CAPITULO: ITEM:
16.1
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 1,908.00 12.00 22,896.00
M 1,300.00 6.00 7,800.00
UND 277.00 2.00 554.00
UND 996.00 2.00 1,992.00
UND 5,535.00 1.00 5,535.00
ML 1,559.00 6.00 9,354.00
UND 565.00 2.00 1,130.00
% 40,050.00 3.00 1,201.50
SUBTOTAL MATERIALES 50,462.50
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 44,686.97 0.10 4,468.70
4,468.70
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TECNICO ELECT. 1.00 38,666.20 1.95 75399.09 2.800 26,928.25
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 2.800 17,758.72
SUBTOTAL MANO DE OBRA 44,686.97
TOTAL COSTOS DIRECTOS 99,618.16
FIRMA SOPM: ADMINISTRA. 17% 16,935.09
IMPREVISTOS 3% 2,988.54
UTILIDAD 10% 9,961.82
5% 4,980.91
TOTAL COSTO INDIRECTO 34,866.36
FECHA
VALOR PRECIO UNITARIO 134,485.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
PUNTO ELECTRICO MONOFASICO - ALUMBRADO
HERRAMIENTA MENOR
DESCRIPCIÓN
ALAMBRE DE COBRE # 12 AWG-THW
ALAMBRE DE COBRE # 14 AWG-THW
BOQUILLA 1/2" + TUERCA
CAJA 5800 GALV. RG 100
INTERRUPTOR SENCILLO
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
TUBO CONDUIT PVC 1/2" T.P.
CURVA CONDUIT 1/2"
DESPERDICIO
DESCRIPCIÓN
CAPITULO: ITEM:
16.2
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 3,959.00 40.00 158,360.00
UND 4,705.00 1.00 4,705.00
RLLO 2,214.00 0.10 221.40
UND 980.00 1.00 980.00
ML 10,840.00 20.00 216,800.00
% 375,381.40 5.00 18,769.07
SUBTOTAL MATERIALES 399,835.47
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 31,280.88 0.10 3,128.09
3,128.09
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TECNICO ELECT. 1.00 38,666.20 1.95 75399.09 4.000 18,849.77
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 4.000 12,431.10
SUBTOTAL MANO DE OBRA 31,280.88
TOTAL COSTOS DIRECTOS 434,244.43
FIRMA SOPM: ADMINISTRA. 17% 73,821.55
IMPREVISTOS 3% 13,027.33
UTILIDAD 10% 43,424.44
5% 21,712.22
TOTAL COSTO INDIRECTO 151,985.55
FECHA
VALOR PRECIO UNITARIO 586,230.00
IMPUESTOS DE LEY 1106/2006
SUBTOTAL EQUIPOS
COSTO INDIRECTO
DESCRIPCIÓN
HERRAMIENTA MENOR
MARQUILLA EN ACRILICO
TUBERIA CONDUIT GALVANIZADA 3/4"
DESPERDICIO
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
CINTA AISLANTE
CAJA DE 4*2 GALVANIZADA - COMPLETA
PROPONENTE:
SECRETARIA DE EDUCACIÓN
SALIDA REFLECTOR MH 150 W.
DESCRIPCIÓN
CABLE DE COBRE # 10 AWG (LUMINARIAS)
CAPITULO: ITEM:
16.3
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 1,559.00 6.000 9,354.00
ML 1,908.00 12.000 22,896.00
ML 853.00 6.000 5,118.00
UND 277.00 2.000 554.00
UND 4,705.00 1.000 4,705.00
1/4 G 41,181.00 0.007 288.27
M3 305,556.00 0.001 305.56
UND 5,757.00 1.000 5,757.00
UND 565.00 2.000 1,130.00
% 37,961.82 5.00 1,898.09
SUBTOTAL MATERIALES 52,005.91
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 17,658.89 0.10 1,765.89
1,765.89
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TECNICO ELECT. 1.00 38,666.20 1.95 75399.09 6.996 10,777.46
OBRERO 1.00 24,692.00 1.95 48149.40 6.997 6,881.43
SUBTOTAL MANO DE OBRA 17,658.89
TOTAL COSTOS DIRECTOS 71,430.70
FIRMA SOPM: ADMINISTRA. 17% 12,143.22
IMPREVISTOS 3% 2,142.92
UTILIDAD 10% 7,143.07
5% 3,571.53
TOTAL COSTO INDIRECTO 25,000.74
FECHA
VALOR PRECIO UNITARIO 96,431.00
TOMACORRIENTE DOBLE AMBIA
CURVA CONDUIT 1/2"
DESPERDICIO
DESCRIPCIÓN
HERRAMIENTA MENOR
MORTERO 1:4
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
ALAMBRE DE COBRE DESNUDO DURO # 14 AWG
BOQUILLA 1/2" + TUERCA
CAJA DE 4*2 GALVANIZADA - COMPLETA
SOLDADURA LIQUIDA PVC
SECRETARIA DE EDUCACIÓN
PUNTO ELECTRICO (TOMACORRIENTE 110 V)
DESCRIPCIÓN
TUBO CONDUIT PVC 1/2" T.P.
ALAMBRE DE COBRE # 12 AWG-THW
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
CAPITULO: ITEM:
16.4
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 1,982.00 12.000 23,784.00
UND 2,517.00 1.000 2,517.00
UND 26,967.00 1.000 26,967.00
% 23,784.00 5.00 1,189.20
SUBTOTAL MATERIALES 54,457.20
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 40,507.70 0.10 4,050.77
4,050.77
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TECNICO ELECT. 1.00 38,666.20 1.95 75399.09 3.050 24,721.01
OBRERO 1.00 24,692.00 1.95 48149.40 3.050 15,786.69
SUBTOTAL MANO DE OBRA 40,507.70
TOTAL COSTOS DIRECTOS 99,015.67
FIRMA SOPM: ADMINISTRA. 17% 16,832.66
IMPREVISTOS 3% 2,970.47
UTILIDAD 10% 9,901.57
5% 4,950.78
TOTAL COSTO INDIRECTO 34,655.49
FECHA
VALOR PRECIO UNITARIO 133,671.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
CABLE DE COBRE THHN Y THW-AWG/MCM #12
CAJA PLASTICA PARA CANALETA
DESPERDICIO
DESCRIPCIÓN
HERRAMIENTA MENOR
IMPUESTOS DE LEY 1106/2006
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
TOMACORRIENTE M.F. DOBLE REGULADA
"Trabajo-progreso y solidaridad"
DESCRIPCIÓN
TOMACORRIENTE DOBLE GRADO HOSPITALARIO
MUNICIPIO DE ARAUCA
CAPITULO: ITEM:
16.5
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 1,908.00 7.000 13,356.00
ML 853.00 3.500 2,985.50
ML 5,535.00 3.500 19,372.50
UND 4,705.00 2.000 9,410.00
UND 277.00 2.000 554.00
UND 5,757.00 1.000 5,757.00
UND 144.00 5.000 720.00
UND 68.00 5.000 340.00
RLLO 2,214.00 0.100 221.40
% 5.00 1,796.77
SUBTOTAL MATERIALES 54,513.17
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 25,024.70 0.10 2,502.47
DIA 10,346.00 5.00 2,069.20
4,571.67
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TECNICO ELECT. 1.00 38,666.20 1.95 75399.09 5.000 15,079.82
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 5.000 9,944.88
SUBTOTAL MANO DE OBRA 25,024.70
TOTAL COSTOS DIRECTOS 84,109.54
FIRMA SOPM: ADMINISTRA. 17% 14,298.62
IMPREVISTOS 3% 2,523.29
UTILIDAD 10% 8,410.95
5% 4,205.48
TOTAL COSTO INDIRECTO 29,438.34
FECHA
VALOR PRECIO UNITARIO 113,548.00
HERRAMIENTA MENOR
CHAZO PLASTICO 1/4" *2.5 CMS.
CINTA AISLANTE
DESPERDICIO
DESCRIPCIÓN
TALADRO MANUAL
CANALETA 4*2.4
CAJA DE 4*2 GALVANIZADA - COMPLETA
BOQUILLA 1/2" + TUERCA
TOMACORRIENTE DOBLE AMBIA
TORNILLO DE 1/4*2
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
SECRETARIA DE EDUCACIÓN
PUNTO ELECTRI.TOMA CORR. MONOF.EN CANALETA
DESCRIPCIÓN
ALAMBRE DE COBRE # 12 AWG-THW
ALAMBRE DE COBRE DESNUDO DURO # 14 AWG
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
CAPITULO: ITEM:
16.6
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 1,908.00 18.000 34,344.00
ML 853.00 9.000 7,677.00
UND 2,517.00 1.000 2,517.00
UND 26,967.00 1.000 26,967.00
ML 5,535.00 9.000 49,815.00
UND 360.00 2.000 720.00
UND 144.00 6.000 864.00
UND 68.00 6.000 408.00
RLLO 2,214.00 0.200 442.80
% 5.00 4,613.94
SUBTOTAL MATERIALES 128,368.74
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 25,024.70 0.10 2,502.47
DIA 10,346.00 4.00 2,586.50
5,088.97
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TECNICO ELECT. 1.00 38,666.20 1.95 75399.09 5.000 15,079.82
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 5.000 9,944.88
SUBTOTAL MANO DE OBRA 25,024.70
TOTAL COSTOS DIRECTOS 158,482.41
FIRMA SOPM: ADMINISTRA. 17% 26,942.01
IMPREVISTOS 3% 4,754.47
UTILIDAD 10% 15,848.24
5% 7,924.12
TOTAL COSTO INDIRECTO 55,468.84
FECHA
VALOR PRECIO UNITARIO 213,951.00
TALADRO MANUAL
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
HERRAMIENTA MENOR
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
PUNTO ELECT. TOMA 110 RED REGULADA EN CANALETA
DESCRIPCIÓN
ALAMBRE DE COBRE # 12 AWG-THW
ALAMBRE DE COBRE DESNUDO DURO # 14 AWG
CAJA PLASTICA PARA CANALETA
TOMACORRIENTE DOBLE GRADO HOSPITALARIO
CANALETA 4*2.4
CHAZO PLASTICO 1/4" *2.5 CMS.
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
BOQUILLA 3/4" + TUERCA
TORNILLO DE 1/4*2
CINTA AISLANTE
DESPERDICIO
DESCRIPCIÓN
CAPITULO: ITEM:
16.7
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 2,546.00 30.00 76,380.00
UND 4,705.00 4.00 18,820.00
UND 980.00 1.00 980.00
ML 10,840.00 15.00 162,600.00
RLLO 2,214.00 0.20 442.80
ML 1,481.00 15.00 22,215.00
% 261,637.80 5.00 13,081.89
SUBTOTAL MATERIALES 294,519.69
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 35,749.57 0.10 3,574.96
3,574.96
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TECNICO ELECT. 1.00 38,666.20 1.95 75399.09 3.500 21,542.60
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 3.500 14,206.98
SUBTOTAL MANO DE OBRA 35,749.57
TOTAL COSTOS DIRECTOS 333,844.22
FIRMA SOPM: ADMINISTRA. 17% 56,753.52
IMPREVISTOS 3% 10,015.33
UTILIDAD 10% 33,384.42
5% 16,692.21
TOTAL COSTO INDIRECTO 116,845.48
FECHA
VALOR PRECIO UNITARIO 450,690.00
DESCRIPCIÓN
IMPUESTOS DE LEY 1106/2006
MARQUILLA EN ACRILICO
TUBERIA CONDUIT GALVANIZADA 3/4"
CINTA AISLANTE
CABLE DE COBRE DESNUDO # 14 AWG 7 HILOS
SUBTOTAL EQUIPOS
COSTO INDIRECTO
DESPERDICIO
DESCRIPCIÓN
HERRAMIENTA MENOR
CABLE DE COBRE # 12 AWG (LUMINARIAS)
CAJA DE 4*2 GALVANIZADA - COMPLETA
MUNICIPIO DE ARAUCA
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
SALIDA UTENSILIOS C/CTO IND.(COLEGIO F.J
"Trabajo-progreso y solidaridad"
CAPITULO: ITEM:
16.8
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 1,908.00 12.000 22,896.00
ML 1,214.00 6.000 7,284.00
UND 775.00 2.000 1,550.00
1/4 G 41,181.00 0.010 411.81
1/4 G 16,384.00 0.010 163.84
UND 332.00 2.000 664.00
ML 1,559.00 2.000 3,118.00
UND 1,661.00 1.000 1,661.00
% 5.00 1,693.68
SUBTOTAL MATERIALES 39,442.33
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 24,062.21 0.10 2,406.22
2,406.22
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TECNICO ELECT. 1.00 38,666.20 1.95 75399.09 5.200 14,499.83
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 5.200 9,562.39
SUBTOTAL MANO DE OBRA 24,062.21
TOTAL COSTOS DIRECTOS 65,910.76
FIRMA SOPM: ADMINISTRA. 17% 11,204.83
IMPREVISTOS 3% 1,977.32
UTILIDAD 10% 6,591.08
5% 3,295.54
TOTAL COSTO INDIRECTO 23,068.77
FECHA
VALOR PRECIO UNITARIO 88,980.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
CAJA OCTOGONAL GALVANIZADA
DESPERDICIO
DESCRIPCIÓN
HERRAMIENTA MENOR
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
SALIDA PARA VENTILADOR DE TECHO O PARED
CURVA PVC 1/2"
SOLDADURA LIQUIDA PVC
LIMPIADOR PVC 1/4
TERMINALES PVC DE 1/2"
TUBO CONDUIT PVC 1/2" T.P.
