vriddhachalam to Tiruvarur Length 23 KM, Jayamkondam to Ariyalur Length 28 KM and
new bypass roads at Chidambaram 27KM, Sirkazhi 23KM, Arani 13 KM, Polur 17KM,
Vriddhachalam 21KM, Ariyalur and Tiruvarur 29 KM. LEA and Lasa Pvt. Ltd. JV, Project
Cost Rs. 205 Cr.
Location: Tamil Nadu
Client: Tamil Nadu Road Sector Project (TNRSP-01)
Duties performed:
Preparation or Checking of IPC (Interim Payment Certificate).
Preparation of Daily Progress Report and Monthly Progress Report.
Preparation of Presentation in MS Power Point showing with salient features, scope of work, Mobilization of Machinery and Manpower, Organization chart, Status of Design & Drawings, Target Vs Achievement, Physical and Linear Progress, Quality Control and Safety.
Reconciliation of Material by site work report and Store or Plant Report.
Find out the working rates of every item (Concrete and Highway Material).
Quantity calculation by Visual Lisp Program for Earth works, GSB, WMM Fly Ash, Fascia area of RE Wall and BT works of Highway for IPC.
-
APPENDIX-B5 CV 04- Sr Quantity Surveyor
Authoritys Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
Concrete, Shuttering and Steel (BBS) Quantity calculation for Culverts, Bridges, Grade Separator, Under Pass, ROB, RUB, Cattle Crossing and Retaining Wall, RE Wall, Crash barrier and Drains.
Design of Drain Invert Level, Height and Bar Bending Schedule in every 10mts. Interval.
Designing F.R.Ls (Finished Road Levels) in every 10mts, as well as cross sectional levels with super elevation. (Vertical Curve design as per IRC-23).
Horizontal Curve design and elevation calculation by using LDD (Land Development Desktop Package). (Horizontal Curve Design as per IRC-38).
Preparation of any type of Cross Sections by using Own made software and Visual LISP Programming.
Preparation of all drawings and layout plan of Culverts, Underpass, Retaining Wall, Drain and necessary maps for approvals.
Calculation of Co-Ordinate by Layout of Culverts, Bridges (Pile to Bearing or Slab Points), Underpass, ROB, RUB, Flyover and others as per surveyor requirement for site works.
Preparation of Junctions Drawing as per site topography (By Typical Junction Drawing) and find out the Co-Ordinates of Proposed Junctions Plan.
Preparation of Plan & Profile with detail of vertical and horizontal curve (Super Elevation & Camber%)
Preparation of Level Sheets for every layers of Highway in every 5Mts or 10Mts Interval.
Preparation of Bar Chart for Culvert or Highways in Excel with Formula and Pictorial View of Major Structure for showing status of Project.
From: August 2002 February 2006
Employer: M/s. RBM-PATI Malaysian (Joint Venture)
Designation: Q.S. Cum CAD Engineer
Project Name: Widening to 4/6 lanes and Strengthening of Existing 2 lane carriageway of NH-6 in the
State of West Bengal from KM 17.60 to KM 72.00 (DankuniKolaghat) Total 54.4 KM
Length, Contract Package WB-1. Consultant: ICT, Project Cost Rs. 447.7 Cr.
Location: West Bengal
Client: NHAI
Duties performed:
Preparation or Checking of IPC (Interim Payment Certificate).
Preparation of Daily Progress Report and Monthly Progress Report.
Preparation of Presentation in MS Power Point showing with salient features, scope of work, Mobilization of Machinery and Manpower, Organization chart, Status of Design & Drawings, Target Vs Achievement, Physical and Linear Progress, Quality Control and Safety.
Reconciliation of Material by site work report and Store or Plant Report.
Find out the working rates of every item (Concrete and Highway Material).
Quantity calculation by Visual Lisp Program for Earth works, GSB, WMM Fly Ash, Fascia area of RE Wall and BT works of Highway for IPC.
Concrete, Shuttering and Steel (BBS) Quantity calculation for Culverts, Bridges, Grade Separator, Under Pass, ROB, RUB, Cattle Crossing and Retaining Wall, RE Wall, Crash barrier and Drains.
Design of Drain Invert Level, Height and Bar Bending Schedule in every 10mts. Interval.
