ATCS System and Train Control Upgrade Program

November 28, 2018

(20 Slides)

Dan HowardProject Manager

Engineering, Maintenance, and Safety Committee

LRV Signaling Slide 2 / 20

Presentation Outline

• SFMTA Overview

• What is Train Control?

• ATCS System Overview

• Current Challenges

• Roadmap for the Future

LRV Signaling Slide 3 / 20

SFMTA Overview

• Over 73,000 daily boardings

• 71.5 Miles of track (5.8 Miles in tunnel)

• 9 Subway stations; 24 Surface stations

• 87 Surface stops

• 2 LRV Yards

LRV Signaling Slide 4 / 20

4

N Judah

L Taraval

M Oceanview

J Church

T Third

Twin Peaks Tunnel

Market StSubway

K Ingleside

LRV Signaling Slide 5 / 20

What is Train Control?Primarily, train control is a safety system which is designed to prevent train-to-train collisions.

Generally, train control systems do not address the risk of collision between trains and other vehicles, bicycles, or pedestrians. These capabilities are currently being researched.

LRV Signaling Slide 6 / 20

What is Train Control? (cont)Secondarily, more modern train control systems can be used to manage rail service, giving operations staff the tools to monitor and adjust trains’ speeds and dwell times to ensure the trains stay on schedule and maintain consistent headways.

LRV Signaling Slide 7 / 20

What is Train Control? (cont)

Generally, there are two types of train control:

Fixed block

Moving block

LRV Signaling Slide 8 / 20

Existing Signaling Systems

• Above Ground• Line of sight manual operation with Transit Signals• VETAG for Train Operator switch position request• VETAG for Traffic Signal interface• VPI and relay based interlockings

• Market St. and new Central Subways• Thales Seltrac IS: loop based, with ATO • Secondary Train Detection using Axle Counter Blocks

LRV Signaling Slide 9 / 20

A Surface Interlocking (3rd & 25th)

LRV Signaling Slide 10 / 20

ATCS System Overview

LRV Signaling Slide 11 / 20

VCC – Vital Control Computer

LRV Signaling Slide 12 / 20

ATCS System Overview

LRV Signaling Slide 13 / 20

Station Controllers

LRV Signaling Slide 14 / 20

ATCS System Overview

LRV Signaling Slide 15 / 20

Wayside Equipment

LRV Signaling Slide 16 / 20

ATCS System Overview

LRV Signaling Slide 17 / 20

Carborne Equipment (VOBC)

LRV Signaling Slide 18 / 20

ATCS System Overview

LRV Signaling Slide 19 / 20

SMC – System Management Center

LRV Signaling Slide 20 / 20

ATCS System Overview

LRV Signaling Slide 21 / 20

Current Challenges

LRV Signaling Slide 22 / 20

Geography

LRV Signaling Slide 23 / 20

Portal Delays

LRV Signaling Slide 24 / 20

Communication Issues

LRV Signaling Slide 25 / 20

Breakdowns

LRV Signaling Slide 26 / 20

Subway Congestion

LRV Signaling Slide 27 / 20

System Failures

LRV Signaling Slide 28 / 20

Surface Variability / Turnbacks

LRV Signaling Slide 29 / 20

Roadmap for the Future

• Technology Upgrades

• System Expansion

• New Capabilities

LRV Signaling Slide 30 / 20

Technology Upgrades

• Replace loop cable with wireless

• New onboard computers

• New central computers

• New axle counters / secondary detection

Would address:System Failures Communication IssuesPortal Delays

LRV Signaling Slide 31 / 20

System ExpansionExpanding the system to the surface would eliminate some key geographic issues, specifically

Portal Delays: Reduced by the trains staying within the system

Communication Issues & Breakdowns: Reduced by the trains entering at yards, where issues can be addressed.

Subway Congestion, Surface Variability, and Turnbacks: Controllers would be able to ‘see’ trains in the entire system, allowing them better opportunity

LRV Signaling Slide 32 / 20

Connection to Traffic Signals

LRV Signaling Slide 33 / 20

New Capabilities

• In-cab signaling

• Coordination with traffic signals

• Enforcement of signal violations

• Automatic Fault Monitoring

• Adaptive headway management

• Reverse running and special events