DESCRIPCIÓN
ALAMBRE DE COBRE # 12 AWG-THW
ALAMBRE DE COBRE # 14 AWG DESNUDO
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
CAPITULO: ITEM:
16.9
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 2,546.00 18.00 45,828.00
UND 4,705.00 1.00 4,705.00
UND 980.00 1.00 980.00
ML 10,840.00 9.00 97,560.00
ML 1,481.00 9.00 13,329.00
RLLO 2,214.00 0.20 442.80
% 157,159.80 5.00 7,857.99
SUBTOTAL MATERIALES 170,702.79
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 20,853.92 0.10 2,085.39
2,085.39
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TECNICO ELECT. 1.00 38,666.20 1.95 75399.09 6.000 12,566.52
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 6.000 8,287.40
SUBTOTAL MANO DE OBRA 20,853.92
TOTAL COSTOS DIRECTOS 193,642.10
FIRMA SOPM: ADMINISTRA. 17% 32,919.16
IMPREVISTOS 3% 5,809.26
UTILIDAD 10% 19,364.21
5% 9,682.10
TOTAL COSTO INDIRECTO 67,774.73
FECHA
VALOR PRECIO UNITARIO 261,417.00
IMPUESTOS DE LEY 1106/2006
MARQUILLA EN ACRILICO
TUBERIA CONDUIT GALVANIZADA 3/4"
CABLE DE COBRE DESNUDO # 14 AWG 7 HILOS
CINTA AISLANTE
DESPERDICIO
SUBTOTAL EQUIPOS
COSTO INDIRECTO
DESCRIPCIÓN
HERRAMIENTA MENOR
SECRETARIA DE EDUCACIÓN
SALIDA SECAMANOS COL. F.J.CALDAS
DESCRIPCIÓN
CABLE DE COBRE # 12 AWG (LUMINARIAS)
CAJA DE 4*2 GALVANIZADA - COMPLETA
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
CAPITULO: ITEM:
16.10
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 2,978.00 35.00 104,230.00
UND 4,705.00 1.00 4,705.00
UND 980.00 1.00 980.00
ML 10,840.00 15.00 162,600.00
RLLO 2,214.00 0.20 442.80
UND 7,239.00 1.00 7,239.00
UND 19,610.00 1.00 19,610.00
% 267,272.80 5.00 13,363.64
SUBTOTAL MATERIALES 313,170.44
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 56,350.13 0.10 5,635.01
5,635.01
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
OFICIAL 1.00 33,103.00 1.95 64550.85 2.000 32,275.43
AYUDANTES 1.00 24,692.00 1.95 48149.40 2.000 24,074.70
SUBTOTAL MANO DE OBRA 56,350.13
TOTAL COSTOS DIRECTOS 375,155.58
FIRMA SOPM: ADMINISTRA. 17% 63,776.45
IMPREVISTOS 3% 11,254.67
UTILIDAD 10% 37,515.56
5% 18,757.78
TOTAL COSTO INDIRECTO 131,304.45
FECHA
VALOR PRECIO UNITARIO 506,460.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
TIMBRE ZUMBADOR 127V 60HZ
DESPERDICIO
DESCRIPCIÓN
HERRAMIENTA MENOR
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
SALIDA TIMBRE Y CITOFONO COL. F.J.CALDAS
DESCRIPCIÓN
CABLE DE DATA UTP CATEGORIA 5E 4(2x24 AWG)
MARQUILLA EN ACRILICO
TUBERIA CONDUIT GALVANIZADA 3/4"
CINTA AISLANTE
MODULO PULSADOR DE TIMBRE LUZ PILOTO
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
CAJA DE 4*2 GALVANIZADA - COMPLETA
CAPITULO: ITEM:
16.11
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 2,546.00 6.00 15,276.00
ML 1,481.00 3.00 4,443.00
UND 4,705.00 1.00 4,705.00
RLLO 2,214.00 0.20 442.80
UND 980.00 1.00 980.00
ML 10,840.00 3.00 32,520.00
% 52,681.80 5.00 2,634.09
SUBTOTAL MATERIALES 61,000.89
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 15,640.44 0.10 1,564.04
1,564.04
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TECNICO ELECT. 1.00 38,666.20 1.95 75399.09 8.000 9,424.89
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 8.000 6,215.55
SUBTOTAL MANO DE OBRA 15,640.44
TOTAL COSTOS DIRECTOS 78,205.37
FIRMA SOPM: ADMINISTRA. 17% 13,294.91
IMPREVISTOS 3% 2,346.16
UTILIDAD 10% 7,820.54
5% 3,910.27
TOTAL COSTO INDIRECTO 27,371.88
FECHA
VALOR PRECIO UNITARIO 105,577.00
IMPUESTOS DE LEY 1106/2006
CAJA DE 4*2 GALVANIZADA - COMPLETA
CINTA AISLANTE
MARQUILLA EN ACRILICO
TUBERIA CONDUIT GALVANIZADA 3/4"
DESPERDICIO
SUBTOTAL EQUIPOS
COSTO INDIRECTO
DESCRIPCIÓN
HERRAMIENTA MENOR
CABLE DE COBRE DESNUDO # 14 AWG 7 HILOS
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
SALIDA SENSOR BAÑOS COL. F.J.CALDAS
DESCRIPCIÓN
CABLE DE COBRE # 12 AWG (LUMINARIAS)
ANALISIS DE PRECIOS UNITARIOS
CAPITULO: ITEM:
17.1
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 880,083.00 1.00 880,083.00
UND 980.00 1.00 980.00
UND 250,451.00 1.00 250,451.00
UND 11,400.00 42.00 478,800.00
UND 560.00 4.00 2,240.00
SUBTOTAL MATERIALES 1,612,554.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 305,179.28 0.10 30,517.93
30,517.93
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TECNICO ELECT. 1.00 38,666.20 1.95 75399.09 0.410 183,900.22
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 0.410 121,279.06
SUBTOTAL MANO DE OBRA 305,179.28
TOTAL COSTOS DIRECTOS 1,948,251.21
FIRMA SOPM: ADMINISTRA. 17% 331,202.71
IMPREVISTOS 3% 58,447.54
UTILIDAD 10% 194,825.12
5% 97,412.56
TOTAL COSTO INDIRECTO 681,887.92
FECHA
VALOR PRECIO UNITARIO 2,630,139.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
HERRAMIENTA MENOR
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
TABLERO TRIF.42 C/CTOS ESPACIO TOTALIZADOR
DESCRIPCIÓN
TABLERO TRIF. 42 CIRC. CON ESPAC.TOTALIZADOR
INTERRUPTOR TERMO MAG.T-INDUSTRIAL 3x100A
INTERR.TERMOMAGNETICO 1*20 AMP.ENCHUFAB.
ANCLAJE DE 5/16"x1 7/8"
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
MARQUILLA EN ACRILICO
CAPITULO: ITEM:
17.2
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 1,023,650.00 1.000 1,023,650.00
UND 825,595.00 1.000 825,595.00
UND 980.00 9.000 8,820.00
UND 91,875.00 3.000 275,625.00
RLLO 2,214.00 3.000 6,642.00
ML 5,915.00 9.000 53,235.00
ML 16,214.00 12.000 194,568.00
ML 7,993.00 27.000 215,811.00
UND 1,667.00 18.000 30,006.00
UND 3,540.00 6.000 21,240.00
UND 560.00 4.000 2,240.00
UND 1,332.00 18.000 23,976.00
UND 250,451.00 3.000 751,353.00
UND 600,373.00 1.00 600,373.00
SUBTOTAL MATERIALES 4,033,134.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 101,726.43 0.10 10,172.64
10,172.64
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TECNICO ELECT. 1.00 38,666.20 1.95 75399.09 1.230 61,300.07
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 1.230 40,426.35
SUBTOTAL MANO DE OBRA 101,726.43
TOTAL COSTOS DIRECTOS 4,145,033.07
FIRMA SOPM: ADMINISTRA. 17% 704,655.62
IMPREVISTOS 3% 124,350.99
UTILIDAD 10% 414,503.31
5% 207,251.65
TOTAL COSTO INDIRECTO 1,450,761.57
FECHA
VALOR PRECIO UNITARIO 5,595,795.00
DPS CLASE II+III(1P+NPE)VC:150V.IN(8/20):10KA,(max descarga 20ka,up:<0
DESCRIPCIÓN
HERRAMIENTA MENOR
CABLE PARA SOLDADOR # 6 75 A.
TERMINAL 1 HUECO 1/4" 6 AWG
TERMINAL 1 HUECO 5/16 " # 2
ANCLAJE DE 5/16"x1 7/8"
TERMINAL 1 HUECO #8 AWG
INTERRUPTOR TERMO MAG.T-INDUSTRIAL 3x100A
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
CONMUTADOR TETRAPOLAR 75A.
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
TABLERO BY PASS-LLAVE CONMUT.75A+DPS
DESCRIPCIÓN
GABINETE T-INDUSTRIAL GRAL. 1.20*0.80*0.30 M.
ANALISIS DE PRECIOS UNITARIOS
MARQUILLA EN ACRILICO
BARRAJE DE COBRE 100 A.
CINTA AISLANTE
CABLE PARA SOLDADOR #8 75 AMP.
CABLE PARA SOLDADOR #2
CAPITULO: ITEM:
17.3
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 310,440.00 1.000 310,440.00
UND 179,140.00 1.000 179,140.00
UND 133,640.00 6.000 801,840.00
UND 49,660.00 1.000 49,660.00
UND 33,540.00 1.000 33,540.00
UND 53,300.00 6.000 319,800.00
UND 565,500.00 1.000 565,500.00
UND 226,200.00 1.000 226,200.00
SUBTOTAL MATERIALES 2,486,120.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 500,494.02 0.10 50,049.40
50,049.40
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TECNICO ELECT. 1.00 38,666.20 1.95 75399.09 0.250 301,596.36
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 0.250 198,897.66
SUBTOTAL MANO DE OBRA 500,494.02
TOTAL COSTOS DIRECTOS 3,036,663.42
FIRMA SOPM: ADMINISTRA. 17% 516,232.78
IMPREVISTOS 3% 91,099.90
UTILIDAD 10% 303,666.34
5% 151,833.17
TOTAL COSTO INDIRECTO 1,062,832.20
FECHA
VALOR PRECIO UNITARIO 4,099,496.00
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
SECRETARIA DE EDUCACIÓN
TABLERO CONTROL ALUMBRADO AREAS COMUNES
DESCRIPCIÓN
GABINETE MET.60*40*20 CMS. CON PUERTA Y CHAPA
TOTALIZADOR DE 80 AMP. (LEGRAND O SIMILAR)
SUBTOTAL EQUIPOS
PULSADOR DOBLE VERDE ROJO STAR-STOP
BARRAJE, CABLE, CANALETA Y TERMINALES
BORNERA DE 3 ELEMENTOS COMPAQ
DESCRIPCIÓN
HERRAMIENTA MENOR
CONTACTOR TRIFASICO 32 AMP. CARGA AC1.
TACO RIEL 2*6 AMP.
LAMPARA ROJA DE SEÐALIZACIËN
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
CAPITULO: ITEM:
17.4
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
SUBTOTAL MATERIALES 2,945,023.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 417,078.35 0.10 41,707.84
41,707.84
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TECNICO ELECT. 1.00 38,666.20 1.95 75399.09 0.300 251,330.30
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 0.300 165,748.05
SUBTOTAL MANO DE OBRA 417,078.35
TOTAL COSTOS DIRECTOS 3,403,809.19
FIRMA SOPM: ADMINISTRA. 17% 578,647.56
IMPREVISTOS 3% 102,114.28
UTILIDAD 10% 340,380.92
5% 170,190.46
TOTAL COSTO INDIRECTO 1,191,333.21
FECHA
VALOR PRECIO UNITARIO 4,595,142.00
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
2,344,650.00
600,373.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
HERRAMIENTA MENOR
UND 2,344,650.00 1.000
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
TABLERO ESPECIAL DE CIRCUITOS SIST. SEG.