Designing F.R.Ls (Finished Road Levels) in every 10mts, as well as cross sectional levels with super elevation. (Vertical Curve design as per IRC-23).
Horizontal Curve design and elevation calculation by using LDD (Land Development Desktop Package). (Horizontal Curve Design as per IRC-38).
Preparation of any type of Cross Sections by using Own made software and Visual LISP Programming.
Preparation of all drawings and layout plan of Culverts, Underpass, Retaining Wall, Drain and necessary maps for approvals.
Calculation of Co-Ordinate by Layout of Culverts, Bridges (Pile to Bearing or Slab Points), Underpass, ROB, RUB, Flyover and others as per surveyor requirement for site works.
Preparation of Junctions Drawing as per site topography (By Typical Junction Drawing) and find out the Co-Ordinates of Proposed Junctions Plan.
-
APPENDIX-B5 CV 04- Sr Quantity Surveyor
Authoritys Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
Preparation of Plan & Profile with detail of vertical and horizontal curve (Super Elevation & Camber%)
Preparation of Level Sheets for every layers of Highway in every 5Mts or 10Mts Interval.
Preparation of Bar Chart for Culvert or Highways in Excel with Formula and Pictorial View of Major Structure for showing status of Project.
From: Apr 1999 Aug 2002 Employer: M/s. RBM-TANTIA (JV) Designation: Ast. Q.S./CAD Engineer
Project Name: Widening of 2-Lanes or Bypass New Alignment at State of Mizoram, Total 112 Km Length. Project Cost Rs. 370 Cr. Consultant: Shiladia & Ghirjee
Location: Mizoram Client: Govt.of Mizoram Duties performed:
Preparation of IPC (Interim Payment Certificate).
Preparation of Plan & Profile with detail of vertical and horizontal curve (Super Elevation & Camber%)
Preparation of Level Sheets for every layers of Highway in every 5Mts or 10Mts Interval.
Quantity Estimation, Analysis of Rates, identifying source of material, etc. Languages:
Read Write Speak English Good Good Good Hindi Excellent Excellent Excellent Bengali Excellent Excellent Excellent
Summary of Qualification & Experience vis--vis the requirements as per TOR
Requirements as per TOR (Enclosure-B)
Possessed by the Staff Member
Break-up of experience
Brief Description of project Man-
(1) Essential Qualifications. (a).(Graduate in Civil Engineering from recognized university. (b)Total Professional Experience of 15 years in handling Highway Contracts. (c) At least 10 years experience as Quantity Surveyor in Highway project. (d) He should have handled as Quantity Surveyor in atleast two projects in Construction Supervision of Two/four of laning Highways. (e) Not more than 65 years of age. 2) Preferential Qualifications. (a) Post Graduate Degree in Construction Management/ Engineering/certificate course in management/ certificate course in construction management/ certificate course in contract management.
(a).B.Tech (Civil Engineering) from Uttar Pradesh Technical University (UPTU). (b). Has 15 years experience in Highway Contract projects. (c). Has 15 years experience as Quantity Surveyor in Highway projects. (d). More than 5 projects (listed alongside) (e). He is about
36years of age.
Six Laning of Kolaghat to Kharagpur from CH: 72+000 to CH: 129+000 (Excluding 1KM. Roopnarayan Bridge), Total Project Length 56 KM. NH-6, in the state of West Bengal under NHDP Phase-V on DBFOT Toll Basis.
2.33years
Construction of 6 - Laning of Ranchi Ring Road in State of Jharkhand
1.75years
Widening to 4/6 - lanes and Strengthening of Existing 2 lane carriageway of NH-25 in the State of Uttar Pradesh from KM: 104.100 to KM: 172.362 (Jhanshi-Bhagnipur)
1.92years
Widening to 4/6 - lanes and Strengthening of Existing 2 lane carriageway of NH-75 in the State of Madhya Pradesh and Uttar Pradesh from KM: 16.000 to KM: 56.150 and KM: 54.000 to KM: 97.130 (Gwalior - Jhansi)
1.08years
TNRSP-01 (Tamil Nadu Road Sector Project 01) Upgrading of Roads of 2-Lanes
1.17years
Widening to 4/6 lanes and Strengthening of Existing 2 lane carriageway of NH-6 in the State of West Bengal from KM 17.60 to KM 72.00 (DankuniKolaghat) Total 54.4 KM Length, Contract Package WB-1.