DESCRIPCIÓN
TABLERO ESPECIAL DE CIRCUITOS SISTEMA DE
SEGURIDAD
DPS CLASE II+III (1P+NPE) VC:150V.IN(8/20):10KA,(max
descarga 20ka,up:<0 UND 600,373.00 1.000
CAPITULO: ITEM:
18.1
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 949,452.00 1.00 949,452.00
ML 4,408.00 15.00 66,120.00
ML 1,982.00 30.00 59,460.00
M3 427,910.00 0.23 98,419.30
% 223,999.30 5.00 11,199.97
SUBTOTAL MATERIALES 1,184,651.27
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 30,764.24 0.10 3,076.42
DIA 77,595.00 7.00 11,085.00
DIA 362,110.00 7.00 51,730.00
65,891.42
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
LINIERO 1.00 39,749.80 1.95 77512.11 7.017 11,046.17
COND. AYUD. 1.00 24,692.00 1.95 48149.40 7.017 6,861.72
SUPERVISOR 1.00 46,263.70 1.95 90214.22 7.017 12,856.34
SUBTOTAL MANO DE OBRA 30,764.24
TOTAL COSTOS DIRECTOS 1,281,306.93
FIRMA SOPM: ADMINISTRA. 17% 217,822.18
IMPREVISTOS 3% 38,439.21
UTILIDAD 10% 128,130.69
5% 64,065.35
TOTAL COSTO INDIRECTO 448,457.42
FECHA
VALOR PRECIO UNITARIO 1,729,764.00
CAMIONETA PICK-UP SIN COND.
GRUA EXTENSION PARA POSTES
SUBTOTAL EQUIPOS
COSTO INDIRECTO
POSTE CONCRETO 12M 510 KG
CABLE DE COBRE DESNUDO # 8 AWG 7 HILOS
IMPUESTOS DE LEY 1106/2006
DESPERDICIO
DESCRIPCIÓN
HERRAMIENTA MENOR
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
POSTE CONCRETO 12M*510 KG.-SUM. E INSTAL
DESCRIPCIÓN
CABLE DE COBRE THHN Y THW-AWG/MCM #12
CONCRETO 1:2:3 3000 PSI
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
CAPITULO: ITEM:
18.2
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 1,499,135.00 1.000 1,499,135.00
M3 427,910.00 0.230 98,419.30
% 98,419.30 5.00 4,920.97
SUBTOTAL MATERIALES 1,602,475.27
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 89,108.37 0.10 8,910.84
DIA 77,595.00 4.00 19,398.75
DIA 362,110.00 7.00 51,730.00
80,039.59
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
LINIERO 1.00 39,749.80 1.95 77512.11 2.423 31,995.16
COND. AYUD. 1.00 24,692.00 1.95 48149.40 2.423 19,874.93
SUPERVISOR 1.00 46,263.70 1.95 90214.22 2.423 37,238.29
SUBTOTAL MANO DE OBRA 89,108.37
TOTAL COSTOS DIRECTOS 1,771,623.22
FIRMA SOPM: ADMINISTRA. 17% 301,175.95
IMPREVISTOS 3% 53,148.70
UTILIDAD 10% 177,162.32
5% 88,581.16
TOTAL COSTO INDIRECTO 620,068.13
FECHA
VALOR PRECIO UNITARIO 2,391,691.00
IMPUESTOS DE LEY 1106/2006
DESPERDICIO
CAMIONETA PICK-UP SIN COND.
GRUA EXTENSION PARA POSTES
SUBTOTAL EQUIPOS
COSTO INDIRECTO
DESCRIPCIÓN
HERRAMIENTA MENOR
SECRETARIA DE EDUCACIÓN
POSTE EN CONCRETO 12 MTS.*1050 KGF
DESCRIPCIÓN
POSTE CONCRETO 12M 1050 KG
CONCRETO 1:2:3 3000 PSI
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
CAPITULO: ITEM:
18.3
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 38,192.00 1.000 38,192.00
SUBTOTAL MATERIALES 38,192.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 7,820.22 0.10 782.02
782.02
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELECT. 1.00 38,666.20 1.95 75399.09 16.000 4,712.44
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 16.000 3,107.78
SUBTOTAL MANO DE OBRA 7,820.22
TOTAL COSTOS DIRECTOS 46,794.24
FIRMA SOPM: ADMINISTRA. 17% 7,955.02
IMPREVISTOS 3% 1,403.83
UTILIDAD 10% 4,679.42
5% 2,339.71
TOTAL COSTO INDIRECTO 16,377.98
FECHA
VALOR PRECIO UNITARIO 63,172.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
HERRAMIENTA MENOR
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
PERCHA T.PESADO 5 PUESTOS AISLADOR CARRETE
DESCRIPCIÓN
PERCHA ACERO GALVANIZADO DE 5 PUESTOS
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
CAPITULO: ITEM:
18.4
UNIDAD: ML ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
SUBTOTAL MATERIALES -
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 6,528.91 0.10 652.89
652.89
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
LINIERO 1.00 39,479.80 1.95 76985.61 28.000 2,749.49
SOLDADOR 1.00 54,268.70 1.95 105823.97 28.000 3,779.43
SUBTOTAL MANO DE OBRA 6,528.91
TOTAL COSTOS DIRECTOS 7,181.80
FIRMA SOPM: ADMINISTRA. 17% 1,220.91
IMPREVISTOS 3% 215.45
UTILIDAD 10% 718.18
5% 359.09
TOTAL COSTO INDIRECTO 2,513.63
FECHA
VALOR PRECIO UNITARIO 9,695.00
IMPUESTOS DE LEY 1106/2006
SUBTOTAL EQUIPOS
COSTO INDIRECTO
DESCRIPCIÓN
HERRAMIENTA MENOR
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
TRASLADO RED DE BAJA TENSION 5 HILOS
DESCRIPCIÓN
ANALISIS DE PRECIOS UNITARIOS
CAPITULO: ITEM:
18.5
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
SUBTOTAL MATERIALES -
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 50,666.61 0.10 5,066.66
5,066.66
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
LINIERO 1.00 39,479.80 1.95 76985.61 3.300 23,328.97
SUPERVISOR 1.00 46,263.70 1.95 90214.22 3.300 27,337.64
SUBTOTAL MANO DE OBRA 50,666.61
TOTAL COSTOS DIRECTOS 55,733.28
FIRMA SOPM: ADMINISTRA. 17% 9,474.66
IMPREVISTOS 3% 1,672.00
UTILIDAD 10% 5,573.33
5% 2,786.66
TOTAL COSTO INDIRECTO 19,506.65
FECHA
VALOR PRECIO UNITARIO 75,240.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
HERRAMIENTA MENOR
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
TRANSLADO DE LUMINARIA ALUMBRADO PUBLICO
DESCRIPCIÓN
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
CAPITULO: ITEM:
18.6
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 327,482.00 1.00 327,482.00
UND 35,989.00 1.00 35,989.00
UND 17,374.00 1.00 17,374.00
UND 27,301.00 1.00 27,301.00
ML 3,900.00 3.00 11,700.00
UND 3,598.00 2.00 7,196.00
UND 4,000.00 1.00 4,000.00
% 11,700.00 5.00 585.00
SUBTOTAL MATERIALES 431,627.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 33,439.97 0.10 3,344.00
3,344.00
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
LINIERO 1.00 39,479.80 1.95 76985.61 5.000 15,397.12
SUPERVISOR 1.00 46,263.70 1.95 90214.22 5.000 18,042.84
SUBTOTAL MANO DE OBRA 33,439.97
TOTAL COSTOS DIRECTOS 468,410.96
FIRMA SOPM: ADMINISTRA. 17% 79,629.86
IMPREVISTOS 3% 14,052.33
UTILIDAD 10% 46,841.10
5% 23,420.55
TOTAL COSTO INDIRECTO 163,943.84
FECHA
VALOR PRECIO UNITARIO 632,355.00
IMPUESTOS DE LEY 1106/2006
BRAZO TUBER. SCHEDULE 40 GALV. 3/4"*1.50
FOTOCELDA N/C -PROTEC - DESCARGA 1000VA
CABLE ENCAUCHETADO 2x14
CONECTOR BIMETAL.RAN.PARAL. UN PERNO
BASE PARA FOTOCELDA
DESPERDICIO
SUBTOTAL EQUIPOS
COSTO INDIRECTO
DESCRIPCIÓN
HERRAMIENTA MENOR
BOMBILLA DE SODIO ALTA PRESION 150 W,208
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
LAMPARA DE NA-70W-208V-COMPLETA INSTALADA
DESCRIPCIÓN
LUMINARIA DE 70 W SODIO208/ 220 V
ANALISIS DE PRECIOS UNITARIOS
CAPITULO: ITEM:
18.7
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 270.00 4.000 1,080.00
UND 1,107.00 14.000 15,498.00
UND 277.00 4.000 1,108.00
UND 73,396.00 2.000 146,792.00
UND 14,737.00 4.000 58,948.00
UND 2,130.00 4.000 8,520.00
UND 7,908.00 2.000 15,816.00
UND 20,757.00 3.000 62,271.00
UND 24,100.00 6.000 144,600.00
UND 315.00 14.000 4,410.00
UND 6,227.00 3.000 18,681.00
UND 11,907.00 3.000 35,721.00
SUBTOTAL MATERIALES 513,445.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
-
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
SUBTOTAL MANO DE OBRA -
TOTAL COSTOS DIRECTOS 513,445.00
FIRMA SOPM: ADMINISTRA. 17% 87,285.65
IMPREVISTOS 3% 15,403.35
UTILIDAD 10% 51,344.50
5% 25,672.25
TOTAL COSTO INDIRECTO 179,705.75
FECHA
VALOR PRECIO UNITARIO 693,151.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
ESTRUCTURA A5020 ENELAR
DESCRIPCIÓN
ARANDELA PLANA REDONDA PARA PERNO 1/2"
PERNO DE MAQUINA DE 5/8"x10"
GRAPA DE RETENCION A.FORJ.CAL.6-2/0 AWG
AISLADOR T- ESPIGO DE 13.2 KV ROSCA 1"
ARANDELA DE PRESION PARA PERNO DE 5/8"
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
ARANDELA CUADRADA PLANA PERNO 5/8"
ARANDELA DE PRESION PARA PERNO DE 1/2"
CRUCETA METALICA GALV. 2-1/2x2-1/2x3/16"
DIAGONAL GALV. ANGU. 1-1/2"x1-1/2"x3/16"
PERNO DE MAQUINA ACERO GALVANIZADO
DESCRIPCIÓN
TUERCA DE OJO ALARGADO ACERO GALVANIZADO
ESPARRAGO 12*5/8" CON TUERCAS, ARANDELAS
CAPITULO: ITEM:
18.8
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 79,706.00 1.000 79,706.00
UND 20,817.00 1.000 20,817.00
UND 7,908.00 2.000 15,816.00
UND 3,200.00 2.000 6,400.00
UND 315.00 2.000 630.00
UND 277.00 1.000 277.00
UND 19,000.00 3.000 57,000.00
UND 10,739.00 3.000 32,217.00
UND 1,100.00 1.000 1,100.00
UND 270.00 1.00 270.00
SUBTOTAL MATERIALES 214,233.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 53,186.61 0.10 5,318.66
5,318.66
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
LINIERO 1.00 39,479.80 1.95 76985.61 3.800 20,259.37
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 3.800 19,841.87
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 3.800 13,085.37
SUBTOTAL MANO DE OBRA 53,186.61
TOTAL COSTOS DIRECTOS 272,738.27
FIRMA SOPM: ADMINISTRA. 17% 46,365.51
IMPREVISTOS 3% 8,182.15
UTILIDAD 10% 27,273.83
5% 13,636.91
TOTAL COSTO INDIRECTO 95,458.39
FECHA
VALOR PRECIO UNITARIO 368,197.00
IMPUESTOS DE LEY 1106/2006
PERNO DE MAQUINA DE 5/8"x10"
ARANDELA CUADRADA PLANA DE 4"x4"x5/8"
ARANDELA DE PRESION PARA PERNO DE 5/8"
AISLADOR TIPO PIN 13.2KVANSI55-4
PIN PARA CRUC. METAL. DE 13.2 KV EN POST
PERNO DE MAQUINA DE 1/2"x1 1/2"
ARANDELA DE PRESION PARA PERNO DE 1/2"
ARANDELA PLANA REDONDA PARA PERNO 1/2"
DESCRIPCIÓN
SUBTOTAL EQUIPOS
COSTO INDIRECTO
HERRAMIENTA MENOR
DESCRIPCIÓN
CRUCETA METALICA DE 2M 2 1/2*2 1/2*1/4"
DIAGONAL RECTA 1 1/2*1 1/2*3/16", 0.68 M
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
CRUCETA DE PASO PIN SENCILLO
CAPITULO: ITEM:
18.9
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 270.00 4.000 1,080.00
UND 1,107.00 14.000 15,498.00
UND 277.00 4.000 1,108.00
UND 73,396.00 2.000 146,792.00
UND 14,737.00 4.000 58,948.00
UND 2,130.00 4.000 8,520.00
UND 7,908.00 2.000 15,816.00
UND 20,757.00 3.000 62,271.00
UND 24,100.00 6.000 144,600.00
UND 315.00 14.000 4,410.00
UND 6,227.00 3.000 18,681.00
UND 11,907.00 3.000 35,721.00
SUBTOTAL MATERIALES 513,445.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 106,943.17 0.10 10,694.32
10,694.32
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 1.170 64,443.67
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 1.170 42,499.50
SUBTOTAL MANO DE OBRA 106,943.17
TOTAL COSTOS DIRECTOS 631,082.48
FIRMA SOPM: ADMINISTRA. 17% 107,284.02
IMPREVISTOS 3% 18,932.47
UTILIDAD 10% 63,108.25
5% 31,554.12
TOTAL COSTO INDIRECTO 220,878.87
FECHA
VALOR PRECIO UNITARIO 851,961.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
HERRAMIENTA MENOR
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
ESTRUCTURA A5020 ENELAR
DESCRIPCIÓN
AISLADOR T- ESPIGO DE 13.2 KV ROSCA 1"
ARANDELA DE PRESION PARA PERNO DE 5/8"
TUERCA DE OJO ALARGADO ACERO GALVANIZADO
ESPARRAGO 12*5/8" CON TUERCAS, ARANDELAS
ARANDELA PLANA REDONDA PARA PERNO 1/2"
PERNO DE MAQUINA ACERO GALVANIZADO
PERNO DE MAQUINA DE 5/8"x10"
ARANDELA DE PRESION PARA PERNO DE 1/2"
CRUCETA METALICA GALV. 2-1/2x2-1/2x3/16"
DIAGONAL GALV. ANGU. 1-1/2"x1-1/2"x3/16"
GRAPA DE RETENCION A.FORJ.CAL.6-2/0 AWG
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
ARANDELA CUADRADA PLANA PERNO 5/8"
CAPITULO: ITEM:
18.10
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 30,222.00 1.000 30,222.00
UND 14,737.00 4.000 58,948.00
UND 2,130.00 4.000 8,520.00
UND 315.00 8.000 2,520.00
UND 277.00 4.000 1,108.00
UND 69,189.00 2.000 138,378.00
UND 6,742.00 2.000 13,484.00
ML 4,890.00 2.000 9,780.00
UND 1,246.00 3.000 3,738.00
UND 134,000.00 3.000 402,000.00
UND 4,567.00 2.000 9,134.00
UND 38,746.00 2.000 77,492.00
UND 138,121.00 3.000 414,363.00
ML 10,516.00 12.000 126,192.00
UND 135,584.00 1.000 135,584.00
UND 2,746.00 3.000 8,238.00
UND 3,598.00 8.000 28,784.00
UND 1,042.00 3.000 3,126.00
UND 899.00 6.000 5,394.00
UND 8,995.00 4.00 35,980.00
SUBTOTAL MATERIALES 1,512,985.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 263,333.07 0.10 26,333.31
DIA 45,000.00 1.00 45,000.00
71,333.31
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
LINIERO 2.00 39,479.80 1.95 153971.22 1.000 153,971.22
AYUD. RED. E. 2.00 28,041.50 1.95 109361.85 1.000 109,361.85
SUBTOTAL MANO DE OBRA 263,333.07
TOTAL COSTOS DIRECTOS 1,847,651.38
FIRMA SOPM: ADMINISTRA. 17% 314,100.73
IMPREVISTOS 3% 55,429.54
UTILIDAD 10% 184,765.14
5% 92,382.57
TOTAL COSTO INDIRECTO 646,677.98
FECHA
VALOR PRECIO UNITARIO 2,494,329.00
ESPARRAGO 10*5/8" CON TUERCAS, ARANDELAS
CINTA BANDIT DE 5/8"
HEBILLA PARA CINTA BAND-IT DE 5/8"
CORTACIRCUITO MONOPOLAR 15 KV - 100 A
PERNO DE OJO DE 5/8"x8"
COLLARIN PARA TRNSFORMADOR PLAT. 1/2"
PARARRAYO T-DISTRIB.12 KV-10 KA
DESCRIPCIÓN
HERRAMIENTA MENOR
PERNO DE MAQUINA ACERO GALVANIZADO
ARANDELA DE PRESION PARA PERNO DE 5/8"
ARANDELA DE PRESION PARA PERNO DE 1/2"
CABLE DE COBRE DESNUDO No.4 AWG 7 HILOS
TERMINAL TIPO PALA PARA CONDUC. 2 AWG
VARILLA COOPER WELL CU-CU 5/8"*2.44 M
HILO FUSIBLE 3 A. 15 KV, TIPO H.
CONECTOR BIMETAL.RAN.PARAL. UN PERNO
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
TUBO CONDUIT METALICO 1/2" GALV.
CRUCETA METAL.GALV. 2-1/2x2-1/2x3/16"
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
DIAGONAL GALV. ANGU. 1-1/2"x1-1/2"x3/16"
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
ESTRUCTURA 711 MONTAJE TRANSF. EN POSTE
ARANDELA GALVANIZADA DE 5/16"
EQUIPO P/TENSIONAR REDES
SUBTOTAL EQUIPOS
PERNO GALVANIZADO DE 3/16"*1" CON TUERCA
CAPITULO: ITEM:
18.11
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
SUBTOTAL MATERIALES 8,923,322.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 174,847.92 0.10 17,484.79
17,484.79
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 1.000 75,399.09
AYUD. ELECT. 2.00 25,499.70 1.95 99448.83 1.000 99,448.83
SUBTOTAL MANO DE OBRA 174,847.92
TOTAL COSTOS DIRECTOS 9,115,654.71
FIRMA SOPM: ADMINISTRA. 17% 1,549,661.30
IMPREVISTOS 3% 273,469.64
UTILIDAD 10% 911,565.47
5% 455,782.74
TOTAL COSTO INDIRECTO 3,190,479.15
FECHA
VALOR PRECIO UNITARIO 12,306,134.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
HERRAMIENTA MENOR
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
TRANSFORMADOR TRIF. 75 KVA - INSTALADO
DESCRIPCIÓN
8,923,322.00 TRANSFORMADOR TRIF. en aceite 75 KVA. 13.200 v
(11.400v)/214/123v UND 8,923,322.00
"Trabajo-progreso y solidaridad"
1.000
MUNICIPIO DE ARAUCA
CAPITULO: ITEM:
18.12
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 135,584.00 1.00 135,584.00
UND 30,222.00 1.00 30,222.00
ML 10,516.00 8.00 84,128.00
UND 3,598.00 1.00 3,598.00
ML 4,890.00 2.00 9,780.00
UND 1,246.00 2.00 2,492.00
UND 19,447.00 1.00 19,447.00
UND 203,767.00 0.15 30,565.05
KG 5,535.00 20.00 110,700.00
% 5.00 11,202.75
SUBTOTAL MATERIALES 437,718.80
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 43,888.85 0.10 4,388.88
4,388.88
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
LINIERO 1.00 39,479.80 1.95 76985.61 3.000 25,661.87
AYUD. RED. E. 1.00 28,041.50 1.95 54680.93 3.000 18,226.98
SUBTOTAL MANO DE OBRA 43,888.85
TOTAL COSTOS DIRECTOS 485,996.53
FIRMA SOPM: ADMINISTRA. 17% 82,619.41
IMPREVISTOS 3% 14,579.90
UTILIDAD 10% 48,599.65
5% 24,299.83
TOTAL COSTO INDIRECTO 170,098.79
FECHA
VALOR PRECIO UNITARIO 656,095.00
CABLE DE COBRE DESNUDO No.4 AWG 7 HILOS
CONECTOR BIMETAL.RAN.PARAL. UN PERNO
SOLDADURA CADWELLx250 GR
MOLDE DE SOLDADURA EXOTERMICA
HIDROSOLTA,TRATAMIENTO DE SUELO ARTIFIC.
DESPERDICIO
DESCRIPCIÓN
HERRAMIENTA MENOR
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
DESCRIPCIÓN
VARILLA COOPER WELL CU-CU 5/8"*2.44 M
TUBO CONDUIT METALICO 1/2" GALV.
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
PUESTA A TIERRA EN BAJA TENSION
HEBILLA PARA CINTA BAND-IT DE 5/8"
CINTA BANDIT DE 5/8"
CAPITULO: ITEM:
18.13
UNIDAD: KM ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
KM 4,265,000.00 1.000 4,265,000.00
% 4,265,000.00 5.00 213,250.00
SUBTOTAL MATERIALES 4,478,250.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
-
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
SUBTOTAL MANO DE OBRA -
TOTAL COSTOS DIRECTOS 4,478,250.00
FIRMA SOPM: ADMINISTRA. 17% 761,302.50
IMPREVISTOS 3% 134,347.50
UTILIDAD 10% 447,825.00
5% 223,912.50
TOTAL COSTO INDIRECTO 1,567,387.50
FECHA
VALOR PRECIO UNITARIO 6,045,638.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
CABLE ACSR No.1/0 DESNUDO ALUM. REF. N.A
IMPUESTOS DE LEY 1106/2006
DESPERDICIO
DESCRIPCIÓN
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
CABLE C ACSR 1/0 AWG RAVEN
DESCRIPCIÓN
"Trabajo-progreso y solidaridad"
MUNICIPIO DE ARAUCA
CAPITULO: ITEM:
18.14
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
SUBTOTAL MATERIALES -
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 26,333.31 0.10 2,633.33
DIA 362,110.00 10.00 36,211.00
DIA 124,152.00 10.00 12,415.20
51,259.53
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
LINIERO 2.00 39,479.80 1.95 153971.22 10.000 15,397.12
AYUD. RED. E. 2.00 28,041.50 1.95 109361.85 10.000 10,936.19
SUBTOTAL MANO DE OBRA 26,333.31
TOTAL COSTOS DIRECTOS 77,592.84
FIRMA SOPM: ADMINISTRA. 17% 13,190.78
IMPREVISTOS 3% 2,327.79
UTILIDAD 10% 7,759.28
5% 3,879.64
TOTAL COSTO INDIRECTO 27,157.49
FECHA
VALOR PRECIO UNITARIO 104,750.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
HERRAMIENTA MENOR
GRUA EXTENSION P/POSTES
CAMIONETA PICK-UP
SECRETARIA DE EDUCACIÓN
DESHINCADA POSTE DE 8 M.