3.58yers
Widening of 2-Lanes or Bypass New Alignment at State of Mizoram
2.50years
-
APPENDIX-B5 CV 04- Sr Quantity Surveyor
Authoritys Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
Certification by the Candidate
I, the undersigned, Avijit Saha S/o Dipal Saha, 65, Suryasen Palli, Nimta, G.B. Road, Kolkata 700049
undertake that this CV correctly describes myself, my qualifications and my experience and Employer would be at
liberty to debar me if any information given in the CV, in particular the Summary of Qualification & Experience vis--vis
the requirements as per TOR is found incorrect. I further undertake that I have neither been debarred by NHAI
or any other central/stage government organization nor left any assignment with the consultants engaged
by Employer / contracting firm (Redecon (India) Pvt Ltd) for any continuing work of Employer without
completing my assignment. I will be available for the entire duration of the current project Consultancy services
for Authoritys Engineer for Supervision of Improvement & Augmentation of Karaikudi - Ramanathapuram
section to 2 laning with Paved Shoulders from Km 94.000 to Km 174.000 (Existing Chainage from Km 94.000
to Km 174.000 of NH 210 including 500m on SH 35 Madurai Road (near Devakottai Rasta Railway Station)
(Total Design Length 80.000 Km) on Engineering Procurement and Construction (EPC) Mode under NHDP
Phase-III in the State of Tamil Nadu. If I leave this assignment in the middle of the work, Employer would be at
liberty to debar me from taking any assignment in any of the Employer works for an appropriate period of time
to be decided by the Employer. I have no objection if my services are extended by the Employer for this work in future.
I further undertake that my CV is being proposed for this project by Redecon (India) Pvt Ltd and I have not given
consent to any other consultant(s) to propose my CV for any position for this project.
I further undertake that if due to my inability to work on this project due to unavoidable circumstances, due to
which consultants firm is forced to seek replacement. In such unavoidable circumstances, I shall not undertake
any employment in Employer projects during the period of assignment of this project and Employer shall consider my
CV invalid till such time.
I undertake that I have no objection in uploading/hosting of my credentials by Employer in public domain.
I further certify that I am associated with the following assignments as on date (as on 7 days prior to due date for
submission of proposal) including those for which LOA has been received by the firm and the inputs in these
assignments shall not affect the work of the current assignment.
Name of Assignment Client Date of LOA Likely start (Month / Year)
Likely end (Month /Year)
Total input of the Person (man-months)
N/A NA
.. Date
(Signature of Key Personnel) (Day/Month/Year)
Certification by the firm
The undersigned on behalf of M/s Redecon (I) Pvt. Ltd. H-54, Kalkaji, New Delhi-19 certify that the qualification
and experience details of Er. Avijit Saha, S/o Dipal Saha, 65, Suryasen Palli, Nimta, G.B. Road, Kolkata
700049 as described in the CV has been checked and found to be correct. It is also certified that Er. Avijit Saha
to the best of our knowledge has neither been debarred by NHAI or any other Central/State Government
organization nor left his assignment with any other consulting firm engaged by the Employer / Contracting firm (firm
to be supervised now) for the ongoing projects.
We understand that if the information about leaving the past assignment is known to the Employer,
Employer would be at liberty to remove the personnel from the present assignment and debar him for an
appropriate period to be decided by the Employer.
Date : [Signature of authorised representative of the Firm] (Day/Month/Year)
******
-
APPENDIX-B5
Authoritys Engineer of NH-210 under NHDP
CV 0
P-II in the state of Tamil Nadu
CV 04- Sr Quantity Surveyor
Redecon (India) Pvt Ltd
-
APPENDIX-B5 CV 04- Sr Quantity Surveyor
Authoritys Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
-
APPENDIX-B5 CV 04- Sr Quantity Surveyor
Authoritys Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
-
APPENDIX-B5 CV 04- Sr Quantity Surveyor
Authoritys Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
-
APPENDIX-B5 CV 04- Sr Quantity Surveyor
Authoritys Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
-
APPENDIX-B5 CV 04- Sr Quantity Surveyor
Authoritys Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
top related