DESCRIPCIÓN
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
CAPITULO: ITEM:
18.15
UNIDAD: ML ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 66,540.00 1.00 66,540.00
UND 30,870.00 1.00 30,870.00
UND 10,500.00 0.33 3,465.00
SUBTOTAL MATERIALES 100,875.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 6,256.18 0.10 625.62
625.62
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 20.000 3,769.95
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 20.000 2,486.22
SUBTOTAL MANO DE OBRA 6,256.18
TOTAL COSTOS DIRECTOS 107,756.79
FIRMA SOPM: ADMINISTRA. 17% 18,318.65
IMPREVISTOS 3% 3,232.70
UTILIDAD 10% 10,775.68
5% 5,387.84
TOTAL COSTO INDIRECTO 37,714.88
FECHA
VALOR PRECIO UNITARIO 145,472.00
DESCRIPCIÓN
HERRAMIENTA MENOR
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
BOQUILLA TERMINAL
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
DUCTO METALICO TUBERIA GALV. IMC 3"
DESCRIPCIÓN
TUBERIA GALVANIZADA IMC 3"
CAPACETE GALVANIZADO IMC 3"
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
CAPITULO: ITEM:
18.16
UNIDAD: ML ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 24,826.00 6.000 148,956.00
ML 15,206.00 2.000 30,412.00
% 179,368.00 5.00 8,968.40
SUBTOTAL MATERIALES 188,336.40
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 1,251.24 0.10 125.12
125.12
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 100.000 753.99
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 100.000 497.24
SUBTOTAL MANO DE OBRA 1,251.24
TOTAL COSTOS DIRECTOS 189,712.76
FIRMA SOPM: ADMINISTRA. 17% 32,251.17
IMPREVISTOS 3% 5,691.38
UTILIDAD 10% 18,971.28
5% 9,485.64
TOTAL COSTO INDIRECTO 66,399.47
FECHA
VALOR PRECIO UNITARIO 256,112.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
CABLE DE COBRE THHN Y THW-AWG/MCM #1/0
CABLE DE COBRE THHN Y THW-AWG/MCM #2
IMPUESTOS DE LEY 1106/2006
DESPERDICIO
DESCRIPCIÓN
HERRAMIENTA MENOR
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
ACOMETIDA CABLE CU 2(3#1/0+1#2)AWG,THHN
DESCRIPCIÓN
"Trabajo-progreso y solidaridad"
MUNICIPIO DE ARAUCA
CAPITULO: ITEM:
18.17
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 913,455.00 1.000 913,455.00
SUBTOTAL MATERIALES 913,455.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 851,624.25 0.10 85,162.43
85,162.43
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 0.260 289,996.50
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 0.260 191,247.75
OBRERO 2.00 24,692.00 1.95 96298.80 0.260 370,380.00
SUBTOTAL MANO DE OBRA 851,624.25
TOTAL COSTOS DIRECTOS 1,850,241.68
FIRMA SOPM: ADMINISTRA. 17% 314,541.08
IMPREVISTOS 3% 55,507.25
UTILIDAD 10% 185,024.17
5% 92,512.08
TOTAL COSTO INDIRECTO 647,584.59
FECHA
VALOR PRECIO UNITARIO 2,497,826.00
IMPUESTOS DE LEY 1106/2006
SUBTOTAL EQUIPOS
COSTO INDIRECTO
DESCRIPCIÓN
HERRAMIENTA MENOR
SECRETARIA DE EDUCACIÓN
CAJA DE PASO REF. CS 276 CODENSA
DESCRIPCIÓN
CAJA DE PASO REF CS 276 CODENSA
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
CAPITULO: ITEM:
18.18
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 1,215,400.00 1.00 1,215,400.00
UND 226,940.00 3.00 680,820.00
UND 180,000.00 1.00 180,000.00
SUBTOTAL MATERIALES 3,426,220.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 834,156.70 0.10 83,415.67
83,415.67
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 0.150 502,660.60
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 0.150 331,496.10
SUBTOTAL MANO DE OBRA 834,156.70
TOTAL COSTOS DIRECTOS 4,343,792.37
FIRMA SOPM: ADMINISTRA. 17% 738,444.70
IMPREVISTOS 3% 130,313.77
UTILIDAD 10% 434,379.24
5% 217,189.62
TOTAL COSTO INDIRECTO 1,520,327.33
FECHA
VALOR PRECIO UNITARIO 5,864,120.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
HERRAMIENTA MENOR
BORNERA DE 9 ELEMENTOS
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
SECRETARIA DE EDUCACIÓN
ARMARIO GRUPO MEDIDA B.T. 3 TCS 5 A.
DESCRIPCIÓN
ARMARIO CON ESPACIO PARA TOTALIZADOR
TRANSFORMADOR DE CORRIENTE 200/5AMP.
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
1,350,000.00 1.000 1,350,000.00 UND MEDIDOR DE 3 ELEMENTOS ELECT. PERFIL DE CARGA 5
A. x 220 v.
CAPITULO: ITEM:
18.19
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 9,795.00 1.000 9,795.00
UND 1,500.00 2.000 3,000.00
SUBTOTAL MATERIALES 12,795.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 2,085.39 0.10 208.54
208.54
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 60.000 1,256.65
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 60.000 828.74
SUBTOTAL MANO DE OBRA 2,085.39
TOTAL COSTOS DIRECTOS 15,088.93
FIRMA SOPM: ADMINISTRA. 17% 2,565.12
IMPREVISTOS 3% 452.67
UTILIDAD 10% 1,508.89
5% 754.45
TOTAL COSTO INDIRECTO 5,281.13
FECHA
VALOR PRECIO UNITARIO 20,370.00
IMPUESTOS DE LEY 1106/2006
SUBTOTAL EQUIPOS
COSTO INDIRECTO
DESCRIPCIÓN
HERRAMIENTA MENOR
CONECTOR DVH4
MUNICIPIO DE ARAUCA
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
ESTRIBO DE BAJA TENSION
DESCRIPCIÓN
CABLE DE COBRE THHN Y THW-AWG/MCM #4
"Trabajo-progreso y solidaridad"
ANALISIS DE PRECIOS UNITARIOS
CAPITULO: ITEM:
18.20
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 586,167.00 1.000 586,167.00
SUBTOTAL MATERIALES 586,167.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 461,296.47 0.10 46,129.65
46,129.65
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 0.480 157,081.44
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 0.480 103,592.53
OBRERO 2.00 24,692.00 1.95 96298.80 0.480 200,622.50
SUBTOTAL MANO DE OBRA 461,296.47
TOTAL COSTOS DIRECTOS 1,093,593.12
FIRMA SOPM: ADMINISTRA. 17% 185,910.83
IMPREVISTOS 3% 32,807.79
UTILIDAD 10% 109,359.31
5% 54,679.66
TOTAL COSTO INDIRECTO 382,757.59
FECHA
VALOR PRECIO UNITARIO 1,476,351.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
CAJA DE PASO REF. CS 275 CODENSA
DESCRIPCIÓN
HERRAMIENTA MENOR
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
SECRETARIA DE EDUCACIÓN
CAJA DE PASO REF. CS 275 CODENSA
DESCRIPCIÓN
CAPITULO: ITEM:
18.21
UNIDAD: ML ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 13,663.00 1.000 13,663.00
ML 214.00 1.000 214.00
SUBTOTAL MATERIALES 13,877.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 2,274.97 0.10 227.50
227.50
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 55.000 1,370.89
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 55.000 904.08
SUBTOTAL MANO DE OBRA 2,274.97
TOTAL COSTOS DIRECTOS 16,379.47
FIRMA SOPM: ADMINISTRA. 17% 2,784.51
IMPREVISTOS 3% 491.38
UTILIDAD 10% 1,637.95
5% 818.97
TOTAL COSTO INDIRECTO 5,732.81
FECHA
VALOR PRECIO UNITARIO 22,112.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
DESCRIPCIÓN
HERRAMIENTA MENOR
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
DUCTO PVC CONDUIT 3"
DESCRIPCIÓN
TUBO CONDUIT PVC 3" T.P.
CINTA REFLECTIVA DE SEÐALIZACION
CAPITULO: ITEM:
19.1
UNIDAD: ML ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 48,639.00 3.000 145,917.00
ML 38,950.00 1.000 38,950.00
ML 24,826.00 1.000 24,826.00
UND 5,994.00 0.240 1,438.56
UND 5,088.00 0.090 457.92
UND 4,216.00 0.090 379.44
RLLO 2,214.00 0.100 221.40
UND 938.00 1.000 938.00
% 5.00 1,252.37
SUBTOTAL MATERIALES 214,380.69
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 20,853.92 0.10 2,085.39
2,085.39
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 6.000 12,566.52
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 6.000 8,287.40
SUBTOTAL MANO DE OBRA 20,853.92
TOTAL COSTOS DIRECTOS 237,320.00
FIRMA SOPM: ADMINISTRA. 17% 40,344.40
IMPREVISTOS 3% 7,119.60
UTILIDAD 10% 23,732.00
5% 11,866.00
TOTAL COSTO INDIRECTO 83,062.00
FECHA
VALOR PRECIO UNITARIO 320,382.00
DESCRIPCIÓN
HERRAMIENTA MENOR
SUBTOTAL EQUIPOS
COSTO INDIRECTO
DESCRIPCIÓN
CABLE DE COBRE THHN Y THW-AWG/MCM #4/0
CABLE DE COBRE THHN Y THW-AWG/MCM #1/0
TERMINAL 1 HUECO 1/2#4/0
AMARRE FAST-TIE 4"(100mm)
DESPERDICIO
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
ACOMETIDA TRIF. CU 3#4/0+1#3/0+1#1/0
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
CABLE DE COBRE THHN Y THW-AWG/MCM #3/0
TERMINAL 1 HUECO 1/2 3/0 AWG
TERMINAL 1 HUECO 3/8 #1/0
CINTA AISLANTE
IMPUESTOS DE LEY 1106/2006
CAPITULO: ITEM:
19.2
UNIDAD: ML ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 6,352.00 4.00 25,408.00
M 6,922.00 1.00 6,922.00
UND 2,249.00 1.20 2,698.80
UND 1,667.00 0.40 666.80
UND 1,332.00 0.40 532.80
RLLO 2,214.00 0.30 664.20
UND 938.00 1.00 938.00
% 5.00 1,649.71
SUBTOTAL MATERIALES 39,480.31
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 4,170.78 0.10 417.08
417.08
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 30.000 2,513.30
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 30.000 1,657.48
SUBTOTAL MANO DE OBRA 4,170.78
TOTAL COSTOS DIRECTOS 44,068.17
FIRMA SOPM: ADMINISTRA. 17% 7,491.59
IMPREVISTOS 3% 1,322.05
UTILIDAD 10% 4,406.82
5% 2,203.41
TOTAL COSTO INDIRECTO 15,423.86
FECHA
VALOR PRECIO UNITARIO 59,492.00
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
ACOMETIDA TRIF. CU 3#6+1#6+1#6 T.D.-T.BY
DESCRIPCIÓN
CABLE DE COBRE THHN Y THW-AWG/MCM #6
CABLE DE COBRE DESNUDO No.6 AWG 7 HILOS
TERMINAL 1 HUECO 1/4 4AWG
TERMINAL 1 HUECO 1/4" 6 AWG
TERMINAL 1 HUECO #8 AWG
CINTA AISLANTE
AMARRE FAST-TIE 4"(100mm)
DESPERDICIO
DESCRIPCIÓN
HERRAMIENTA MENOR
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
CAPITULO: ITEM:
19.3
UNIDAD: ML ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 1,960.00 1.000 1,960.00
RLLO 2,214.00 0.100 221.40
% 2,181.40 5.00 109.07
SUBTOTAL MATERIALES 2,290.47
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 862.92 0.10 86.29
86.29
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 145.000 519.99
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 145.000 342.93
SUBTOTAL MANO DE OBRA 862.92
TOTAL COSTOS DIRECTOS 3,239.68
FIRMA SOPM: ADMINISTRA. 17% 550.75
IMPREVISTOS 3% 97.19
UTILIDAD 10% 323.97
5% 161.98
TOTAL COSTO INDIRECTO 1,133.89
FECHA
VALOR PRECIO UNITARIO 4,374.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
CABLE DE COBRE AISLADO # 12
DESCRIPCIÓN
CABLE DE COBRE AISLADO # 12 THW.AWG
CINTA AISLANTE
DESPERDICIO
DESCRIPCIÓN
HERRAMIENTA MENOR
CAPITULO: ITEM:
19.4
UNIDAD: ML ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 3,959.00 4.00 15,836.00
ML 6,119.00 1.00 6,119.00
UND 1,332.00 0.08 106.56
RLLO 2,214.00 0.20 442.80
UND 938.00 1.00 938.00
% 22,397.80 5.00 1,119.89
SUBTOTAL MATERIALES 24,562.25
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 2,502.47 0.10 250.25
250.25
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 50.000 1,507.98
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 50.000 994.49
SUBTOTAL MANO DE OBRA 2,502.47
TOTAL COSTOS DIRECTOS 27,314.97
FIRMA SOPM: ADMINISTRA. 17% 4,643.54
IMPREVISTOS 3% 819.45
UTILIDAD 10% 2,731.50
5% 1,365.75
TOTAL COSTO INDIRECTO 9,560.24
FECHA
VALOR PRECIO UNITARIO 36,875.00
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
CABLE DE COBRE # 10 AWG (LUMINARIAS)
CABLE DE COBRE # 8 AWG (LUMINARIAS)
TERMINAL 1 HUECO #8 AWG
CINTA AISLANTE
AMARRE FAST-TIE 4"(100mm)
DESPERDICIO
DESCRIPCIÓN
HERRAMIENTA MENOR
SUBTOTAL EQUIPOS
COSTO INDIRECTO
PROPONENTE:
SECRETARIA DE EDUCACIÓN
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
ACOMETIDA TRIF. CU 3#8+1#8+1#10 T.R.-T.
CAPITULO: ITEM:
19.5
UNIDAD: ML ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 3,801.00 1.000 3,801.00
RLLO 2,214.00 0.100 221.40
UND 1,220.00 0.700 854.00
% 4,022.40 5.00 201.12
SUBTOTAL MATERIALES 5,077.52
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 4,170.78 0.10 417.08
417.08
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 30.000 2,513.30
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 30.000 1,657.48
SUBTOTAL MANO DE OBRA 4,170.78
TOTAL COSTOS DIRECTOS 9,665.38
FIRMA SOPM: ADMINISTRA. 17% 1,643.11
IMPREVISTOS 3% 289.96
UTILIDAD 10% 966.54
5% 483.27
TOTAL COSTO INDIRECTO 3,382.88
FECHA
VALOR PRECIO UNITARIO 13,048.00
DESPERDICIO
DESCRIPCIÓN
HERRAMIENTA MENOR
SECRETARIA DE EDUCACIÓN
LINEA CABLE ENCAUCHETADO3x12THHN
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
DESCRIPCIÓN
CABLE ENCAUCHETADO 3x12
CINTA AISLANTE
CONECTOR DE RESORTE 12 -8 AWG 3M
CAPITULO: ITEM:
20.1
UNIDAD: ML ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 51,512.00 1.00 51,512.00
ML 7,815.00 1.50 11,722.50
UND 135.00 2.00 270.00
ML 12,862.50 0.30 3,858.75
UND 560.00 2.00 1,120.00
UND 55,125.00 0.04 2,205.00
ML 12,193.00 1.00 12,193.00
% 12,193.00 5.00 609.65
SUBTOTAL MATERIALES 83,490.90
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 15,640.44 0.10 1,564.04
1,564.04
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 8.000 9,424.89
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 8.000 6,215.55
SUBTOTAL MANO DE OBRA 15,640.44
TOTAL COSTOS DIRECTOS 100,695.38
FIRMA SOPM: ADMINISTRA. 17% 17,118.21
IMPREVISTOS 3% 3,020.86
UTILIDAD 10% 10,069.54
5% 5,034.77
TOTAL COSTO INDIRECTO 35,243.38
FECHA
VALOR PRECIO UNITARIO 135,939.00
CABLE DE COBRE DESNUDO No.2 AWG 7 HILOS
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
BANDEJA S.P. PORTACABLE GALV. 0.20*0.08 *2.40 M.
ANCLAJES 3/8"
TUERCA 3/8"
CANAL LISA DE 1 5/8"x1 7/8"
ANCLAJE DE 5/16"x1 7/8"
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
BANDEJA PORTACABLE DUCTO CERRA.TROQUEL. (HORIZ.)
CURVA HORIZONTAL GALV. S.P. A 90° 30*8 CMS.
DESPERDICIO
DESCRIPCIÓN
HERRAMIENTA MENOR
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
CAPITULO: ITEM:
20.2
UNIDAD: ML ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 47,366.67 1.00 47,366.67
ML 7,815.00 1.50 11,722.50
UND 135.00 2.00 270.00
ML 12,862.50 0.30 3,858.75
UND 560.00 2.00 1,120.00
UND 11,300.00 0.04 452.00
ML 12,193.00 1.00 12,193.00
% 12,193.00 5.00 609.65
SUBTOTAL MATERIALES 77,592.57
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 15,640.44 0.10 1,564.04
1,564.04
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 8.000 9,424.89
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 8.000 6,215.55
SUBTOTAL MANO DE OBRA 15,640.44
TOTAL COSTOS DIRECTOS 94,797.05
FIRMA SOPM: ADMINISTRA. 17% 16,115.50
IMPREVISTOS 3% 2,843.91
UTILIDAD 10% 9,479.71
5% 4,739.85
TOTAL COSTO INDIRECTO 33,178.97
FECHA
VALOR PRECIO UNITARIO 127,976.00
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESPERDICIO
DESCRIPCIÓN
HERRAMIENTA MENOR
CANAL LISA DE 1 5/8"x1 7/8"
ANCLAJE DE 5/16"x1 7/8"
CURVA VERTICAL GALV. S.P. A 90° 20*8 CMS.
CABLE DE COBRE DESNUDO No.2 AWG 7 HILOS
SUBTOTAL EQUIPOS
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
ANALISIS DE PRECIOS UNITARIOS
DESCRIPCIÓN
BANDEJA S.P. PORTACABLE GALV. 0.20*0.08 *2.40 M.
ANCLAJES 3/8"
TUERCA 3/8"
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
BANDEJA PORTACABLE DUCTO CERRA.TROQUEL. (VERT.)
CAPITULO: ITEM:
20.3
UNIDAD: ML ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 22,050.00 1.00 22,050.00
UND 3,346.00 2.00 6,692.00
UND 367.00 2.00 734.00
UND 40.00 4.00 160.00
SUBTOTAL MATERIALES 29,636.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 8,341.57 0.10 834.16
834.16
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 15.000 5,026.61
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 15.000 3,314.96
SUBTOTAL MANO DE OBRA 8,341.57
TOTAL COSTOS DIRECTOS 38,811.72
FIRMA SOPM: ADMINISTRA. 17% 6,597.99
IMPREVISTOS 3% 1,164.35
UTILIDAD 10% 3,881.17
5% 1,940.59
TOTAL COSTO INDIRECTO 13,584.10
FECHA
VALOR PRECIO UNITARIO 52,396.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
CANALETA METALICA 12*5 CMS.CON DIVISION
TAPA TROQUELADA T/VOZ DATOS
ANCLAJE 1/4"x1/4"
TORNILLO AUTOPERFORANTE #8x1/2" GALV.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
CANALETA METALICA 12x5 CMS CON DIVISION
DESCRIPCIÓN
HERRAMIENTA MENOR
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
CAPITULO: ITEM:
21.1
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 1,275.00 40.000 51,000.00
UND 4,705.00 1.000 4,705.00
UND 17,978.00 1.000 17,978.00
UND 12,257.00 0.020 245.14
UND 980.00 1.000 980.00
ML 2,041.00 8.000 16,328.00
UND 27,301.67 1.000 27,301.67
UND 26,288.50 1.000 26,288.50
UND 2,081.00 1.000 2,081.00
UND 1,041.00 1.000 1,041.00
UND 1,041.00 1.000 1,041.00
UND 15,250.00 1.000 15,250.00
% 5.00 3,378.66
SUBTOTAL MATERIALES 167,617.97
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 65,854.48 0.10 6,585.45
6,585.45
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 1.900 39,683.73
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 1.900 26,170.74
SUBTOTAL MANO DE OBRA 65,854.48
TOTAL COSTOS DIRECTOS 240,057.89
FIRMA SOPM: ADMINISTRA. 17% 40,809.84
IMPREVISTOS 3% 7,201.74
UTILIDAD 10% 24,005.79
5% 12,002.89
TOTAL COSTO INDIRECTO 84,020.26
FECHA
VALOR PRECIO UNITARIO 324,078.00
PROPONENTE:
SECRETARIA DE EDUCACIÓN
SALIDA TELEFONO 30 PARES COL. F.J.C.
CAJA DE 4*2 GALVANIZADA - COMPLETA
TOMA RJ45
CINTA AISLANTE SUPER 33
IMPUESTOS DE LEY 1106/2006
CABLE UTP CAT. 5E LEGRAND 305 MTS.
TUBO CONDUIT PVC 3/4" T-P
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
HERRAMIENTA MENOR
SUBTOTAL EQUIPOS
PATCH CORD CAT. 6 10FT 3m. AZUL AMP.
PATCH CORD CAT. 6 5m. AZUL AMP.
MARCACION FACE PLATE CINTA
INDUST.BLAN.PANDUIT(LS7-75-1)3/4"x1" - L#8
MARCACION CABLE UTP CINTA INDUST. BLANCA T-
PANDUIT(LS7-75-1)-3/4"x1"
MARCACION PATCH CORD AMBOS EXTRE. CINTA
INDUSTRI. BLANCA T-PANDUIT(LS7
PRUEBA DE RED TELEFONICA
COSTO INDIRECTO
MARQUILLA EN ACRILICO
DESCRIPCIÓN
DESPERDICIO
DESCRIPCIÓN
CAPITULO: ITEM:
21.2
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 20,800.00 1.000 20,800.00
UND 560.00 4.000 2,240.00
SUBTOTAL MATERIALES 23,040.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 25,024.70 0.10 2,502.47
2,502.47
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 5.000 15,079.82
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 5.000 9,944.88
SUBTOTAL MANO DE OBRA 25,024.70
TOTAL COSTOS DIRECTOS 50,567.17
FIRMA SOPM: ADMINISTRA. 17% 8,596.42
IMPREVISTOS 3% 1,517.02
UTILIDAD 10% 5,056.72
5% 2,528.36
TOTAL COSTO INDIRECTO 17,698.51
FECHA
VALOR PRECIO UNITARIO 68,266.00
DESCRIPCIÓN
HERRAMIENTA MENOR
SECRETARIA DE EDUCACIÓN
CAJA DE PASO METALICA 20*20*10
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
DESCRIPCIÓN
CAJA DE PASO MET. 20*20*10
ANCLAJE DE 5/16"x1 7/8"
CAPITULO: ITEM:
21.3
UNIDAD: ML ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 8,569.00 1.000 8,569.00
1/4 G 41,181.00 0.015 617.72
% 9,186.72 5.00 459.34
SUBTOTAL MATERIALES 9,646.05
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 3,128.09 0.10 312.81
312.81
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 40.000 1,884.98
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 40.000 1,243.11
SUBTOTAL MANO DE OBRA 3,128.09
TOTAL COSTOS DIRECTOS 13,086.95
FIRMA SOPM: ADMINISTRA. 17% 2,224.78
IMPREVISTOS 3% 392.61
UTILIDAD 10% 1,308.69
5% 654.35
TOTAL COSTO INDIRECTO 4,580.43
FECHA
VALOR PRECIO UNITARIO 17,667.00
DESPERDICIO
DESCRIPCIÓN
HERRAMIENTA MENOR
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
TUBO PVC CONDUIT 2"
SOLDADURA LIQUIDA PVC
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
DUCTO PVC CONDUIT 2"
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
CAPITULO: ITEM:
21.4
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 306,250.00 1.00 306,250.00
UND 560.00 4.00 2,240.00
SUBTOTAL MATERIALES 308,490.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 8,341.57 0.10 834.16
834.16
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 15.000 5,026.61
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 15.000 3,314.96
SUBTOTAL MANO DE OBRA 8,341.57
TOTAL COSTOS DIRECTOS 317,665.72
FIRMA SOPM: ADMINISTRA. 17% 54,003.17
IMPREVISTOS 3% 9,529.97
UTILIDAD 10% 31,766.57
5% 15,883.29
TOTAL COSTO INDIRECTO 111,183.00
FECHA
VALOR PRECIO UNITARIO 428,849.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
PROPONENTE:
SECRETARIA DE EDUCACIÓN
CAJA T-STRIP TELEFONICO 30 PARES CON REG
"Trabajo-progreso y solidaridad"
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
DESCRIPCIÓN
HERRAMIENTA MENOR
DESCRIPCIÓN
CAJA PARA STRIP TELEFONICO 30 PARES CON
REGLETAS
ANCLAJE DE 5/16"x1 7/8"
MUNICIPIO DE ARAUCA
CAPITULO: ITEM:
21.5
UNIDAD: ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 4,722.00 1.000 4,722.00
SUBTOTAL MATERIALES 4,722.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 3,292.72 0.10 329.27
329.27
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 38.000 1,984.19
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 38.000 1,308.54
SUBTOTAL MANO DE OBRA 3,292.72
TOTAL COSTOS DIRECTOS 8,344.00
FIRMA SOPM: ADMINISTRA. 17% 1,418.48
IMPREVISTOS 3% 250.32
UTILIDAD 10% 834.40
5% 417.20
TOTAL COSTO INDIRECTO 2,920.40
FECHA
VALOR PRECIO UNITARIO 11,264.00
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
CABLE TELEFONICO DE 25 PARES
DESCRIPCIÓN
HERRAMIENTA MENOR
SUBTOTAL EQUIPOS
SECRETARIA DE EDUCACIÓN
CABLE TELEFONICO DE 25 PARES
MUNICIPIO DE ARAUCA
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
"Trabajo-progreso y solidaridad"
CAPITULO: ITEM:
22.1
UNIDAD: ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 1,316.00 20.00 26,320.00
UND 4,705.00 1.00 4,705.00
UND 17,978.00 1.00 17,978.00
UND 12,257.00 0.02 245.14
UND 980.00 1.00 980.00
ML 7,184.00 6.00 43,104.00
% 69,669.14 5.00 3,483.46
SUBTOTAL MATERIALES 96,815.60
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 25,024.70 0.10 2,502.47
2,502.47
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 5.000 15,079.82
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 5.000 9,944.88
SUBTOTAL MANO DE OBRA 25,024.70
TOTAL COSTOS DIRECTOS 124,342.77
FIRMA SOPM: ADMINISTRA. 17% 21,138.27
IMPREVISTOS 3% 3,730.28
UTILIDAD 10% 12,434.28
5% 6,217.14
TOTAL COSTO INDIRECTO 43,519.97
FECHA
VALOR PRECIO UNITARIO 167,863.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
SECRETARIA DE EDUCACIÓN
SALIDA SONIDO COL. F.J.C.
DESPERDICIO
DESCRIPCIÓN
HERRAMIENTA MENOR
TUBERIA EMT 3/4" CON ACCESORIOS Y ANCLAJES
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
DESCRIPCIÓN
CABLE PARALELO 2x14 NEGRO
CAJA DE 4*2 GALVANIZADA - COMPLETA
TOMA RJ45
CINTA AISLANTE SUPER 33
MARQUILLA EN ACRILICO
CAPITULO: ITEM:
22.2
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 2,828.00 1.000 2,828.00
1/4 G 41,181.00 0.010 411.81
UND 1,260.00 0.300 378.00
UND 437.00 0.300 131.10
UIND 3,702.00 0.300 1,110.60
UND 415.00 0.300 124.50
UND 560.00 0.500 280.00
UND 609.00 0.400 243.60
UND 1,484.00 0.500 742.00
% 3,239.81 5.00 161.99
SUBTOTAL MATERIALES 6,411.60
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 5,440.15 0.10 544.02
544.02
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 23.000 3,278.22
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 23.000 2,161.93
SUBTOTAL MANO DE OBRA 5,440.15
TOTAL COSTOS DIRECTOS 12,395.77
FIRMA SOPM: ADMINISTRA. 17% 2,107.28
IMPREVISTOS 3% 371.87
UTILIDAD 10% 1,239.58
5% 619.79
TOTAL COSTO INDIRECTO 4,338.52
FECHA
VALOR PRECIO UNITARIO 16,734.00
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
TUBO CONDUIT PVC 1"
SOLDADURA LIQUIDA PVC
ADAPTADOR TERMINAL PVC 1"
CODO PVC CONDUIT 1"
GRAPA SOPORTE Y/O AMARRE
ANCLAJE DE 5/16"x1 7/8"
SUPLEMENTO 2400 GALV.
ABRAZADERA AJUSTABLE 1"
DESCRIPCIÓN
HERRAMIENTA MENOR
SUBTOTAL EQUIPOS
COSTO INDIRECTO
DESPERDICIO
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
DUCTO PVC CONDUIT INSTALADO COL.F.J.C.
CAJA 10x10 GALV.ANIZADA DOBLE FONDO
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
CAPITULO: ITEM:
22.3
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 20,800.00 1.000 20,800.00
UND 560.00 4.000 2,240.00
SUBTOTAL MATERIALES 23,040.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 25,024.70 0.10 2,502.47
2,502.47
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 5.000 15,079.82
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 5.000 9,944.88
SUBTOTAL MANO DE OBRA 25,024.70
TOTAL COSTOS DIRECTOS 50,567.17
FIRMA SOPM: ADMINISTRA. 17% 8,596.42
IMPREVISTOS 3% 1,517.02
UTILIDAD 10% 5,056.72
5% 2,528.36
TOTAL COSTO INDIRECTO 17,698.51
FECHA
VALOR PRECIO UNITARIO 68,266.00
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
HERRAMIENTA MENOR
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
DESCRIPCIÓN
CAJA DE PASO MET. 20*20*10
ANCLAJE DE 5/16"x1 7/8"
SECRETARIA DE EDUCACIÓN
CAJA DE PASO METALICA 20*20*10
CAPITULO: ITEM:
23.1
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 2,278.00 40.000 91,120.00
UIND 3,702.00 1.000 3,702.00
UND 17,978.00 1.000 17,978.00
UND 12,257.00 0.020 245.14
UND 980.00 1.000 980.00
ML 2,041.00 8.000 16,328.00
UND 26,288.50 1.000 26,288.50
UND 27,301.67 1.000 27,301.67
UND 2,081.00 1.000 2,081.00
UND 1,041.00 1.000 1,041.00
UND 1,041.00 1.000 1,041.00
UND 15,250.00 - -
% 107,693.14 5.00 5,384.66
SUBTOTAL MATERIALES 193,490.97
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 69,513.06 0.10 6,951.31
6,951.31
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 1.800 41,888.38
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 1.800 27,624.68
SUBTOTAL MANO DE OBRA 69,513.06
TOTAL COSTOS DIRECTOS 269,955.33
FIRMA SOPM: ADMINISTRA. 17% 45,892.41
IMPREVISTOS 3% 8,098.66
UTILIDAD 10% 26,995.53
5% 13,497.77
TOTAL COSTO INDIRECTO 94,484.37
FECHA
VALOR PRECIO UNITARIO 364,440.00
DESCRIPCIÓN
HERRAMIENTA MENOR
SALIDA DE DATOS CABLE UTP CAT.6 COL. F.J
MARCACION FACE PLATE CINTA
INDUST.BLAN.PANDUIT(LS7-75-1)3/4"x1" - L#8
PATCH CORD CAT. 6 10FT 3m. AZUL AMP.
MARQUILLA EN ACRILICO
TUBO CONDUIT PVC 3/4" T-P
PATCH CORD CAT. 6 5m. AZUL AMP.
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
MARCACION CABLE UTP CINTA INDUST. BLANCA T-
PANDUIT(LS7-75-1)-3/4"x1"
MARCACION PATCH CORD AMBOS EXTRE. CINTA
INDUSTRI. BLANCA T-PANDUIT(LS7
SUBTOTAL EQUIPOS
PRUEBA DE RED TELEFONICA
CAJA 10x10 GALV.ANIZADA DOBLE FONDO
TOMA RJ45
CINTA AISLANTE SUPER 33
DESPERDICIO
CABLE DE DATA UTP CATEGORIA 6 LEGRAND 305.VERDE
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
COSTO INDIRECTO
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
CAPITULO: ITEM:
23.2
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 1,408,750.00 1.00 1,408,750.00
UND 1,470.00 4.00 5,880.00
UND 183,750.00 1.00 183,750.00
UND 122,562.00 14.00 1,715,868.00
UND 49,735.00 1.00 49,735.00
UND 699,132.00 3.00 2,097,396.00
UND 2,081.00 30.00 62,430.00
UND 938.00 48.00 45,024.00
SUBTOTAL MATERIALES 5,568,833.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 178,747.86 0.10 17,874.79
17,874.79
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 0.700 107,712.99
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 0.700 71,034.88
SUBTOTAL MANO DE OBRA 178,747.86
TOTAL COSTOS DIRECTOS 5,765,455.65
FIRMA SOPM: ADMINISTRA. 17% 980,127.46
IMPREVISTOS 3% 172,963.67
UTILIDAD 10% 576,545.57
5% 288,272.78
TOTAL COSTO INDIRECTO 2,017,909.48
FECHA
VALOR PRECIO UNITARIO 7,783,365.00
AMARRE FAST-TIE 4"(100mm)
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
RACK DE COMUNICACIONES AB. 6 PIEZAS 2.4
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
RACK COMUNICACION ABIERTO 2.4 M.
ANCLAJE 1/2"*2"
MULTITOMA PARA GABINETE
ORGANIZADOR DE CABLES HORIZ-VERTICAL.
MARQUILLA PARA RACK DE COMUNIICACION
PACH PANEL 48 PUERTOS ANG. CAT.6 RL45 PANDUIT
MARCACION FACE PLATE CINTA
INDUST.BLAN.PANDUIT(LS7-75-1)3/4"x1" - L#8
DESCRIPCIÓN
HERRAMIENTA MENOR
SUBTOTAL EQUIPOS
CAPITULO: ITEM:
23.3
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 20,800.00 1.000 20,800.00
UND 560.00 4.000 2,240.00
SUBTOTAL MATERIALES 23,040.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 25,024.70 0.10 2,502.47
2,502.47
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 5.000 15,079.82
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 5.000 9,944.88
SUBTOTAL MANO DE OBRA 25,024.70
TOTAL COSTOS DIRECTOS 50,567.17
FIRMA SOPM: ADMINISTRA. 17% 8,596.42
IMPREVISTOS 3% 1,517.02
UTILIDAD 10% 5,056.72
5% 2,528.36
TOTAL COSTO INDIRECTO 17,698.51
FECHA
VALOR PRECIO UNITARIO 68,266.00
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
CAJA DE PASO MET. 20*20*10
ANCLAJE DE 5/16"x1 7/8"
SUBTOTAL EQUIPOS
COSTO INDIRECTO
SECRETARIA DE EDUCACIÓN
CAJA DE PASO METALICA 20*20*10
DESCRIPCIÓN
HERRAMIENTA MENOR
CAPITULO: ITEM:
24.1
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 2,978.00 12.00 35,736.00
UIND 3,702.00 1.00 3,702.00
UND 12,257.00 0.02 245.14
UND 980.00 1.00 980.00
ML 7,184.00 5.00 35,920.00
% 71,901.14 5.00 3,595.06
SUBTOTAL MATERIALES 80,178.20
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 12,512.35 0.10 1,251.24
1,251.24
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 10.000 7,539.91
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 10.000 4,972.44
SUBTOTAL MANO DE OBRA 12,512.35
TOTAL COSTOS DIRECTOS 93,941.78
FIRMA SOPM: ADMINISTRA. 17% 15,970.10
IMPREVISTOS 3% 2,818.25
UTILIDAD 10% 9,394.18
5% 4,697.09
TOTAL COSTO INDIRECTO 32,879.62
FECHA
VALOR PRECIO UNITARIO 126,821.00
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESPERDICIO
DESCRIPCIÓN
HERRAMIENTA MENOR
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
SALIDA SENSOR DE MOVIMIENTO MAGET.STROBE
DESCRIPCIÓN
CABLE DE DATA UTP CATEGORIA 5E 4(2x24 AWG)
CAJA 10x10 GALV.ANIZADA DOBLE FONDO
CINTA AISLANTE SUPER 33
MARQUILLA EN ACRILICO
TUBERIA EMT 3/4" CON ACCESORIOS Y ANCLAJES
CAPITULO: ITEM:
24.2
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 2,278.00 12.00 27,336.00
UIND 3,702.00 1.00 3,702.00
UND 12,257.00 0.02 245.14
UND 980.00 1.00 980.00
ML 7,184.00 10.00 71,840.00
% 99,421.14 5.00 4,971.06
SUBTOTAL MATERIALES 109,074.20
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 36,801.03 0.10 3,680.10
3,680.10
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 3.400 22,176.20
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 3.400 14,624.83
SUBTOTAL MANO DE OBRA 36,801.03
TOTAL COSTOS DIRECTOS 149,555.33
FIRMA SOPM: ADMINISTRA. 17% 25,424.41
IMPREVISTOS 3% 4,486.66
UTILIDAD 10% 14,955.53
5% 7,477.77
TOTAL COSTO INDIRECTO 52,344.37
FECHA
VALOR PRECIO UNITARIO 201,900.00
PROPONENTE:
SECRETARIA DE EDUCACIÓN
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
SALIDA SENSOR DE HUMO COL.F.J.C.
DESCRIPCIÓN
CABLE DE DATA UTP CATEGORIA 6 LEGRAND 305.VERDE
CAJA 10x10 GALV.ANIZADA DOBLE FONDO
DESPERDICIO
DESCRIPCIÓN
HERRAMIENTA MENOR
CINTA AISLANTE SUPER 33
MARQUILLA EN ACRILICO
TUBERIA EMT 3/4" CON ACCESORIOS Y ANCLAJES
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
CAPITULO: ITEM:
24.3
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
ML 2,278.00 35.00 79,730.00
UND 12,257.00 0.02 245.14
UND 980.00 1.00 980.00
ML 7,184.00 5.00 35,920.00
UND 3,702.00 1.00 3,702.00
% 115,895.14 5.00 5,794.76
SUBTOTAL MATERIALES 126,371.90
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 37,916.21 0.10 3,791.62
3,791.62
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 3.300 22,848.21
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 3.300 15,068.00
SUBTOTAL MANO DE OBRA 37,916.21
TOTAL COSTOS DIRECTOS 168,079.73
FIRMA SOPM: ADMINISTRA. 17% 28,573.55
IMPREVISTOS 3% 5,042.39
UTILIDAD 10% 16,807.97
5% 8,403.99
TOTAL COSTO INDIRECTO 58,827.91
FECHA
VALOR PRECIO UNITARIO 226,908.00
SALIDA CIRCUITO CCTV COL.F.J.C.
DESCRIPCIÓN
CABLE DE DATA UTP CATEGORIA 6 LEGRAND 305.VERDE
CINTA AISLANTE SUPER 33
MARQUILLA EN ACRILICO
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
"Trabajo-progreso y solidaridad"
SECRETARIA DE EDUCACIÓN
MUNICIPIO DE ARAUCA
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESPERDICIO
DESCRIPCIÓN
HERRAMIENTA MENOR
TUBERIA EMT 3/4" CON ACCESORIOS Y ANCLAJES
CAJA 10x10 GALV.ANIZADA DOBLE FONDO
CAPITULO: ITEM:
24.4
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 4,613.00 12.00 55,356.00
UND 3,800.00 10.00 38,000.00
UIND 3,702.00 1.00 3,702.00
UND 14,388.00 1.00 14,388.00
UND 12,257.00 0.02 245.14
UND 980.00 1.00 980.00
% 245.14 5.00 12.26
SUBTOTAL MATERIALES 112,683.40
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 31,280.88 0.10 3,128.09
3,128.09
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 4.000 18,849.77
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 4.000 12,431.10
SUBTOTAL MANO DE OBRA 31,280.88
TOTAL COSTOS DIRECTOS 147,092.36
FIRMA SOPM: ADMINISTRA. 17% 25,005.70
IMPREVISTOS 3% 4,412.77
UTILIDAD 10% 14,709.24
5% 7,354.62
TOTAL COSTO INDIRECTO 51,482.33
FECHA
VALOR PRECIO UNITARIO 198,575.00
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
MARQUILLA EN ACRILICO
DESPERDICIO
DESCRIPCIÓN
HERRAMIENTA MENOR
DESCRIPCIÓN
TUBERIA EMT 1"
ACCESORIOS EMT 1"
CAJA 10x10 GALV.ANIZADA DOBLE FONDO
TOMACORRIENTE 3 POLOS/TIERRA PARA 15AMP 125V
NARANJA
CINTA AISLANTE SUPER 33
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
SALIDA CONSOLA CONTROL INCENDIO,ALARMAS
IMPUESTOS DE LEY 1106/2006
SUBTOTAL EQUIPOS
COSTO INDIRECTO
CAPITULO: ITEM:
25.1
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 14,850,000.00 1.000 14,850,000.00
ML 7,993.00 60.000 479,580.00
UND 1,667.00 6.000 10,002.00
UND 12,257.00 0.300 3,677.10
ML 16,214.00 20.000 324,280.00
UND 3,540.00 4.000 14,160.00
ML 5,915.00 20.000 118,300.00
UND 1,332.00 4.000 5,328.00
% 3,677.10 5.00 183.86
SUBTOTAL MATERIALES 15,805,510.96
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 37,916.21 0.10 3,791.62
3,791.62
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 3.300 22,848.21
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 3.300 15,068.00
SUBTOTAL MANO DE OBRA 37,916.21
TOTAL COSTOS DIRECTOS 15,847,218.79
FIRMA SOPM: ADMINISTRA. 17% 2,694,027.19
IMPREVISTOS 3% 475,416.56
UTILIDAD 10% 1,584,721.88
5% 792,360.94
TOTAL COSTO INDIRECTO 5,546,526.58
FECHA
VALOR PRECIO UNITARIO 21,393,745.00
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
REGULADOR TRIF.18 KVA(UPS)PYRAMID DSP
DESCRIPCIÓN
REGULADOR TRIF. 18 KVA UPS PYRAMID 20KVA(3/3)208V.
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
ANALISIS DE PRECIOS UNITARIOS
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
TERMINAL 1 HUECO #8 AWG
DESPERDICIO
DESCRIPCIÓN
HERRAMIENTA MENOR
CABLE PARA SOLDADOR # 6 75 A.
TERMINAL 1 HUECO 1/4" 6 AWG
CINTA AISLANTE SUPER 33
CABLE PARA SOLDADOR #2
TERMINAL 1 HUECO 5/16 " # 2
CABLE PARA SOLDADOR #8 75 AMP.
CAPITULO: ITEM:
25.2
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 9,236,500.00 1.000 9,236,500.00
SUBTOTAL MATERIALES 9,236,500.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 625,617.53 0.10 62,561.75
62,561.75
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 0.200 376,995.45
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 0.200 248,622.08
SUBTOTAL MANO DE OBRA 625,617.53
TOTAL COSTOS DIRECTOS 9,924,679.28
FIRMA SOPM: ADMINISTRA. 17% 1,687,195.48
IMPREVISTOS 3% 297,740.38
UTILIDAD 10% 992,467.93
5% 496,233.96
TOTAL COSTO INDIRECTO 3,473,637.75
FECHA
VALOR PRECIO UNITARIO 13,398,317.00
MUNICIPIO DE ARAUCA
SECRETARIA DE EDUCACIÓN
SWITCH 3 COM. 48 PUERTOS 100/1000
DESCRIPCIÓN
NET SWITCH 48 PUERTOS 100/1000 V. 3 COM.
"Trabajo-progreso y solidaridad"
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
HERRAMIENTA MENOR
SUBTOTAL EQUIPOS
CAPITULO: ITEM:
25.3
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 77,492.00 1.000 77,492.00
UND 332.00 2.000 664.00
ML 1,908.00 9.000 17,172.00
ML 1,300.00 4.500 5,850.00
UND 1,661.00 1.000 1,661.00
UND 1,300.00 2.000 2,600.00
ML 1,559.00 4.500 7,015.50
1/4 G 16,384.00 0.010 163.84
1/4 G 41,181.00 0.003 123.54
UND 126.00 1.000 126.00
% 30,324.88 5.00 1,516.24
SUBTOTAL MATERIALES 114,384.13
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 28,437.16 0.10 2,843.72
2,843.72
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 4.400 17,136.16
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 4.400 11,301.00
SUBTOTAL MANO DE OBRA 28,437.16
TOTAL COSTOS DIRECTOS 145,665.00
FIRMA SOPM: ADMINISTRA. 17% 24,763.05
IMPREVISTOS 3% 4,369.95
UTILIDAD 10% 14,566.50
5% 7,283.25
TOTAL COSTO INDIRECTO 50,982.75
FECHA
VALOR PRECIO UNITARIO 196,648.00
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
LAMPARA FLUORESCENTE 2*32W ILTELUX-IR
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
HERRAMIENTA MENOR
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
LIMPIADOR PVC 1/4
SOLDADURA LIQUIDA PVC
TORNILLO PARA LAMINA 3/8"
DESPERDICIO
DESCRIPCIÓN
CONECTOR RESORTE ROJO
TUBO CONDUIT PVC 1/2" T.P.
DESCRIPCIÓN
LAMPARA FLUORESCENTE 2*32W-ILTELUX-IR 16 SELDAS
TERMINALES PVC DE 1/2"
ALAMBRE DE COBRE # 12 AWG-THW
ALAMBRE DE COBRE # 14 AWG
CAJA OCTOGONAL GALVANIZADA
CAPITULO: ITEM:
25.4
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 137,824.00 1.000 137,824.00
SUBTOTAL MATERIALES 137,824.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 30,887.12 0.10 3,088.71
3,088.71
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 4.000 18,849.77
OBRERO 1.00 24,692.00 1.95 48149.40 4.000 12,037.35
SUBTOTAL MANO DE OBRA 30,887.12
TOTAL COSTOS DIRECTOS 171,799.83
FIRMA SOPM: ADMINISTRA. 17% 29,205.97
IMPREVISTOS 3% 5,154.00
UTILIDAD 10% 17,179.98
5% 8,589.99
TOTAL COSTO INDIRECTO 60,129.94
FECHA
VALOR PRECIO UNITARIO 231,930.00
PROPONENTE:
SECRETARIA DE EDUCACIÓN
LAMPARA TIPO BALA DE 26W
DESCRIPCIÓN
LAMPARA TIPO BALA DE 26W
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
HERRAMIENTA MENOR
CAPITULO: ITEM:
25.5
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 520,625.00 1.000 520,625.00
SUBTOTAL MATERIALES 520,625.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 62,561.75 0.10 6,256.18
6,256.18
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 2.000 37,699.55
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 2.000 24,862.21
SUBTOTAL MANO DE OBRA 62,561.75
TOTAL COSTOS DIRECTOS 589,442.93
FIRMA SOPM: ADMINISTRA. 17% 100,205.30
IMPREVISTOS 3% 17,683.29
UTILIDAD 10% 58,944.29
5% 29,472.15
TOTAL COSTO INDIRECTO 206,305.02
FECHA
VALOR PRECIO UNITARIO 795,748.00
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
DESCRIPCIÓN
HERRAMIENTA MENOR
SUBTOTAL EQUIPOS
REFLECTOR MH 150W TIPO WALL PACK
DESCRIPCIÓN
REFLECTOR MH 150W TIPO WALL PACK
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
CAPITULO: ITEM:
25.6
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 346,369.00 1.000 346,369.00
SUBTOTAL MATERIALES 346,369.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 16,683.13 0.10 1,668.31
1,668.31
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 7.500 10,053.21
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 7.500 6,629.92
SUBTOTAL MANO DE OBRA 16,683.13
TOTAL COSTOS DIRECTOS 364,720.45
FIRMA SOPM: ADMINISTRA. 17% 62,002.48
IMPREVISTOS 3% 10,941.61
UTILIDAD 10% 36,472.04
5% 18,236.02
TOTAL COSTO INDIRECTO 127,652.16
FECHA
VALOR PRECIO UNITARIO 492,373.00
LAMPARA EMERGENCIA T-QUANTUM ELM2 5.4 H. 120/227
V. BATERIA PLOMO
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SECRETARIA DE EDUCACIÓN
LAMPARA DE EMERGENCIA TIPO QUANTUM
DESCRIPCIÓN
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
HERRAMIENTA MENOR
CAPITULO: ITEM:
25.7
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 220,255.00 1.000 220,255.00
SUBTOTAL MATERIALES 220,255.00
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 17,874.79 0.10 1,787.48
1,787.48
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 7.000 10,771.30
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 7.000 7,103.49
SUBTOTAL MANO DE OBRA 17,874.79
TOTAL COSTOS DIRECTOS 239,917.27
FIRMA SOPM: ADMINISTRA. 17% 40,785.94
IMPREVISTOS 3% 7,197.52
UTILIDAD 10% 23,991.73
5% 11,995.86
TOTAL COSTO INDIRECTO 83,971.04
FECHA
VALOR PRECIO UNITARIO 323,888.00
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
HERRAMIENTA MENOR
SUBTOTAL EQUIPOS
SECRETARIA DE EDUCACIÓN
LUZ SALIDA DE EMERGENCIA SERIE URA-21
DESCRIPCIÓN
LUZ DE EMERGENCIA SERIE URA-21 120V+10% 50/60 HZ-
CLASE II IP 42 IK
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
CAPITULO: ITEM:
25.8
UNIDAD: UND ACTIVIDAD:
MATERIALES
UNID. PR. UNIT CANT. VR. UNIT.
UND 125,303.78 1.000 125,303.78
SUBTOTAL MATERIALES 125,303.78
EQUIPO Y HERRAMIENTAS
TIPO CANT. T/HORARIA REND. VR. UNIT.
% 20,853.92 0.10 2,085.39
2,085.39
MADO DE OBRA
DESCRIPCIÓN No. SALARIO % PREST JORNAL REDN/DIA VR. UNIT.
TEC. ELEC. 1.00 38,666.20 1.95 75399.09 6.000 12,566.52
AYUD. ELECT. 1.00 25,499.70 1.95 49724.42 6.000 8,287.40
SUBTOTAL MANO DE OBRA 20,853.92
TOTAL COSTOS DIRECTOS 148,243.09
FIRMA SOPM: ADMINISTRA. 17% 25,201.33
IMPREVISTOS 3% 4,447.29
UTILIDAD 10% 14,824.31
5% 7,412.15
TOTAL COSTO INDIRECTO 51,885.08
FECHA
VALOR PRECIO UNITARIO 200,128.00
SECRETARIA DE EDUCACIÓN
SENSOR DE MOVIMIENTO 180° ALUMBRADO
DESCRIPCIÓN
SENSOR DE MOVIMIENTO 180° 1000 WL
MUNICIPIO DE ARAUCA
"Trabajo-progreso y solidaridad"
ANALISIS DE PRECIOS UNITARIOS
CONSTRUCCIÓN, TERMINACIÓN Y/O MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA URBANA DEL MUNICIPIO DE ARAUCA.
PROPONENTE:
SUBTOTAL EQUIPOS
COSTO INDIRECTO
IMPUESTOS DE LEY 1106/2006
DESCRIPCIÓN
HERRAMIENTA MENOR
top related